Home / IAG / Determination 673095
Determination 673095
Settlement of home fire damage claim: repair cost, landscaping cover, temporary accommodation and compensation
Summary
After a fire damaged their home, the complainants disputed the insurer's settlement, landscaping cover, further temporary accommodation and professional fees. AFCA found landscaping covered, increased the settlement by $18,756.43 with interest, awarded $1,500 non-financial loss, and rejected the accommodation and fee claims.
Permanent landscaping features fall within the policy's home improvements definition, and a 15% contingency was fair given the substantive reinstatement works.
Issues
- Claim amount dispute primary · upheld
“The insurer should increase its settlement by $18,756.43. The insurer should also pay interest on this sum pursuant to section 57 of the Insurance Contracts Act 1984.”
- Delay secondary · upheld
“Whilst there were some delays in providing quotations and claims handling, the panel considers it fair the insurer pays the complainants $1,500 compensation for non-financial loss.”
- Product terms interpretation secondary · upheld
“The insurer is required to pay the complainants' landscaping costs. This is covered under the policy.”
Subjects and remedies
home or building damagepay claimpay interestpay non financial loss
Text of the determination
Determination
Case number 673095
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 673095 Page 2 of 8
Case number: 673095 29 July 2020
1 Determination overview
1.1 Complaint
On 12 October 2018, the complainants lodged a claim under their home insurance
policy with the financial firm (insurer) after a fire caused damage to their home.
The insurer assessed and accepted the claim. However, the following issues remain
in dispute:
whether the landscaping is covered under the policy
the cost of repairing the damage to the home
whether the complainants are entitled to further temporary accommodation costs
whether the complainants are entitled to compensation and professional fees
1.2 Issues and key findings
Is the insurer required to increase its building settlement offer?
The insurer is required to pay the complainants’ landscaping costs. This is covered
under the policy.
The insurer should also increase its contingency by 5% as set out in section 2.1.
Is the insurer liable for further temporary accommodation costs?
No. This is because the insurer has already paid beyond the policy coverage of 52
weeks. Further, the additional allowance paid addresses any delays the insurer may
have caused.
Are the complainants entitled to compensation and professional fees?
The complainants are entitled to $1,500 compensation for non-financial loss. The
complainants are not entitled to reimbursement of their representative’s fees or their
professional costs.
1.3 Determination
This determination is partially in favour of the complainants.
The insurer is to settle the complainants’ claim as set out in section 2.1.
The insurer should also pay $1,500 compensation for non-financial loss.
Determination | Case number: 673095 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer required to increase its building settlement offer?
Complainants have an onus to establish valid claim and policy coverage
When lodging an insurance claim, the complainants bear the initial onus to establish a
valid claim to which the policy responds . If the complainants can establish a valid
claim, the onus shifts to the insurer to show, on the balance of probabilities, it is
entitled to rely on a condition or exclusion under the policy to deny the claim.
There is no dispute the complainants established a valid claim for fire damage to their
home. Further, the parties have agreed upon a scope of works provided by the
complainants’ builder (SL).
The dispute remains as to what is the reasonable cost to repair the property. The
parties also dispute whether landscaping is covered by the policy.
Insurer is liable to cover costs of landscaping
The insurer relies on its policy. This defines building cover to include home
improvements. Home improvements includes ‘permanent landscaping features’.
How ever, it specifically excludes ‘soil or bushland’.
The insurer says the costs claimed are predominantly for plants and flowers as well
as turf and soil. The insurer says these are not permanent landscaping features such
that they are covered under the defi nition of ‘home improvements’.
The complainants disagree with this view. They say the garden was professionally
landscaped and by its simple definition, plants would not be considered bushland or
soil.
The panel does not accept plants or turf professionally applied could be considered
soil or bushland. The panel also accepts these would be permanent landscaping
features. The plants and turf were affixed to the land and maintained over 17 years.
There is no dispute they had roots connected to the land. The plants were not in
containers that could easily be transported. If the home was to be sold, it is unlikely
these would be removed and transferred to the complainants’ new property.
Therefore, their damage is covered by the policy.
The complainants provided a quotation from SC to replace the landscaping for
$38,566. This quote does not look at replacing soil or bush. The only aspect of the
quote that refers to soil is ‘fertilisers and soil conditioners’. This appears limited to
preparing the soil for the plants.
The insurer has provided no evidence to show that this is not a reasonable cost to
repair the damaged landscape.
Determination | Case number: 673095 Page 4 of 8
Therefore, the insurer is to pay the complainants’ quotation from SC for $38,566 plus
interest pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest
applies from 14 days after the quotation was issued until payment is made.
Parties experts provide differing opinions as to cost of building repairs
The parties agreed upon the scope of works provided by (SL). This was arranged by
the complainants. The insurer later agreed to cover the costs of this report. The
dispute remains as to the reasonable settlement of the repairs.
The complainants provided a quotation for the repairs from builder (AR) for an amount
of $533,082. They have also provided an estimate of the repairs from quantity
surveyor P for $630,000.
The insurer provided two quotations of its own. Builders BB provided a quotation for
$375,128.52 and (UB) provided an estimate for $235,200.21 to complete the repairs.
The insurer opted to authorise BB to complete the repairs. However, the complainants
intend to demolish and build a new property on the basis they felt BB’s quotation was
inadequate and they did not believe the property could be restored to its original
condition.
To support their view that BB’s quotation was inadequate, the complainants had P
compare the costs between AR and BB. The main areas of contention are BB’s costs
for the roof, preliminaries, plumbing fixtures and joinery.
The complainants say BB has not allowed enough for the following:
costs to restore the high Edwardian style roof
BB has only allowed for basic fixtures, not to the same quality as existing
the plaster quotation does not allow for solid plaster linings and demolition
the joinery sum allowed is inadequate
there is an insufficient allowance for supervision in the preliminaries
The insurer says BB are sufficiently experienced and qualified to estimate the cost to
repair the property. BB provided a copy of its subcontra ctor’s quotations for the
plaster, roofing and plumbing. BB stands by its quotation and was willing to undertake
the repairs. The quotations were actionable.
The insurer further noted any shortfall in the quotes is addressed by the allowance of
a 10% contingency.
Determination | Case number: 673095 Page 5 of 8
Insurer not required to increase building settlement offer
Based on the exchanged information, the panel is not satisfied the insurer should be
required to increase its settlement.
Whilst PR has pointed out several differences in the quotations between BB and AR,
it is clear BB’s quotation is mainly consistent with SL’s scope of works. In particular,
regarding the roof, BB’s allowance is based on the sub - contractor’s quote. The sub -
contractor’s quote was consistent with SL’s scope of works for th e roof. Therefore,
there is insufficient basis to dismiss BB’s allowance for the roof.
The insurer has consistently stated that it was ready, willing and able to do the works.
There is no evidence to support the complainant’s position that the insurer coul d not
restore the property.
BB has repeatedly stated it is willing to stand by the quotes. Further, the insurer
confirmed BB has been a builder for almost eight years dealing with major projects.
The panel also notes BB’s quote is mainly consistent with SL’s scope of works. To the
extent it is not (i.e. the allowance for only basic fixtures), this is addressed in the
contingency.
On balance, the panel finds the insurer’s reliance on BB’s quotation was fair and
reasonable.
However, for the contingency, the panel considers it is fair to allow 15%. The works
required are substantive. The possibility for additional costs is high when you consider
numerous references to removal and reinstatement and a possibility of this being
unsuccessful. This should also account for the possibility that all the proper fixtures
have not been included.
Therefore, the insurer should increase its settlement by $18,756.43. The insurer
should also pay interest on this sum pursuant to section 57 of the Insurance Contracts
Act 1984 (the Act). Interest is payable from 8 August 2018, being when the insurer
sought to cash settle the claim, until payment is made.
2.2 Is the insurer liable for further temporary accommodation costs?
Complainants are not entitled to further temporary accommodation costs
The complainants’ policy clearly and unambiguously says it provides coverage for
temporary accommodation up to a maximum of 52 weeks under the policy.
The insurer has shown it paid about 14 weeks of rent and accommodation costs
beyond the 52 weeks policy limit. This does not appear to be disputed.
The complainants argue as the claim has not been appropriately settled, they should
be paid for ongoing rental costs.
Determination | Case number: 673095 Page 6 of 8
The panel disagrees. The insurer was ready, willing and able to repair the property.
The complainants refused this option as they wished to demolish and rebuild the
home. This was a substantive reason as to why the claim has been delayed.
The panel acknowledges the insurer did not cash settled the claim until 8 August
2019. This would have contributed to the delay.
However, the insurer has paid or arranged temporary accommodation for about 3
months above the 12 month limit. The panel considers this additional allowance
sufficiently accounts for any delays contributed by the insurer.
Further, the panel does not accept the insurer’s failure to include an additional 5%
contingency should have contributed to the delay. The insurer paid a substantial
amount of money (over $400,000). This should have been sufficient for the
complainants to start the process of rebuilding their property and mitigate their
potential temporary accommodation costs.
Therefore, no further action is required by the insurer for temporary accommodation
costs.
2.3 Is the complainant entitled to compensation and professional fees?
AFCA can award compensation in certain circumstances
AFCA’s Rules enable it to award compensation to a complainant for non -financial loss
up to $5,000. Compensation for non-financial loss is limited. AFCA may decide an
insurer should compensate a complainant for such a loss only where there has been:
an unusual amount of physical inconvenience;
time taken to resolve a situation; or
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation for non-financial loss and
expects a complainant to be moderately robust and bear the usual degree of
inconvenience when managing an insurance claim.
Complainants seeks compensation for claims handling experience
The complainants are dissatisfied with the claims experience. The complainants
highlighted delays by the insurer, no appointment of a loss adjustor, not obtaining an
independent scope of works, withholding its quotations for several months and poor
communications.
A review of the available information shows the insurer was hesitant to cover SM’s
cost for its scope of work despite relying upon it.
The insurer also took a considerable amount of time to action the council’s reque st to
confirm the property was safe.
Determination | Case number: 673095 Page 7 of 8
Whilst there were some delays in providing quotations and claims handling, the claim
itself is a large quantum with multiple facets. However, given the combination of
issues identified above, the panel considers it fair the insurer pays the complainants
$1,500 compensation for non-financial loss.
Claim preparation fees and further professional fees
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant in the course of a complaint. These costs can be awarded
if the complainant needed an expert to understand or establish their claim. These
costs are normally capped at $5,000 unless exceptional circumstances apply.
The complainants’ representative says it became involved in the claim due to a lack of
attention by the insurer and a lack of communication.
The available information shows the complainants sought representation shortly after
the claim was lodged. Further, if a party chooses this option, it is generally at their
expense, unless there are circumstances which specifically warrant it.
The main issue in dispute were the cost of repairs. The panel preferred the insurer’s
position on this. Further, there is no evidence to show the complainants were not
capable of advocating this dispute.
Given this, the panel does not accept the circumstances warrant for the insurer to
contribute to the representative’s costs.
In relation to the professional fees charged by PR, as these have not assisted the
complainants’ po sition, the insurer is not liable to pay these costs.
Determination | Case number: 673095 Page 8 of 8
3 Supporting information
3.1 AFCA’s approach to this determination
This dispute has been considered based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this recommendation and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.