Insurer's cash settlement offer for leaking shower damage was insufficient to repair bathroom
Summary
The complainant's claim for water damage from a leaking shower rose was accepted, but the insurer offered only $4,507.33 for limited repairs. AFCA found the bathroom must be replaced, ordered a cash settlement of $20,991.76 net of excess with interest, and awarded $2,000 compensation.
The preponderance of contemporaneous expert evidence showed the leak caused damage requiring full bathroom replacement, and the insurer's post-remediation assessment was given less weight.
Issues
- Claim amount dispute primary · upheld“The preponderance of the material establishes on the balance of probabilities the leak has caused damage to the bathroom which requires its complete replacement.”
- Delay secondary · upheld“There has been an unusual amount of time taken to resolve the situation which would have interfered with the complainant's expectation of enjoyment or peace of mind.”
Subjects and remedies
home or building damagepay claimpay interestpay non financial loss
Related
Text of the determination
Determination
Case number 681174
Financial firm RACQ Insurance Limited
Determination | Case number: 681174 Page 2 of 15
Case number: 681174 27 May 2020
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (the insurer) after noticing wet
carpet and other damage in the master bedroom. The insurer appointed builder (B) to
inspect the insured property and determine the cause of damage.
Following the assessment, builder B confirmed the water was leaking behind the
shower wall through the shower rose. Builder B provided a quotation of $19,992.51
for the claim related repairs. After receiving the quotation from builder B, the insurer
engaged builder (A) to inspect the property and provide a quotation for repairs.
A inspected the property and provided a quotation of $4,507.33. The insurer says A‟s
quotation is fair. The insurer says it can either authorise A to undertake the repairs or
cash settle the complainant $4,507.33 less the policy excess.
The complainant disputes the insurer‟s decision and seeks the insurer to appoint
builder B to undertake the repairs.
The case analyst provided the parties with a preliminary assessment on the issues in
dispute. The preliminary assessment was in favour of the complainant.
As the insurer did not accept the preliminary assessment, the complaint has been
referred to me for determination .
1.2 Issues and key findings
Is the insurer’s offer fair and in accordance with the policy terms?
As the available information establishes on the balance of probabilities the claimed
damage was caused by the leaking pipe, the insurer‟s offer is not fair and not in
accordance with policy terms.
Is the complainant entitled to compensation?
The available information establishes an award of compensation in the sum of $2,000
is warranted.
1.3 Determination
This determination is in favour of the complainant.
Should the complainant accept this determination, then within seven days of
notification of acceptance, the insurer is to decide whether it will authorise builder B to
complete repairs or, cash settle the complainant pursuant to builder B‟s quotation.
Determination | Case number: 681174 Page 3 of 15
The claim is to be settled as set out in this determination in the paragraph headed
“mechanism for settlement”.
The insurer is also to pay the complainant $2,000 compensation.
Determination | Case number: 681174 Page 4 of 15
2 Reasons for determination
I have decided this complaint based on what is fair in all the circumstances, having
regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding). I have considered all the material submitted by the parties,
both before and after the preliminary assessment. I am satisfied that the
documentation I have relied on has been provided to both parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
After the preliminary assessment was rejected, the parties made further submissions
and the insurer provided some further material from its expert. Where relevant, these
further submissions will be referred to in this determination.
2.1 Is the insure r’s offer fair and in accordance with the policy terms?
Complainant must establish claimed damage caused by leaking pipe
The complainant must establish on the balance of probabilities that she has suffered
a loss caused by an event to which the policy responds. This is known as a prima
facie claim.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
In the context of this claim, the complainant must establish damage to the home
caused by a leaking pipe and all the claimed damage was caused by a leaking pipe.
The relevant policy terms are set out in supporting section 3.2 of this determination.
Experts have inspected the damage and provided opinions
The claim was made on 12 August 2019 after the complainant discovered wet carpet
in the bedroom which she believed was coming from the adjoining en-suite bathroom.
The insurer‟s plumber undertook leak detection tests and concluded the shower rose
connection to the combo thread was leaking and entering the wall cavity of the en-
suite shower up high. Whatever the policy response, the insurer admitted the claim
and does not resile from that admission.
The dispute is about the extent of damage caused by the leak.
Both parties had experts inspect the damage and provide opinions. The insurer also
arranged for its technical expert to review the opinions. The technical expert did not
Determination | Case number: 681174 Page 5 of 15
inspect the damage. A summary of those opinions is set out in supporting section 3.3
of this determination.
The quotes relied on by the complainant are to replace the bathroom. The quote
relied on by the insurer is significantly less. This is because the insurer says the
bathroom does not need to be repaired or replaced as it is not damaged.
The insurer relies on opinion which says there is no mould damage or damage to the
timber wall framing. The insurer also says the bathroom would only need to be
replaced if the waterproof membrane had failed.
Builder A says the waterproofing has not been damaged and he guarantees the
waterproofing will not fail as a result of the event.
The insurer also argues the mould and water staining does not mean the damage is
such that the bathroom must be completely replaced. Moreover, it says its builder
should be preferred because he provided a report after remediation was completed. It
says more weight should be placed upon the report which details damage following
the remediation.
In these circumstances, the insurer was prepared to authorise its builder A to
undertake repairs which have been identified as arising from the leak so that it would
be responsible for any variations which may arise and afford the complainant the
lifetime guarantee on repairs as provided in the policy.
After the preliminary assessment, the insurer said should the complainant
demonstrate the waterproofing had failed sometime later then it would investigate
those matters at that time.
Preponderance of opinion establishes the bathroom must be replaced
Having reviewed the available material, I am satisfied the bathroom must be replaced.
I prefer the opinions of the complainant‟s builder (M), builder B and the plumber to the
opinions relied on by the insurer.
This is because the technical expert relied on by the insurer did not ever inspect the
bathroom but relied on the opinion of builder A. The expert spoke to builder A who
said there was no damage to the bathroom itself, no damage to the timber wall
framing and no damage to the waterproofing.
Builder A inspected the bathroom after the mould remediation and drying. He said the
timber framework and fibre cement wall linings were in good condition. He also
described insignificant damage because the water only escaped for a minimum period
and leaked slowly while the shower was in use.
Having reviewed the contemporaneous evidence of builder B, the plumber and the
restorer, I am satisfied it is probable there was not insignificant damage to the
bathroom. The thermal camera showed extremely high readings to the wall and slab.
Determination | Case number: 681174 Page 6 of 15
The plumber noted the shower was used two or three times a day. In view of the
significant mould damage seen in the photographs, I accept it is probable the shower
has been leaking for some time and made the surrounding areas extremely wet.
I find the assumption relied on by builder A to be flawed. I do not accept it is likely
water escaped for a minimum period. In these circumstances, I do not find its opinion
should be preferred because it examined the damage after remediation.
Moreover, the restorer noted the mould damage and reported it took five days for the
timber frames moisture levels to return to an acceptable level.
The plumber said as these areas were so wet this could compromise the
waterproofing due to the timber expanding a nd shrinking.
Builder B said the water leak had caused further damage to surrounding materials in
the en-suite and so the waterproofing had been compromised.
After the preliminary assessment, builder B said the waterproofing passed tests
performed when i nspected but because the water had saturated the timber frame his
opinion remained this could affect the waterproofing over time and as the area dries
out this could cause the frame to shrink and affect the bathroom walls.
The complainant‟s builder M advi sed the en-suite should be replaced because of the
nature of the leaks and the lack of visibility to determine the extent of damage to the
framework and existing waterproofing membrane.
Having reviewed all the available material, I am satisfied the preponderance of the
material establishes on the balance of probabilities the leak has caused damage to
the bathroom which requires its complete replacement.
Builder B’s quote represents what it would cost to repair the damage
The insurer‟s policy sets out how it settles a claim. At its option it may pay the cost to
have the home repaired as new or pay the insured what it would cost the insurer to
repair the home.
Both M and B have provided quotes to repair and reinstate the master bedroom, entry
and en-suite.
B ‟s quote includes minor repairs to bedroom two, a builder‟s margin of 14%, home
warranty insurance, supervision and GST and totals $19,992.51.
M‟s quote does not include damage to the second bedroom and includes GST only.
Having reviewed the available info rmation, I find B‟s quote more comprehensive and it
represents what it would cost the insurer to repair the claimed damage.
Determination | Case number: 681174 Page 7 of 15
Mechanism for settlement
The insurer‟s policy provides a lifetime guarantee on repairs. The insurer will
guarantee the quality of repairs authorised if completed by a repairer authorised by
the insurer.
Should the complainant accept this determination, then within seven days of
notification of acceptance, the insurer is to decide whether it will authorise builder B to
complete repairs or cash settle the complainant pursuant to builder B‟s quotation.
If not already done so, the complainant is to pay to the insurer $1,000 policy excess.
If the insurer opts to cash settle the complainant pursuant to builder B‟s quotation ,
then it must allow another 10% for contingencies/variations which may occur during
repairs and for the loss of the benefit of the lifetime guarantee on repairs.
To cash settle the claim fairly and in accordance with the policy terms and conditions,
the insurer is to pay to the complainant $19,992.51 plus 10% for contingencies less
the policy excess of $1,000 (net $20,991.76).
If the insurer cash settle the claim, the insurer is also to pay interest pursuant to
section 57 of the Insurance Contracts Act 1984 (the Act) on the net sum of
$20,991.76 from 17 September 2019 (the date of the insurer‟s offer based on A‟s
quote instead of B‟s quote ) until the settlement date.
2.1 Is the complainant entitled to compensation?
Compensation paid in some circumstances
The complainant is a relief teacher and said she needed to take time without pay to
deal with the claim. She says there were unnecessary delays and staff were rude.
She said she and her husband have been inconvenienced as there is one bathroom
only available to 6 members of the family.
She also says she and her husband have been without a bedroom door or carpet. Her
husband is an emergency worker which includes shift and night work and has
suffered from lack of sleep because they have been unable to prevent noise or light
into the bedroom.
Correspondence shows the insurer tried to accommodate repair arrangements to give
the complainant more flexibility.
AFCA may award compensation (capped at $5,000) if there has been an unusual
degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainant‟s expec tation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and
Determination | Case number: 681174 Page 8 of 15
anxiety. AFCA expects complainants to be moderately robust and to bear the normal
degree of inconvenience experienced when a problem occurs and to take reasonable
steps to manage the situation.
Fair the insurer pays the complainant $2,000 compensation
The claim was made on 12 August 2019. The insurer responded quickly by appointing
a builder, a plumber and undertaking remediation works. On 17 September 2019, it
agreed to meet the claim, but pay an amount insufficient to repair the claimed
damage caused by the leaking pipe.
In the circumstances, I agree there has been an unusual degree of physical
inconvenience in the loss of use of the bathroom and the inability to close the
bedroom door ensuring a good night sleep. Further, the claims decision has meant
there has been an unusual amount of time taken to resolve the situation which would
have interfered with the complainant‟s expectation of enjoyment or peace of mind.
Taking all matters into account, I am satisfied it is fair the insurer pays the
complainant $2,000 compensation.
Determination | Case number: 681174 Page 9 of 15
3 Supporting information
3.1 Our Approach
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence betwee n the parties
and in the insurer‟s Notice of Response . Both the policy document and the Notice
have been exchanged with the complainant.
Insured events
We cover loss or damage to your home or contents that is caused by certain events. We call
them insured events. For us to cover you for loss or damage caused by an insured event, the
event must happen:
at the insured address; and
during the period of insurance.
Leaks
Leaks are liquids that are leaking, bursting, discharging or overflowing from certain items or
devices. For example, the hose in your dishwasher bursts and water damages your kitchen
cupboards and floors.
We may also cover some other costs under the extra benefit „Investigating leaks‟– see page
35.
Yes ✔ The following items or devices malfunction at or near your home and leaks from them
cause loss or damage to your home or contents:
dish and clothes washing machines
water catchment trays in refrigerators, freezers and evaporative air conditioners
waterbeds
pipes, gutters and drains which are fixed or connected to your home
fixed domestic items which include water tanks, lavatory cisterns and pans, baths,
basins and sinks
water mains.
No ✘ Loss or damage caused by:
leaks from shower recesses or cubicles
What we pay for your home
Determination | Case number: 681174 Page 10 of 15
Settling your claim
Options to settle your claim
We may choose, at our option, one or more of the following ways to settle your claim:
1. Pay the cost to have your home rebuilt or repaired as new – that is, pay to rebuild
or repair it using the same materials if they are readily available in Australia or
equivalent materials in terms of quality, purpose and specifications.
2. Pay you the cost to us – that is, pay you what it would cost us to rebuild or repair your
home as new up to the:
> home sum insured
> sum insured that applies under the optional benefit „Landlord‟s fixtures and
fittings‟.
We also pay any extra benefits that apply to your claim.
We may change our mind and pay you the cost to us to complete the remaining repairs
if you don‟t cooperate r easonably with us in rebuilding or repairing your home
3.3 Summary of expert reports
Date Action
Complainant’s quotation (M)
6 February 2020
Quotation for the repairs and reinstatement to master
bedroom and entry and replacement of the master
ensuite due to leak within the shower recess: $18, 590.
Complaints report (M)
6 February 2020
Advise ensuite be replaced entirely due to the nat ure
of the leaks and the lack of visibility to determine the
extent of damage to the framework and existing
waterproof membrane.
By replacing the ensuite you will gain a full warranty
and certificate to the new waterproofing membrane
and all of the works carried out by me and another
licensed trades.
Leak detection report
21 August 2019
Inspected and photographed 13 Augus t 2019 and
reported on caus e of water entry.
Water damage to the carpet behind the bedroom door
is located directly opposite the ensuite shower.
Thermal camera shows bedroom wall damp in the
lower wall and the slab in the corner.
Moisture tested the slab . Reading 99% showing it is
saturated. Tiled ens uite floor has an elevated moisture
rating of 77% outside the shower screen door.
Moisture tested wall of the bedroom opposite the
ensuite shower and it had a high reading up to the
height of the shower mixe r.
Wall between the shower and the bedroom had high
Determination | Case number: 681174 Page 11 of 15
Date Action
moisture readings which is spread to the slab but not
easily visible.
Bedroom slab is saturat ed and carpet damaged.
Shower used two or three times a day.
Cut two holes in the bedroom wall - found moistur e
levels and the wall cavity damp with mould. Water
stains around the back of the shower fibro wall around
the shower rose penetration.
Water stains around the rose and high moisture in the
rose area indicates rose connection to the combo
thread was leaking and then ent ering the wall cavity up
high.
Due to the timber frame of the shower as well as the
tiled shower floor being so wet this could compromise
the waterproofing due to the timber expanding and
shrinking.
Bathroom may need to be stripped and reinstated to
current code.
Found mould in the cavity. Sealed the shower ros e
wall penet ration and re - installed the shower rose.
Restoration report (T)
26 August 2019
Noted visible mould growth on back of carpet and
findings of plumber.
As a make safe, i nstalled drying equipment and sealed
off the mould affected carpet and door. Recommended
work in relation to the mould affected carpet and
sanitising to the concret e walls and ceiling in the
master bedroom and adjoining bathroom.
Recommended wall backing o nt o the shower be
removed due to mould growth.
Mould found on the back of the fibre cement wall
board, frame, skirting and gyprock and door frame and
wall next to door.
Timber frames still reading high moisture level and
equipment rearranged to target dry and hydrogen
peroxide applied.
Make safe cost $4,482.50 for dehumiders and air
movers for 5 days.
Make safe commenced 15 August and by 26 August
timber frames were dry.
Make safe report (B)
28 August 2019
Leak had caused damage to carpet, gyprock, skirting
and door frame.
Timber frames reading high moisture levels. On
second attendance hydrogen peroxide applied. On
third attendance frames dry.
Dehumidifiers, air movers etc for five days. Costs,
including builders margin and GST $5,438.37.
Report a nd quote (B) Inspected and photographed the damage and
Determination | Case number: 681174 Page 12 of 15
Date Action
4 September 2019 engaged plumber.
Plumber tested and discovered shower rose brass
fitting is leaking within the wall due to a small crack in
the weld.
Now remediation completed and mould removed the
affected areas can be replaced.
Full replacement of the ensuite is required as the
waterproofing has been compromised and the water
leak has caused further damage to surrounding
materials in the ensuite.
Bedroom carpet and underlay to be replac ed. Repairs
to entry and bedroom 2.
Repairs to bathroom, main bedroom, entry, second
bedroom $19,992.51.
Insurer’s technical manager
7 September 2019
Have reviewed the claim and the latest reports and
scope/quote from B.
Find that the leak inspection report has clearly
highlighted that the wat er leak is from the shower ros e
connection. Due to the fact that this penetration was
sealed it has allowed water track from inside the
recess back into the wall cavity. This claim should be
declined as water escaping the sh ower rec ess. It is not
from a leaking pipe in the wall cavity and if this was
sealed then the water would have stayed within the
recess causing no further damage.
If claims have already accepted the claim, then this
should be limited to the carpet and the holes in the
plasterboard wall behind the bat hroom. The
scope/quote from B is excessive and the bathroom
does not need to be repaired and/or replac ed. All tests
clearly state that the shower recess is ok and has not
failed so I'm insure why they are allowi ng for bathroom
repairs.
B to amend their scope/quote to repair the holes that
they have cut into the wall if claims are to accept this
claim.
Asse ssment report (A)
11 September 2019
Inspected and photographed premises with
complainant.
Reviewed report fr om B who engaged a plumber who
conducted all necessary tests to the shower recess.
Notes conclusion regarding insufficient seal around
shower rose.
Seal has now been installed around shower rose and
new thread tape installed to mitigat e any further leaks.
Ran the shower. Didn‟t leak.
Inspected the wall and noted restoration and complete
drying and mould remediation. Timber framework in
good condition. Fibre cement wall linings in good
Determination | Case number: 681174 Page 13 of 15
Date Action
condition. Believe shower recess or bat hroom has not
been compromised.
Du e to insignificant damage seen say wat er only
escaped for a minimal period of time and leak ed slowly
while shower in use.
Talk to B‟s plumber to determine if repairs are long -
term repairs or a make safe.
Discussed work required to the entry and in the
bedr oom.
Confirm sighted damages consistent with an escape of
liquid claim. Based on the plumbing report that has
been supplied that the water has been able to enter
the wall cavity from inside the shower recess tracking
through the penetration in the wall li ning.
Quotation (A)
11 September 2019
Quotation for cost of repairs to master bedroom and
entry $4,507.33.
Insurer’s technical manager
12 September 2019
Reviewed latest reports and scope/quote from A.
Fair based on the evidence provided.
Spoken to A and he has confirmed that the water has
escaped the recess through an unsealed shower rose.
This has since been sealed by others and no damage
in the bathroom itself.
Recommend that due to the claim being accepted then
the scope/quote from A at $4,507 - 33 is f air and ok to
authorise.
Email from A to insurer
17 March 2020
At the time of our inspection no damage to the
waterproofing would have been caused by the event.
Waterproofing would not be compromised during
repairs. Ensuite is not being touched.
Proposed repairs meet current building Code
requirements. Works are cosmetic only, installation of
doors, plastering and painting.
Email from A to insurer
21 April 2020
Guarant ee that the waterproofing will not fail as a
result of the event. However , waterproofing does fail
eventually as bat hrooms age, also as it was a
waterproofing issue with the tap penetrations
theoretically it is failed waterproofing that has caused
the EOL in the first instance.
Yes , we can warrant repairs, however, will hold no
liability for any future water escape that may occur as
a result of the incorrectly installed waterproofing
around the tap penet rations.
Insurer’s technical manager
23 March 2020
Reviewed the claim again and the latest reports and
scope/quote from M again st the original reports and
scope from A.
Determination | Case number: 681174 Page 14 of 15
Date Action
Still recommend that the scope/quote from A is fair and
would still stand. The bathroom has not suffered any
damage. The wall cavities have been exposed around
the recess from behind. The evidence shows that the
ti mber wall framing is not damaged.
Water ingress has occurred from water running
through the tap penetrations which have since been
silicone. This means that only some water was
escaping the recess while the shower was in use. The
rest of the recess has bee n fully tested with no leaks
occurring. The A scope/quote is to repair all the
resultant water damage.
M is just stating that the bathroom needs to be
replaced. They have not conducted water tests like A
or B. The bat hroom would only require to be stripped if
the waterproof membrane had failed and needs to be
re - done. This is not the case in this claim and a
bathroom strip out is being quoted on for upgrade and
renovation needs only and unrelated to the insurance
claim.
Email to insurer from B
20 April 20 20
At the time of our inspection the waterproofing passed
the tests performed. This indicates at that point in time
it showed it was water tight.
As stated in the report the water that leaked and
saturated the timber frame could affect the wat er
proofing over time as the area dries out it could cause
the frame to shrink and affect the bathroom walls.
Best to confirm this would be to have the shower used
for a period of time and check if the moisture levels
continue to stay dry.
Extraction from the report below Recommendations.
Due to the timber frame of the shower as well as the
tiled shower floor being so wet this could compromise
the water proofing due to the timber expanding and
shrinking.
Bathroom may need to be stripped and reinstated to
current code.
Mould should be treated as a safety precaution.
We found yellow and green mould in the cavity.
We have sealed the shower rose wall penetration and
re - installed the shower rose.
Silicone installed around the shower rose penetration
is a long term repair.
3.4 Other relevant material considered and relied on
Parties‟ submissions/emails and all attachments to all submissions/emails both
before and after the preliminary assessment.
Determination | Case number: 681174 Page 15 of 15
Parties‟ expert reports and quotations for repair.
Photographs.
Insurer‟s claim fi le notes.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.