Home / Suncorp Group / Determination 674769

Determination 674769

Storm damage claim declined as long-term ground movement

FirmSuncorp Group
Decided2020-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's insurer declined a storm claim for cracked balcony tiles and north-west wall cracking as long-term damage. AFCA found the damage was caused by the 20 December 2018 storm within 72 hours, so the insurer must reimburse the underpinning and balcony repair costs plus a 15% uplift.

The policy covers subsidence caused by a storm occurring within 72 hours, and the insurer did not prove that an exclusion applied.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 674769 Financial firm AAI Limited Determination | Case number: 674769 Page 2 of 10 Case number: 674769 25 November 2020 1 Determination overview 1.1 Complaint The complainant held a home and contents insurance policy the financial firm (insurer). He lodged a claim in May 2019 for storm damage to a balcony and the north western wall of his property. The insurer assessed the damage and declined the claim on the basis the damage is long-term damage and not a result of the single storm. This is excluded under the policy. The complainant says the damage occurred within 72 hours of the storm and is therefore covered under the policy. 1.2 Issues and key findings What is the proximate cause of damage? On balance, the available evidence is the damage occurred as a result of subsidence due to a single storm on 20 December 2018. I am satisfied the damage, which is described as recent, occurred within 72 hours of the storm. Is the insurer entitled to decline the claim? The insurer is not entitled to decline the claim. It is liable for the cost of underpinning and balcony repairs. 1.3 Determination This determination is in favour of the complainant. The complainant is to supply the insurer with information showing the cost he incurred in repairing and underpinning the balcony. The insurer is to reimburse this amount within 7 days of receiving the information. The insurer is pay 15 % uplift on the above sum to account for the policy lifetime guarantee on home repairs being unavailable as work was carried out by the complainant. Determination | Case number: 674769 Page 3 of 10 2 Reasons for determination I have decided this case based on what is fair in all circumstances, having regard to the relevant legal principles, good industry practice, industry codes of practice and previous relevant decisions of AFCA and predecessor schemes. I have considered all the material submitted by both parties. I am satisfied the documentation I have relied upon has been provided to both parties. 2.1 What is the proximate cause of damage? Complainant must establish a valid claim under the policy The complainant‟s policy covers loss or damage caused by certain insured events listed in the policy. The policy lists „Storm‟ as an ins ured event, and specifies subsidence caused by a storm and occurring within 72 hours of the storm is covered. Otherwise, the policy excludes all ground movement. The onus is on the complainant to establish a valid claim under the policy. In this instance, this means the complainant must show the claimed damage is a result of the storm. If the complainant can establish a valid claim, the onus shifts to the insurer to show the damage is excluded, or it is otherwise entitled to refuse the claim. Experts disagree on whether damage occurred as a result of a single storm The complainant contacted the insurer on 17 May 2019 to lodge a claim for damage caused by severe storms on 20 December 2018. The damage consists of a crack through tiling on a first floor balcony , and cracking to the building‟s north -west corner. The insurer arranged a plumber (BP) to test for leaking pipes at the property. In a report dated 29 May 2019, BP noted all lines were intact therefore plumbing and stormwater pipes were not the cause of damage. BP said the cracking was likely a result of subsidence. BP says due to the property sitting on a steep slope, heavy rain flows under the concrete driveway and garage. BP says the vacant block adjacent to the property contributes to this. The insur er‟s engineer (PE) attended and agree with this view, noting some subsidence occurred due to rainwater runoff from the high adjoining areas washing away soils beneath building foundations. PE recommended the insurer engage a geotechnical engineer to determine soil conditions at the site. In refusing the claim, the insurer relies on the PE report, stating “ the damages to the home have been caused by rainwater run off from high adjoining areas which have washed away the soils beneath the building’s footings o ver a period of time ”. On review, I find no indication that PE says this process occurred over a period of time. Determination | Case number: 674769 Page 4 of 10 Geotechnical engineer MO was engaged by the insurer, and supplied a report dated 6 September. MO opines the damage is due to loss of subgrade support, with fine soil particles washed away by water flows across bedrock after significant storms. MO notes surface conditions and general cleanliness of the crack suggests it occurred within 12 months of the inspection date. MO concludes the damage occurred as a result of the storm event of 20 December 2018. The insurer engaged a third engineer, SW, to attend and review previous reports. SW supplied a report dated 15 November 2019. SW notes the overall rainfall from the storm event of 20 December 2020 was not significant compared with other events in 2019 or earlier. SW also says footings at the affected area of the home sit atop sandy soil, whereas footings at the rear are founded on bedrock. SW says the absence of internal cracking shows there has been no significant settlement since the event occurred. SW says the balcony cracking is due to water penetrating the balcony slab and causing corrosion to steel reinforcement. SW has not carried out testing to arrive at this view. Rather, SW notes there is no evidence of subsidence causing the balcony to shift away from the structure. SW concludes the damage is a result of a long-term issue and was not caused by the single event in December 2018. After the insurer refused the claim, the complainant paid for underpinning. He also engaged an engineer (SB) observe and comment. SB says exposed footings sit atop saturated clayey sand materials. SB says there is no evidence of loose sand which could have caused the damage. SB says the damage was caused by December 2018 storm, with a blocked drain contributing to this. SB asserts the storm did not wash away soils yet resulted in subsidence. SB does not describe the mechanism via which this subsidence occurred. SB also incorrectly asserts soil was misclassified by MO as a borehole test only reached a depth of 1.4m, whereas the MO report says the test location was 1.4m from the complainant‟s home. SB‟s view that dra ins were blocked is unsupported, although is potentially a reference to overflow from gutters or inadequate surface storm water drainage. Regardless, I do not find the SB report particularly persuasive given it has not effectively described the reasoning supporting its conclusions. On balance, proximate cause was movement within 72 hours of the storm The complainant says that he noticed a small crack in the tiles after the storm on 20 December 2018. He says that the crack continued to become bigger over a period of time. No information has been provided that disputes this. The complainant did not immediately notify the insurer, however once they became larger he lodged the claim. I am satisfied that the insurer has not been prejudiced by this delay. I am also Determination | Case number: 674769 Page 5 of 10 satisfied that the complainant is first noticed the cracks at the time of the storm. The damage was caused at that time and became more apparent over time. On review of all information, for the reasons below I am satisfied the damage occurred as a result, and within 72 hours, of the storm on 20 December 2018. I am not persuaded by SW that the damage is a long-term issue. SW correctly asserts the volume of rain was unremarkable in terms of total volume over 24 hours. However, this does not consider rainfall intensity over a short period which is a a key consideration for drainage. Noting geotechnical opinion is the 20 December storm caused the damage, I consider it is feasible the storm released an unusually high volume of rainfall over a short period, resulting in sub surface flows capable of causing subsidence. A greater volume of water over a far longer period may not have this effect. I also note SW attended the site in November 2019. MO attended two months earlier and described the cracks as appearing fresh. This description conflicts with the SW view damage is long-term, and is not addressed by SW. The complainant has supplied photographs and video footage taken during balcony repairs which he says is evidence of corroded steel reinforcement. In absence of plans or similar showing where steel reinforcement is situated, I cannot accept this as evidence the steel was not corroded. That the complainant lodged the claim almost six months after the loss. However, the complainant says he noticed the damage earlier, yet did not pursue the matter as the crack appeared minor. That an RZ report exists dated 13 May 2019 shows the complainant was pursuing the matter prior to lodging the claim. I also note the policy requires the damage to occur within 72 hours of a storm, and not to be observed within 72 hours. As such, while it warrants consideration, the delay does not establish the damage over 72 hours from the storm. It is also concerning the complainant failed to produce the RZ report. While the email from RZ clarifies differential footing movement could be a result of the storm, context is lacking. However, on balance, I am satisfied the complainant has established a valid claim for subsidence occurring within 72 hours as a result of the storm. I am not satisfied the insurer has met its onus to show exclusions apply to the claimed damage. 2.2 Is the insurer entitled to decline the claim? Insurer is liable for the cost of underpinning and balcony repairs The available evidence, on balance, suggests the damage occurred as a result and within 72 hours of the storm on 20 December 2018. Determination | Case number: 674769 Page 6 of 10 This falls within the insured event storm, and the insurer has not shown any exclusions apply to the claimed damage. The insurer is therefore liable for the damage. The complainant has arranged for underpinning and repairs to his balcony. The insurer‟s liability extends to the costs incurred by the complainant in c arrying out these repairs. SW says reinforcing a single slab may lead to ongoing issues. Given this, and the serious structural element to underpinning work, the insurer should increase this amount by 15 % to account for the lack of a lifetime guarantee on repairs. Determination | Case number: 674769 Page 7 of 10 3 Supporting information 3.1 Policy wording What you are covered for – Insured events If you have a Classic, Classic Extras or Classic Advantages insurance policy, we cover your home and contents when covered under this policy for loss or damage at the insured address caused by an insured event during the period of insurance. There are some things we do not cover and these are shown on the „We do not cover‟ section of the following tables on pages 17 to 25 and in the „General exclusions‟ on pages 58 to 62. Storm We cover Loss or damage by a storm. We do not cover ‒ … ‒ loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage caused by a landslide or subsidence that occurs within 72 hours of, and directly because of, a storm and not because of erosion over time, structural fault or design fault; ‒ .... General Exclusions Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: ‒ „Storm‟ (see page 18); ‒ „Flood‟ (see page 17) ; ‒ „Earthquake and Tsunami‟ (see page 19); ‒ „Explosion‟ (see page 25). Seepage of water water seeping or running: ‒ through the earth (hydrostatic water seepage); ‒ down the sides of earth or earth fill that is up against your home; Determination | Case number: 674769 Page 8 of 10 ‒ down the sides or underneath swimming pools or spas causing them to move, change shape, lift or leak through their hydrostatic valves; ‒ against or through retaining walls and forcing them to move or crack; ‒ from agricultural pipes. 3.2 Expert reports and opinion Record Key points Insurer’s plumber ( BP ) Leak det ection r eport 29 May 2019 Summary of findings  Plumbing and storm wat er pipes are not the cause of the damage (intact, no breakages)  Due to steep slope, heavy rain flows under concrete driveway and garage. Vacant block beside contributes to this. Insurer’s engineer ( PE ) Report 28 June 2019  Based on our visual inspection, the pattern of the cracking in the brickwork indicates that some subsidence has occurred. The building is located on the down slope and the subsidence is lik ely occurring due to rainwater runoff from the high adjoining areas washing away the soils beneath the building footings. The issues are occurring predominately at the nort h - western corner of the building.  The cracking in the walls have propagated up to th e Level 1 front balcony from ground level, causing the balcony slab to fail and the tiles to delaminat e. We recommend all cracked and drummy tiles be removed and replaced. The slab edges should also be inspected during the works and repairs carried out as required.  … We highly recommend engaging a geot echnical engineer to determine the existing soil conditions. Complainant’s engineer (RZ) Letter 27 August 2019 Further to our repo r t dated 13/5/2019, Mr X requested clarification regarding the meaning of "Differential Footing Movement". Differential footing movement is caused when the foundation material under the concrete footing has lost its capacity to support the footing caused by subsidence. i.e the w ashing away of the founding soils due to the increased egress of water. The site is stee p and the residence is located on the down slope. The site is subjected to surface runoff from the upstream properties. Mr X mentioned that on the 20/ 12/2018, the site was subjected to a severe storm, causing water surface runoff and around the dwelling. This storm in our opinion can caus e subsidence of the founding soils, inevitably leading to differential footing movement Complainant’s Geotechnical Engineer (MO) Repo rt 6 September 2019  Based on the material observed within the borehole excavated near the north - western column, it is inferred that the column footing is founded on very loose sand. The vertical deflection of the column is caused by saturated and loose subgrade material being inadequate for the applied loads.  The cracks observed within the structure are indicative of loss of subgrade support. Water movement within granular subgrade Determination | Case number: 674769 Page 9 of 10 Record Key points material has the pot ential to remove subgrade material by piping. Due to the presence of shallo w and relatively impermeable bedrock at the site there is water flow across the top of rock following rainfall events. Significant storm events will result in water. Flow across top of rock level regardless of the presence or absence of broken stormwater p ipes. Evidence of flow across the top of rock and discharge downslope was observed within the driveway upslope of the existing residence and is a feature of the geological conditions throughout Earlwood.  The surface conditions and general cleanliness of t he balcony crack indicated that the crack was formed within 12 mont hs of the inspection date.  Given the subgrade conditions, observed infiltration water flow in response to heavy rainfall and the fresh condition of the crack, it is most probable that the damage to the structure occurred as a result of subgrade degradation associated with the storm event of 20 December 2018. Insurer’s Engineer (SW) Forensic Engineering Report 15 November 2019  The total daily rainfall of 32mm was recorded on 21 December 201 9  In 2019 there were 6 days with higher daily rainfall.  The event on the 20th and 21st Dec ember 2018 was the worst hailstorm event in Sydney in 20 years and the damage caused by the hailstorm was declared a catastrophic event, however, the overall volume o f rain was not significant compared to similar rain events in 2019 and significantly less than the high rain events noted in 8.3 that have occurred since the construction of the subject property.  Any settlement caused by wash out of sand below the footings is a long - term , ongoing, issue exacerbated during all significant rain events and not just a single event in December 2018. As noted in the MW Geotechnical report water flow across the top of ro ck is a feature of the geological conditions throughout Earlwood and not just at the subject property.  The absence of the internal cracking indicates that the slope in the floor has been a long - term issue and any further settlement due to water flow at be drock level after the immediate construction settlement has been a slow long - term process. Any minor internal cracking may have been repaired over the years during redecoration works.  T he cracking in the floor tiles at the edge of the balcony slab on the western side of the balcony is not indicative of settlement cracking. Note that the floor tiles are over 30 years and there is no edge drainage on the balcony to prevent water flowing down the face of the concrete slab. If the column at the north west cor ner had dropped then we would have expected to have sighted cracking in the floor slab radiating out from the north west corner. The crack is slightly raised on one side which is more indicative Determination | Case number: 674769 Page 10 of 10 Record Key points that moisture has penetrated into the edge of the slab causin g slight corrosion of the steel reinforcement which has caused slight uplift at the edge of the slab. Further investigations involving the removal of the tiles are required to confirm the condition of the concrete and reinforcement. The extent of the crack ing is minor and it is likely that a concrete repair is required to the edge of the balcony slab together with new balcony tiles. We disagree with the statement in the Part ridge report that the balcony slab has failed.  In conclusion, it is our opinion t hat the sloping floors and external cracking is a long - term issue and was not caused by the single event in Dec ember 2018. Complainant’s Engineer (SB) Report 6 July 2020  It is unreasonable to expect unprofessional resident to detect a hairline crack within 72 hours  I inspected the property during the excavation stage to determine the design requirement for underpinning. I p rovided a design for a single un derpinning.  The investigations revealed that an existing concrete pier was pr esent with a depth of 3m supported by saturated clayey sand materials.  The borehole depth of 1.4m is inadequate due to depth of existing pile of 3.2m.  SW mischaracterized the nature of soil classification in Geotechnical investigation. SW use general description of area, and not findings for location – this is because borehole test is 1.4m while the table refers to greater depths.  There is no evidence of loose sand which could have caused the damage.  The assessment was only desktop is procedurally unfair.  In my opinion, the ev idence suggests that the damage was ca used by a single event, storm of Dec ember 2018 and subsequent subsidence due to th e failure of the storm wat er system including but not limited to blocked drain.