Home / QBE / Determination 681754
Determination 681754
Contents flood-damage claim declined under flood exclusion
Summary
A business disputed the insurer's refusal of a $138,494.88 contents claim after a 2019 Townsville flood. AFCA accepted water ingress through the ceiling caused some contents loss, ordering $18,700 plus $2,000 non-financial loss, while upholding the flood exclusion for the rest.
Water that escapes from a watercourse is flood water even when mixed with rainwater, so the flood exclusion applies, but ceiling ingress damage was covered.
Issues
- Claim denial primary · upheld“The insurer is to pay the complainant $18,700 for the damage to contents from water ingress through the ceiling; the balance was flood excluded.”
- Poor claim handling secondary · upheld“The panel found the insurer's position was unreasonable in refusing all contents damage and maintaining no loss had been substantiated.”
Subjects and remedies
natural disastersmall businesspay claimpay non financial loss
Related
Text of the determination
Determination
Case number 681754
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 681754 Page 2 of 10
Case number: 681754 24 September 2020
1 Determination overview
1.1 Complaint
The complainant held a business insurance policy with the financial firm (insurer). The
insured property is in Hermit Park, Queensland.
A claim was lodged under the policy after the complainant ’s property was inundated
with water on 2 February 2019, during a heavy rainfall event.
The insurer has accepted liability for damage to the insured property because of rain
and/or stormwater ingress from the ceiling, however the insurer says the complainant
has failed to substantiate its loss in relation to such damage.
The insurer maintains most of the inundation was caused by flood, which is excluded
from cover under the terms of the policy.
1.2 Issues and key findings
Is the damage covered under the terms of the policy?
The panel accepts it is reasonable to conclude that there was damage to the contents
from the leaking ceiling/roof.
The panel considers it fair in the circumstances that the insurer pays the complainant
the sum of $18,700 for its liability in this regard.
The insurer is entitled to deny the balance of the claim as:
the policy specifically excludes loss or damage caused by flood
on balance, other than the water that came through the roof, the water that caused
the loss was flood water.
Is the insurer required to pay non-financial loss compensation?
The insurer is required to pay the complainant non-financial loss compensation of
$2,000.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is to pay the complainant the sum of $18,700 for the damage to contents
from water ingress through the ceiling, within fourteen days of the complainant’s
acceptance of this determination.
Determination | Case number: 681754 Page 3 of 10
In addition and upon acceptance of this determination by the complainant, the insurer
is to pay the complainant non-financial loss compensation of $2,000.
The insurer is entitled to rely upon the terms and conditions of the policy to deny the
balance of the complainant’s claim.
Determination | Case number: 681754 Page 4 of 10
2 Reasons for determination
2.1 Is the damage covered under the terms of the policy?
The complainant’s business policy with the insurer provides cover for physical loss of
or damage to contents which occurs during the period of insurance directly caused by
an event not otherwise excluded. Defined events include storm and rainwater. Cover
is subject to the terms, conditions and exclusions under the policy.
The complainant is insured for contents under the property section of the policy up to
$90,000.
The policy has a general exclusion for loss or damage caused by flood.
Flood is defined on page 6 of the product disclosure statement as:
The covering of normally dry land by water that has escaped or been released
from the normal confines of any of the following:
(a) a lake (whether or not it has been altered or modified);
(b) a river (whether or not it has been altered or modified);
(c) a creek (whether or not it has been altered or modified);
(d) another natural watercourse (whether or not it has been altered or modified);
(e) a reservoir;
(f) a canal;
(g) a dam.
The exchanged material confirms the complainant was aware it did not have flood
cover.
Circumstances of the loss
In late January and early February 2019, the city of Townsville and surrounding areas
of north Queensland experienced a significant weather event.
Heavy rainfall occurred over the Townsville catchment for several days and at or
about the complainant’s property.
The insured property is located within a single level commercial building located on
the eastern side of C Road.
The insurer has provided a report from a hydrologist (WR) dated 7 March 2019, which
was prepared following a site inspection on 19 February 2019.
Determination | Case number: 681754 Page 5 of 10
WR says the building was inundated to a maximum depth of about 1 m above floor
level. The floor level of the building is about 0.3 m above the adjacent footpath level.
The ground level at the insured property on the footpath along C Road is about 3.1
mAHD.
Following the site inspection and review of data from the Bureau of Meteorology and
Townsville City Council, WR concluded that:
the initial inundation of the insured property was potentially caused by a
combination of overflows from the Hermit Park Drain and overflows from the Ross
River with the dominant source of water being from the Hermit Park Drain. It
appears that the initial inundation was due to bow waves caused by trucks driving
along C Road;
any inundation at the insured property from rainwater entering through the ceiling
was not due to water overflowing from any watercourse;
the maximum depth of inundation above floor level at the insured property was
caused by floodwater overflowing from the Ross River.
WR also provided a report dated 8 August 2019, on the characterisation of the Hermit
Park Drain as a modified natural watercourse. WR provided two additional reports
dated 4 December 2019 and 21 April 2020, in response to further information
provided by the complainant.
Complainant says there was initial inundation by stormwater
The complainant disputes the claim decision. The complainant has provided a
significant volume of submissions which, for the sake of brevity, will not be repeated
save for the salient points.
Essentially the complainant says that:
there was a first overland flow above floor level inundation, caused by back up of
local stormwater drains and stormwater ponding on streets which commenced from
around 12.00pm on 2 February 2019, which was not flood;
the insured property was damaged by top to bottom stormwater ingress with
stormwater entering the property via the roof;
it agrees that inundation occurring late on 3 February 2019, or early on 4 February
2019, would be attributable to flood as defined by the policy;
it disagrees with key findings in relation to inundation of the property. For example,
the complainant says that WR’s timeline of events as to when the Ross River
overflows occurred is contradictory to earlier reports WR provided to the insurer;
there is no evidence that the Hermit Park Drain overflowed into R Street prior to
Ross River floodwater arriving; the ponded water on C Road did not come from the
Hermit Park Drain but rather from a stream of stormwater flowing along C Road
from the south towards the Hermit Park Drain; and photos and videos taken
Determination | Case number: 681754 Page 6 of 10
throughout 2 and 3 February show relatively clear water on and in the vicinity of C
Road;
the Hermit Park Drain is not a natural watercourse;
the toilets would not flush from 30 January 2019 onwards and when cleaning up
after the event there was sewerage throughout the property;
the drainage system was overwhelmed, and not enough emphasis is made of the
effect of the volume of rain that had already fallen in the days prior to 2 February
2019. When it continued to rain, the backed-up stormwater had nowhere to go.
The complainant agrees with the version of events contained in WR’s report as to the
timing of the initial inundation. That is, the complainant says:
he left the property at around 4.30pm on Friday, 1 February 2019. Water had not
entered the building at that time from any location during the heavy rainfall.
However, the toilets would not flush properly all week. Any time they flushed the
toilet bowl filled up, but it did not overflow;
he received a phone call from a friend on the morning of 2 February 2019, who
advised him that water had surrounded the office and water had entered the
building due to army trucks driving along C Road;
he arrived at the office at around 12.30pm on 2 February 2019. Water had already
entered above floor level at this time. He tried to move the computer server to a
higher level (not high enough because it was inundated);
some volunteers helped him sandbag the entrances during the afternoon and then
he left and did not return until after the event.
In support of its position the complainant has provided two reports from an engineer
(LC) dated 26 July 2019 and 9 December 2019. The first report provides a timeline for
the inundation of properties surrounding the Hermit Park Drain and the Sherriff Street
Drain. The second report maintains that the Hermit Park Drain was an artificial
stormwater drain at the time of the event.
The complainant has provided two further reports from another engineer (FM) dated
24 July 2019 and 8 January 2020. The reports deal primarily with the cause of
Mysterton gauge data variation and conclude that the principal cause of damage to
the building was from the rain event which overwhelmed the roof drainage systems
and caused large local overland flow. These events were compounded by the
passage of emergency service vehicles causing large bow waves that forced water
into the building. This was followed by a secondary cause of damage being the Ross
Creek overtopping its banks and flooding the site.
Complainant also says there was damage to contents from water ingress
through ceiling
The insurer has accepted liability for damage caused to the complainant’s contents
from water ingress through the ceiling. However, the insurer says the complainant has
Determination | Case number: 681754 Page 7 of 10
failed to establish water ingress from the roof caused damage to contents. The
insurer says there was very minor and isolated ceiling damage and based on
discussions with the insured at the time, it was agreed that no damage to the contents
had been caused by stormwater ingress.
The complainant says that there was a significant amount of water which entered
through the ceiling/roof and damaged contents. The complainant identifies the major
points of ingress through the roof as being above the reception area and at the rear
s tore room next to the kitchen , w ith a third lesser point of ingress being in the main
work area. The complainant has supplied a copy of the plumber’s report who attended
on site on 30 January 2019 , which identified where the roof was leaking.
The complainant says there was nobody in the building on Saturday 2 February 2019
to empty the buckets that were gathering water through the ceiling, and as the ceiling
softened and deteriorated due to the volume of water that passed through, the ceiling
leakage was more severe by the morning of 2 February 2019.
The complainant says that contents to the sum of $138,494.88 were damaged by
storm water, directly through the roof and ceiling. The complainant says that the loss
adjuster did not pay much attention to assessing the damaged items and all the
damaged items have now been disposed of. The complainant has quotes for some of
these items and says receipts can be followed up for what has been replaced.
Complainant’s offer for damage to contents is fair in the circumstances
The panel notes that the building owner received a cash settlement from the same
insurer for the ceiling damage in respect of this event. It is clear from the builder’s
repair quote and plumber’s report that the ceiling/roof suffered extensive damage and
the panel disagrees with t he insurer’s submission that this damage was minor in
nature.
The complainant offered to settle the contents claim in the amount of $32,500, which
the insurer rejected. Given the extent of damage to the ceiling/roof, together with the
available information from the complainant regarding damage to contents, the panel
accepts it is reasonable to conclude that there was damage to the contents from the
leaking ceiling/roof.
The panel also accepts that it is reasonable to conclude that some of the contents
were damaged by water that the panel has determined to be flood water and is
excluded from coverage.
The exchanged material does not include sufficient information to determine the
extent of the loss and damage to contents items that occurred on 2 February 2019,
prior to the rising flood waters entering the premises.
However, the panel notes that within an email of 7 May 2020, the director of the
complainant provided a list of items that were destroyed by the rainwater that came
Determination | Case number: 681754 Page 8 of 10
via the roof. The items were said to be at floor level. The price quoted for the items
totals $35,800.
The list of items includes carpets ($12,100), which have already been agreed and
paid for by the insurer. The list also includes ‘Bar cabinet in Board Room” ($5,000).
The areas of the building said to have suffered damage from water via the ceiling
include the reception, rear next to kitchen and to a lesser extent, the main work area.
This does not appear to include the board room.
Given the above, and in the interests of bringing finality to this complaint, the panel
considers that it is fair that the insurer pays the complainant the complainant $18,700,
to cover the damage caused to the complainant’s contents from water ingress through
the roof/ceiling.
The result is that the insurer is to pay the complainant the sum of $18,700 for its
liability in this regard within fourteen days of the complainant’s acceptance of this
determination.
The balance of the loss was caused by flood
WR considered that Ross River floodwater began overflowing into the Hermit Park
Drain from about 9.00am on 2 February 2019.
Heavy rainfall was recorded in the hours prior to the initial inundation. The panel
accepts that stormwater may have been unable to freely drain away from the property
in the afternoon of 2 February 2019 and that there may have been bow waves caused
by trucks driving along C Road. However, this is most likely because the stormwater
was mixing with water from the Hermit Park Drain and the Ross River.
For the sake of completeness, the panel is satisfied that the Hermit Park Drain is a
watercourse for the purposes of the insurance definition of flood.
Given the height of the floor level above ground and the fact that overflows from the
Hermit Park Drain commenced several hours prior to the initial inundation, the panel
is also satisfied that stormwater runoff alone would not have reached the floor level of
the property before mixing with flood water.
It is well established in insurance law that water which has escaped (overflowed) from
a watercourse is flood water and when mixed with rainwater, all is floodwater. That is,
the water that escaped from the Hermit Park Drain is flood water even if it originated
as stormwater.
Further, whilst the panel acknowledges the intensity of rain over numerous days, peak
rainfall did not occur until approximately 4.00pm on 3 February 2019, which is well
after the time of reported inundation.
Determination | Case number: 681754 Page 9 of 10
Having reviewed the exchanged material and considered numerous flood complaints,
the panel is satisfied that both the initial above floor level and the peak inundation
were caused by water overflowing from the Hermit Park Drain and the Ross River.
This is flood, as defined by the policy.
The insurer is entitled to apply the policy exclusion for flood to deny the balance of the
complainant’s claim .
The panel does not accept that the expert reports provided by the complainant
assisted in the resolution of this complaint.
The insurer is not required to reimburse the cost of those reports.
2.2 Is the complainant entitled to non - financial loss compensation?
Compensation paid in some circumstances
The complainant contends that it was unreasonable of the insurer to refuse all
damaged contents on the basis that the ceiling damage was minor in nature. It says
the insurer’s assess or failed to take note of the contents damage despite the ceiling
damage being significant. It says that despite multiple submissions noting the
inconsistency and its willingness to reach a compromise settlement, the insurer
refused to engage causing the complainant delays and frustration in recovering his
business.
AFCA will award compensation (capped at $5,000) if there has been an unusual
degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and
anxiety. AFCA expects complainants to be moderately robust and to bear the normal
degree of inconvenience experienced when a problem occurs and to take reasonable
steps to manage the situation.
Fair the insurer to pay $2,000 compensation for non-financial loss
The insurer was not prepared to offer any compensation for contents damage despite
the known ingress of water from the ceiling over a period of time and the photographic
images provided by the complainant.
Despite this evidence, the insurer maintained that no loss had been substantiated.
In the panel’s view the insurer’s position was unreasonable.
The panel considers it is fair in the circumstances the insurer pays $2,000, to the
complainant for non-financial loss compensation.
Determination | Case number: 681754 Page 10 of 10
3 Supporting information
3.1 AFCA approach to this complaint
We have considered it appropriate to expedite this complaint in accordance with the
Operational Guidelines to the AFCA Rules, due to the nature of the complaint.
Accordingly, this complaint has not been the subject of a preliminary assessment and
has proceeded directly to determi nation.
The determination is made by a panel consisting of the Ombudsman together with a
consumer representative who has extensive experience in consumer claims and an
industry representative who has extensive experience in the insurance industry.
The Ombudsman, who has had extensive experience with flood complaints, viewed
the general area in November 2019.
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.2 Rainwater that mixes with flood water is flood
The Courts have established that once rainwater mixes with flood water, it is all
considered flood water. Where rainwater mixes with flood water and causes damage,
a flood exclusion will usually apply to defeat the claim.
Accordingly, when deciding complaints, consideration has been given to whether
there was any rainwater runoff damage before the flood water arrived at the insured
property.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.