Home / Westpac / Determination 674578

Determination 674578

Insurer declined widespread cracking damage claim as pre-existing movement, not flood

FirmWestpac
Decided2020-07-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed for widespread house cracking after a 2019 flood. The insurer accepted flood damage to the rear extension but declined the remaining cracking as long-term foundation movement. AFCA agreed with the insurer and made no order.

The complainants did not establish that flood caused the remaining cracking, and the policy exclusions for earth movement, settling and shrinkage apply.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination Case number 674578 Financial firm Westpac General Insurance Limited Determination | Case number: 674578 Page 2 of 10 Case number: 674578 28 July 2020 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (insurer) providing cover for their house located in Oak Valley, Queensland. A claim was lodged under the policy for cracking damage to the complainants’ house which the complainant says became apparent following a significant weather event in late January and early February 2019. There is no dispute the policy provides cover for damage caused by flood and there is no dispute flooding occurred at the property. The inundation of the house itself was restricted to the rear extension of the house which comprises just two rooms, the laundry and spare room. The insurer partially accepted the claim and provided cover for the damage to these two rooms. However, it maintains the remainder of the cracking damage to the house, both internally and externally, was caused by pre-existing movement and is therefore not covered. 1.2 Issues and key findings Is the remaining damage to the house covered under the policy? No. The panel is satisfied the insurer has already indemnified the complainants for the portion of the damage which was caused by flood. The panel is not persuaded the complainants have provided substantive evidence to show cracking to the remainder of the ho use was caused or contributed to by flood. Further, the panel considers there have been longstanding issues with movement given the multiple previous repairs apparent both internally and externally. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to this claim. Determination | Case number: 674578 Page 3 of 10 2 Reasons for determination 2.1 Is the remaining damage to the house covered under the policy? Floodwater inundation restricted to rear extension and patio slab In late January and early February 2019, northern Queensland experienced a significant weather event. Heavy rainfall occurred over northern Queensland for several days, at or around the complainant’s property. The insured building is single a storey house. The house consists of a kitchen area, a living area, a bathroom, separate toilet and three bedrooms. There is a further extension to the rear of the house containing a fourth (spare) bedroom and a laundry. This rear extension is set down from the main house slab b y approximately 100mm according to the first engineering expert who inspected the site post-flood (NJ), on the insurer’s behalf. There are also patio and carport slabs located on the left-hand side of the house. The house is located on a large rural block, low on a hillside. NJ says water runoff from neighbouring properties passes through the complainant’s property and down to a nearby creek. NJ reports that when viewed from the front, the site slopes from right to left. NJ reports the rear extension of the house (comprising of the spare bedroom and the laundry) was inundated with approximately 50mm of floodwater, as was the patio slab. NJ says the main house itself (excluding the rear extension) was not inundated by water during the event. The complainants ’ reporting of inundation during the event is essentially in line with NJ’s, though they have indicted the rear extension was inundation to a depth of approximately 30mm while the patio was inundated with approximately 70mm of running floodwater which they say washed soil out from under the patio slab. Parties disagree on the extent of damage which can be attributed to the flood The second engineering expert to inspect the damage to the house on the insurer’s behalf, L, notes in its report that the complainants undertook rendering to the internal solid brick walls in the living room in April 2019 (after the flood). It is reported that shortly after this they noticed the development of cracking to the house and therefore they did not complete rendering to the remaining walls of the house. The complainants lodged a claim for widespread cracking damage to the house, both internally and externally. Following inspection by the insurer’s engineering experts NJ and subsequently L, the insurer agreed floodwater inundation had occurred and that this was restricted to the rear extension and patio slab. The insurer partially accepted the claim and provided indemnity for damage caused to the spare bedroom and laundry which make up the rear extension of the house. Determination | Case number: 674578 Page 4 of 10 However, the insurer does not agree that the remainder of the widespread cracking damage to the external and internal walls, plaster, cornices and ceilings was caused by the flood event. Rather, based on the expert reports it received, particularly those from L, it considers the damage is the result of long-term movement of the building foundations and points to signs of multiple previous repairs to both internal and external cracks. The complainants dispute this decision. They say the cracking damage to the house only became apparent in the period after the flood (approximately two months after). They note the flood event was significant with large volumes of water flowing through their property and they consider this to be a co ntributor, or indeed the primary cause of the cracking damage. There is no dispute flooding occurred and the policy responds to any damage caused by this, so the question is whether the remainder of the cracking damage to the house was caused by flood or by other factors. Signs of previous repairs indicate pre-existing movement There is no dispute the weather event was significant. NJ spoke to the complainants and was advised that there was heavy rainfall and water runoff at the property for approximately a two-week period. Upon inspection of the property, NJ noted the front left-hand corner of the concrete carport slab appears to have been undermined and in NJ’s opinion this was most likely because of poor site drainage. NJ says this is because the channel drainage long the front edge of the carport slab terminates partway along allowing water to penetrate under the front of the carport slab. The panel notes that review of accompanying photos is supportive of NJ’s description of the channel drainage. NJ considered minor cracking to the middle of the carport slab is shrinkage related. NJ further advised the downpipe at the front of the house terminates above ground and this also constitutes poor drainage. NJ noted stepped cracking to various external and internal blockwork walls around the house and noted that in many of these cases previous repairs were evident based on signs such as inconsistent width of mortar joints and evidence of painting and patching. Separation of cornices from ceilings and in or at corners in various parts of the house was also noted, along with separation of skirting boards from floors. Additionally, NJ documented bulging and hairline cracking to the internal rendered blockwork be tween the front two bedrooms. As part of its investigation, NJ conducted a floor level survey and found there was a maximum level difference across the house of 42mm, with heaving having generally occurred to the right-hand side. Determination | Case number: 674578 Page 5 of 10 NJ reported that the slab and footing system of the house is generally experiencing movement because of reactive clay foundations. NJ referred to the evidence of multiple previous repairs both internally and externally and concluded the house has a history of ongoing footing system movement and the cracking damage observed is primarily a reoccurrence of previously repaired cracks. Second engineer considers flood was not the cause of the cracking damage The insurer engaged another engineering expert, L, to conduct another inspection of the property and carry out further investigations into the cause of the cracking damage. Like NJ, L found multiple examples of pre -existing repairs to cracking damage around the house, both internally and externally. L conducted a borehole investigation to determine the nature of the building footings. Excavation was undertaken to a depth of 900mm below ground level and L found that there is a fill material overlaying ‘what appears to be very stiff, dry clay at a depth of 200mm and continuing to boreho le termination at 900mm depth’. L also used a footing probe and found a concrete edge beam or strip footing founded approximately 800mm below ground surface level. Based on these investigations L determined that the footing system is founded approximately 800mm below ground surface level and approximately 600mm into the ‘very stiff, dry natural clay stratum’. When L was questioned further about this, it advised that normal construction would only require footings to be founded to a depth of 100mm into the natural clay. L indicates the footings of the complainants’ house are therefore very deeply founded by comparison. L is of the view that this natural clay stra tum is ‘highly impermeable’ and therefore short-term water exposure because of flooding is unlikely to result in adverse variation to the moisture content of the foundation clays at the maximum depth of the footings. L considers ‘short - term’ floodwater would dissipate and run off in the upper soil layers before adversely affecting the deeper natural clay foundation soils into which the footings are founded. L says this is consistent with the results of its own floor level survey which do not indicate a pattern of heaving to all unpaved sides of the house, as would be expected if flooding was the cause of the foundation movement. L concluded that given the evidence of multiple previous repairs around the house, the widespread cracking for which the complainants are claiming is a result of long- term building movement predating and irrespective of the flood event. Regarding the patio and carport slabs, L noted no significant damage. L noted minor hairline cracking and advised that in its opinion, this was a result of the absence of adequate sawcut joints to allow for normal, long-term movement. Determination | Case number: 674578 Page 6 of 10 Available information supports flooding could have contributed to some degree While NJ indicated the claimed cracking damage to the house was primarily a pre- existing issue, it nevertheless conceded that it is reasonable to conclude that the heavy rainfall event had an adverse effect on the footing system ‘to some degree’ and recommended the nature of the foundations would need to be confirmed via geotechnical testings. L also advised further testing would be required to determine the adequacy of the footing system for the foundation reactivity. The panel notes L considered the building survey results confirmed widespread differential footing movement to the building and that this is consistent with long-term and ongoing moisture content variations of the reactive clay foundations, contributed to by ‘abnormal site moisture conditions’ caused by large -sized trees on the property. While this is essentially in line with NJ’s view that the slab and footing system of the house is generally experiencing movement because of reactive clay foundations, the panel considers this is somewhat at odds with L’s own assertion that the building footings are founded 600mm into very stiff, dry natural clay stratum that is ‘highly impermeable’. Complainants ’ pre-inspection report supports there was pre-existing movement The complainants say L’s assertion in its report that they advised cracking has developed in the two years since purchasing property is incorrect. The complainants say they did not notice the development of cracking to the house until after the flood event. The panel accepts the complainants ’ version of events about this and that they did not notice the cracking until after the flood. The insurer sought further comment from L in relation to this issue. L advised the absence of visible cracks when the house was purchased, and the development of cracks post-flood, does not necessarily indicate there was no pre-existing movement or damage at the property. L says it is common for a house to be freshly painted prior to sale, and for cracks to slowly reappear in the months and years that follow. The complainants elected not to obtain expert opinion on the cause of the cracking damage, citing cost as a prohibitive factor. They did, however, provide a copy the pre- purchase inspection report completed by building expert CB at the time they purchased the house in 2018, along with photos taken by the complainants prior to the flood which they say support the cracking damage was not present prior to t he flood. The panel has reviewed the pre- purchase report and the complainant’s photos. CB’s report clearly states that cracks to the house were ‘evident’ at the time of its inspection to both the interior and exterior. CB is not specific about exactly where in or around the cracks are, however, it notes cracking to ‘masonry or concrete elements’ Determination | Case number: 674578 Page 7 of 10 and also notes cracking to ceiling cornices as well as pointing out ‘defective or poor surfaces were noted to wall material and will need repair prior to next p aining.’ CB reports ‘visible cracking has been cate gorized [sic] as a serviceability defect’. CB goes on to say, ‘cracking of a building element is a serviceability defect where in the opinion of the inspector the function of the building element is impaired, however, the expected consequence of this cracking is unknown until further information is obtained’. CB also notes cracking would typically be expected to a building of this age and construction. Regarding the complainants’ photos, the panel considers the photos are taken from too far away to confirm whether or not cracking was present to the walls and cornices. Insurer’s claim decision allows for damage caused by partial inundation On balance, the panel accepts there has been ongoing foundation movement at the property for an extended period pre-dating the flood event, and this is supported by the evidence of widespread previous repairs throughout the house. The panel has reviewed all the available information and notes that in addition to NJ and L’s descriptions of these various repairs, the repairs are visible in several of the photos accompanying the reports. Nevertheless, the panel notes the weather event was significant, and the rear of extension to the house, which once again has a lower floor level than the remainder of the house, was subjected to inundation. However, the insurer’s claim decision already allows for this, with acceptance of damage to the spare room and laundry, which comprise the rear extension. While the panel accepts the reactive clays may have moved somewhat during the flood, it is satisfied the widespread cracking damage internally and externally to the complainant’s house pre-existed the flood and has occurred over a long period of time. This includes any cracking to the patio and carport slabs. Insurer is not required to take any further action in relation to the claim The panel is not persuaded the complainants have adequately established the widespread cracking damage to their house for which they are claiming was caused exclusively by, or even primarily by the flood event. The panel is satisfied the available information supports that movement has occurred at the complainant’s property over an extended period prior to the flood event, as evidenced by multiple previous repairs both externally and internally to the house. The policy exclusions for earth or soil movement and settling, expansion, shrinkage or vibration, are therefore applicable to the claim. Determination | Case number: 674578 Page 8 of 10 It is not in dispute that there was inundation to the rear extension of the property and the panel is satisfied the insurer’s claim decision adequately allows for this by accepting damage to the laundry and spare room. The remaining damage is considered by the panel to be a result of foundation movement at the property over a long period and the insurer is not required to take any further action in relation to this. Determination | Case number: 674578 Page 9 of 10 3 Supporting information 3.1 Policy wording Product disclosure statement (PDS) page 3: 3 General exclusions. The subsection headed Maintenance and building on page 12 is deleted and replaced with the following, so that your policy does not cover any loss or damage that is caused by or arises from: Maintenance and building:  defects in design, structure, materials, workmans hip or construction, … The subsection headed Wear and tear, and environmental conditions on page 12 is deleted and replaced with the following, so that your policy does not cover any loss or damage that is caused by or arises from: Wear and tear, and environmental conditions.  wear and tear, gradual deterioration, or fading, …  earth or soil movement (other than earthquake) including landslide, subsidence, erosion or heave,  settling, expansion, shrinkage or vibration, …  tree roots. PDS page 18: Flood. Covered. Loss or damage caused by flood, including tsunami and storm surge. Not covered.  loss or damage caus ed by flood for a period of 7 days from the date cover was initially provided by us, unless this policy is replacing another policy with equivalent flood cover and there has been no gap in cover or change to the sum insured, or you have entered into a contract to purchase the property and the risk has passed to you as purchaser,  loss or damage caus ed by or resulting from actions or movements of the sea or high water (other than storm surge and tsunami), or  loss or damage to retaining walls, paths, driveways, bridges or landscaping. PDS page 56: flood means the covering of normally dry land by wat er that has escaped or been released from the normal confines of any of the following: (a) a lake (whether or not it has been altered or modified) (b) a river (whether or not it has been altered or modified) (c) a creek (whether or not it has been altered or modified) (d) another natural wat ercourse (whether or not it has been altered or modi fied) Determination | Case number: 674578 Page 10 of 10 (e) a reservoir (f) a canal (g) a dam.