Home / IAG / Determination 679915

Determination 679915

Cash settlement amount for burst sewerage pipe building damage; contents, cracking and loss of rent

FirmIAG
Decided2020-07-10
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$64,772
Non-financial loss$2,500
Amount claimed$67,507
SourceAFCA PDF

Summary

Landlords claimed after a burst sewer pipe damaged their building and disputed the insurer's $38,361.70 cash settlement, cracking, contents and loss of rent. AFCA increased the cash settlement to $54,362, ordered plumbing, storage and six weeks' loss of rent, and $2,500 non-financial loss with interest on repairs.

The insurer could cash settle, but its settlement was incomplete and its handling caused delay; cracking was excluded wear and settling and contents were not covered.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial lossrepair or rectify

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 679915 Financial firm Insurance Australia Limited Determination | Case number: 679915 Page 1 of 10 Case number: 679915 11 June 2020 1 Determination overview 1.1 Complaint The complainants hold a home building policy with the financial firm (insurer). They lodged a claim in March 2019 after a sewerage pipe in the property burst downstairs. The complainants say because of the loss, contents items were damaged, the tenants who lived upstairs vacated the property and the escape of water caused further movement of the property. The complainants say the insurer ’ s cash settlement amount is insufficient as they are unable to have the works completed for the amount offered. The insurer partially accepted the claim. It says the complainants do not hold cover for contents under the policy. It says it has insufficient information to assess the claim for loss of rent and the cracking in the property was pre-existing. The insurer concludes that its offer of settlement is fair in the circumstances. 1.2 Issues and key findings Is the insurer ’ s offer of settlement for building damage fair in the circumstances? The Panel is satisfied it is fair in the circumstances that the cash settlement be increased as set out under Section 2.1 of this determination. Is the insurer required to contribute to the movement and cracking at the property? The complainants have not established the claim for damage caused by the movement and cracking falls within the terms of the policy. Are the complainants covered for contents? The policy is a building only policy and does not extend to cover contents. The insurer is entitled to decline the contents portion of the claim. Are the complainants entitled to compensation for loss of rent? The Panel is satisfied access to the property, for tenants, would be severely limited during repairs. The Panel is persuaded the insurer should cover the complainants; loss of rent for the repair duration. Determination | Case number: 679915 Page 2 of 10 Are the complainants entitled to compensation for non-financial loss? The Panel is satisfied the actions of the insurer have caused the complainants considerable stress and inconvenience and in the circumstances an award of $2,500, is fair. 1.3 Determination This determination is substantially in favour of the complainants. Within 14 days of acceptance of this determination, the insurer is to pay the complainants:  $54,362 for the cost of repairing the property, the insurer has previously agreed to waive excess on the claim  $4,910 for plumbing costs incurred if not already paid  storage costs of contents incurred to date plus a further six week of storage costs to cover the repair period.  $5,500 being 6 weeks loss of rent  $2,500 in compensation for non-financial loss. Further, the insurer is to arrange the attendance of a mould remediator to assess the property. The insurer is to pay interest, on the cost of repairs only, pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from 28 November 2019 until payment is made. Determination | Case number: 679915 Page 3 of 10 2 Reasons for determination There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. This decision has been made by a Panel consisting of an Ombudsman, an individual with extensive insurance experience and another individual with extensive consumer experience. The decision follows consideration of all the material exchanged. It is based on what is fair in all the circumstances having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous decisions where applicable. While the parties have raised numerous issues in their s ubmissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome. 2.1 Is the insurer ’ s offer of settlement for building damage fair in the circumstances? Valid claim established There is no dispute the insured property suffered damage because of a burst sewerage pipe, to which the policy responds . The issue to determine is whether the insurer ’ s offer of settlement is fair in all the circumstances. Policy provides the insurer with the discretion as to how to settle a claim The policy allows the insurer to settle a claim by:  repairing the damage; or  rebuilding  paying the complainant, the reasonable cost to repair or reinstate the building to the condition it was in just before the loss or damage occurred (cash settlement). The insurer must exercise this discretion fairly, reasonably and consistent with the principles of utmost good faith. The insurer elected to cash settle the complainants as it says it is unable to warrant the works, due to the pre-existing cracking present at the property. The Panel accepts the insurer is entitled to cash settle the complainants in these circumstances. Insurer ’ s scope of work is not actionable The insurer initially appointed EC to assess the complainants ’ property and provide a scope of works. The information shows the insurer ’ s internal assessor was not satisfied EC’s scope of works was accurate, however recommended a cash settlement based on the Determination | Case number: 679915 Page 4 of 10 incomplete scope of works. This is not an appropriate course of action. The assessor should have arranged for EC to reattend and complete the scope the works. Alternatively, the insurer could have worked with the complainants to identify a suitable builder who was willing to complete the works. After the complainants raised concerns in September 2019, the insurer sent an internal assessor to attend the complainants’ property. The assessor completed a detailed scope of works using an internal quoting tool, which the insurer used as the basis of settlement. While the Panel accepts the insurer ’ s scope of works, the Panel does not accept this scope of works is actionable by the complainants. The insurer has conceded the same and offered $38361.70 including a 15% allowance to cover the risk. The insurer has not provided any information which shows the complainants can have the works completed based on the increased amount. Complainants ’ scope of works lacks details The complainants have provided a scope of works and quote from their chosen builder, HC for $67,507 inclusive of GST. The Panel has reviewed the scope and finds it not only lacks detail, but it quotes on items not listed on the insurer ’ s scope of works. Further, it appears to charge twice for plumbing and electrical costs, as under the relevant sections it says it includes plumbing and electrical, however they are also listed separately with additional costs listed. A fair settlement in the circumstances The Panel has compared the two scopes on a like for like basis where possible. Whilst the complainants ’ builder ’s overall costings are significantly higher than the insurer ’ s it is the only actionable quote provided to the Panel. As outlined the complainants’ builder has quoted for work not listed on the insurer ’ s scope of works and has doubled up on items. The Panel is not satisfied the following items should be included:  plaster $4,000  electrical $3,600  plumbing $4,350 This brings HC’s quote down to $49,420.00 excluding GST or $54,362 inclusive of GST. The Panel is satisfied a cash settlement $54,362 is fair in the circumstances based on the insurers scope of works is fair in the circumstances. The Panel notes the Insurer has agreed to include the plumber’s costs incurred by the complainant of $4,910.40. This should be added to the cash settlement if not already paid. Determination | Case number: 679915 Page 5 of 10 The insurer has also agreed, during a conciliation conference, to cover storage costs of the contents items. If it has not already done so the insurer is to reimburse the complainants for any storage costs incurred to date and pay the complainants an additional six weeks of storage to cover the repair duration. The complainants have also raised concerns around the presence of mould in the property. The insurer is required to appoint a mould remediator to assess and treat the presence of any mould which is related to the event. 2.2 Is the insurer required to contribute to the movement and cracking at the property? Cracking damage is pre-existing The complainants admit there was cracking to the property prior to the loss, however they say the cracking has become worse due to damage caused by the event and provide an engineer’s report from AD in support of their position. In its report AD says:  the north western corner of the downstairs section of the property, the windows are twisted, as is the entry door and the northern wall has been pushed out approximately 25mm.  this area is exposed to the hot northern sun and there are no control joints in this area. As a result, the expansion and construction of the single brick wall together with the heavy loads from the house has caused the wall to move. This, possibly coupled with the footings which were too small, the water damage from overflow of the downstairs flood the area has caused movement in the footings  the hot sun expanding the single brick wall, the heavy loads from the house, have all contributed to the structural stress. This is exacerbated because the overhead kitchen floor in its settlement is causing more load on the north west corner. The damage identified by the engineer is consistent with damage occurring gradual ly due to gradual deterioration and wear and tear as well as settling, shrinkage, expansion in the building, foundations and walls. Such damage is excluded from cover. While the panel accepts it is possible the downstairs flooding has contributed to the movement, the Panel is satisfied the dominant proximate cause of the movement are factors which are unrelated to the claimed loss. The available information is not sufficient to support the complainants claim. Accordingly, the insurer is not required to take any action around the movement of the property. Determination | Case number: 679915 Page 6 of 10 2.3 Are the complainants covered for contents? Complainants did not elect for contents cover The complainants say the policy was incepted online and at the time they believed they elected for both home building and contents insurance. The complainants also say the online system did not adequately state they elected for building cover only, and as they were overseas for a large portion of the time, the renewal paperwork went to the real estate agent and they were unaware of the coverage. The policy was incepted in October 2015. At that time the complainants also set up an online self-service profile with the insurer. The insurer says details of the online interaction were not captured, however it has submitted the original certificate of insurance when the policy was incepted. The insurer has also provided a copy of the most recent renewal certificate for the risk address. The Panel is satisfied both supplied certificates show clearly that only the building is insured, with no contents cover present. While the Panel accepts the complainants’ explanation, there is an onus on the complainants to ensure the level of cover suits their needs. The Panel is satisfied the complainants had sufficient time from the policy inception to prior to the event date to review and amend the policy to ensure the coverage was at the appropriate level. Accordingly, the Panel is satisfied there is no coverage for contents under the policy. 2.4 Are the complainants entitled to compensation for loss of rent? Policy covers loss of rent Page 41 of the Product Disclosure Statement (PDS), outlines the insurer will cover loss of rent if it agrees the tenants cannot live in the property or need to move out during repairs, with the only exclusion being if the complainants or the complainants’ family live in the home. There is no dispute the complainants were largely living overseas at the time of loss and the top floor of the building was occupied by tenants. What is in dispute is the reason the tenant vacated and if the policy responds to the complainants ’ claim for loss of rent. Vacating letter is inconclusive The complainants have provided a copy of the estate agent ’ s letter confirming the tenant is vacating dated 4 June 2019, which is over two months after the date of loss. The letter does not contain any information which shows the tenants were vacating due to any issues associated with the loss. The complainants provided a copy of the original tenancy agreement which shows the lease was for a period of 52 weeks from 28 May 2018 and ending o n 26 May 2019. Determination | Case number: 679915 Page 7 of 10 The Panel notes the date of the vacating letter is 4 June 2019, after the tenant’s lease expired. On balance, and without any evidence to the contrary, the Panel is satisfied the reason for the tenant vacating the property is unrelated to the claimed event. Call recording of loss of rent discussion unavailable The complainants say they were advised on multiple occasions during phone interactions, their loss of rent would be covered under the claim. The insurer says the calls in question did not record and the complainants have not suffered a financial prejudice because of the conversation around loss of rent. The phone interaction may be unavailable; however, the insurer has provided case notes of its interactions with the complainants. The first-time loss of rent is discussed was on 9 July 2019. The case notes reflect the insurer ’ s representative advised the complainants it needs a copy of the tenancy agreement and the rental ledger to cover loss of rent. Subsequent case notes refer to the insurer reviewing the loss of rent portion of the claim. At the time of the interaction, the complainants may not have been financially prejudiced because the tenants had already vacated which, on balance, was unrelated to the claimed loss. The Panel is not satisfied the interaction has caused the complainants to suffer prejudice. Insurer required to pay loss of rent The complainants say they have been unable to re-lease the property until works were completed as the entire property is only accessible by one driveway. The Panel accepts the upstairs property could be unliveable during the repair period due to the limited access to the property and the noise associated with construction works. However, there is no information the upstairs property is unliveable because of the claimed event and that it could not be leased in the time leading up to the repairs. Accordingly, the Panel is satisfied the complainants are entitled to be covered for loss of rent for the duration of repairs. The complainants’ builder has indicated a repair time of six weeks. Prior to the event the property was being leased for $925 per week . Accordingly, an award of $5,550 for six weeks loss of rent is fair in the circumstances. 2.5 Are the complainants entitled to compensation for non-financial loss? AFCA may award compensation for non-financial loss Non-financial loss includes claims for stress or inconvenience caused by an error of the financial firm. The maximum amount we can award for non-financial loss is $5,000 for each claim of loss. We will only award this type of compensation if there has been an unusual degree or extent of inconvenience. We will not award compensation for loss that complainants may incur because of pursuing a complaint. Determination | Case number: 679915 Page 8 of 10 Complainants entitled to $2,500 in compensation for non-financial loss There is no dispute the insurers level of service was not up to its expected level . It admitted to this in correspondence with the complaint. Due to the this, the insurer waived the excess on the claim. While this acceptance by the insurer is welcomed, the Panel feels it is prudent to highlight the following to explain how it came to the decision to award compensation. On review of the supplied case notes, it is clear on many instances the only reason action was taken on the claim was when the complainants initiated contact with the insurer. The Panel has noted the insurer failed to keep the complainants informed every 20 business days, during the life of the claim as required under section 7.13 of the General Insurance Code of Practice. Considered in conjunction with the insurer ’ s decision to recommend a cash settlement off an incomplete quote, the Panel is satisfied these actions have caused considerable stress, inconvenience and has significantly and unnecessarily delayed the claim. In the circumstances, the Panel is satisfied an award of $2,500, is warranted. Determination | Case number: 679915 Page 9 of 10 3 Supporting information 3.1 Relevant policy wording Record Key points Product Di sclosure Statement (PDS) Page 41 DD Month YYYY Loss of rent for landlords Buildings Insurance If a listed event causes loss or damage to your home and we agree your tenants can’t live in it and need to move out so it can be repaired or rebuilt. Covered under Buildings Insurance  the rent you lose during the reasonable time it should take to repair or rebuild your home, for up to 12 months from when the listed event took place. We pay this benefit on top of your Buildings sum insured. Not covered  if you or your family live in your home. 3.2 Expert reports Record Key points Complainants ’ Expert Report (AD) 23 March 2020  Photos 9 - 13 show phot os downstairs particularly of the north western corner. The windows in this area are twisted, the northern wall has been pushed out to approximately 25mm, and the ent ry door has twisted.  This area is exposed to the hot nort hern sun and has no co ntrol joints in it. As a result the expansion and construction of the single brick wall together with the heavy loads from the house has caused the wall to move. This pos sibly coupled with footings which were too small, water damage from overflow of the downstairs flooding the area and causing softness in the footings.  The hot sun expanding the single brick wall, the heavy loads from the house, have all contributed to stru ctural stress. This now is exacerbated becaus e the overhead kitchen floor in its settlement is causing more load on North West corner. Determination | Case number: 679915 Page 10 of 10 3.3 Other relevant information considered  HC scope of works  insurers scope of works  claim notes  vacating letter  certificate of insurance.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.