Home / Allianz Australia / Determination 679931
Determination 679931
Storm hail roof claim handling delays and further damage claimed
Summary
The complainant claimed for hail damage to roof tiles from a December 2018 storm. The insurer repaired the roof but repairs began months after lodgement, and the complainant claimed further damage. AFCA found the insurer's policy obligations were met but ordered $500 non-financial loss compensation for claim handling delays.
The insurer is only liable under the complainant's own policy, lead flashing damage from gradual deterioration is excluded, and unusual delay in claim handling warrants modest non-financial loss compensation.
Issues
- Poor claim handling primary · upheld
“I am satisfied there were errors in the insurer's handling of the claim and compensation is warranted in the circumstances.”
- Claim denial secondary · not upheld
“I am satisfied the damage to the lead flashings is due to gradual deterioration, which is a general exclusion under the policy.”
- Delay secondary · upheld
“The insurer has not adequately explained why there was a delay of many months before repairs commenced on the property.”
Subjects and remedies
home or building damagenatural disasterpay non financial loss
Text of the determination
Determination
Case number 679931
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 679931 Page 2 of 6
Case number: 679931 31 March 2020
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) following a storm
event on 20 December 2018, which caused hail damage to roof tiles. The insurer
accepted the claim and arranged repairs.
The insurer says the repairs are complete a nd it has met its obligations under the
policy, however the complainant says there may be further damage which must be
assessed.
The complainant also wants compensation for the delays caused during the claims
process.
1.2 Issues and key findings
Has the insurer met its obligations under the policy?
The insurer has met its obligations under the policy and is not required to take any
further action on the claim.
Is the complainant entitled to compensation?
I am satisfied there were errors in the insurer’s h andling of the claim and
compensation is warranted in the circumstances.
1.3 Determination
This determination is partially in favour of the complainant.
If the complainant accepts this determination, the insurer is to pay the complainant
$500 in non-financial loss compensation. It is not required to take any further action
on the claim.
Determination | Case number: 679931 Page 3 of 6
2 Reasons for determination
2.1 Has the insurer met its obligations under the policy?
Complainant says his property may have further damage
The complainant says his neighbour is also insured with the insurer and had a leak in
his house after the storm. He says he came home to find his neighbour had placed a
tarp over his roof where it joins with the neighbour’s, and he thought the issue may be
coming from his roof.
The complainant says the insurer sent an assessor, who advised it could be a hole
caused by hail, but was not sure if it was from the compla inant’s roof or his
neighbour’s . He says he is now not sure whether the issue is with his own roof or his
neighbour’s, however given the insurer insures both his property and his neighbour’s
property, it should be liable for any damage.
Insurer says it has met its obligations under the policy
The insurer says it repaired the damage to the roof caused by the storm and after the
complainant raised concerns with the roof tiles matching, it agreed to respray the
entire roof.
After the complainant raised further concerns, it appointed an independent builder
(EP) to provide a report. EP stated the recent repairs appeared to be completed to a
satisfactory standard.
EP also stated:
the neighbouring property claims to have water ingress along a section of the
adjoining party wall
step flashings adjoining the neighbouring property have not been correctly
installed, with the wrong use of materials, incorrect lapping and insufficient
coverage
evidence of perished silicone sealants along the step flashing were noted,
suggesting this has been a previous point of water ingress for the neighbouring
property
primary point of water ingress is material deterioration to the lead flashings
adjoining the neighbouring property
the front entry roof has no apron flashing installed, allowing water entry points
one roof tile adjoining the northern barge has been broken from sand bags
installed.
The insurer says whilst the complainant reported a potential water leak at the party
wall between his and his neighbour’s property, he has not provided any evidence of
damage to his property that the policy will cover. It also says EP’s report states any
leak at this point was caused by incorrectly installed step flashing where the
Determination | Case number: 679931 Page 4 of 6
properties join, which is excluded from cover. The insurer refers to the general
exclusions for: ‘ depreciation, gradual deterioration, wear and tear or lack of
maintenance’ and ‘faulty design, structural defects or poor workmanship’.
The insurer also says any damage to the neighbouring property is unrelated to the
complainant’s claim and is not covered.
The insurer says it has fully indemnified the complainant under the policy and it is not
required to take any further action.
Insurer has met its obligations under the policy
Whilst the complainant says the insurer is liable for the damages to his neighbour’s
property as it is the insurer, I can only consider the insurer’s obliga tions under the
complainant’s policy with respect to his property. Any obligation the insurer may have
regarding the neighbour’s property is outside the scope of this determination.
The information provided indicates the insurer has met its obligations under the policy
regarding the hail damage claim. The complainant says he has been advised verbally
that there may be hail damage to the flashing which adjoins the neighbouring
property, however AFCA makes a determination based on written documentation.
There is no written documentation which supports the fact there is unrepaired hail
damage.
EP’s report states the primary point of water ingress is material deterioration to the
lead flashings adjoining the neighbouring property. In the absence of any information
contradicting this report, I am satisfied the damage to the lead flashings is due to
gradual deterioration, which is a general exclusion under the policy. Any repairs to the
lead flashings is therefore excluded under the policy.
2.2 Is the complainant entitled to compensation?
Compensation may be awarded in certain circumstances
Under our Rules, AFCA may award compensation for non-financial loss (capped at
$5,000) where there has been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with a complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to
bear a normal degree of inconvenience during the course of a claim.
Complainant says insurer mishandled the claim
The complainant says the insurer has been slow to respond during the claim, have
sent multiple assessors and builders to his property and he has had to chase activity
for months for any action. He says whilst the insurer initially advised the roofing
Determination | Case number: 679931 Page 5 of 6
repairs had been completed, the roofer who resprayed the roof advised there were
still cracked tiles that needed to be repaired, months after he initially lodged the claim.
The insurer accepts there were dela ys in the claims handling and agreed to waive the
excess on the claim of $700 and also waived a motor vehicle excess of $650 in
relation to a different claim.
Insurer to pay compensation
I have reviewed the claim notes on file. These notes indicate periods of time when the
insurer did not contact the complainant with an update and did not respond to call
back requests.
The complainant lodged the claim on 22 December 2018 and the insurer says repairs
did not commence until 17 June 2019 . The insurer has not adequately explained why
there was a delay of many months before repairs commenced on the property.
Whilst the insurer says it has provided compensation for this delay by waiving the
excess on this claim and another claim, I consider an additional $500 sho uld be
awarded to the complainant in recognition of the insurer’s handling of the claim.
Determination | Case number: 679931 Page 6 of 6
3 Supporting information
3.1 AFCA approach to this complaint
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions of AFCA or its predecessor schemes (which are not binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted only to those issues considered relevant to the outcome.