Home / IAG / Determination 673095

Determination 673095

Settlement of home fire damage claim: repair cost, landscaping cover, temporary accommodation and compensation

FirmIAG
Decided2020-07-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$57,322
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

After a fire damaged their home, the complainants disputed the insurer's settlement, landscaping cover, further temporary accommodation and professional fees. AFCA found landscaping covered, increased the settlement by $18,756.43 with interest, awarded $1,500 non-financial loss, and rejected the accommodation and fee claims.

Permanent landscaping features fall within the policy's home improvements definition, and a 15% contingency was fair given the substantive reinstatement works.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 673095 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 673095 Page 2 of 8 Case number: 673095 29 July 2020 1 Determination overview 1.1 Complaint On 12 October 2018, the complainants lodged a claim under their home insurance policy with the financial firm (insurer) after a fire caused damage to their home. The insurer assessed and accepted the claim. However, the following issues remain in dispute:  whether the landscaping is covered under the policy  the cost of repairing the damage to the home  whether the complainants are entitled to further temporary accommodation costs  whether the complainants are entitled to compensation and professional fees 1.2 Issues and key findings Is the insurer required to increase its building settlement offer? The insurer is required to pay the complainants’ landscaping costs. This is covered under the policy. The insurer should also increase its contingency by 5% as set out in section 2.1. Is the insurer liable for further temporary accommodation costs? No. This is because the insurer has already paid beyond the policy coverage of 52 weeks. Further, the additional allowance paid addresses any delays the insurer may have caused. Are the complainants entitled to compensation and professional fees? The complainants are entitled to $1,500 compensation for non-financial loss. The complainants are not entitled to reimbursement of their representative’s fees or their professional costs. 1.3 Determination This determination is partially in favour of the complainants. The insurer is to settle the complainants’ claim as set out in section 2.1. The insurer should also pay $1,500 compensation for non-financial loss. Determination | Case number: 673095 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer required to increase its building settlement offer? Complainants have an onus to establish valid claim and policy coverage When lodging an insurance claim, the complainants bear the initial onus to establish a valid claim to which the policy responds . If the complainants can establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on a condition or exclusion under the policy to deny the claim. There is no dispute the complainants established a valid claim for fire damage to their home. Further, the parties have agreed upon a scope of works provided by the complainants’ builder (SL). The dispute remains as to what is the reasonable cost to repair the property. The parties also dispute whether landscaping is covered by the policy. Insurer is liable to cover costs of landscaping The insurer relies on its policy. This defines building cover to include home improvements. Home improvements includes ‘permanent landscaping features’. How ever, it specifically excludes ‘soil or bushland’. The insurer says the costs claimed are predominantly for plants and flowers as well as turf and soil. The insurer says these are not permanent landscaping features such that they are covered under the defi nition of ‘home improvements’. The complainants disagree with this view. They say the garden was professionally landscaped and by its simple definition, plants would not be considered bushland or soil. The panel does not accept plants or turf professionally applied could be considered soil or bushland. The panel also accepts these would be permanent landscaping features. The plants and turf were affixed to the land and maintained over 17 years. There is no dispute they had roots connected to the land. The plants were not in containers that could easily be transported. If the home was to be sold, it is unlikely these would be removed and transferred to the complainants’ new property. Therefore, their damage is covered by the policy. The complainants provided a quotation from SC to replace the landscaping for $38,566. This quote does not look at replacing soil or bush. The only aspect of the quote that refers to soil is ‘fertilisers and soil conditioners’. This appears limited to preparing the soil for the plants. The insurer has provided no evidence to show that this is not a reasonable cost to repair the damaged landscape. Determination | Case number: 673095 Page 4 of 8 Therefore, the insurer is to pay the complainants’ quotation from SC for $38,566 plus interest pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest applies from 14 days after the quotation was issued until payment is made. Parties experts provide differing opinions as to cost of building repairs The parties agreed upon the scope of works provided by (SL). This was arranged by the complainants. The insurer later agreed to cover the costs of this report. The dispute remains as to the reasonable settlement of the repairs. The complainants provided a quotation for the repairs from builder (AR) for an amount of $533,082. They have also provided an estimate of the repairs from quantity surveyor P for $630,000. The insurer provided two quotations of its own. Builders BB provided a quotation for $375,128.52 and (UB) provided an estimate for $235,200.21 to complete the repairs. The insurer opted to authorise BB to complete the repairs. However, the complainants intend to demolish and build a new property on the basis they felt BB’s quotation was inadequate and they did not believe the property could be restored to its original condition. To support their view that BB’s quotation was inadequate, the complainants had P compare the costs between AR and BB. The main areas of contention are BB’s costs for the roof, preliminaries, plumbing fixtures and joinery. The complainants say BB has not allowed enough for the following:  costs to restore the high Edwardian style roof  BB has only allowed for basic fixtures, not to the same quality as existing  the plaster quotation does not allow for solid plaster linings and demolition  the joinery sum allowed is inadequate  there is an insufficient allowance for supervision in the preliminaries The insurer says BB are sufficiently experienced and qualified to estimate the cost to repair the property. BB provided a copy of its subcontra ctor’s quotations for the plaster, roofing and plumbing. BB stands by its quotation and was willing to undertake the repairs. The quotations were actionable. The insurer further noted any shortfall in the quotes is addressed by the allowance of a 10% contingency. Determination | Case number: 673095 Page 5 of 8 Insurer not required to increase building settlement offer Based on the exchanged information, the panel is not satisfied the insurer should be required to increase its settlement. Whilst PR has pointed out several differences in the quotations between BB and AR, it is clear BB’s quotation is mainly consistent with SL’s scope of works. In particular, regarding the roof, BB’s allowance is based on the sub - contractor’s quote. The sub - contractor’s quote was consistent with SL’s scope of works for th e roof. Therefore, there is insufficient basis to dismiss BB’s allowance for the roof. The insurer has consistently stated that it was ready, willing and able to do the works. There is no evidence to support the complainant’s position that the insurer coul d not restore the property. BB has repeatedly stated it is willing to stand by the quotes. Further, the insurer confirmed BB has been a builder for almost eight years dealing with major projects. The panel also notes BB’s quote is mainly consistent with SL’s scope of works. To the extent it is not (i.e. the allowance for only basic fixtures), this is addressed in the contingency. On balance, the panel finds the insurer’s reliance on BB’s quotation was fair and reasonable. However, for the contingency, the panel considers it is fair to allow 15%. The works required are substantive. The possibility for additional costs is high when you consider numerous references to removal and reinstatement and a possibility of this being unsuccessful. This should also account for the possibility that all the proper fixtures have not been included. Therefore, the insurer should increase its settlement by $18,756.43. The insurer should also pay interest on this sum pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from 8 August 2018, being when the insurer sought to cash settle the claim, until payment is made. 2.2 Is the insurer liable for further temporary accommodation costs? Complainants are not entitled to further temporary accommodation costs The complainants’ policy clearly and unambiguously says it provides coverage for temporary accommodation up to a maximum of 52 weeks under the policy. The insurer has shown it paid about 14 weeks of rent and accommodation costs beyond the 52 weeks policy limit. This does not appear to be disputed. The complainants argue as the claim has not been appropriately settled, they should be paid for ongoing rental costs. Determination | Case number: 673095 Page 6 of 8 The panel disagrees. The insurer was ready, willing and able to repair the property. The complainants refused this option as they wished to demolish and rebuild the home. This was a substantive reason as to why the claim has been delayed. The panel acknowledges the insurer did not cash settled the claim until 8 August 2019. This would have contributed to the delay. However, the insurer has paid or arranged temporary accommodation for about 3 months above the 12 month limit. The panel considers this additional allowance sufficiently accounts for any delays contributed by the insurer. Further, the panel does not accept the insurer’s failure to include an additional 5% contingency should have contributed to the delay. The insurer paid a substantial amount of money (over $400,000). This should have been sufficient for the complainants to start the process of rebuilding their property and mitigate their potential temporary accommodation costs. Therefore, no further action is required by the insurer for temporary accommodation costs. 2.3 Is the complainant entitled to compensation and professional fees? AFCA can award compensation in certain circumstances AFCA’s Rules enable it to award compensation to a complainant for non -financial loss up to $5,000. Compensation for non-financial loss is limited. AFCA may decide an insurer should compensate a complainant for such a loss only where there has been:  an unusual amount of physical inconvenience;  time taken to resolve a situation; or  interference with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation for non-financial loss and expects a complainant to be moderately robust and bear the usual degree of inconvenience when managing an insurance claim. Complainants seeks compensation for claims handling experience The complainants are dissatisfied with the claims experience. The complainants highlighted delays by the insurer, no appointment of a loss adjustor, not obtaining an independent scope of works, withholding its quotations for several months and poor communications. A review of the available information shows the insurer was hesitant to cover SM’s cost for its scope of work despite relying upon it. The insurer also took a considerable amount of time to action the council’s reque st to confirm the property was safe. Determination | Case number: 673095 Page 7 of 8 Whilst there were some delays in providing quotations and claims handling, the claim itself is a large quantum with multiple facets. However, given the combination of issues identified above, the panel considers it fair the insurer pays the complainants $1,500 compensation for non-financial loss. Claim preparation fees and further professional fees Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply. The complainants’ representative says it became involved in the claim due to a lack of attention by the insurer and a lack of communication. The available information shows the complainants sought representation shortly after the claim was lodged. Further, if a party chooses this option, it is generally at their expense, unless there are circumstances which specifically warrant it. The main issue in dispute were the cost of repairs. The panel preferred the insurer’s position on this. Further, there is no evidence to show the complainants were not capable of advocating this dispute. Given this, the panel does not accept the circumstances warrant for the insurer to contribute to the representative’s costs. In relation to the professional fees charged by PR, as these have not assisted the complainants’ po sition, the insurer is not liable to pay these costs. Determination | Case number: 673095 Page 8 of 8 3 Supporting information 3.1 AFCA’s approach to this determination This dispute has been considered based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this recommendation and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.