Home / Lloyd's / Determination 678538
Determination 678538
Cyclone damage cash settlement and repair scope
Summary
After cyclone damage, the insurer made a cash settlement that the owner disputed as too low. AFCA accepted the insurer's repair scope but ordered additional payments for a roof calculation error, contingencies, a shed, expert costs and tenant accommodation on proof, with interest, and rejected the larger repair claim.
The panel preferred the insurer's assessment of pre-existing and non-cyclone damage, but found the settlement calculation erred and that the policy extra benefits apply.
Issues
- Claim amount dispute primary · upheld“The financial firm has erred in its calculation of this settlement.”
- Claim denial secondary · upheld“The Panel does not agree with the financial firm that such a claimed loss is not contemplated by the policy.”
- Payment error secondary · upheld“The Panel has seen no evidence that the financial firm has paid the agreed sum for the replacement of the garden shed.”
- Policy cancellation or underwriting secondary · not upheld“the Panel accepts that the financial firm is entitled reconsider its underwriting conditions and has acted fairly”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Related
Text of the determination
Determination
Case number 678538
Financial firm Lloyd's Australia Limited
Determination | Case number: 678538 Page 1 of 8
Case number: 678538 13 November 2020
1 Determination overview
1.1 Complaint
The complainant holds a Commercial Strata Policy over its property damaged by
Cyclone Debbie in March 2017. The policy is underwritten by the financial firm.
(Reference to the financial firm will also include reference to the insurer)
A claim was submitted to the financial firm and accepted but a dispute has arisen over
the extent of the cash settlement offered by the financial firm to resolve the claim. The
financial firm has indicated it has not allowed for all damage claimed because areas
were not damaged by the cyclone including areas subject to pre-existing damage or
wear, tear and gradual deterioration.
The complainant is seeking an increased financial settlement from the financial firm.
1.2 Issues and key findings
Has the financial firm met its obligations under the claim?
No. The financial firm is required to pay the complainant a further sum in settlement of
its claim.
1.3 Determination
This determination is substantially in favour of the financial firm.
The financial firm is required to pay to the complainant the sum of:
$26,147.93 as an additional amount for contingencies,
$10,519.46 for the roof,
$6,285.84 for the replacement shed,
Up to $15,000 towards the costs incurred by the complainant for expert reports and
assistance and
Interest on the amounts not already paid, in accordance with section 57 of the
Insurance Contracts Act, from 4 November 2019, to the date of payment
The complainant is to provide proof to the financial firm of amounts paid for expert
reports and assistance. The interest on this amount is to be calculated from the date
the payment was made by the complainant.
The financial firm is to review its obligations to the complainant for tenant
accommodation costs upon proof of loss by the complainant.
Determination | Case number: 678538 Page 2 of 8
2 Reasons for determination
2.1 Has the financial firm met its obligations under the claim?
The complainant and financial firm do not agree on the covered loss
The complainant’s property is covered for accidental damage from any occurrence,
subject to general exclusions including wear and tear, gradual deterioration and lack
of maintenance.
The financial firm arranged for assessor (A) to advise it on the loss sustained because
of the cyclone. A arranged a building consultant (M) to provide a scope of works of
repairs required.
Initial concerns were raised by A as to the extent of the cyclone damage. A reported
there was evidence of general wear and tear, and a lack of maintenance. M also held
similar concerns and the scope of works reflected this.
The financial firm accepted its assessor’s opinion that damage to the paintwork could
not be attributed to by the cyclone. It also accepted its assessor’s opinion that the
doors and windows had been leaking water with every rainstorm due to maintenance
issues and that only a small portion of the tiled roof needed repair. The financial firm
also concluded that most of the internal damage was primarily a product of wear and
tear and the existence of the property in a tropical environment rather than the
cyclone.
Builders (T) and (Q) provided quotes on the accepted scope of works. The financial
firm preferred T’s quote over Q and authorised repairs.
The complainant would not sign the Scope of Works contract presented by T, largely
because it disputed the extent of the scope of works.
The financial firm facilitated multiple attendances by M and T at the insured premises
to attempt to resolve the differences between it and the complainant over the scope of
works.
The complainant arranged for an engineer (E) to assess the damage from the
cyclone. E provide reports from inspections undertaken in October 2018, April 2019
and August 2019.
E did not agree that M made sufficient allowance for repairs to damaged areas in the
scope of works. E provided a list of the areas in which no allowance had been made
in the scope of works where it should have been.
An agreement could not be reached on the settlement. The complainant maintains
there was no evidence of any wear and tear damage or a lack of maintenance before
the cyclone. The complainant also maintains it was entitled to seek a full replacement
Determination | Case number: 678538 Page 3 of 8
for the roof and the estimate of costs to repair the premises by the insurer are
unrealistic.
The financial firm has made a cash settlement
The financial firm offered a financial settlement for the roof over the building
containing the retail store on the ground floor and residential dwelling upstairs. This
settlement was reduced with the reduction of the excess and GST. The settlement
paid was $1,788.08.
The financial firm made two other payments for incidental expenses in the sum of
$1,918.82 and $307.10 before making a final payment of $287,627.19, in November
2019. This sum included an allowance of 10% for contingencies ($26,147.93) and
20% for builders mark up.
It should be noted that from the sum of $1,918.82, a sum of money deducted for the
excess which the insurer alleged was underpaid in the settlement of $1,788.08.
The complainant has disputed the settlement sum
The complainant has disputed the cash settlement and the following items remain in
dispute:
Overall repair costs
The complainant and the financial firm remain in dispute as to the overall repair costs.
The complainant has produced quotes indicating the repairs to the roof alone would
cost over $190,000. Therefore, it submits the scope of works and offers from the
financial firm’s repairers are not realistic.
The complainant also notes the quotes from the financial firm are very old and do not
accurately reflect the current repair costs. Finally, the complainant also notes the
f inancial firm’s ch osen repairer is now refusing to complete the work so additional
allowances needs to be made for contingencies.
The key differences in the sums quoted for the repairs arise from the dispute as to the
actual loss and damage caused by the cyclone.
The Panel has assessed the reports provided. The Panel prefers M’s assessment of
loss over E’s assessment.
A & M attended the complainant’s premises very quickly after the financial firm was
notified of the claim in May 2017. With T, they have attended the premises on multiple
occasions to consider and re-consider the loss and damage flowing from the cyclone.
On multiple occasions they have reviewed the loss following observations from the
complainant and conducted further assessments to consider these observations.
Such attendances have led to variations of the scope of works, and in the panel’s
view, fairly so.
Determination | Case number: 678538 Page 4 of 8
E attended the premises in October 2018, April 2019 and August 2019. The first
attendance occurred almost 18 months after the cyclone.
E concedes there were maintenance issues with the premises but does not attach
much significance to these issues. E refers to water ingress at multiple points of the
premises but does not accept such ingress was caused by any wear and tear or
gradual deterioration before the cyclone.
E refers to foundation movement contributed to cracking throughout the premises but
does not concede such foundation movement could have occurred over time. E
attributes the crack to load forces provided by the cyclonic winds.
E accepts the assertion of the complainant on the structural state of the premises
without any obvious evidence to support such assertions.
On balance, the Panel accepts the age and location of the premises lends to the
conclusion there was likely to be some evidence of wear a nd tear and deterioration.
The Panel accepts the assessments of A and M that much of the repairs claimed by
the complainant were pre-existing and not caused by the cyclone.
As such, save for a couple of variations, the Panel accepts that the quotation upon
which the financial firm based its cash settlement is a fair and reasonable quotation to
reflect the loss caused by the cyclone.
On the other hand, the panel is concerned that the q uotation used for the cash
settlement was not actionable.
Whilst the financial firm has allowed a 10% uplift for contingencies ($26,147.19),
given the transfer of risk of repairs that occurs when a cash settlement is made, the
panel is satisfied it is fair that the financial firm pays an additional 10% for
contingencies.
This means that the financial firm is to pay the complainant the additional amount of
$26,147.93, for contingencies.
As noted above, the financial firm made an allowance for roof repairs over the
building containing the retail store on the ground floor and residential dwelling
upstairs. Such a settlement was reduced with the payment of the excess and GST.
The settlement paid was $1,788.08.
The financial firm has erred in its calculation of this settlement. The initial quote for
this section of the roof was $15,898.08 for repairs as opposed to the complainant’s
quote for $29,693.33 for replacement. The insurer then added a variation agreed by T
in the sum of $10,890. The accepted sum for repairs was therefore amended to
$26,788.08.
After further review the financial firm agreed that this should be increased to
$41,191.36 but sent a release to the complainant with the sum of $26,788.08. The
Determination | Case number: 678538 Page 5 of 8
sum was reduced by the excess of $25,000 and the release signed by the
complainant allowed for a payment of $1,788.08 which was duly paid.
The financial firm noted there was an error, however, in the settlement proposal as
GST was not deducted from the loss, as it should have been. The financial firm
therefore concluded that, after the deduction of GST, the complainant was required to
pay an extra $647.23 for the excess. This was as opposed to being paid $1,788.08.
The financial firm later deducted this $647.23 from a further payment made to the
complainant.
What the financial firm should have paid was $41,191.36, less GST of $4,531.05 and
an excess of $25,000. The sum of which is $11,660.31. Taking away the $1,788.08 it
did pay and adding in the $647.23 it deducted from another payment, the financial
firm is required to pay the complainant an extra sum of $10.519.46.
Accommodation for tenant house 2 nd bedroom @ $77.00/ day (2yrs) $ 56,000.00
The complainant is seeking the costs of having to relocate a tenant for two years
because the room was uninhabitable. The financial firm says such loss is not covered
by the policy, however, it would be expected that loss of rent from the tenant would
have occurred.
The Panel does not agree with the financial firm that such a claimed loss is not
contemplated by the policy. It is clearly contemplated by section two of the policy.
However, there is a shortage of information to calculate the extent of the loss.
Upon provision by the complainant of evidence to support this loss, the financial firm
is to make additional payment, under the terms of the policy, for the amount proven.
Replacement of garden shed (insurers quote) $ 6,285.84
The complainant says it agreed to the cost of the replacement of the garden shed.
There is no dispute as to whether the shed should be replaced. It has been replaced
but the complainant is alleging that the sum agreed has not been paid.
The Panel has seen no evidence that the financial firm has paid the agreed sum for
the replacement of the garden shed. As such, the loss is payable by the financial firm
unless it can provide proof it has done so previously.
Allowance for mental stress of owner including pain and suffering over this
insurance issue now almost 3 years of disagreements
The financial firm says the complainant is not entitled to such an award under the
policy. The financial firm may be correct, but such loss can be contemplated by AFCA
in circumstances where AFCA consider that financial firm has conducted itself in a
manner that has provided undue delay or aggravation to a complainant.
Determination | Case number: 678538 Page 6 of 8
Given the long history of the claim it is often the case such an award may be made.
The Panel is not inclined to make such an award in this instance.
The delay has primarily been caused by the fundamental differences in the opinion of
the complainant and the financial firm in relation to the loss and damage caused by
the cyclone. The Panel accepts the complainant has not actively assisted the financial
firm in facilitating an earlier agreement.
As the Panel agrees with the assessment of the loss by the financial firm, and the
Panel considers that the financial firm has made every effort to try and commence
repairs on the property, the Panel is not inclined to make such an award.
Work involved by owner in complying with insurance requests
The financial firm says the complainant is not entitled to such an award under the
policy. The Panel notes that such an allowance is contemplated as an extra benefit
under section 1 and 2 of the policy. The benefit is capped at $25,000 under section 2.
The complainant has not provided evidence of how such a loss is calculated. The
Panel also notes that the complainant has been provided with assistance by an
experienced claims manager and the allowance is to include such costs.
The Panel is therefore not prepared to make an allowance to the complainant under
this section.
Accommodation for owners whilst house repaired 4wks $2,500.00
The financial firm says the premises are not deemed to be uninhabitable nor will they
be rendered as being uninhabitable during the period of reinstatement. As the
complainant has not provided sufficient evidence to support such an assertion, the
Panel is not inclined to make an award for this claim.
Engineers expenses and travel up to $15,000.00
The financial firm says the complainant is not entitled to such expenses as the
complainant chose to engage the services of additional parties despite the financial
firm absorbing the cost of multiple (independent) Engineering, Loss Adjusting and
Building inspections over the course of 3 years.
The Panel does not agree that this is the required test. As noted above, the policy
does allow such an extra benefit under section 1 and 2 for costs incurred by the
complainant in providing evidence the financial firm needs to assess the claim.
The panel also recognises the special circumstances of this claim and the assistance
provided to the complainant by his experts.
Determination | Case number: 678538 Page 7 of 8
Subject to appropriate receipts, the Panel is prepared to allow a contribution of
$15,000, towards the cost incurred by the complainant in arranging for the engineer to
attend and report on multiple occasions.
The complainant has established it is entitled to a further cash settlement
The complainant is therefore entitled to receive additional sums for the following:
Additional payment for contingencies $26,147.93
Cash settlement for the building $10,519.46
Replacement of garden shed $6,285.84
Engineers expenses $15,000.00
The financial firm should pay interest on the sums in accordance with s57 of the
Insurance Contracts Act from the date the complainant submitted the complainant to
AFCA, being 4 November 2019.
The financial firm is also required to pay the costs incurred for tenant accommodation,
upon proof by the complainant of the loss incurred.
The financial firm should pay interest on the amount incurred, from the date it was
incurred by the complainant.
Cancellation of insurance
The financial firm denied the complainant ongoing insurance coverage as the property
had not been repaired for a lengthy period.
The financial firm subsequently agreed to a six-month extension until October 2019.
Given the time that has passed, and the repairs not completed, together with the
extension offered, the Panel accepts that the financial firm is entitled reconsider its
underwriting conditions and has acted fairly in the circumstances.
Determination | Case number: 678538 Page 8 of 8
3 Supporting information
3.1 Key references
EXTRA BENEFITS
2. Claim preparation costs - We will pay You for those reasonable costs
that You incur in providing the claim details that We need.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.