Adequacy of cash settlement for water damage repairs, fence damage claim, and claim handling delays
Text of the determination
Determination
Case number 676581
Financial firm Insurance Australia Limited
Determination | Case number: 676581 Page 2 of 16
Case number: 676581 30 July 2020
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm
(the insurer). The complainant lodged a claim with the insurer in January 2019 after
returning from a cruise to find a water leak had caused extensive damage to his
house.
There is no dispute the damage to the complainant’s house was caused by an
insured event covered by the policy. The insurer accepted the claim, paid for
temporary accommodation and engaged experts to prepare a scope of works and
provide quotes on the cost of repairs. The complainant was also invited to provide
quotes.
The insurer was willing to arrange repairs, however the complainant advised he would
prefer a cash settlement. A dispute arose as to exactly what repairs should be
included in the scope of works and what constitutes a fair cash settlement amount.
This remained unresolved and the process to finalise the claim became protracted.
To resolve the complaint, the complainant would like the insurer to cash settle him for
a further $40,294.11 (in addition to the settlement it has already made) for repairs to
the house, further sums for c-bus and solar systems, $9,272 for damage to his fence
and compensation for stress and inconvenience.
1.2 Issues and key findings
Is the insurer’s cash settlement for repairs fair in the circumstances?
No. The insurer is required to add a 10% contingency amount of $51,132.32 to its
total cash settlement of $511,323.27.
Is the insurer required to cover damage to the fence?
The available information shows evidence of both new and old damage to the fence.
The insurer is required to cover 25% of the cost of repairs to the fence.
Is the complainant entitled to compensation?
The insurer is required to pay the complainant $2,500 compensation.
Determination | Case number: 676581 Page 3 of 16
1.3 Determination
This determination is substantially in favour of the complainant.
Should the complainant accept this determination then within seven days of
notification of acceptance, the insurer is required to pay to the complainant the
following amounts:
$51,132.32 additional cash settlement
interest pursuant to section 57 of the Insurance Contracts Act 1984 on $51,132.32
from 24 July 2019 (the date of its final decision) until settlement
$2,318 contribution to fence repairs
$2,500 compensation
Otherwise, the insurer is not required to take any further action in relation to the claim
or the complaint.
Determination | Case number: 676581 Page 4 of 16
2 Reasons for determination
2.1 Is the insurer’s cash settlement for repairs fair in the circumstances?
Scope of works was completed and both parties obtained quotes
It is not in dispute the damage to the complainant’s house was caused by an insured
event covered by the policy and accordingly the insurer accepted the claim. The
insurer engaged building expert IP to complete a scope of works upon which costings
would be based.
There were ongoing conversations between the complainant and the insurer as to
exactly what repairs and items should be included in the scope of works. Ultimately,
most of these items were agreed. Those which were not fully agreed will be discussed
later in this determination.
The insurer indicates that its initial preference was to arrange the repairs through one
of its panel builders, however the complainant advised the insurer that he would
prefer a cash settlement, so he could engage his own builder for quality reasons. The
insurer notes the policy provides it with the discretion to determine whether repairs
will be arranged and warranted or whether the claim will be cash settled, but in the
interests of reaching an amicable resolution it agreed to cash settle the claim.
The relevant policy terms are set out in supporting section 3.2 of this determination.
The insurer engaged three of its panel builders (CS, BB and AR) to prepare costings
based on IP’s scope of works. The complainant was also invited to pro vide his own
quotes based on the scope and ultimately provided two quotes from building experts
AB and TD.
Extracts from the costings are set out in section 3.3 of this determination.
The insurer advises that if it had arranged the repairs it would have chosen the lowest
of its panel builder’s quotes and the decision to cash settle the claim came at
significant cost to it.
Complainant rejected insurer’s cash settlement offers
The insurer reviewed the various quotes and made a cash settlement offer of
$443,841.90. This was based on an average of the three amounts quoted by its panel
builders CS, BB and AR. The insurer says normal practice would be to select the
most competitive (cheapest) of the three quotes, however in the interests of resolving
the claim it based its offer on an average of the three quotes.
The insurer further advised that after calculating this average it was determined that
AR, which provided the most expensive of the three quotes, had made an error in its
Determination | Case number: 676581 Page 5 of 16
quote. Accordingly, AR revised its quoted amount down from $539,617.38 to
$499,323.27.
Nevertheless, to resolve the claim, the insurer said it would honour the inflated
average amount of $443,841.90, based on the ave rage including AR’s original quoted
amount of $539.617.30.
I note that AR’s original quote of $539,617.38 was not itemised and as such it is not
apparent what the error in this quote was and why the quoted amount was
subsequently reduced.
Complainant says insurer should consider his quotes, add missing items
The complainant was dissatisfied with this offer and rejected it. He noted the insurer
did not take either of the quotes he provided into consideration or include them in its
average. He further said that some individual items, in particular the c-bus electrical
system and the solar system, had not been adequately allowed for in any of the
quotes obtained by the insurer.
The complainant’s two quotes were for considerably more than the insurer’s quotes ,
with AB and TD quoting $609,875 plus GST and $753,630.08 including GST
respectively to complete the repairs.
It is noted the insurer advised that it had not factored the complainant’s quotes into its
calculations as they did not meet its requirements fo r an itemised cost breakdown.
The complainant subsequently arranged and provided itemised breakdowns on his
quotes. However, the insurer continued not to include them in its calculations for
various reasons including its contention that some of the work claimed was unrelated
to the claim. One of other reasons cited was what the insurer deemed to be excessive
amounts quoted, such as the $70,000 quoted for the replacement of the kitchen.
The complainant says his house is comprised of high quality fittings and finishes, and
the kitchen contained caeser stone. The complainant says it was TD who originally
built the house.
In response to some of the complainant’s concerns, the insurer made a revised cash
settlement offer of $499,323.27 based on AR’s (revised) q uote. Subsequently the
insurer also offered a further $12,430 for the c-bus lighting system for total of
$511,753.27. This additional figure was to allow for the costing on the c-bus electrical
system having been revised since the insurer’s original quotes were prepared.
Insurer did not agree to honour AR’s original quote of $539,617.38
The insurer later cash settled the complainant for this amount ($511,323.27),
following the complainant’s advice that he accepted the offer on 28 July 2019.
However, the complainant subsequently advised that this amount was insufficient to
complete all the repairs to the house.
Determination | Case number: 676581 Page 6 of 16
The complainant has since moved back into the property but advises due to the 12-
month policy allowance for accommodation having expired he had to do this while the
house remained unfinished. In correspondence the complainant advised some of the
unfinished work includes, but is not limited to, to the kitchen, bathrooms, railing on
stairs, lighting and power.
In his most recent correspondence with AFCA, the complainant continues to seek a
further $40,294.11 for repairs. This amount constitutes the difference between the
$499,323.27 the insurer paid for repairs based on AR’s most recent quote (less the
additional $12,430 for the increased c-bus quote), and the $539,617.38 AR originally
quoted before revisions were made.
The complainant is seeking this amount specifically because of correspondence the
insurer sent to him which stated that although AR had since reduced its quote, the
insurer would still ‘honour the inflated figure’.
In the complainant’s view, this amounted to the insurer agreeing to honour AR’s
original quote of $539,617.38.
Having reviewed the relevant correspondence, including the insurer’s internal dispute
resolution (IDR) letter dated 24 July 2019, I am not persuaded this is the case. The
insurer was in fact offering to honour the inflated average figure of $443,841.90. This
figure was arrived at by averaging the quotes from CS and BB, along with AR’s
original quote for $539,617.38. If the insurer had recalculated the average based on
AR’s new reduced quote of $499,323.27, along with CS and BB’s quotes, the figure
would have reduced to $430,410.53.
I have reviewed all the available information and I do not accept the insurer agreed to
pay the complainant the $539,617.38 originally quoted by AR at any point.
Insurer’s cash settlement already includes full amounts for c-bus and solar
Additionally, the complainant seeks further settlements for the c-bus and solar
systems. Specifically, the complainant is seeking $28,435.13 for the solar system,
and $14,000 for the c-bus system, as per his email to AFCA dated 26 March 2020. In
previous correspondence the complainant advised he was seeking a further $12,430
for the c-bus system and it is unclear why he has since revised this amount.
I note the updated quote for the c-bus system provided by the complainant (TF ’s
quote dated 4 April 2019) totalled $49,700.
AR’s quote of $499, 323.27, upon which the insurer based its cash settlement, allows
$38,400 for the c-bus system. I further note the insurer cash settled the complainant a
further $12,430, and the total of these two amounts exceeds the revised amount of
$49,700 that was quoted for the c-bus system (this is because TF ’s quote excluded
GST and the insurer has included this in its settlement figures). Therefore, based on
Determination | Case number: 676581 Page 7 of 16
the available information, I do not consider the complainant is entitled to any further
settlement for the c-bus system.
Regarding solar, AR’s quote, upon which the insurer based its cash settlement ,
includes the full amount of $28,435 which the complainant is requesting for this item.
Therefore, I do not consider the complainant is entitled to any further settlement for
the solar system.
Insurer is required to add a contingency amount to its settlement
After the complaint came to AFCA, the insurer offered a further $10,000, on top of the
$511,323.27 it has already paid, to resolve the complaint. The complainant rejected
this offer.
The complainant says his quotes are higher because they are fully inclusive and allow
for the high quality of fittings and finishes to the house. The complainant contends the
insurer’s quotes are lower because they were submitted based on the insurer
arranging the repairs, and as such the builders would have submitted variations,
increasing in the overall costs.
I consider there is merit to this point. I note AR’s quote of $499,323.27 upon which the
insurer based its cash settlement of fer states ‘variations will be paid by the client’.
Additionally, the quotation was prepared based on work being always done during
ordinary working hours. Finally, the quotation was valid for a period of 30 days (from 3
July 2019) after which time it would be subject to review.
I also note the IP scope of works upon which all the quotes (both the insurer’s and the
complainant’s) were based states there are limitations to the inspection and the
report. It says: ‘this report is not an all -encompassing report dealing with the building
from every aspect. It is a reasonable attempt to identify any obvious resultant damage
at the time of the inspection’.
Additionally, while I note the insurer initially declined to include the complainant’s
quotes in its calculations due to lack of an itemised cost breakdown, the complainant
later obtained cost breakdowns. Regardless, the insurer still did not use the
complainant’s quotes in its calculations even though the revised quotes provided
relevant detail.
The policy pro vides how a claim will be settled. At the insurer’s option, it can arrange
for its repairers to undertake repairs or it can pay the reasonable cost to repair the
home. I acknowledge the insurer could have chosen the cheapest quotation and
arranged for that builder to undertake repairs. However, having reviewed the
quotation from BB, I do not accept it is probable the insurer would have ended up
paying less than what it has offered. This is because BB’s offer is clearly subject to a
site inspection and BB also states, ‘no allowance made for unforeseen damages or
latent conditions.”
Determination | Case number: 676581 Page 8 of 16
The complainant’s quotes were for significantly higher amounts than those obtained
by the insurer. The insurer is not obliged to factor these quotations into its calculations
particularly in circumstances where it is willing to undertake repairs.
However, when making a cash settlement, an insurer must act fairly. It must ensure
that a cash settlement is sufficient to undertake the agreed repairs and that it
considers any variations and contingencies which may occur once repairs commence.
Additionally, it should consider that risk has been transferred to the complainant in
circumstances where he will no longer have the benefit of the insurer’s lifetime
guarantee on repairs.
Having considered all the available material, the extent of the repairs, the degree of
difficulty with the repairs, and the time since the quotations relied on were compiled, I
am satisfied there is a likelihood the complainant will encounter additional, unforesee n
costs in engaging his own builder to complete repairs. Additionally, the complainant
will not benefit from a warranty on the works provided by the insurer. I am satisfied
therefore it is fair that a further contingency amount should be added to the cash
settlement to allow for these issues.
As set out earlier, I am satisfied the insurer’s offer considered the additional amounts
sought by the complainant for the solar system and the c -bus system. And I
acknowledge the quotation relied on by the insurer already included a 15% mark-up
for the builder’s margin.
Taking all these matters into account, I am satisfied it fair in the circumstances the
insurer adds a 10% contingency amount on top of its cash settlement of $511,323.27.
The insurer is therefore required to cash settle the complainant a further $51,132.32.
I am satisfied it is also fair the insurer pay interest pursuant to section 57 of the
Insurance Contracts Act 1984 on $51,132.32 from 24 July 2019 (the date of its final
decision) until settlement.
2.2 Is the insurer required to cover damage to the fence?
Complainant says insurer’s trades damaged his fence, insurer disagrees
The complainant says the insurer’s trades people caused damage to the rendered
fence at the front of his property. The complainant has provided several photos
showing render chipped off the edges of the fence. The complainant has also
supplied a photo of gyprock debris in the grass next to the fence, and he considers
this is evidence of trades having thrown gyprock from the house to the fence, and of
trades passing materials over the fence.
The insurer reviewed the photos and information provided by the complainant and
had one of its panel builders, CS, provide an opinion. The insurer notes CS was not
persuaded the damage to the fence was caused by trades as the damaged areas
Determination | Case number: 676581 Page 9 of 16
show significant evidence of rusting and discolouration meaning the damage is likely
pre-existing and has been present for some time.
Further, CS noted there was no need for trades to pass materials over the fence as
the open driveway is only a few steps away.
It is noted that the insurer agreed that other damage to the complainant’s house,
specifically to a rendered column at the front of the house, and to a garage door, was
caused by its trades. The insurer cash settled the complainant for these repairs.
Evidence of old and new damage, insurer required to cover 25% of costs
The complainant obtained a quote from quote from TD for all the damaged render
(including to the fence and the front column for which the insurer has already
accepted liability and cash settled).
The total amount of the quote was $20,900, and the insurer cash settled the
complainant $11,628 for repairs to the damaged render on the front column. This
leaves $9,272 of the quoted amount of $20,900 which can be attributed to repairs of
the fence, and it is this amount the complainant is seeking.
Having reviewed all the available information and photos, I accept fence shows
notable rust and pre-existing damage, however there is also evidence of some fresh
render broken off the fence, particularly on corners and around the edges.
Further, given trades damaged the rendered column at the front of the house and the
garage door, it appears at least one of the trades on site did not take as much care as
should have been the case. I therefore consider it possible fence was damaged (even
if only to a minimal degree) by trades too.
Having considered the available material, I am of the view there is more pre-existing
damage than new damage, given the notable rust and deterioration to areas of the
fence.
Given this, I consider it fair in the circumstances the insurer cash settles the
complainant for 25% of the amount (which shall include interest) requested for repairs
to the fence. This amounts to $2,318. The insurer is not required to take any further
action in relation to the fence beyond this.
2.3 Is the complainant entitled to compensation?
Compensation may be awarded in some circumstances
The complainant seeks compensation for stress and inconvenience (non-financial
loss) due to the insurer’s claims handling.
Determination | Case number: 676581 Page 10 of 16
AFCA will award compensation (capped at $5,000) if there has been an unusual
degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and
anxiety. AFCA expects complainants to be moderately robust and to bear the normal
degree of inconvenience experienced when a problem occurs and to take reasonable
steps to manage the situation. Compensation is not awarded when the degree of
inconvenience is within the normal range of a claim, or when an insurer has handled a
situation reasonably.
Fair the insurer pays the complainant $2,500 compensation
I accept that this was a complex claim with significa nt repairs required to the
complainant’s house, and as such there was a high probability that the process to
finalise a scope of works and agree on a settlement figure would be somewhat
protracted. I also accept the insurer agreed to cash settle the complainant as per the
complainant’s request and as such the focus shifted to establishing a fair settlement
figure.
However, I acknowledge the insurer’s failure to consider the complainant’s quotes,
despite sufficient detail caused the process to continue for longer than otherwise
would have been the case. Additionally, the insurer failed to provide the quotations it
was relying on in a timely fashion. Given the extensive nature of the damage to the
complainant’s house and the insurer’s stated failures this woul d have caused the
complainant additional stress and inconvenience including moving back into an
unfinished house earlier this year.
While acknowledging the complexities of the case, I note from the correspondence
between the parties, particularly early in the dispute, queries from the complainant
were not dealt with promptly. The insurer apologised that the level of service did not
meet the complainant’s expectations. Nonetheless, in view of the extensive damage
to the house and the time it would take to repair (while the complainant and his family
were living away from their home) this failure to communicate promptly would have
also caused stress and anxiety.
I acknowledge the insurer has made payments to the complainant along the way. I
also acknowledge the insurer has made genuine efforts to settle the claim. However,
for the reasons stated, I am satisfied an award of compensation is warranted.
I am satisfied it is fair in the circumstances the insurer pays to the complainant $2,500
compensation.
Determination | Case number: 676581 Page 11 of 16
3 Supporting information
3.1 Our Approach
As advised to the parties, we have considered it appropriate to expedite this
complaint in accordance with the Operational Guidelines to the AFCA Rules, due to
the nature of the complaint. Accordingly, this complaint has not been the subject of a
recommendation and has proceeded directly to determination.
This complaint has been determined based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered for the purposes of this determination.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Extracts from policy terms
The relevant policy extracts are referred to in the correspondence between the parties
and in the insurer’s Notices of Response. Both the policy document and the Notices
have been exchanged with the complainant.
Product disclosure statement (PDS) page 65:
General exclusions for all covers and benefits
The exclusions set out in this section apply to all covers and benefits under your
policy.
What we don’t cover :
Loss damage, injury or death arising from:
• Rust, corrosion, gradual deterioration, depreciation, wear or tear
Determination | Case number: 676581 Page 12 of 16
(PDS) page 73:
How we settle your buildings claim
We will choose to settle your claim for loss or damage to your home and any
‘other benefits’ in one of the following ways:
1. Arrange for repairers, builders or suppliers to repair or rebuild your home
If you agree, we can arrange for our preferred repairers, suppliers or builders to
repair or rebuild your home. We may enter into a contract with our selected
repairer, builder and/or supplier on your behalf.
2. Pay you the reasonable cost to repair or rebuild your home
We can choose to:
• pay you
• pay your nominated repairer, supplier or builder, or
• provide you with store credits from one of our nominated suppliers.
For example, we may pay you directly when:
• you decide not to repair or rebuild your home, or
• you don’t start repairing or rebuilding your home within 6 months from when
the loss or damage takes place, or within any longer period we agreed to in
writing.
PDS page 74:
3. Pay you the Buildings sum insured
We may pay you the Buildings sum insured, when we consider your home to be a
total loss or when we choose to do so.
If we pay you the Buildings sum insured, then your policy ends and you don’t get
a refund of your premium.
We will continue your liability cover (see pages 61 to 63) for up to 6 months from
when the listed event took place. However, liability cover will end during this
period if:
• construction starts at your site, or
• you sell the site or any portion of it, or
• you take out a new Buildings Insurance policy for your site.
Determination | Case number: 676581 Page 13 of 16
4. Pay for other benefits
We will choose the method of settlement for your claim under any ‘other benefits’
we provide.
When you have a Home Plus policy, the extra costs we pay under ‘Safety Net’
cover are not considered an ‘other benefit’.
Lifetime guarantee
We provide a lifetime guarantee on the workmanship of repairs to your home that
we authorise.
This means we will fix any defect caused by poor workmanship done by our
preferred repairers or builders that we authorise.
We will decide how to fix any defect.
When you’re not covered by this guarantee :
This guarantee does not apply to:
• repairs you authorise yourself
• loss, damage or failure of any electrical or mechanical appliance or machine,
or
• wear and tear that is consistent with normal gradual deterioration of your
home
3.3 Extracts from material exchanged
Date Action
Internal property asse ssment
report
25 January 2019
Assessed and photographed 25 January 2019.
Accommodation requirement 6 to 8 months.
Estimated cost of building damage is $270,000.
Make safe completed.
Complainant on holidays and possible wat er running
for at least 10 days.
Home in average condition; custom - built in 2005;
custom built quality home with above average fit out
and major ele ctrical fit out.
Has C bus system, solar setup, ducted AC system.
Full extent of the wiring to both power and C bus not
known until property stripped out.
Extensive result ant damage described and
photographed and due to water ingress complete
removal and r edo of kitchen and wet areas; all
electrical light fittings waterlogged.
Determination | Case number: 676581 Page 14 of 16
Date Action
Quotation TF electrical
4 April 2019
Supplying, installing, re - wiring and re - programming
data, phone, speaker, Cbus switches, light fittings,
intercom, security alarm, smoke detectors, speaker
outlets, and other electrical needs $38, 400 exclusive of
GST.
Updated quotation TF
electrical
4 April 2019
Some further electrical items added, $49, 700 exclusive
of GST.
Quotation (BB)
24 June 2019
Quote priced on report/scope provided by property
report 15 May 2019.
Should repairs proceed quotation subject to a site
inspection.
No allowance made for unforeseen damages or latent
conditions.
Prime cost allowances and provisional sum allowances
described.
Total including builder’s margin and GST $385,962.08.
Quotation (CS)
23 June 2019
Quotation included electrical works as per supplied
quote from TF electrical, $38,400; Solar $28,850; and
Home Warranty insurance.
Total plus GST $405,946.26.
Quotation provided as per scope of works and is for
cash settlement purposes only.
Quotation stands for 30 days.
Tender/quotation (AR)
24 June 2019
Quote priced on report/scope provided by property
report 15 May 2019.
1. Hygienist $5,200
2. As per buildi ng inspection report $419,117
HOW $2,258
Total including GST and markup (15% ) $539,617.38.
Revi sed tender/quotation (AR)
3 July 2019
Quote priced on report/scope provided by property
report 15 May 2019.
Includes 6.AC, 7.CBUS ($38,400) and 8. Solar
($28,435).
Total $394,721.95 plus markup (15%) plus GST.
Total quoted including GST and markup $499,323.27.
Price includes owner’s quote for CBUS and Solar.
No allowance made to submit plans and specifications
to local council.
Quotation valid for 30 days .
All variations will be at charge out rates and invoic ed
as a separate item from the normal contract.
Extra costs incurred if work performed outside ordering
working hours.
Determination | Case number: 676581 Page 15 of 16
Date Action
No allowance made to move, store or pack contents.
Complainant’s quotation (AB)
15 July 2019
Quote priced on report/scope provided by property
report 15 May 2019.
Electrical and solar not included in the quote.
$609,875 plus GST.
Quote valid for 30 days.
Complainant’s quotation (TD)
26 July 2019
Quote priced on report/scope provided by property
report 15 May 2019.
Total including GST and builder’s markup $753,630.
Breakdown of costing included $70,000 for kitchen.
Electrical included additional work to Cbus $32,000.
Complainant’s quotation (TD)
4 September 2019
Inspected 10 August 2019.
Cost to fix all fence damaged (not the rust) and 2 front
columns render and painting $20,900 including GST.
Includes description of work to be done.
Time to complete 10 days.
Email from CS
26 September 2019 Damage to the wall is not consistent that of being
damaged by impact from trades/materials, there was
no needs to over the fence carrying material when the
open driveway is only a few short steps away with
easy access.
Damage is consistent with being present for an
extended period of time prior to any works
commencing on site, which is confirmed by the rust
and discolouration of the area.
Report regarding air -
conditioner
undated
AC is a Daikin Ducted unit model RY200KUY1
Upon trying to use the unit an error E0 was found. This
e rror indicates that all the mother PCB and Sub - board
need to be replac ed as they have been wat er
damaged, this includes the outdoor fan.
Recommend replacement of the unit as it cannot be
fixed
Attached is also quote number 001029 for replacement
of this faulty unit.
Quotation to replace air -
conditioner
15 February 2020
Remove and replace air - conditioner $11,865 plus
GST.
Determination | Case number: 676581 Page 16 of 16
3.4 Other relevant material considered and relied on
Parties’ submissions /emails and all attachments to all submissions/emails.
Parti es’ reports , photographs, quotations and estimates.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.