Home / QBE / Determination 672923

Determination 672923

Insurer declined a storm and rainwater damage claim by relying on structural defect, wear and tear and prior damage exclusions

FirmQBE
Decided2020-12-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$153,982
Non-financial loss—
Amount claimed$172,154
SourceAFCA PDF

Summary

The complainant's home and contents were damaged by water entering during the February 2019 Townsville rain event, and the insurer declined the claim under exclusions. AFCA found the storm was the dominant cause, ordered a cash settlement of $143,481.65 with interest, reimbursement of claim-related costs and a $5,000 contribution to representation costs.

The proximate cause is the dominant or effective cause, and the insurer had not established that the cited defects or deterioration caused the loss.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interest

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 672923 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 672923 Page 2 of 9 Case number: 672923 14 December 2020 1 Determination overview 1.1 Complaint The complainant has home building and contents insurance with the financial firm (insurer) and lodged a claim following damage to his home building and contents caused by a storm in February 2019. The insurer does not dispute there was a storm but declined the claim and says the damage is excluded from cover as it was caused by:  a structural defect, faulty design or faulty workmanship  gradual deterioration or wear and tear  damage not previously repaired. The complainant disagrees with the insurer and wants the insurer to pay his claim and claim-related costs, such as professional representation and expert reports. 1.2 Issues and key findings Is the insurer entitled to decline the complainant’s claim ? No. The panel is satisfied the storm was the cause of the damage to the insured property. The insurer has not established that the cited exclusions apply to deny indemnity for the loss. Is the insurer liable for the complainant’s claim -related costs? Yes. The complainant ’s claim-related costs were reasonably incurred due to the insurer incorrectly declining his claim. 1.3 Determination This determination is in favour of the complainant. Within 14 days of the complainant’s acceptance of this determination, the insurer is to pay the complainant $143,481.65. The insurer must also pay interest on the settlement in line with section 57 of the Insurance Contracts Act 1984 (the Act), from 29 August 2019 to date of payment of the claim. Further, the insurer must pay the complainant $5 ,000 pursuant to AFCA rule D.5 as contribution to the complainant’s professional costs incurred in the course of this complaint. Determination | Case number: 672923 Page 3 of 9 2 Reasons for determination The complainant is represented by a claims management firm. Reference to the complainant in this determination includes reference to the representative. There has been a full exchange of material between the parties and each party has had the opportunity to address the issues that are in dispute. Due to the issues involved this matter, it has been referred to a panel for determination. The panel comprises the Lead ombudsman, a member with extensive experience as a consumer representative and a member with significant industry experience. The determination follows consideration of all the relevant material. It is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Is the insurer entitled to decline the complainant’s claim? No, the panel is satisfied the proximate or dominant cause of the damage was the storm. Policy provides cover for storm damage The complainant ’ s policy insures the building for full replacement and contents for $42,400 and covers several listed events including cover for storm, rainwater, flood and wind subject to several limitations and conditions. There is no dispute that following extreme rainfall in Townsville in February 2019 (1260mm for rain fell in the ten days to 8/2/2019 and is estimated at a 1:300 to a 1:500-year event) a large volume of water entered the property. Water ingress was identified to the following areas:  bedroom 1 bay window unit  office window area  bedroom 2  sunken lounge area. Parties disagree over the proximate cause of the damage When considering whether damage is covered by an insurance policy, it is necessary to assess the proximate cause of the damage. The proximate cause is not necessarily the first or the last or the sole cause of damage. It is the dominant or effective or operative cause. While the insurer does not dispute there was a storm and the property inundated, it relied on its exclusion: Determination | Case number: 672923 Page 4 of 9 ‘ In a flood event, we won't cover water entering buildings because of a structural defect, faulty design or faulty workmanship’ In support of the denial, the insurer relied on a builder’s report from AB (March 2019) and an engineer’s report from AM (April 2019). In summary they stated:  the slab is the same height as the ground and the water entered at slab level  the guttering at the front was full of debris and in other areas had rusted  window units and flashings were not sealed, causing rain water to enter inside and flood the sunken floor in the lounge  the raised garden outside of the study acted as a water repository which leaked into the house  the patio at the rear had been enclosed over time, was non-compliant under building codes, and the wooden timber framing had rotted  render on external besser bricks had cracked, allowing water to seep inside  the building was not consistent with construction codes 2016 BCA/NCC and AS:3700 & AS:4773.1. The complainant disagrees and obtained an expert report from FM in April 2020 who stated:  the uniqueness of the event and amount of driving rain was outside the design range for gutters and windowsills to manage. Rainfall levels the highest on record since records began  the suggestion of a lack of maintenance to the exterior masonry brick render and paint work 300mm below the window sill is not possible as there are no signs of long term delay to the masonry bricks  it was highly unlikely that the integrity of the slab was compromised at the time of the rain event  there is evidence that the property had been weatherproofed  there is no significant evidence of pre-existing water ingress damage  the main cause was water seeping through the window frames and soffit lining of the bay windows. This did not occur initially, but only after the rain increased in intensity (early February 2019). Insurer’s evidence is not persuasive as to the cause of the loss The Panel is not persuaded by the insurer’s evidence. AM and FM provided conflicting opinions about when the dwelling was constructed – 1996 and 2012, and 2007 respectively. DC, who was appointed by AM, says the original building approval was for ‘ a dwelling and carport which included an open patio to the rear ’, granted 2 January 1997. It cites the following legislation as applicable at the date of construction: Determination | Case number: 672923 Page 5 of 9  Building Act 1975.  Standard Building By-Laws.  Building Code of Australia (BCA) 1990 - Housing Extract 1993 - Amendment 7 (BCA 1990). In the absence of any compelling evidence to the contrary, the panel considers it more likely than not the dwelling was constructed circa 1997 – around the time the approval was issued. The insurer has not argued the dwelling, carport, and open patio were not constructed according to the relevant regulations around 1997. Nor has it argued the regulations circa 1997 have the same construction requirements as those it seeks to rely on to decline the claim (2016 BCA/NCC and AS:3700 & AS:4773.1). The panel is not satisfied the 2016 BCA/NCC and AS:3700 & AS:4773.1 are relevant to the construction of the home. Further, the insurer has not shown when the patio was converted. Even if it had, the Panel is not satisfied the insurer has shown alleged defects were the proximate cause of the damage. The complainant denies the alleged defects have been present in the property since it was constructed, and the patio was converted. He said they never experienced the damage or water ingress before the storm/flood. The panel notes the period preceding and following the purchase of the property appears to have been relatively dry up to the 2019 storm – apart from in March 2016. The cumulative rainfall for the 2019 storm was 1235mm – more than three times the daily average of rain in March 2016. The panel accepts there appears to be some gradual deterioration to the property which pre-dated the storm. The panel also accepts there may be ways the construction of dwelling and conversion of the patio could have been better . It is true of almost any structure, built years ago that the construction could have been better (particularly where standards may have changed) and some gradual deterioration will exist. However, to the extent any defects and gradual deterioration existed, the Panel is not satisfied the insurer established these led to or caused the loss. While the storm was an unusually severe event, the panel finds it unlikely the property has not been subjected to other significant storms since 1997 (when it was likely constructed). The panel expects the dwelling would show signs of significant pre- existing damage and prior water ingress had defects existed to the extent alleged by the insurer. Conversely, the property appears to have been weatherproof for many years before the significant storm event in 2019. Based on the photographs exchanged, the property appears to be reasonably maintained. Determination | Case number: 672923 Page 6 of 9 The panel is persuaded that the uniqueness and power of the rain event caused water to enter through window frames, which flooded the interior of the house. The panel doubts the complainant would have allowed water to enter his property in times past, without addressing this. The only known change in circumstances was the storm. The panel is satisfied the storm is the dominant or effective cause of the damage to the insured property. Insurer required to indemnify the complainant for his loss The Panel accepts the insurer is liable to settle the complainant’s claim. The complainant provided a scope of works by FM for the repairs totalling $126,940.57, and a quote from a builder (JGC) for the same amount. He also claimed $39,713.36 worth of contents damage. The insurer did not challenge the costs or say they are excessive. There is nothing to suggest FM’s and JGC’s scope and quotes, or the contents claim, are unfair or unreasonable in the circumstances. The building and contents costs appear to be for the areas identified as damaged by the storm. The panel is satisfied the costs appear reasonable in the circumstances given the extent of the damage and significance of the storm. It is also fair for it to add a 15% contingency to the building quote to account for unforeseen damage and/or works, and the complainant’s loss of the insurer’s lifetime guarantee on the quality of repairs offered by the policy. This would bring the quote to $145,981.65. For the avoidance of any further delays, the insurer is cash settle the claim for damage to the insured property for $143,481.65 being the quoted amount including a 15% contingency, less the applicable policy excess of $2,500. 2.2 Is the insurer required to cover the complainant’s claim -related costs? Complainant seeks reimbursement for claim-related costs The complainant seeks the insurer to reimburse him the following claim related costs:  expert report (FM) - $3,520, due 28 April 2020  scope of works - $1,980, paid 15 May 2020  professional representation – unquantified fees. Fair in the circumstances for the insurer to pay claim-related costs The expert report and scope of works assisted the complainant in establishing his loss. Therefore, the Panel considers it fair in the circumstances for the insurer to reimburse him these costs. Determination | Case number: 672923 Page 7 of 9 The insurer must also pay interest on the amounts in line with section 57 of the Act, from the date the invoices were paid until the date it makes the payment. For completion, this means from 15 May 2020 for the scope of works, and from 28 April 2020 for the report (unless the complainant can show he paid it sooner). The complainant also says it was necessary for him to engage a professional representative, at a cost to him, for the following reasons.  he attempted to resolve the matter without professional representation and without success for some months  there was a significant power imbalance without professional representation because the insurer has a much higher level of knowledge, expertise, and resources to support its position; he never faced this situation before  before he engaged professional representation, he did not realise that he could engage an independent engineer to attend the property to investigate and report on the causes of the loss; even if he had, he did not know which expert to engage  nuances of causation (proximate cause, contribution, etc) are complex issues most general consumers are not well-placed to address without expert assistance  the engagement of a professional representative enabled him to present strong evidence justifying the water ingress was caused by the extreme weather event, not a real or perceived building defect. The complainant provided compelling and convincing reasoning it was necessary for him to engage a professional representative. The Panel is persuaded he has shown the complaint raised complex issues and he was unable to reasonably handle the complaint without getting advice. Accordingly, it is fair and reasonable in the circumstances for the insurer to compensate him his financial loss in engaging a representative. The complainant must provide the insurer invoices and remittance advice for the work his representative performed for the claim and complaint. The insurer must also pay interest on the amount in line with section 57 of the Act, from the date the invoice(s) were paid until the date it makes the payment. The insurer is entitled to limit its liability to $5,000 to these costs. Determination | Case number: 672923 Page 8 of 9 3 Supporting information 3.1 Product disclosure statement (PDS) Section Policy wording WHEN YOUR BUILDI NGS ARE PROTECTED … Insured event … Storm, rainwater, flood or wind We will cover Loss or damage as a result of:  storm (including named cyclone)  rainwater  flood, or  wind. We won’t cover Water entering your buildings:  through an opening made for building, renovation or repair work  because of a structural defect, faulty design or faulty workmanship EXCLUSIONS Any cover we provide is subject to the following exclusions:  general exclusions – applies to buildings, contents and liability covers including any optional benefit cover selected  buildings and contents cover exclusions – apply to buildings cover claims and contents cover including any optional cover selected BUILDI NGS AND CONTENTS COVER EXCLUSIONS We will not pay for any loss or damage which is caused directly or indirectly by: …  erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear …  a defect in an item, structural defects, faulty or poor workmanship or design …  previous damage that has not been repaired. HOW WE SETTLE A BUILDINGS CLAIM … Lifetime guarantee on buildings repairs We guarantee that if …  a defect arises in the lifetime of your buildings as a result of poor quality workmanship or use of incorrect materials or poor quality materials , [due to a repairer authorised by the insurer] we will rectify the problem by arranging, directly authorising and paying for further replacement, repair or rebuilding. Determination | Case number: 672923 Page 9 of 9 3.2 Relevant material considered and relied on  Parties’ submissions/emails and all attachments to all submissions/emails, to date .  Certificate of insurance.  PDS (policy terms and conditions).  Photographs.  Bureau of Meteorology records.  Climate statements.  AM submission on relevant regulations, including extracts of the regulations (2016 BCA/NCC and AS:3700 & AS:4773.1).  Local government Submission to the Office of the Inspector-General Emergency Management 31 March 2019 , ‘ with respect to the monsoon trough rainfall and flooding event in January and February 2019 ’ .  All reports and counter-reports submitted by AM and FM and their supporting evidence.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.