Home / Suncorp Group / Determination 679595
Determination 679595
Incomplete and defective storm repairs and cash settlement amount
Summary
A homeowner disputed the insurer's storm claim, saying the insurer's builder left repairs incomplete and defective and the settlement was too low. AFCA ordered the insurer to pay $39,974.84 plus interest, $2,500 non-financial loss and the expert report cost.
The insurer must repair or pay the cost of repairing the storm-damaged parts to an acceptable standard under the policy, and it is responsible for its builder's defective work.
Issues
- Repairs or contractors primary · upheld“The insurer should make further contributions towards incomplete repairs and rectification of inadequate repairs by its builder.”
- Claim amount dispute secondary · upheld“The complainant's quote was preferred for several rooms and the insurer is required to increase its settlement amount.”
- Third-party or outsourcing failure secondary · upheld“The insurer's builder DK did not follow the scope of works, including gap sealing and painting.”
- Unfounded fraud allegation secondary · upheld“The insurer's assessor made serious allegations which upset the complainant; the insurer retracted and apologised.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 679595
Financial firm AAI Limited
Determination | Case number: 679595 Page 2 of 13
Case number: 679595 26 July 2021
1 Determination overview
1.1 Complaint
On 10 January 2019, the complainant lodged a claim under his home insurance policy for
damage to his building and contents caused by a storm.
The insurer accepted the claim and authorised repairs. However, the complainant says there
are incomplete repairs and rectificat ion required for some of the insurer’s repairs. He seeks a
cash settlement for this.
The insurer disputes this.
1.2 Issues and key findings
Should the insurer contribute further towards the claim?
The insurer should make further contributions towards incomplete repairs and rectification of
inadequate repairs as detailed in section 2.1.
Is the complainant entitled to compensation?
The insurer should pay $2,500 in non-financial loss. This is because the complainant suffered
an unusual degree of stress and inconvenience during the claims handling. The insurer
should also pay W’s report cost if it has not done so already.
1.3 Determination
This determination is mostly in favour of the complainant.
The insurer should settle the claim by paying the amounts set out in section 2.1. The insurer
should also pay $2,500 in non-financial loss and reimburse W’s report cost (if it has not done
so already).
The insurer should pay all outstanding amounts within 21 days of being notified the
complainant accepts this determination.
Determination | Case number: 679595 Page 3 of 13
2 Reasons for determination
2.1 Should the insurer contribute further towards the claim?
Parties disagree on scope of works and acceptable standard of repair
The complainant’s policy covers the insured property for loss or damage caused by an
insured event. Storm is an insured event. The complainant’s policy also includes the option
for accidental damage. This is considered an insured event.
The policy also defines an insured event to be:
… is always a single event, accident or occurrence which you did not intend or
expect to happen
There is no dispute the complainant’s home was damaged by a storm. During the storm,
parts of the roof were ripped off allowing water to enter multiple areas of the home.
The insurer accepted the claim and authorised repairs. The repairs were based on the scope
of works (SOW) provided by the insurer’s builder DK. This had been subject to several
variations.
The dispute is about the incomplete and poor repairs completed by DK. The complainant
says DK has not completed repairs as detailed in the SOW. The complainant also says other
areas have been damaged that have not been repaired or accepted.
The insurer does not accept all the damage claimed was caused by the storm or that DK’s
repairs were of an unacceptable standard.
Complainant obtained an expert report and revised repair quote
The complainant provided a report from a building consultant (W).
The complainant seeks to rely on W’s findings to support his claim as well as an amended
repair quote provided by TC for $75,104 reflective of W’s findings. I have taken this to be the
extent of his claim that he seeks compensation for regarding this insurance claim.
In his opening statements, W noted DK’s SOW referred to ‘gap seal’ and ‘remove and
replace’ . W says these methods were not used as specified. He also comments on the poor
quality and incomplete repairs throughout the home.
The insurer provided a report from its assessor to comment on W’s report . The insurer has
also relied on other evidence submitted.
Noting W has addressed the issues in each room individually, I have proceeded on a similar
basis.
Lounge Room
W identifies gaps between architraves and wall linings. He also says the window architraves
have been fixed over a short length of timber moulding. Tops of architraves and a door jamb
have not been painted.
The insurer’s assessor says the home suffers from inherent issues with gaps that were pre-
existing the storm. The insurer and the assessor do not accept it was required to rectify these.
The assessor does not comment on the specific issues about the short length of timber
moulding. The assessor says the painting has been at industry standard.
Determination | Case number: 679595 Page 4 of 13
The complainant correctly points out that the insurer’s scope of works was to gap seal. If this
has not been done, then the SOW was not followed. I also note the SOW for this room
included stripping and replacing wall linings, ceiling linings and cornices. It is difficult to accept
that good workmanship was to replace linings but leave pre-existing gaps in the room.
Regarding the painting, there are clearly areas that have been missed. This has been
supported by photos. The insurer has not provided a reason as to why this has remained
incomplete.
Therefore, I accept the complainant’s position for the lounge room.
Living Room
W notes gaps between the architraves and wall linings. W says the tops of architraves have
not been painted and there are imperfections in the painting around the power points.
According to W, the fitting of the new skirting was so poor, the complainant engaged another
tradesman to rectify the repair. An image of the poor repair has been provided by the
complainant.
The insurer says the painting was at standard. It has referred to its previous submissions
about the gaps. For reasons expressed in the lounge room, I am not persuaded by the
insurer’s argument about the gaps.
For the painting, it is clear the door jamb was not painted. This does not support the insurer’s
position that the painting was completed at industry standards. The photos of the poor skirting
also supports the complainant’s position about the qualit y of works.
Therefore, I accept the complainant’s position on this.
Kitchen
W says the storm caused a crack in the wall lining. The SOW says, ‘remove and replace
2sqm wall plaster’. W says this repair did not happen. W also says the wall lining immediately
adjacent to the light switch has been poorly prepared and left with visible defects.
DK says two visible set marks suggest repairs have been completed. The insurer says the
works are satisfactory and to trade standard. However, the insurer has offered an allowance
for further repairs.
An image provided by the complainant shows two marks which do not appear to cover 2sqm.
Although the image is not clear, it supports the complainant’s position. W also supports the
complainant’s position. Therefore, I am not satisfied the repair to the wall sheeting is
reasonable.
For the wall lining around the light switch, the insurer maintains the painting was to standard.
However, there have been several examples in other rooms where this has not been the
case. The compl ainant’s position is supported by an independent expert. I prefer his position.
The insurer offered $350 in resolution of this. The complainant has provided a quote from TC
to rectify all these works. This is based on W’s scope of works.
I accept the complainant’s position. This is because W’s scope of works reflects the works
necessary to rectify this room. The insurer is liable for the costs sought.
Kitchen pantry
W notes there is a soft patch of plaster on the pantry wall. W says this is water damage
caused by the storm. He says the adjoining room (bedroom 1) was water damaged and
Determination | Case number: 679595 Page 5 of 13
required replacement of all wall and ceiling linings. W says new wall sheeting, cornice and
skirting is therefore required in this area.
The insurer says this damage is not related to the storm event but rather, is the result of the
complainant’s attempt to remove shelving.
The complainant says removing a shelf would leave a hole, not a bubble in the plaster. The
complainant also notes this damage would not have been evident to assessors as it was low
down and the shelving would have overshadowed it.
An image provided by the complainant and in W’s report shows the bubble. I agree a bubble
is not consistent with damage from removing shelving. It is more consistent with water
damage. The complainant and W also note the adjoining room was storm damaged and all
the wall and ceiling linings were replaced. This further reinforces the complainant’s position
that this is storm damage.
Given all this, I prefer the compla inant’s position. The insurer is liable for this.
Bedroom 1 (Bedroom 2 and Boys’ room)
W reports an object is protruding through the southern wall of this room. He also notes the
floating timber flooring has lifted due to a leaking air-conditioner.
The insurer says the leaking air-conditioner is a new event. The complainant disagrees. The
complainant says the insurer has agreed to replace the air-conditioner as part of the storm.
Therefore, he says the flooring damage is part of the claim.
For the object p rotruding through the southern wall, the insurer’s assessor said this is new
and has not been raised previously. The complainant says he never raised this issue due to a
breakdown in the relationship with the assessor.
It is not clear what has caused this protrusion, or why it could be associated with the claim or
the repairs. The evidence does not show this was raised contemporaneous to the repairs. W
does not explain how this object could have been caused by the insurer’s repairs or the claim.
Therefore, I do not accept the complainant’s position on this.
For the air- conditioner, I accept the complainant’s position. The insurer has not disputed that
it agreed to replace the air-conditioner under this claim. If it accepts the air-conditioner was
damaged by the storm, then the resultant damage to the floor would flow from this. The
flooring should be accepted as part of this claim.
T has allowed $2,620 for this room. This has not been broken down between the repairs to
the wall and the floor. In the interest of finalising this matter, and noting there were two main
items within this area in dispute, I consider it fair to allow half of this cost.
Bedroom 2 and Store (Bedroom 4 and Store)
W says the roof over these rooms was blown off in the storm and considerable amounts of
water entered. He comments that DK’s SOW was limited to repairing a crack under the
window and painting the walls and ceiling.
W says the crack was not repaired but just painted over. The walls and ceiling were poorly
prepared for painting and there are imperfections throughout.
W says extensive repairs are required to restore this room. This includes the replacement of a
built-in wardrobe.
Determination | Case number: 679595 Page 6 of 13
The complainant says water entered this room many times between the storm event and
completion of the roof repairs. Images of further water damage and evidence of poor repairs
have been provided in support.
The insurer says painting of this room was completed and work was of accepted trade
standard. The insurer has offered replacement of the wardrobe and a small job allowance for
the room. This totalled $4,030.50 exclusive of builder’s margin , GST and contingency.
Having reviewed the photos, there appears to be evidence supporting the painting is poor. It
is not clear why the linings were not replaced in this room given the water entry and the fact
this part of the roof was blown off.
Given all this, I prefer W’s evidence about the reasonable scope of works required for this
room. TC has quoted $18,385. There is nothing to suggest this is unreasonable for W’s
recommenced scope of works. This should be allowed.
Sunroom
W says repairs in this room are poor and repainting of the walls and ceilings has not been
completed to a sufficient standard. W also said it is possible the storm weakened the wall and
ceiling frame. If this is the case, the linings need to be removed and the frame strengthened.
The insurer says DK completed all accepted repairs and painting, and all work was of an
accepted trade standard. However, an amount of $1,264 (exclusive of GST, build er’s margin
and contingency) has been included in the insurer’s cash settlement offer.
W does not explain why he believes the wall and ceiling frame in this room could have been
weakened by the storm. The insurer’s engineer, DW, did not say further investigation was
necessary when inspecting the home more contemporaneous to the event.
I am therefore not persuaded by W’s evidence that the linings need to be removed and the
frame inspected.
Given this, I do not accept W’s scope of works is reasonable. Instead, I consider the insurer’s
offer in this case is reasonable. When adding builder’s margin, GST and the 15%
contingency, the sum payable for this room should be $1,790.84.
Laundry
W said there are gaps in the seals that were not covered. This resulted in dust which has
stained the walls. W said the gaps should be filled and the walls, ceilings, architraves,
skirtings and timber mouldings should be repainted.
The insurer maintains its position about the gap seals. However, for reasons explained, I am
not persuaded by this. The gaps should have been sealed to this room. Otherwise, this would
mean the insurer’s works would not be warrantable or have any longevity. This cannot be a
reasonable outcome for claim related repairs authorised by the insurer.
The insurer should therefore pay the amount of TC ’s quote ($2,280) for this room.
Bathroom
DK’s SOW for this room included the following:
the partial strip and replacement of wall linings on the northern wall (adjoining the
sunroom)
stripping and replacement of the linings on the western wall
replacement of ceiling linings
replacement of a full width wall mirror
Determination | Case number: 679595 Page 7 of 13
vanity to be removed and reinstalled on completion of the works
repainting of all walls and ceiling linings.
This was later cash settled. This is because DK said they could not warrant the works as the
ceiling’s height was below current standards. The amount allowed was $7,733.88.
W said this was an excuse. W says the bathroom is not a habitable room and as such, can
have a ceiling height of 2.1 metres. W said DK simply reneged on the works.
I do not accept W’s evidence on this. DK said the bathroom height was between 2,020mm
and 2,040mm. This was confirmed by the insurer’s building co - ordinator. The insurer’s
building co-ordinator also provided an extract of the relevant code to show this height was
below the standard for a non-habitable room. W does not comment on this applicable code or
refute the measurements are correct.
Therefore, I accept the insurer’s decision to cash settle the bath room was fair and
reasonable. The available information shows the bathroom has likely not been built to the
relevant code. This could arise in complications in the repairs that the insurer cannot warrant.
Whilst I note the complainant says he has found builders to do the works, this does not mean
the insurer’s position is unreasonable. It is also not clear if the complainant’s builders are
aware that the ceiling’s height is below current standards.
W also says the scope of repairs are inadequate. W noted the bathroom is adjacent to
bedroom 2 and store. These bore the brunt of the storm. W noted it is quite possible that, in
the future, there will be deterioration to wall linings, electrical fittings, mirror, the timber vanity
unit and the wall mounted exhaust fan. W also says the ceramic tiles may, as a result of water
inundation, become drummy and need to be removed along with the toilet. W recommended
complete gutting of the bathroom except for the fibreglass shower/bath enclosure.
I am not persuaded by W’s evidence. DK’s SOW was verified by an assessor. It was based
on contemporaneous inspections. W does not provide say these additional areas have
damage. W only says it is possible these would suffer damage in future. However, given W
inspected the area more than 18 months after the event, it would be expected such damage
would have manifested by now. W does not report that it has.
Therefore, I do not accept W’s evidence shows DK’s SOW was inadequate.
The complainant says the vanity cannot be reinstalled once works begin. This has not been
commented on by the insurer. It seems realistically possible this is the case. The
complainant’s quote includes $1,400 for replacement of the vanity. The insurer has not
challenged this amount. I also note it is an increase of about 18% of the insurer’s cash
settlement offer. This would reflect a fair contingency for this risk.
Transportable building
In his report, W says the decision to cash settle this aspect of the claim due to the pitch of the
roof is an excuse. W says these buildings are not subject to any code restrictions, council
approval or inspections. He also says the SOW is inadequate.
Further, W says the roof leaked and caused further damage. This means the roof requires
repairs.
W does not report on the cause of the leak nor does he link the leak to the insured event.
Instead, he recommends the roof be repaired, flashings and the internal ceiling be replaced,
and all walls and the ceiling painted.
The insurer says the accepted works are more than adequate. The insurer explains its
decision to offer a cash settlement is based on the building’s roof pitch of 2 degrees being
less than the manufacturer’s recommendation of 5 degrees.
Determination | Case number: 679595 Page 8 of 13
I consider the decision to cash settle correct . W does not refute the insurer’s position that the
manufacturer of the roof sheets recommends a pitch of 5 degrees. W’s report does not
discuss the reason the roof is leaking. The insurer’s experts did not find evidence the roof
was damaged by the repairs. It is therefore not clear the additional damage that has occurred
was linked to the storm or pre-existing issues.
Given this, I do not accept the insurer is required to provide any allowance for this beyond
what it has already agreed to.
Sheds
W refers to two corrugated iron sheds located to the west of the house. W says both were
damaged by flying debris during the storm.
The complainant provided images of the damage and TC included a costing in his quote. The
insurer says the dents appear to be old, the iron is in poor condition and it is impossible to
verify if the damage is related to the incident.
The complainant says he had not claimed these initially because he thought these would be
covered by his farm policy. He later discovered this was incorrect. He also notes a building
nearby was substantively affected by the storm. It therefore seems likely this damage was
from the storm, either from debris of that building or otherwise.
The PDS describes what is covered as part of the home. Sheds and outbuildings are
considered part of the home. The insurer has not made any submission to say these are not
covered by the policy as part of the building.
I consider it likely these were damaged by the storm. It is supported by W. The complainant’s
explanation as to why these were not included earlier is reasonable. The damage appears
consistent with debris from a storm. It is fair in all the circumstances to allow TC ’s c osting of
$2,070.
Windows and one door
TC ’s quote includes $4,019 for this. W’s report makes no mention of this item.
The insurer has allowed $1,100 (exclusive of builder’s margin, GST and contingency). When
these factors are included, the amount allowed is $1,558.48.
I prefer the complainant’s quote. This is because it is actionable and there is no dispute it is
based on the same scope of works.
The insurer is required to increase its settlement amount
After careful consideration of all the available information, I consider it is fair in all the
circumstances that the insurer pays $39,974.84 plus interest in full and final settlement of this
claim. This is based on the following:
Items TC’s quote Decision
Lounge room (Bed 1) $2,300.00 $2,300.00
Living room (lounge) $450.00 $450.00
Kitchen $3,870.00 $3,870.00
Pantry $2,100.00 $2,100.00
Bed 1 (Bed 2 Boys bedroom) $2,620.00 $1,310.00
Bed 2 & Store (Bed 4 & Store) $18,385.00 $18,385.00
Determination | Case number: 679595 Page 9 of 13
Sunroom $8,200.00 $1,790.84
Laundry (Bed 3, laundry/bathroom) $2,280.00 $2,280.00
Bathroom $22,650.00
$1,400.00 (on top of
insurer’s cash
settlement offer
Transportable building $6,160.00 $0.00
Corrugated Iron shed (adjacent to house
fence) $720.00 $720.00
Corrugated Iron shed (west of house) $1,350.00 $1,350.00
Reglaze 3 windows and 1 door $4,019.00 $4,019.00
TOTALS $75,104.00 $39,974.84
Interest is to be calculated pursuant to section 57 of the Insurance Contracts Act 1984.
Interest applies from 8 March 2021, being 30 days after TC issued his latest quotation, until
payment is made. I consider it fair to apply interest in this way given most of the costs has
been based on TC ’s quote.
2.2 Is the complainant entitled to compensation?
Compensation is awarded conservatively
Under the AFCA Rules, we may award compensation (capped at $5,000) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
Insurer should pay $2,500 in non-financial loss
The complainant expressed his dissatisfaction with the way the insurer handled his claim,
specifically regarding:
ongoing issues with the builder not following the scope of works
delays in responding to repair issues
unsupported allegations made by the insurer’s assessor suggesting the complainant was
attempting defraud the insurer
the ultimate breakdown of the relationship between the parties.
The available information shows there were issues with the insurer’s repairs. This has clearly
caused an unusual amount of stress and inconvenience. I also note the insurer’s assessor did
make serious allegations which clearly upset the complainant. Whilst the insurer has
mitigated this to a degree by retracting these allegations and apologising for the comments,
some form of compensation should be included for this.
I do not accept all of the issues have been caused by the insurer. There were items that the
complainant had included later on that had not initially been brought to the assessor’s
Determination | Case number: 679595 Page 10 of 13
attention. The issues were complicated by the complainant undertaking his own works. The
insurer did attempt to engage regularly in this process.
Given all this, and considering our conservative approach, it is fair in all the circumstances for
the insurer to pay $2,500 in non-financial loss.
Insurer should reimburse W’s report costs
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant in the course of a complaint. These costs can be awarded if the
complainant needed an expert to understand or establish their claim. These costs are
normally capped at $5,000 unless exceptional circumstances apply.
The complainant provided W’s invoice of $3,300. This has been forwarded to the insurer. It is
not clear if the insurer has paid this cost. If not, the insurer should pay the invoice because I
accept this report was necessary and assisted the complainant’s claim.
Determination | Case number: 679595 Page 11 of 13
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy wording
PDS, Pg. 87
We choose how we settle home claims
If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will:
- repair damage to your home;
- rebuild your home;
- pay you what it would cost us to repair or rebuild your home;
If we repair (or pay you what it would cost us to repair), we will at our option do so on a ‘new
for old’ basis or to a similar condition to what your home was in before the loss or damage
occurred.
We will not:
- pay extra to replace your home or contents to a better standard, specification or
quality than it was before the loss or damage occurred
Determination | Case number: 679595 Page 12 of 13
Pg. 89
Repairing or rebuilding damaged parts
We will only repair or rebuild the parts that are damaged in the incident covered by your
policy. You cannot claim to replace undamaged parts of your home to create a uniform
appearance ...
3.3 Expert reports
Record Key points
Insurer assessment reports
Dated 31 July 2020
Notes of 3 June 2020
12 November 2020
Transportable building roof was found to be pitched at
2 degrees and manufacturers recommendation ...5
degrees
Unable to warrant repairs to the Transportable
building as the roof pitch is under 2 degrees and will
continue to leak.
Gap sealing has been addressed multiple times
All accepted work has been completed to trade
standard
the home suffers inherent issues with gaps from age/
wear and tear
Painting defects to home... quality and finish is
acceptable
Insurer Assessor’s Building
Consultant Report
10 March 2020
Complainant expert report
(W)
14 October 2020
DK noted they are unable to warrant the repairs to the
bathroom due to the ceiling being under height and
does not meet .... NCC - Building Code of Australia.
Measurements taken .... confirm the height ... to be
less than the NCC - BCA...
The extent of the damage ... does not warrant the full
replacement of the bathroom..
...bathroom scope of works provided by DCB is over
scoped, it does not reflect repair requirements only
from the insured event...
Glazing ....it is dif ficult to support the theory dust and
sand have caused instances of pitting, however it
cannot be disregarded.
Scope of Works.. uses expressions like ‘gap seal’ and ‘
remove and replace’. The insured has taken this to
mean the method of repair, but the method was not to
gap seal. These items need to be done as specified...
Determination | Case number: 679595 Page 13 of 13
Record Key points
... in rooms that have been repaired, there are gaps
between architraves and wall linings...
Bathroom is not a habitable room .... in accordance
with the NCC, can have a height of 2100 mm.
... the repairs in the DK scope are inadequate .... I
recommend complete gutting of the bathroom...
3.4 Other relevant material considered and relied on
• Parties’ submissions/emails and all attachments to all submissions/emails.
• Assessment reports and claim notes
• Insurer’s Product Disclosure Statement
• Photographs, invoices and quotations.
• Correspondence between the parties
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.