Home / RACQ / Determination 678678
Determination 678678
Cyclone Debbie home, shed and chicken coop damage claim and repair quality
Summary
Homeowners disputed the insurer's Cyclone Debbie repairs and declined items. AFCA found the house repairs complete, ordered payment of $3,438 for a shed roller door and chicken coop roof sheet, and ordered a $4,718.45 refund of the building consultant's report with interest.
Pre-existing corrosion and wear and tear are excluded, so only unrepaired cyclone damage is payable, and unsatisfactory repairs made the consultant report reasonable to obtain.
Issues
- Claim denial primary · not upheld“The insurer declined the balance of the damage as pre-existing and caused by gradual deterioration and wear and tear”
- Repairs or contractors secondary · upheld“I am satisfied that the original works to the house were not completed in a satisfactory manner”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interest
Related
Text of the determination
Determination
Case number 678678
Financial firm RACQ Insurance Limited
Determination | Case number: 678678 Page 1 of 6
Case number: 678678 2 July 2021
1 Determination overview
1.1 Complaint
The complainants hold a Household Home & Contents Policy with the financial firm (insurer).
A claim was lodged following damage to the house caused by Cyclone Debbie.
The insurer accepted the claim, paid for damaged contents, and accepted some building
damage. The insurer’s bu ilder completed repairs. The insurer declined the balance of the
damage saying that it was pre-existing and caused by gradual deterioration and wear and
tear.
The complainants say that some of the repairs are of poor quality and further disagree with
the items declined by the insurer.
The complainants are represented by an advocate and in this determination, both the
complainants and the advocate are referred to as ‘the complainants’.
This matter has been the subject of a preliminary review which recommended the insurer pay
for some further damage. The complainants reject this, and the matter has been referred for
determination.
1.2 Issues and key findings
Is the insurer required to pay for further damage?
On the information provided to me, on balance, I am satisfied:
the insurer is not required to pay any further costs relating to the damage to the home
the insurer is liable for further costs relating to the shed for replacement for one roller door
in the sum of $2,615
the insurer says the damage to the chicken coup required one roofing sheet replaced at
approximately cost of $250. I believe that this offer is reasonable in the circumstances.
I am satisfied that the sum of $2,165 is fair and reasonable, however, on the basis that the
complainants will undertake to repair it themselves, the insurer is also to pay an uplift of 20%
to cover contingencies and loss of guarantee.
The insurer is to pay the complainants $3,438.
Is the insurer required to refund cost of M’s report?
I am satisfied that it was reasonable for the complainants to engage M to assess the damage
and repairs. The insurer is to refund the $4,718.45 paid for the report, and to pay interest
pursuant to section 27 of the Insurance Contracts Act 1984 (the Act), from the date paid by
the complainants until refunded.
Why is the outcome fair?
I am satisfied that the insurer has shown that there was no further damage as to the house
building which occurred in the Cyclone.
Determination | Case number: 678678 Page 2 of 6
I am satisfied further that the insurer has rectified all requirements in relation to the house
building.
In relation to the shed, I am satisfied that the only remaining damage was to one roller door
and that any other damage to the premises is a result of wear and tear which is excluded
under the policy.
I am satisfied that the offer by the insurer, in relation to the chook pen is correct.
In the circumstances, it is fair that the insurer makes the payments to rectify these issues and
that they also pay an uplift of 20% to cover contingencies and loss of guarantee.
1.3 Determination
This determination is partially in favour of the complainants.
The insurer is to pay the complainants the sum of $3,438.
The insurer is to refund the $4,718.45 paid for M’s report, together with interest pursuant to
section 27 the Act, from the date paid by the complainants until refunded.
Determination | Case number: 678678 Page 3 of 6
2 Reasons for determination
2.1 Is the insurer required to pay for further damage?
The current dispute is in relation to the ongoing dispute between the insurer and the
complainants in relation to the work and assessment of the property following Cyclone
Debbie.
The complainants held a Home & Contents policy with the insurer and lodged a claim for
damage to the home, chicken coup and shed following Cyclone Debbie.
The insurer accepted the claim, but a dispute has arisen over the completion of works and in
respect of damage to the shed and chook pen.
The insurer assessed the complaints by the complainants in relation to the work that had
been carried out on the home, and also in relation to outstanding matters in respect of the
shed. An offer was made on a without prejudice to any dispute and the insurer paid the
complainants $53,185.48 in relation to problems in respect of the home and $9,299.94 in
relation to the shed.
Expert reports
The insurer arranged for buildings consultants (S) to inspect the property and they provided a
report on 24 May 2017. I note that the complainants’ response to the preliminary view has not
raised anything further in relation to the building but only in relation to the shed and chicken
coup. Regarding that I have only dealt with the issues in relation to the shed and the chicken
coup.
S found in relation to the machinery shed as follows:
galvanised corrugated metal sheeting was extensively corroded to parts, predominantly to
lower ends of the roof sheeting of the enclosed section of the shed, and to the lower ends
and lapped joins of the open section of the shed
corrosion was significant in some areas and this had resulted in holes to the roof sheet
surface which would allow water to ingress to the interior areas of the shed
the holes in the roof sheeting caused by corrosion and remedial work to seal the lapped
joins pre-dates the Cyclone event. Therefore, I consider this to be a maintenance related
issue
the missing and deflected metal wall sheeting is consistent with dislodgement caused by
the intense wind pressure experienced during a cyclone event
the deflected metal wall sheeting and broken glass louvres is consistent with dislodgement
by intense wind pressure experienced during a cyclone event.
S provided a series of photos which show corroded sections of the roof sheeting together with
some remedial work which has been carried out and photographs inside the machinery shed
showing corrosion holes.
The complainants have referred to the building consultant (M) who inspected the premises on
13 November 2018 and provided a report dated 22 November 2018. M stated in respect of
the shed roof as follows:
pre-existing issues with corrosion
high wind lifting the leading edges resulted in permanent damage to roof sheet laps – has
also compromised the anti-capillary function of the roof sheets
Determination | Case number: 678678 Page 4 of 6
multiple fasteners have also lifted and are sitting proud of the roof sheet crest resulting
from the suctions and pressures associated with Cyclone Debbie
roller door on western side of shed has several indentations from impact of flying debris
and will need to be removed and replaced.
In respect of the chook pen, M stated:
chook pen has one roof sheet on western side damaged.
M provided photos showing pre-existing damage to the roof.
M concluded as follows:
The only way to rectify the damage to the shed is to replace roof entirely.
The insurer arranged for M’s report to be reviewed by (SB) a quality and technical assessor.
SB found:
no dispute some wind damage from the Cyclone. But shed had pre-existing issues that
have allowed for the wind to lift the sheets more
different metals causing corrosion
foot traffic dents
rust and corrosion
prior and incorrect fitting and screw/nail
M also provided a report in relation to the property following an inspection on 14 November
2018. M came to the conclusion:
it seems there are many deficiencies in the repairs that have been completed
there are also a number of areas of cyclone damage that was not included within the repair
scope
southern end of main shed, original scope of works, specified 20sqm of wall cladding was
to be removed and replaced where only two sheets approximately 1.2m long have been
replaced
internal areas of drilling and major issues being the preparation and finish of paint work
throughout all internal areas what appears to be one coat finish
some skirtings are of different colour shades
study, bedroom 2 and bedroom 3 walls are sheeted with chamfered butt join product which
have in the past been gapped and plastered which have in turn cracked along the butt join
bedrooms have Masonite sheeting and joins have expanded and should have been
replaced as per scope of works with variation, these joins have now further expanded
resulting in cracking to joins
kitchen ceiling has been removed and replaced with one ceiling sheet, cracked and will
need to be replaced
patio roof has been removed and replaced with existing roof batons being re-used with
additional new batons installed to meet current regulations
corrugated roof sheeting has been installed and the roof pitch of approximately 2 degrees
and does not meet manufacturer’s requirements
patio and car port roof timber roof batons are also required to be removed and replaced as
reusing the timber batons often results in splitting and compromising the overall strength of
the roof baton and is evident to patio and car port areas
eastern wall scope of works to remove and replace 21sqm of wall sheeting and although
hard to prove now the wall is painted, insured has advised that only 5.5sqm has been
replaced on the southern end.
Determination | Case number: 678678 Page 5 of 6
Insurer not required to pay any further amounts in relation to house
On the information provided to me, I am satisfied that the original works to the house were not
completed in a satisfactory manner.
The insurer has paid a further sum of $53,185.48 on 19 November 2018 in relation to further
repairs to the house.
On reviewing the expert reports, I am not satisfied that there are any further repair costs
which are not dealt with by this original payment.
The insurer is not required to make any further payments in relation to the house.
Insurer required to pay for further damage to shed
The dispute in relation to the shed is substantially with respect to whether the roofing should
be replaced.
I am satisfied that the information provided by S and further review carried out by SB of M’s
report shows on balance that the shed had pre-existing issues that had allowed the wind to lift
the sheeting more than one would have expected. I am satisfied that the roof, as shown by
the photographs, was in poor condition and I note that the insurer has provided information to
this date that the fitting and screw nails were poor and incorrect. I am not satisfied that the
roof requires replacement given that the damage occurred to the pre-existing gradual
deterioration wear and tear which is excluded under the policy.
I also note that the insurer has already paid the sum of $9,299.94 in relation to further work
required after repairs. This was paid on 19 November 2018.
I am, however, satisfied, on balance, that there was damage to one roller door. There were
dents to this door which I am satisfied most likely came about during the Cyclone. The
complainants have provided a quote for repair to the three roller doors in the sum of $7,845. I
am not satisfied that two of the doors suffered a damage in the Cyclone. The insurer is to pay
the sum of $2,865 being the sum for a single roller door. I accept that this sum was not
included in the amount of $9,299.94 paid on 19 November 2018.
I am not satisfied that there is any other works required to the shed which are covered under
the policy and are still a responsibility with the insurer.
Insurer to pay replacement of one roof sheet to chook pen
I note th at in SB’s report, they have noted that there was damage to one roof sheet. I accept
that this is the responsibility of the insurer on the information provided to me.
The insurer has suffered a sum of $250 in relation to this damage and it is fair and reasonable
that this amount be paid.
Insurer to pay 20% uplift
The insurer is to pay the cost of the replacement of one roller door in the sum of $2,615
together with $250 for the roof sheeting on the chicken coup. This is a total sum of $2,615.
The complaints are to pay an uplift of 20% on this sum to cover contingencies. The insurer is
to pay the total sum of $3,438.
Determination | Case number: 678678 Page 6 of 6
2.2 Is the insurer required to refund cost of M’s report?
Complainants seek cost of M’s report
The complainants seek the cost of M’s report.
AFCA will refund reports obtained by complainants where the report has been necessary and
has assisted in making a determination and are below the AFCA limit.
In the circumstances, I am satisfied that the report was required to assess the damage that
had occurred to the property and which had not been satisfactorily repaired. Had the insurer’s
repairers carried out satisfactory works, it would not have been necessary for the
complainants to obtain this report. Whilst the insurer has offered payments in relation to the
roller door and the sheet on the chicken coup that it was not covered in the initial repairs or in
the subsequent settlement.
The information provide d indicate that M’s report is in the sum of $4,718.45. The insurer is to
pay this sum together with interest pursuant to section 57 of the Insurance Contracts Act
1984 (the Act) from the date paid by the complainants until refunded by the insurer. The
complainants are to provide a copy of the proof and date of payment to the insurer.