Home / Suncorp Group / Determination 679543

Determination 679543

Leaking pipe damage; scope of repairs and earth movement exclusion

FirmSuncorp Group
Decided2020-07-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed under their home policy for damage from a leaking pipe, and the insurer accepted part of the claim but disputed the wall and footing repairs. AFCA applied the earth movement exclusion to the western wall and footings, but ordered a new scope, cash settlement of 50% of the northern wall and internal repairs plus a 15% uplift, and report cost reimbursement with interest.

The panel preferred the structural engineer's floor-level survey, which attributed most of the wall and footing movement to earth movement from clay shrinkage rather than the leaking pipe.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interestreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 679543 Financial firm AAI Limited Determination | Case number: 679543 Page 2 of 9 Case number: 679543 30 June 2020 1 Determination overview 1.1 Complaint The complaint relates to a claim made by the complainants in November 2018, under their Home and Contents Building Insurance policy held with the financial firm (insurer), regarding damage at the insured property caused by a leaking pipe. The claim has been accepted by the insurer, but a dispute continues as to the extent of the insurer’s obligations to the complainant s under the terms and conditions of the policy and in in regard to the claim. 1.2 Issues and key findings What is the extent of the insurer’s obligation to the complainants under the terms of the policy and in regard to the claim? The insurer is to:  arrange a new scope of works for the internal damage at the property in accordance with the terms of this determination  the insurer is to obtain an actionable quotation based upon the scope of works for the internal damage at the property  the insurer is to obtain an actionable quotation to establish 50% of the cost to repair the northern external wall at the property  the insurer is to cash settle the complainant based upon the actionable quotation for the internal damage and the actionable quotation for the cost to repair 50% of the northern external wall. To these amounts, the insurer is to add a 15% uplift to account for the transfer of risk of the repairs to the complainants. The insurer is to reimburse the complainants for the costs they incurred in obtaining the engineering report from B and the building report from W. The complainants are to provide invoices and receipts detailing the cost of those two reports. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is to meet its obligations to the complainants in accordance with this determination. Determination | Case number: 679543 Page 3 of 9 2 Reasons for determination This complaint has been the subject of a preliminary assessment issued by the authority on 18 May 2020. The complainants have not accepted the preliminary assessment. This determination is made by a panel consisting of the Ombudsman together with a consumer representative who has extensive experience in consumer claims and an industry representative who has extensive experience in the insurance industry. The complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions where applicable. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered. Within their post preliminary assessment submissions, the complainants say that the preliminary assessment made no reference to several issues raised and reports that they have provided. The complainants also say that the conciliation was cut short and they did not have the opportunity to get across all their submissions. Whilst the panel acknowledges that it is unfortunate that the conciliation was cut short, the panel is satisfied that both parties have had ample opportunity to make submissions, which both parties have done. The panel wishes to emphasize that all the exchanged material has been considered. However, the various submissions of the parties run to literally thousands of pages. All those submissions and all the material have been exchanged between the parties and considered by the panel. The panel does not regard it as either relevant or helpful to restate all the submissions and all the material which has been exchanged. The panel, after considering all the exchange material, will focus upon that material which the panel considers relevant to the outcome. Further, whilst the complainants say that they have presented material which challenges the conclusions reached by the insurer and its various representatives, the panel’s task is to determine what evidence it prefers based upo n that evidence and having regard to all the other submissions and material provided. Determination | Case number: 679543 Page 4 of 9 Ultimately, the panel will decide on the balance of probabilities (what is most likely) and do what it considers fair in all the circumstances. 2.1 What is the extent of the insurer’s obligation to the complainant s under the terms of the policy and in regard to the claim? The complainants ’ claim relates to damage at the insured property caused by a leaking pipe. Whilst the insurer has accepted the claim, it says that some of the damage is excluded from coverage under the terms and conditions of the policy. The insurer has accepted 100% of the internal damage and 50% of the cost to repair the northern wall. Coverage of the policy The complainants ’ Home and Contents Insurance policy provides coverage in the event of loss and damage at the insured address caused by an insured event listed within the policy documentation. Details of the policy are contained within the Product Disclosure Statement (PDS). The PDS details: The coverage provided by the policy is subject to conditions and exclusions which are also contained within the PDS. Determination | Case number: 679543 Page 5 of 9 The PDS details: … It is accepted insurance law that the complainants carry the onus to establish a loss which is covered by the policy. The insurer has accepted the claim. The insurer seeks to rely upon exclusions within the policy to limit its liability to the complainants in relation to the claim. The insurer carries the onus to establish the application of an exclusion to deny or limit its obligation to the complainants. Internal damage at the home The insurer has accepted the internal damage to the home. Whilst there was initially some issue raised in relation to repairs in the kitchen, the panel understands that the insurer has accepted these repairs. The panel notes that the complainants say that the kitchen cupboards and benchtops have moved and the insurer should be liable for repairs. The panel agrees with the complainants ’ submission. However, the panel is of the view that there is insufficient information to reach a conclusion as to the extent of the insurer’s obligations to the complainant s in relation to the internal damage, i ncluding the kitchen. The insurer is to obtain a further scope of works and an up to date actionable quotation based upon that further scope of works. The insurer is then required to cash settle the complainants for the amount of the actionable quotation, plus a 15% uplift to account for the transfer of risk of repairs from the insurer to the complainants. Determination | Case number: 679543 Page 6 of 9 Payment of this cash settlement amount will final ise the insurer’s obligations to the complainants in relation to the internal repairs. The parties are asked to work together to finalise this aspect of the claim. If the parties are unable to reach agreement regarding this aspect of the claim, then the parties are entitled to come back to the authority for further determination as to the amount payable by the insurer regarding the internal repairs. Repairs to the northern and western walls The parties have made numerous submissions and provided numerous reports regarding the damage which is said to have been caused by the leaking pipe. As previously stated, the panel wishes to emphasize that all the submissions and all the reports have been considered. It is fair to say that several reports reach completely different conclusions regarding the cause of the damage. In those circumstances, it is necessary for the panel to make a finding on the balance of probabilities as to which conclusion the panel prefers, that is, which conclusion in the panel’s opinion is more likely to have been the cause of the damage. The insurer has offered to pay 50% of the cost to repair the northern wall but has declined the claim for the western wall. The complainants say that the insurer should meet the cost of repairs to both walls and the stabilisation of the footings. The complainants support their position with several reports. The complainants have provided a report from a structural engineer B, who concludes: The defects noted to the north side and north side of the residence at (address), has been caused by a leaking pipe which saturated the north side of the sub floor and cause the clay soil to swell with resultant heaving of the footings in the affected area. B also says that this is consistent with the internal damage and it is unlikely the trees have had any effect on the soil moisture. The insurer engaged an engineer S to determine the cause of the damage at the insured property. The panel notes of significance that S conducted a floor le vel survey which found that the property had subsided in the northwest corner of the house by 66mm. B did not survey the floor levels. Determination | Case number: 679543 Page 7 of 9 Further, the panel notes the photograph of the cracking in the external wall, which forms part of a pre-purchase property inspection report. Based on that photograph, the panel is satisfied that there were already forces in play well prior to the leaking water pipe event. S concluded that:  The general slope in the floor to the low area at the north west corner of the building is indicative of gradual settlement caused by long term drying out (shrinkage) of the natural clay at the unprotected/exposed northern and western sides of the property, exacerbated by nearby trees.  The escape of water on the northern elevation of bedroom one and under bedroom one ensuite has caused localised expansion of the natural clay in this area that has resulted in uplift of the footings and raised floor levels in the middle of the northern side of the building around bedroom two and three and the door entrance to bedroom one.  The recent dry period in (P) would have resulted in further shrinkage of the natural clay at the front north west corner. This dry period has probably resulted in additional settlement at the north west corner since the February 2017 building inspection that would have contributed to some of the internal cracking and sticking doors. It is, however, possible that any additional drying out settlement may only have resulted in slight additional cracking and distortion in the doors and it was the uplift of the footings caused by the escape of water event that resulted in the noticeable internal cracking and sticking doors.  On that basis it would therefore be reasonable to attribute 100% of the cost of the adjustment of doors and crack repairs in affected rooms to the escape of water event with the proviso that it would not be possible to relevel floors and doors due to the global fall in the building towards the north west corner that was not caused by the escape of water event. For clarification the affected rooms are Bedroom 1 including ensuite, Bedroom 2, Bedroom 3, bathroom, front hall, family room and rear hall.  Based on the recent dry period and very dry conditions at the front of the building it is our opinion that the outward movement of the brick substructure of the western wall was caused by differential shrinkage of the natural clay across the width of the footing i.e. clay at the front of the substructure is significantly drier that the clay in the subfloor that has resulted in rotation of the footings and the lateral movement of the substructure at damp proof course level. Note that the damp proof course would act as a slip plane between the lower brick substructure and the upper brick veneer.  It is possible that the continued escape of water under the ensuite of bedroom 1 has maintained the moisture in the sub-floor under bedroom 1 by not allowing the ground to dry out as much as the ground in front of the western elevation and therefore exacerbated the lateral movement of the brick substructure on the front western elevation. Note, however, that the primary cause of the movement of the Determination | Case number: 679543 Page 8 of 9 brick substructure was due to drying out shrinkage of the natural clay and not due to the escape of water event i.e. 100% of the outward movement of the brick substructure on the front western elevation is attributed to the drying out shrinkage at the front of the house.  The vertical cracking on the northern elevation has been caused by a combination of lateral movement of the brick veneer along the northern elevation caused by the aforementioned lateral movement of the brick substructure on the front western elevation and the slight uplift of the footings under the external northern wall of bedroom 2 and 3 caused by the escape of wate r event. Note that the absence of articulation joints on the brick veneer has exacerbated the vertical cracking.  It is our opinion that 50% of the cost to repair the vertical cracking on the northern elevation can be attributed to the escape of water event. The complainants seek to challenge several conclusions within the S report. In particular:  By way of capillary action, the moist clay soil would expand (effectively uphill) towards the wall. Having dealt with hundreds of flood and earth movement claims, the panel does not accept this submission from the complainants. Importantly, the complainants’ submission is not supported by expert opinion.  The panel does not regard the local Council’s statement that it is unaware of subsidence issues, as helpful. The statement is not supported by expert opinion and not specific to the complainants ’ property.  Having reviewed all the exchanged material, the panel is satisfied that the trees were at the most a minor contributing cause, rather than the proximate cause of the loss. Having reviewed all the exchanged material, the panel prefers the conclusions of S. The report is more persuasive, comprehensive and based upon a floor level survey, which in the panel’s view is critical to establish the impact of various factors on the home. Further the pre-purchase photo showing the crack in the wall establishes that there was already movement at the home, well prior to the leaking water pipe event. Having considered all the material, the panel is satisfied the insurer has established the application of its exclusion for earth movement, to deny or limit its obligations to the complainants under the terms of the policy. As a result, the insurer should obtain a scope of works and current actionable quotation to repair the northern wall, but not including the cost to stabilize the footings to the wall. The insurer is to cash settle the complainants 50% plus 15% uplift, of the cost to repair the wall. The insurer is not required to contribute to the cost of repairs to the western wall. Determination | Case number: 679543 Page 9 of 9 Additional matters The complainants incurred costs in obtaining reports. Given the complexity of the complaint, the panel is satisfied that it is fair that the insurer contributes to the cost of some of the reports. Upon provision of receipts or invoices by the complainant, the insurer is required to reimburse the cost of the reports from B and W. If the complainants have already paid for these reports the insurer is required to pay interest on the amounts, in accordance with the Insurance Contracts Act 1984 (the Act) from the dates the complainants paid the amounts, until the date the insurer reimburses the amounts. The insurer is not required to pay interest on the payments for repairs as the settlement is to be based upon a current actionable quotation.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.