Determination 678674

Storm damage claim: insurer limited liability to roof and ceiling damage and declined internal structural damage pending engineering assessment

FirmHollard
Decided2020-09-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$25,838
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A home insurance claim for storm damage was partly declined, with the insurer disputing structural roof frame and brick wall damage. AFCA found the storm caused ceiling and roof damage the insurer must pay, and allowed the insurer to have structural damage assessed by an engineer.

The insurer's own expert accepted storm causation for the ceilings and roof, so prejudice from the complainant's refusal did not justify refusal, but the insurer may assess the structural damage given its significance.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimreassess claim

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 678674 Financial firm The Hollard Insurance Company Pty Ltd Determination | Case number: 678674 Page 2 of 9 Case number: 678674 20 August 2020 1 Determination overview 1.1 Complaint The complaint relates to a claim by the complainant under his Home Insurance policy, held with the financial firm (insurer), arising from damage to the insured property, resulting from a storm that occurred on 14 March 2019. The insurer initially denied the claim then subsequently accepted the claim for roof repairs. The insurer continues to deny the claim for the internal damage. The complainant has refused to allow the insurer to have the balance of the claim assessed by an engineer as he says t he damage was assessed by the insurer’s assessors. The insurer says that it has been prejudiced. The complainant wants the insurer to accept the claim for all resulting damage. He says the actions of the insurer caused delays resulting in further damage and seeks non-financial loss. 1.2 Issues and key findings Is the insurer entitled to limit its liability? I am satisfied, on balance, the complainant has shown the insurer is liable for some internal damage. However, the insurer is entitled to deny the portion of the claim relating to the internal brick walls and roof frame, until the complainant agrees to an engineering assessment. Is the complainant entitled to non-financial loss? The complainant has not established an entitlement to non-financial loss, 1.3 Determination This determination is partially in favour of the complainant. The insurer is required to cash settle the complainant $25, 838.148, for repairs to the ceilings, cornices, roof tiles and insulation. If the complainant will allow the insurer to have the damage assessed by an engineer, the insurer is required to provide to the complainant with a panel of three independent engineers to assess the damage to the timber roof frame, doorways and brick walls. The complainant is to select one from that panel. The insurer is to engage the engineer and determine its obligations to the complainant under the terms of the policy. Determination | Case number: 678674 Page 3 of 9 2 Reasons for determination Circumstances of the loss As stated, the claim relates to damage to the property that resulted from a storm that occurred on 14 March 2019. On 21 August 2019, he insurer accepted the claim for damage to the roof. On 9 October 2019, the property was reinspected by the insurer’s assessor (JLG) and significant internal damage was identified in the laundry, master bedroom, hallway and kitchen. Due to the increase in scope, the insurer advised the complainant it intended to arrange an assessment by an engineer to comment on the cause of damage. On 30 November 2019, the complainant advised he did not want the property to be reassessed. He submitted a complaint with AFCA. The complainant submitted an engineer’s report (from PP) to the insurer, dated 16 March 2020. The complainant initially sought for the insurer to accept the claim for damage to the ceilings. Subsequently , the complainant’s engineer identified significant damage to the roof and internal brick walls, doorways and cornices. The complainant says the actions of the insurer caused delays resulting in further damage and the development of mould. The insurer main tains it is entitled to assess the damage and the complainant’s refusal to allow the insurer’s engineer to attend the property has prejudiced the insurer’s investigation of the claim. Complainant established a valid claim The complainant is required to show, on the balance of probabilities, he suffered a loss caused by a risk insured against under the policy. This is known as a valid claim. The complainant’s policy provides cover for insured events, subject to conditions and exclusions. The policy will only cover the damage if caused by one of the insured events. Insured events include storm and rainwater. I am satisfied that the storm caused damage to the roof and the insurer has accepted this aspect of the claim. What is in dispute is whether the storm damaged the roof frame in addition to internal wall, cornices, doorways and ceilings Ceilings damaged by storm The complainant says a storm on 14 March 2019 caused water to ingress the roof, penetrating the horsehair ceilings which once damp, collapsed and sagged. The Determination | Case number: 678674 Page 4 of 9 insurer says there is insufficient evidence to indicate the damage was caused by the storm. Following lodgement of the claim, the insurer arranged for a roofing expert and an assessor (JLG) to attend at the property. JLG advised there was no evidence of storm damage to the roof and the insurer declined the claim. In June 2019, the complainant obtained a report from roofer NL who linked the damage to the roof to the storm. Upon receipt of the report, the i nsurer accepted the claim for damage to the roof only. On 9 October 2019, the property was reinspected by the JLG and significant internal damage was identified. Due to the increase in scope, the insurer advised the complainant it intended to arrange a building assessment by an engineer. The complainant rejected the recommendation and engaged an independent engineer, PP, to assess the cause of damage. PP inspected the property, including the roof cavity, provided accompanying photos and three reports. PP says the storm caused severe damage to roof tiles allowing water ingress into the hallway, kitchen, main bedroom, ensuite, loungeroom and laundry. This lead to failure of the ceilings and cracking in cornices, doorways and brick walls. Because the complainant would not agree to the i nsurer completing a further assessment, the insurer obtained a desktop report from an engineer (SCE). Having reviewed the evidence from both parties, I note SCE agrees with PP that:  tiles may have been damaged by impact from branches, indicating storm damage to the roof  cracking and separating of cornices is attributed to failure of the ceiling  there is resultant water damage to the ceilings, roof insulation and roof tiles which is consistent with storm damage and small tree branch impact. The insurer says the complainant breached policy conditions requiring him to agree to inspections and by doing so, has prejudiced the insurer’s ability to assess the claim. However, because the insurer’s expert agrees the storm caused damage to the ceilings and cornices, roof insulation and tiles, I do not consider the insurer has demonstrated it has been prejudiced in relation to this damage. Therefore, the insurer is not entitled to limit its liability and is required to accept the claim for damage to the ceilings and cornices, roof insulation and roof tiles. Unclear what caused significant structural damage The complainant is seeking for the insurer to accept all resulting damage from the storm including significant structural damage identified by PP. Determination | Case number: 678674 Page 5 of 9 The additional damage identified by PP included:  deflection, distortion and tearing of the timber roof frame due to heavy loads of hail storm  cracking around doorways of master bedroom, kitchen, bedrooms and hallway  cracking of brick walls. PP attributed:  the damaged timber roof frame to impact of tree branches and the accumulation of hailstones and debris, causing the frame to sag  damage to the brick walls as storm damage and discounted the likelihood of the damage being caused by ground or foundation movement. It was SCE’s opinion that :  the failure of the roof frame cannot be attributed to the storm because the damage pattern does not align with tree impact, hail or a build-up of water weight. This is because the entire frame has collapsed as opposed to localised damage and short-intermittent loads such as branch impact do not give rise to permanent deflections to the entire roof frame  the weight of any tree branches manually removed by the insured or any associated rainfall would have a weight of a significant order of magnitude less than the self-weight of the roof tiles  cracking to the internal walls shows evidence of previous patch repairs, and is not consistent with minor tree branch damage, but rather general foundation related movements  PP identified the roof’ s wooden frame is rotten. Wood rot occurs over an extended period and not from a single storm event.  the recommended repairs are consistent with long-term roof spread and not localized structural damage from tree branch impact. Based on the reports provided, I am not satisfied the complainant has demonstrated the damage to the roof frame and cracking to the brick walls, can be attributed to the storm. This is because:  the entire roof frame has failed and is deteriorating suggesting the damage was not caused by a singular storm event but has occurred over time  there is internal cracking which cannot be linked to water ingress or failure of the ceilings  PP says differential ground movement did not cause internal cracking, however, has not tested the soil, inspected the footings or completed earth level tests. Determination | Case number: 678674 Page 6 of 9 Property requires further assessment The complainant has rejected the insurer’s request to have an engineer assess the structural damage. The complainant says the insurer should have identified and assessed the damage at the beginning of the claim. The insurer says it is entitled to limit its liability until an engineer inspects the property. This is because policy says in assessing the claim, the complainant may be asked to make their building and contents available for inspection by the ins urer or its agent if appointed by them or if diagnosis is required. I appreciate the complainant’s concerns about the need for further assessments, however, the property has significant structural damage which was either not identifiable at lodgement or has developed since that day. It is not normal practice for an engineer to initially be engaged if there is no sign of structural damage. The report from the complainant’s engineer PP , is not sufficiently compelling about the cause of the structural damage. Given this, I am satisfied that the insurer is entitled to engage an engineer to review the structural damage. Insurer required to take further action As above, the insurer is liable for the damage to the ceilings, roof insulation and roof tiles only. The insurer has provided a scope of works for repairs for $21,531.79 for repairs to the ceilings and cornices, roof insulation and roof tiles. The complainant has not provided a quote for repairs. The insurer is to cash settle the cost of internal repairs for $21,531.79, plus 20% contingency and transfer of risk. The total is $25, 838.148. I also consider it reasonable and necessary that the insurer assess the structural damage to the roof frame and cracking in the internal brick walls. It is possible further damage may be identified at this point. If the complainant accepts this Determination, within fourteen days the insurer is required to provide to the complainant with a panel of three independent engineers to assess the structural damage. Once selected the insurer is required to appoint an engineer and complete its investigation of the claim in a timely fashion. 2.1 Is the complainant entitled to non-financial loss? Claim decline did not cause further damage The complainant says the claim delays caused by the insurer resulted in additional damage to the property, including the development of mould. This lead to significant Determination | Case number: 678674 Page 7 of 9 stress and inconvenience suffered by the complainant and his family and has put their health at risk. AFCA will only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind. In assessing whether to award compensation, AFCA expects complainants to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs and take reasonable steps to minimise the inconvenience suffered. Where a complainant has cont ributed to their loss arising from the financial firm’s conduct, their level of compensation may be reduced accordingly. I have reviewed the claim notes and submissions by both parties. The claim was lodged in March 2019. The insurer communicated the claim decline in May 2019. The complainant submitted his own report in July 2019. The SOW was submitted for approval in August 2019. This was rejected. At the end of October 2019, the insurer requested the property be assessed by an engineer which was rejected by the complainant in November 2019. The complainant then lodged a complaint with AFCA and obtained his own engineer report in March 2020. I accept the claims process has been lengthy and is still ongoing, however, I am not satisfied based on the information received, the actions of the insurer solely caused delays. The complainant’s queries were responded to in a timely manner and the insurer managed the claim reasonably well overall. A claim decline of itself is not a reason to warrant compensation. Delays can be attributed to the complainant obtaining his own independent reports. It is clear the property has deteriorated and mould worsened, however, the complainant has not taken steps to mitigate his loss. The complainant has not repaired the roof to prevent further water ingress and has not completed mould remediation to stop the spread of mould. In its notice of response, the insurer offered to undertaken mould remediation which the complainant rejected. Based on this information, I am not satisfied the complainant has established an entitlement to compensation. Determination | Case number: 678674 Page 8 of 9 3 Supporting information 3.1 Relevant policy terms Insured events – You are covered for loss or damage to your building or contents (as applicable) caused by Storm, rainwater and flood You are not covered for Loss or damage:  to plants, trees, artificial grass and lawns;  to swimming pool covers, spa covers or plastic or vinyl swimming pool liners;  to retaining and/or freestanding outdoor walls;  to fences and gates that are not structurally sound or well maintained;  to loose surfaces of paths and driveways;  involving cracking to paths, driveways or any outdoor surfaces;  to a sporting surface or court;  to external shade cloth and/or shade sails, unless professionally installed and less than 5 years old;  caused by water entering your building due to building altera tions, renovations or additions;  caused by water that has seeped or percolated into your building;  caused by gradual deterioration due to rainwater; or  caused to external paintwork if that is the only damage to that part of your building. We also do not pay for the cost of cleaning or removing mud or debris out of swimming pools and spas and replacing the water. Accidental damage We cover When your building is insured, we will cover you for damage caused unintentionally to your building. When your contents are insured, we will cover you for damage caused unintentionally to your contents . Assessing your claim After you have lodged a claim with us we will assess it. When we are doing this, we may ask you for information or assistance to help with the process. Determination | Case number: 678674 Page 9 of 9 We will require you to:  let us see or take possession of any damaged property;  keep items that have been damaged and allow us to inspect them or assess repair costs;  make your building and contents available for inspection by us or an assessor or agent appointed by us or when diagnosis is required;  send us any communication you receive about the claim from anyone else (including letters of demand and communication about court proceedings); and  do everything you can to help us to negotiate, defend or settle your claim or to recover costs from another party responsible for the loss or damage to your building and contents.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.