Home / IAG / Determination 680409

Determination 680409

Water damage claim declined; cash settlement for drying and mould remediation

FirmIAG
Decided2020-04-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$1,903
Non-financial loss—
Amount claimed$1,903
SourceAFCA PDF

Summary

The insurer denied a water damage claim to the home because the damage was not caused by an insured event, but it had offered $1,500 toward drying and mould remediation. AFCA upheld the denial but ordered a cash settlement of $1,902.55 for the structural drying and mould remediation.

The policy excludes water escaping from a shower recess or base, and once the insurer agreed to fund structural drying it was not fair to withdraw or reduce that offer.

Issues

Subjects and remedies

home or building damagepay claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 680409 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 680409 Page 2 of 10 Case number: 680409 17 April 2020 1 Determination overview 1.1 Complaint The complainants hold an insurance policy with the financial firm (the insurer) covering their home. On 12 October 2019, the complainants lodged a claim under the policy for water damage to the walk-in robe directly behind the ensuite shower recess. The insurer appointed consultants to inspect the damage and provide reports in relation to the cause of the damage. On the basis of these reports, the insurer denied the claim because the damage was not caused by an insured event. Even though the insurer was not liable to pay the claim pursuant to the policy terms, the insurer accepted make safe costs and offered to pay the complainants $1,500. The complainants say this is insufficient to undertake the make safe work required. The complainants also complain about the way the claim was processed and managed by the insurer. The case analyst provided the parties with a preliminary assessment on the issues in dispute. The preliminary assessment was in favour of the insurer. The insurer accepted the preliminary assessment, but it was not accepted by the complainant . In the circumstances, the complaint has been referred to me for determination . 1.2 Issues and key findings Is the insurer liable for the claimed damage? The available information establishes on the balance of probabilities the claimed damage was not caused by a leaking pipe. In the circumstances, the insurer is entitled to decline the claim. In circumstances where the insurer was prepared to pay for structural drying until it realised a further cost (the mould remediation) may be involved, it was not fair to withdraw the offer or negotiate the offer particularly when the difference between the amount offered and the actual cost was relatively small. Are the complainants entitled to compensation? The available information does not establish an award of compensation is warranted. 1.3 Determination This determination is substantially in favour of the financial firm. Determination | Case number: 680409 Page 3 of 10 Should the complainants accept this determination then within seven days of notification of acceptance, the insurer is to pay to the complainants $1,902.55. Otherwise, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 680409 Page 4 of 10 2 Reasons for determination I have decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). I have co nsidered all the material submitted by the parties, both before and after the preliminary assessment. I am satisfied that the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. No new material provided after preliminary assessment After the preliminary assessment was rejected, the parties made no further submissions nor provided any new material. 2.1 Is the insurer liable for the claimed damages? Complainants have not established a valid claim The complainants must establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. The complainants must establish the claimed damage was caused by a leaking pipe. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. The insurer must establish the damage was caused by water leaking or escaping from a shower recess or shower base or by gradual deterioration. The relevant policy extracts are set out in supporting section 3.2 of this determination. It is not in dispute there was a water leak from the shower which damaged adjacent areas including the skirting board near the ensuite shower recess and the skirting board in the walk - in robe. This is confirmed by the reports provided. A summary of the reports is set out in supporting section 3.3 of the determination. T he insurer relies on the reports and says there has been no damage from an insurable event under the policy, and so the complainant has not established a valid claim. The complainants make a number of observations about the reports. The claim file notes show they questioned the opinions provided. In response, the insurer obtained Determination | Case number: 680409 Page 5 of 10 further reports. In addition, the complainants argue one of the causes of damage was lack of waterproofing which was not required when the house was built. The complainants have not provided any expert reports. I ha ve carefully considered the insurer’s reports and photographs provided. I have considered the tests undertaken by the plumbers. I am satisfied the photographs show long-term water damage. Having reviewed the material provided I am satisfied the insurer has established on the balance of probabilities the claimed water damage was because of water leaking from a shower recess because of missing grout and missing sealant between the shower base and wall tiles. I accept the plumber indicates there was no waterproofing to the shower base. But the reports identify other causes of damage as well. The policy terms are clear and unambiguous. A claim is not covered where damage is caused by water leaking or escaping from the shower recess or shower base. On the available material, the complainants have not established on the balance of probabilities the damage was caused by water leaking from the pipe. In the circumstances, I am satisfied the complainants have not established a valid claim and the insurer is entitled to decline the claim. Fair the insurer pays the complainants $1,902.55 The complainants want a make safe (drying and mould removal) carried out. As part of a November review, the insurer acknowledges the drying of the base plate was accepted as part of the make safe and it authorised the builder (JP) to proceed. Following the review, JP indicated mould remediation was required before further structural drying could be done as the sub plate was still wet. JP provided a scope of works for mould remediation work and structural drying. JP estimated the cost was $1,902.55 including GST and builder’s margin. As part of its review, the insurer offered the complainants a contribution to these costs of $1,500.00. The insurer explained there was no cover as damage was not from a listed event. Because of this, it said it was not obliged to pay for a make safe either. But, because the insurer had earlier accepted the structural drying costs, the insurer was willing to contribute $1,500 towards these costs. In its notice of response, the insurer indicated it was prepared to honour the offer of $1,500 in full and final settlement to resolve the claim and the complaint but if it was not accepted the offer will expire. The complainant says in order for the complaint to be resolved, she is seeking for the drying and the mould remediation to be done. The complainants have not provided Determination | Case number: 680409 Page 6 of 10 any material in relation to these costs. The only available information is from the insurer which indicates the estimated cost is $1,902.55. I accept the insurer is not liable for the claimed damage nor is it liable for the make safe costs. However in circumstances where it was prepared to pay for structural drying until it realised a further cost (the mould remediation) may be involved, I do not consider it was fair to withdraw the offer or negotiate the offer particularly when the difference between the amount offered and the actual cost was relatively small. In circumstances where there is other uninsured damage, I am satisfied it is fair the insurer cash settle the claim. In the absence of any other material, I am satisfied it is fair the insurer pay to the complainants $1,902.55 (net of the policy excess) for the structural drying and mould remediation . 2.2 Is the complainant entitled to compensation for non-financial loss? Compensation paid only in some circumstances The complainants make a number of complaints about the way the claim was handled. These complaints include that there was delay in processing the claim as the claim was not properly assessed for several weeks. They say the make safe was not carried out and so the family was exposed to mould. They criticise the insurer’s communication and refer to conflicting and non-accurate reports. They also say any allegation of their use of silicone to cover up the issue was not true and was upsetting. AFCA will award compensation (capped at $5,000) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s exp ectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and anxiety. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. An award of compensation is not warranted The available information shows the claim was made on 12 October 2019. At first a desktop assessment was undertaken by the builder JP. However, a plumber attended and tested on 15 October 2019. Both the builder and another plumber re-attended on 31 October 2019. The claim was denied on 6 November 2019. A final decision was made on 4 December 2019. In the circumstances, on the available material, I do not accept the insurer did not handle the claim in a timely manner. Determination | Case number: 680409 Page 7 of 10 I have reviewed the expert reports and the claim file notes. I do not agree the expert reports were unclear or contradictory. Further, I consider the claim file notes show the insurer was reasonably responsive. I am not satisfied the available material establishes the insurer alleged any bad faith actions on the part of the complainants. In view of the photographs which show lo ng-term water damage, I do not accept any actions or inactions on behalf of the insurer materially contributed to mould damage. Taking all matters into account, I am not satisfied the available information warrants an award of compensation. Determination | Case number: 680409 Page 8 of 10 3 Supporting information 3.1 Our Approach It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the policy document and the Notice have been exchanged with the complainants. Water and oil leaks If loss or damage is caused by water or oil leaking or escaping from an item shown here. Covered  Water leaking or escaping from: - House gutters, drainpipes or pipes Not covered  water leaking or escaping from a shower recess or shower base  costs to repair or replace the item that the water or oil leaked or escaped from. 5. General exclusions for all covers and benefits What we don’t cover Loss, damage, injury or death arising from:  Rust, corrosion, gradual deterioration, depreciation, wear and tear. 3.3 Summary of expert reports Date Action Emergency home assi st 12 October 2019  Attended 12 October 2019.  Wet area in walk in robe directly behind shower recess in ensuite.  Member accessed plaster in robe and base place in stud wall. Wet.  No visible leak from water pipes. Dry.  Advised member it is likely to be either shower waste or shower base/tiles. Mould remediation report (JP)  On 15 October 2019, desk top assessment, photographs and provided Scope of Works for mould remediation works and structural drying.  Estimated cost of remediation $1,902.55 including Determination | Case number: 680409 Page 9 of 10 Date Action GST and margin. Mould remediation report (JP)  Home assist had attended, and insured had cut a hole in the walk - in robe wall. No water damage to the wall cavity between the ensuite and walk in robe.  Water damaged skirtin g board in ensuit e and robe.  Damage becaus e of escape of water through deteriorated silicon in the shower recess.  Plumber confirmed water was escaping bet ween the shower screen and tiled wall junction due to deteriorated silicone.  Repair estimate $962.1 2. Maintenance works repair estimate $400.  Photographs annotated and include photographs of the ensuite and robe skirting which shows long - term water damage. Leak location report 15 October 2019  Tested and photographed damage.  Confirmed damage to skirting and carpet in adjoining room and walk in robe and to skirting in the ensuite.  Complainant res ealed edges of screen and int ernal angles inside shower to try to resolve the problem. A neat job but unsuccessful.  Spray/flood test produced small amoun t of water on either side of the base where it joins the wall. Small damp spot in robe.  Water damage due to leaking shower base tiles/screen. Initial site report (RX)  29 October 2019 ins pected and confirmed damage to carpet in robe, bedrooms and ensuite.  Carpets are restorable. Moisture readings conducted. Readings returned to normal. Drying equipment not required. No further action required. Plumber’s report 31 October 2019  Attended to test and photograph damage.  Most tests passed.  Spray test to shower wall tiles and shower screen failed.  Described damage. Described application of sealant  Noted open and missing grout lines on the wall tiles of the shower recess. Noted open sealant between the top of the shower base and bottom of wall tiles.  Home built in 1990. Then, waterproofing not compulsory.  Conclusion: based on information described and testing the water damage is indicative of long - term water escape from the shower recess due to missing and open grout lines, missing or gapped sealing betwee n the shower base and wall tiles and no Determination | Case number: 680409 Page 10 of 10 Date Action waterproofing to the shower recess. Report (JP) 31 October 2019  Re - attended to inspect, photograph and report on the shower and to undertake a leak detection to identify whet her the tap fittings were leaking or if the damage was from faulty workmanship.  Re - inspection confirmed damage caused by the lack of grout, silicon and waterproofing to the shower recess.  Plumber confirmed no leaks from the breach or shower rose. Baseplate is wet. Mould is present to the back of the walk - in robe skirting. Make safe to dry the base plate has been requested and repairs can only commence once the base plate has dried.  Provided a provisional scope of works. Estimated total cost of repairs $1,826.06.  Complainant to make shower reces s watertight.  Marked claim for review as damage is long - term and not due to a burst pipe. 3.4 Other relevant material considered and relied on  Parties’ submissions/emails and all attachments to all submissions/emails.  Parties’ expert reports.  Photographs.  Insurer’s claim file notes.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.