Burst pipe water damage: additional mould remediation and whole-house carpet replacement costs

FirmQBE
Decided2020-11-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$7,574
Non-financial loss—
Amount claimed$82,315
SourceAFCA PDF

Summary

After a burst pipe, the complainant cash-settled a mould remediation quote, then claimed further mould spread and sought whole-house carpet replacement. AFCA found the further damage resulted from the complainant's delay, rejected the additional costs, but ordered a 15% uplift of $7,573.50 on the cash settlement.

Where a claimant takes a cash settlement and delays remediation, the insurer is not liable for further damage, though a 15% uplift reflects the risk transferred to the complainant.

Issues

Subjects and remedies

home or building damagepay claim

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 674340 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 674340 Page 2 of 7 Case number: 674340 11 November 2020 1 Determination overview 1.1 Complaint The complainant holds a building and contents insurance policy with the financial firm (insurer). He lodged a claim on 21 January 2019 after a burst water pipe caused water damage to the rumpus room of his house. The complainant says the damage was initially isolated to this room but, due to the delays by the insurer, the damage has since spread throughout the home. The insurer has settled the complainant $121,328.12 to date for mould remediation and damaged contents. However the complainant says this is now insufficient to reinstate the property, given the insurer ’ s lack of action. To resolve the complaint the complainant wants the insurer to provide an independent assessment of the damage and offer an adequate settlement, replace carpets throughout the home, and restore/decontaminate all furniture which has sustained mould damage. 1.2 Issues and key findings Is the insurer liable for additional costs? The panel is not satisfied the additional cost of mould remediation now required is a direct result of the insurer ’ s delays or lack of action. The complainant was cash settled in a timely manner based on a quote he provided; but he did not attend to the works in a reasonable timeframe, and that allowed further damage to develop. That means the insurer is not liable for any further damage arising from the delays. It is not required to remediate additional furniture, or replace carpets beyond that in the room where damage originally occurred . However, it is fair in the circumstances that the cash settlement amount already paid be increased by 15% to take account of the transfer of risk from the insurer to the complainant in dealing with the claim-related repairs/remediation. 1.3 Determination This determination is substantially in favour of the insurer. It is required to pay the complainant a further $7,573.50. Determination | Case number: 674340 Page 3 of 7 2 Reasons for determination There has been a full exchange of material between the parties, and each party has had the opportunity to address the issues arising from that. Due to the nature of/complexities involved in this dispute, it has been referred to a Panel for determination. This determination follows consideration of all the information exchanged, and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous AFCA decisions where applicable. While both parties have made numerous submissions, for the purposes of this determination, commentary has been restricted to those issues which have a direct bearing on the outcome of the complaint. 2.1 Is the insurer liable for additional costs? Insurer cash settled for mould remediation and damaged items The insurer says the complainant provided his own quote from ‘D’ for mould remediation on 16 May 2019. The complainant requested that be accepted by the insurer in order for works to be undertaken. The insurer reviewed the quote and confirmed the following day it was willing to settle for the quoted amount of $50,490. However, the complainant asked the insurer not to raise settlement for this amount until works were complete. The insurer sent an email the same day requesting the complainant proceed with the mould remediation in line with the quote. On 21 May 2019 the complainant advised the insurer he required additional time to investigate the mould issue and was requesting further reports from mould experts on how to best remediate the damage. On 30 May 2019 the complainant called the insurer to advise he was satisfied with the scope of works provided by ‘M’ and confirmed he was willing to proceed with works as quoted. He advised he would undertake further testing post-remediation to confirm the work was completed to an adequate standard. He requested the insurer provide settlement accordingly and reiterated he would still like the carpet to be replaced throughout the entire home. On 31 May 2019 the insurer raised payment as per D’s quote. In addition, the insurer has paid for the following items:  $37,400 for replacement of the cabinet;  $7,623.18 for replacement of carpet in rumpus room; and Determination | Case number: 674340 Page 4 of 7  $5,000.00 for a rug, in accordance with the policy limit. Complainant says further damage was caused due to insurer ’s delays When the complainant lodged his claim on 21 January 2019, he said the damage from the burst pipe was isolated to the rumpus room and that no other damage was evident. The insurer arranged for trades to conduct a make-safe and assess the extent of the damage. Th e complainant says the contractor which attended from ‘J’ was not adequately qualified and the purpose of his attendance was just to take photos and report back to the insurer. The same day, ‘S’ attended the prope rty to install drying equipment, and a section of the carpet was cut out in the rumpus room since mould formation was evident. The complainant says he raised concerns about the wet carpet under a cabinet but that was not removed, which meant the room did not dry out entirely. He says he was told by the trades the cabinet was too heavy (approximately 400kgs) a nd there was also the risk of electrocution due to it being near damp electricals. The complaint says he raised the issue of the damp carpet underneath the cabinet again with the insurer on 28 January 2019, but the matter was not appropriately addressed. On 11 February 2019 he advised the insurer the floorboards surrounding the cabinet were starting to go black and that this was spreading further to the floorboards around it. The insurer arranged further trades to attend, however the cabinet was not removed from the property. This process appears to have been complicated by the complainant making access difficult and also not allowing tradesmen to perform the work as he did not believe they were sufficiently qualified. The complainant says on 13 February 2019 he arranged for his own removalist to remove the cabinet to avoid any further damage occurring. The complainant believes the insurer should be liable for the increased repair/remediation costs because it was due to the lack of action by the insurer that further mould damage developed and spread. Insurer says it was complainant’s delay which caused further damage On 11 June 2019 the complainant reiterated that all carpets throughout the home needed to be replaced in order to completely remove the mould, in line with advice he received from industry body ‘IICRC’. He also confirmed ‘D’ (who had originally quoted the complainant for the work) was not a member of IICRC. The complaint lodged a formal complaint with the insurer on 12 September 2019 regarding its decision not to replace all the carpet. He also requested an additional settlement for the increased mould remediation costs. The insurer responded to the complainant on 8 October 2019 confirming it maintained its decision to only replace that part of the carpet that had been damaged. It also confirmed it would not pay for any additional costs in relation to mould remediation. Determination | Case number: 674340 Page 5 of 7 The complainant provided reports from mould r emediation specialists ‘BHS’ and ‘SME’ (in October and November 2019 respectively) to support his position. The insurer says the complainant advised he has not engaged D or another contractor to perform remediation works since receiving the cash settlement approximately 5 months earlier. The insurer says it had discharged its liability to the complainant regarding mould remediation on 31 May 2019 and that it paid these funds on the understanding that this amount would remediate all mould within the complai nant’s home based on the information provided by the complainant on 17 May 2019 and in D’s quote. The insurer is therefore of the opinion the complainant has failed to mitigate his loss, and has allowed mould to spread. The insurer relies on the following policy exclusion and condition to support its position: General exclusions (page 61 of the product disclosure statement) If the incident arises from or is connected with: […]  Previous damage which hasn’t been repaired General conditions (page 62) […]  the insured is required to take reasonable care to prevent further damage Insurer not liable for additional damage On the available evidence, the panel is satisfied the insurer has acted reasonably and in accordance with its obligations under the policy, having raised payments for the claim-related damage in a timely manner to allow work to be undertaken promptly. The panel considers, on balance, the complainant did fail to mitigate his loss, and caused extensive delays resulting in further mould contamination throughout the home, which in turn increased the total remediation cost. On that basis, the insurer is not liable for further damage which has arisen since it cash settled , as requested by the complainant, in line with the complainant’s quot e. Fair, however, for cash settlement amount for mould to be increased It is important to note, however, that when a cash settlement is made, the insured then takes on the responsibility of completing the claim-related work, and assumes Determination | Case number: 674340 Page 6 of 7 associated risks (including, for example, the risk of further unforeseen claim-related damage being found). In situations where the insurer undertakes or authorises repairs/remediation, then the risk for that repair or remediation work remains with the insurer which is then responsible for dealing with any further damage that may be uncovered in the course of the work. To be clear, that is distinct from a situation where other unrelated damage is discovered, for which the insurer is not liable under the claim or the policy. (It is also distinct from the further damage which the complainant is now claiming, which has arisen because of delays in dealing with the original issues, and for which the insurer is not liable.) In this case, the cash settlement was based on an actionable quote obtained by the complainant, and the complainant was prepared to accept that. However, the panel considers it fair in the circumstances that an allowance also be made for the fact that the complainant is taking on the risk associated with the work. The panel considers an uplift of 15% of the quoted amount is fair and appropriate in the circumstances. The insurer is required to increase the cash settlement for mould remediation by a further $7,573.50. Insurer entitled to decline whole house carpet replacement The policy provides the insurer will cover carpet (as part of the ‘ contents ’ cover under the policy), but only the cost to repair or replace the carpet in the room, hallway or passageway where the damage occurred. The complainant says that mould has now spread to all carpets throughout the home and so all carpet must be replaced. He has provided a quote for $82,315 for the full carpet replacement. Whilst it is not disputed the mould has spread beyond the damaged rumpus room area, the panel is not persuaded this is because of anything the insurer did or failed to do, and so it would not be fair to hold the insurer responsible for any further costs. Instead, the panel is satisfied, on balance, the further damage is a direct result of the complainant failing to undertake remediation works in a timely manner. While the panel appreciates the complainant may have wanted the added comfort of obtaining other expert reports, particularly after he discovered D was apparently not a member of the relevant industry institute, the delays that resulted while he investigated other experts was not something for which the insurer was responsible. The insurer is therefore not required to replace all carpet throughout the house, either under the terms of the policy, or otherwise. On 12 July 2019 it paid $7,623.18 for that section of carpet in the rumpus room which was damaged initially, and the policy does not require it to cover matching otherwise undamaged carpet. Determination | Case number: 674340 Page 7 of 7 3 Supporting information 3.1 Relevant policy provisions Subject Terms PDS General exclusions Page 61 What we won’t cover If the incident arises from or is connected with: […]  Previous damage that hasn't been repaired PDS General conditions Page 62 Care and maintenance You must take reasonable care to prevent damage, injury or loss. We won't pay for damage, injury, loss or your liability to which your failure to take reasonable care is a contributing factor. At all times, you must:  Prevent damage to property insured, as well as to others and their property  Minimise the cost of any claim under your Policy  Comply with all laws.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.