Home / AIG Australia Limited / Determination 671944

Determination 671944

Denial of IT equipment claim after storm and power disturbance

FirmAIG Australia Limited
Decided2020-09-17
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant
Amount awarded$45,240
Non-financial loss—
Amount claimed$45,490
SourceAFCA PDF

Summary

The insurer denied a professional practice's claim for IT equipment damaged after a storm and power disturbance, arguing causation was not shown. AFCA found the claim valid and ordered payment of the replacement quote less the excess, with interest under the Insurance Contracts Act.

The complainant established on the balance of probabilities that the power disturbance caused physical damage to the equipment, which is an insured sudden and unexpected occurrence.

Issues

Subjects and remedies

pay claimpay interest

Related

All AIG Australia Limited determinations · Find similar determinations

Text of the determination

Determination Case number 671944 Financial firm AIG Australia Limited Determination | Case number: 671944 Page 2 of 7 Case number: 671944 16 September 2020 1 Determination overview 1.1 Complaint The complainant is a professional practice and it holds a business insurance policy with the financial firm (insurer). In January 2019 the complainant made a claim for damage it says was caused to its IT equipment by a storm and a consequent power surge on 20 October 2018. The insurer does not dispute the storm and a power disturbance occurred on 20 October 2018. However, it has denied the claim as it says there is insufficient evidence that the power disturbance event caused physical damage to the IT equipment. The insurer says it is therefore not liable for the claim for the replacement of the IT equipment. The complainant is dissatisfied with the insurer’s decision and it says that the insurer has handled the claim in an unreasonable manner. The case manager provided the parties with a preliminary assessment on the issues in dispute on 10 June 2020. The preliminary assessment was in favour of the insurer. The complainant has rejected the preliminary assessment. 1.2 Issues and key findings? Is the insurer entitled to deny the claim? On considering available information, I am satisfied that the complainant has on the balance of probabilities established a valid claim within the policy terms. The insurer is not entitled to deny the claim. Is the complainant entitled to non-financial loss compensation? While there have been some delays with the claim due to gaining information from IT experts, I am satisfied the insurer has handled the claim in a reasonable manner. The complainant is not entitled to non-financial loss compensation. 1.3 Determination This determination is in favour of the complainant. Within 14 days of acceptance of this determination by the complainant, the insurer is to pay the claimant $45,239.53 for the quote provided on 22 January 2019 (less the $250 policy deductible) and in accordance with the policy terms for the Reinstatement Value of the damaged equipment. The insurer is required to pay interest on this amount pursuant to section 57 of the Insurance Contracts Act 1984 from 21 February 2019 until the date the payment of the claim is made. Determination | Case number: 671944 Page 3 of 7 2 Reasons for determination I have decided this case based on what is fair in all the circumstances, having regard to the relevant legal principles, good industry practice, codes of practice and prior AFCA determinations (which are not binding) where applicable. The case manager provided the parties with a preliminary assessment on 10 June 2020 on the issues in the dispute. The preliminary assessment was in favo ur of the insurer. The complainant rejected the preliminary assessment. I have taken into account all the material submitted by the parties, including submissions made after the preliminary assessment. I am satisfied that the documentation I have relied on has been provided to both parties. 2.1 Is the insurer entitled to deny the claim? The circumstances of the claim The complainant lodged its claim on 21 January 2019. The complainant says there was a storm and an associated power surge on 20 October 2018 that caused damage to IT equipment. The equipment listed in the complainant’s claim includes a 2012 model server, a laptop and eleven 2012 model workstation computers. It is not in dispute that:  there was a power disruption event on 20 October 2018 due to a storm  the alarm system at the practice registered a power supply interruption  the following day, the service screen at the practice went red. The complainant says that after the event on 20 October 2018, the IT equipment immediately had issues such as freezing and unstable operations and these issues were consistent with equipment damage caused by exposure to a power surge. The complainant says it has been informed by its IT firm that the only possible explanation for the IT issues was a power surge causing damage to the server and other machines on the network. In a submission provided after the preliminary assessment, the insurer says:  the complainant’s IT contractor conducted system testing on our around 22 November 2018 (4 weeks after the initial event), which is inconsistent with the statements by the complainant that the systems are critical to business operations  there is no evidence to show that the computer system received or required substantial diagnostics and investigations until 3 months after the event (January 2019), which is contradictory to the complainant’s statements that the systems were severely and irreparably damaged following the event on 20 October 2018  there is insufficient evidence to provide a causation link between the power event occurring on 20 October 2018 and the ultimate determination that the systems required full replacement (that was made on or around 20 January 2019) Determination | Case number: 671944 Page 4 of 7  there is no evidence to support the nature and extent of damage was sufficient to satisfy policy conditions that physical damage has occurred. The non-specific nature of fault description and the inadequate diagnostics by the various IT contractors provide no grounds to conclude that the damage is the result of a specific insurable event. Complainant must establish valid claim within terms of the policy The complainant is required to show, on the balance of probabilities, that it is more likely than not, that it suffered a loss caused by a risk insured under the policy. This is known as a valid claim. Cover Section 1 of the complainant’s policy covers damage caused to tangible property (real and personal) caused by fire and other insured perils. ‘Damage’ is defined to mean physical loss, damage or destruction. Cover Section 1 covers insured perils of ‘lightning or thunder bolt’ and ‘unspecified damage caused by any sudden, unexpected, or unforeseen occurrence.’ The sum insured under the policy for Cover Section 1 is $844,131 for contents, with a sub-limit of $250,000 for the insured peril of ‘ unspecified damage ’ . Cover Section 8A covers computer and electrical equipment breakdown (with sum insured of $10,000). However, this cover excludes damage caused by lightning, thunderbolt, heating and storm. ‘Breakdown’ is also defined to mean damage arising from internal defects causing sudden stoppage of functions. The complainant says that damage to the IT equipment was caused by a power surge (as a result of a storm). To establish a valid claim under Cover Section 1, the complainant must establish on the balance of probabilities that an insured peril under the policy occurred and that this event caused physical damage to its IT equipment. IT experts say power surge caused damage to IT equipment The complainant provided reports from two IT providers - PCS and SSIT. PCS inspected the IT system on 22 November 2018 and it provided ongoing assistance to the complainant for IT system issues in the following months. SSIT provided a brief report on 8 May 2019 stating its IT engineer had attended the complainant’s practice on 2 May 2019 and ‘the main issue reported was unstable equipment intermittently freezing/not starting up/automatically rebooting’. SSIT reported that after verifying the problem, it was determined that the cause of the damage was an electrical power surge. Determination | Case number: 671944 Page 5 of 7 On 19 May 2019, PCS provided a brief report stating it had done a full diagnostic in its workshop, there was mainboard failure on both machines it had assessed, the machines needed replacement, and the computers were affected by recent power surges and had continual issues since then. The insurer’s loss assessor J provided three reports and says:  if the computer system had been affected adversely by the power surge, it would not be able to continue to be used  the intermittent issues with the system and its progressive failure is possibly due to the ageing components of the system (noting nearly all of the equipment was 7 years old at the date of the power surge)  the condition of the computers was consistent with behaviour expected for systems of this age, including deterioration of hardware and reducing reliability  there was no uninterrupted power supply or power filtration system to protect the equipment and there was no evidence of damage to the power supply unit (PSU) modules  it is generally considered that an external power surge would cause demonstrable damage to the PSU before progressing deeper into the system to affect other components  the absence of damage to the PSU significantly reduces the likelihood of a mains originating power surge as being a possible cause  the likelihood that a power surge event sufficient to damage the downstream on-board systems of 13 individual computers without damaging a single PSU is extremely low. The complainant has established a valid claim The parties do not dispute that a storm and a power outage/interruption occurred on 20 October 2018. The parties do no dispute that the day following these events, the complainant’s IT system had a ‘red screen’ event , and that following the event the complainant’s IT equipment had ongoing and various operational issues. It is therefore not in dispute that a sudden, unexpected, or unforeseen event occurred that, more likely than not, adversely impacted the operation of the complainant’s IT equipment. I find it is not necessary to determine if the power interruption event was a power ‘surge’. The power at the complainant’s business was disrupted (likely due to the storm event) on 20 October 2018, and the next day, the IT system had operational issues. Therefore, the question is whether the power outage /interruption caused physical damage to the complainant’s IT equipment. While I acknowledge that the information provided by the complai nant’s IT experts does not include specific details of diagnostics and physical examination of the Determination | Case number: 671944 Page 6 of 7 relevant IT equipment, the reports of the IT experts consistently find that the power outage/interruption event caused physical damage to the IT equipment. Available information shows that it is more likely than not that the operation of the complainant’s IT system/equipment was impacted by the power outage/interruption event on 20 October 2018. It is more likely than not that the issues with the operation of the IT system after this event were due to physical damage caused to IT equipment. No information has been provided to show that the operational issues with the IT equipment were occurring before 20 October 2018, and no information has been provided to show that the operational issues were caused by damage to software (not hardware). While I acknowledge that more detailed diagnostics could have been provided on the extent and nature of the physical damage to the complainant’s IT equipment, it is fair and reasonable in the circumstances to find that the power outage/interruption event on 20 October 2018 did cause physical damage to the complainant’s IT equipment. On considering available information, I am therefore satisfied on the balance of probabilities that the complainant has established that an insured peril under the policy (that is, a sudden, unexpected, or unforeseen occurrence) caused physical damage to its IT equipment. Accordingly, the complainant has established a valid claim under Cover Section 1 of the policy. The insurer is not entitled to deny the claim. The insurer is required to settle the complainant’s claim for Reinstatement Value (in accordance with the relevant terms of the cover) in accordance with PCS ’s quote (22 January 2019) for replacement of damaged IT equipment, less the $250 policy excess. This amount is $45,239.53. The insurer is required to pay interest on this amount pursuant to section 57 of the Insurance Contracts Act 1984 from 21 February 2019 (one month after the claim was made) until the date the payment of the claim is made. 2.2 Is the complainant entitled to non-financial loss compensation? AFCA’s approach to n on-financial loss compensation AFCA may award compensation for non-financial loss in certain circumstances. Compensation is capped at $5,000. AFCA takes a conservative approach to awarding compensation for non-financial loss. Compensation is only provided where the complainant has suffered from an unusual amount of physical inconvenience or stress, or the financial firm’s conduct has meant the time taken to resolve the situation has been unusually excessive. AFCA expects Determination | Case number: 671944 Page 7 of 7 complainants to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. Information shows the insurer managed the claim in a reasonable manner I acknowledge that some delays were caused to the claims process due to access to information from IT experts. However, on considering available information, there is nothing to show that the insurer has committed an error in handling the claim. I therefore find that the insurer has handled the claim i n a reasonable and timely manner. Accordingly, the complainant is not entitled to non-financial loss compensation.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.