Home / AIG Australia Limited / Determination 671944
Determination 671944
Denial of IT equipment claim after storm and power disturbance
Summary
The insurer denied a professional practice's claim for IT equipment damaged after a storm and power disturbance, arguing causation was not shown. AFCA found the claim valid and ordered payment of the replacement quote less the excess, with interest under the Insurance Contracts Act.
The complainant established on the balance of probabilities that the power disturbance caused physical damage to the equipment, which is an insured sudden and unexpected occurrence.
Subjects and remedies
pay claimpay interest
Text of the determination
Determination
Case number 671944
Financial firm AIG Australia Limited
Determination | Case number: 671944 Page 2 of 7
Case number: 671944 16 September 2020
1 Determination overview
1.1 Complaint
The complainant is a professional practice and it holds a business insurance policy
with the financial firm (insurer). In January 2019 the complainant made a claim for
damage it says was caused to its IT equipment by a storm and a consequent power
surge on 20 October 2018.
The insurer does not dispute the storm and a power disturbance occurred on 20
October 2018. However, it has denied the claim as it says there is insufficient
evidence that the power disturbance event caused physical damage to the IT
equipment. The insurer says it is therefore not liable for the claim for the replacement
of the IT equipment.
The complainant is dissatisfied with the insurer’s decision and it says that the insurer
has handled the claim in an unreasonable manner. The case manager provided the
parties with a preliminary assessment on the issues in dispute on 10 June 2020. The
preliminary assessment was in favour of the insurer. The complainant has rejected
the preliminary assessment.
1.2 Issues and key findings?
Is the insurer entitled to deny the claim?
On considering available information, I am satisfied that the complainant has on the
balance of probabilities established a valid claim within the policy terms. The insurer
is not entitled to deny the claim.
Is the complainant entitled to non-financial loss compensation?
While there have been some delays with the claim due to gaining information from IT
experts, I am satisfied the insurer has handled the claim in a reasonable manner. The
complainant is not entitled to non-financial loss compensation.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of acceptance of
this determination by the complainant, the insurer is to pay the claimant $45,239.53
for the quote provided on 22 January 2019 (less the $250 policy deductible) and in
accordance with the policy terms for the Reinstatement Value of the damaged
equipment. The insurer is required to pay interest on this amount pursuant to section
57 of the Insurance Contracts Act 1984 from 21 February 2019 until the date the
payment of the claim is made.
Determination | Case number: 671944 Page 3 of 7
2 Reasons for determination
I have decided this case based on what is fair in all the circumstances, having regard
to the relevant legal principles, good industry practice, codes of practice and prior
AFCA determinations (which are not binding) where applicable.
The case manager provided the parties with a preliminary assessment on 10 June
2020 on the issues in the dispute. The preliminary assessment was in favo ur of the
insurer. The complainant rejected the preliminary assessment.
I have taken into account all the material submitted by the parties, including
submissions made after the preliminary assessment. I am satisfied that the
documentation I have relied on has been provided to both parties.
2.1 Is the insurer entitled to deny the claim?
The circumstances of the claim
The complainant lodged its claim on 21 January 2019. The complainant says there
was a storm and an associated power surge on 20 October 2018 that caused damage
to IT equipment. The equipment listed in the complainant’s claim includes a 2012
model server, a laptop and eleven 2012 model workstation computers.
It is not in dispute that:
there was a power disruption event on 20 October 2018 due to a storm
the alarm system at the practice registered a power supply interruption
the following day, the service screen at the practice went red.
The complainant says that after the event on 20 October 2018, the IT equipment
immediately had issues such as freezing and unstable operations and these issues
were consistent with equipment damage caused by exposure to a power surge. The
complainant says it has been informed by its IT firm that the only possible explanation
for the IT issues was a power surge causing damage to the server and other
machines on the network.
In a submission provided after the preliminary assessment, the insurer says:
the complainant’s IT contractor conducted system testing on our around 22
November 2018 (4 weeks after the initial event), which is inconsistent with the
statements by the complainant that the systems are critical to business operations
there is no evidence to show that the computer system received or required
substantial diagnostics and investigations until 3 months after the event (January
2019), which is contradictory to the complainant’s statements that the systems
were severely and irreparably damaged following the event on 20 October 2018
there is insufficient evidence to provide a causation link between the power event
occurring on 20 October 2018 and the ultimate determination that the systems
required full replacement (that was made on or around 20 January 2019)
Determination | Case number: 671944 Page 4 of 7
there is no evidence to support the nature and extent of damage was sufficient to
satisfy policy conditions that physical damage has occurred. The non-specific
nature of fault description and the inadequate diagnostics by the various IT
contractors provide no grounds to conclude that the damage is the result of a
specific insurable event.
Complainant must establish valid claim within terms of the policy
The complainant is required to show, on the balance of probabilities, that it is more
likely than not, that it suffered a loss caused by a risk insured under the policy. This is
known as a valid claim.
Cover Section 1 of the complainant’s policy covers damage caused to tangible
property (real and personal) caused by fire and other insured perils. ‘Damage’ is
defined to mean physical loss, damage or destruction.
Cover Section 1 covers insured perils of ‘lightning or thunder bolt’ and ‘unspecified
damage caused by any sudden, unexpected, or unforeseen occurrence.’
The sum insured under the policy for Cover Section 1 is $844,131 for contents, with a
sub-limit of $250,000 for the insured peril of ‘ unspecified damage ’ .
Cover Section 8A covers computer and electrical equipment breakdown (with sum
insured of $10,000). However, this cover excludes damage caused by lightning,
thunderbolt, heating and storm. ‘Breakdown’ is also defined to mean damage arising
from internal defects causing sudden stoppage of functions.
The complainant says that damage to the IT equipment was caused by a power surge
(as a result of a storm).
To establish a valid claim under Cover Section 1, the complainant must establish on
the balance of probabilities that an insured peril under the policy occurred and that
this event caused physical damage to its IT equipment.
IT experts say power surge caused damage to IT equipment
The complainant provided reports from two IT providers - PCS and SSIT.
PCS inspected the IT system on 22 November 2018 and it provided ongoing
assistance to the complainant for IT system issues in the following months.
SSIT provided a brief report on 8 May 2019 stating its IT engineer had attended the
complainant’s practice on 2 May 2019 and ‘the main issue reported was unstable
equipment intermittently freezing/not starting up/automatically rebooting’. SSIT
reported that after verifying the problem, it was determined that the cause of the
damage was an electrical power surge.
Determination | Case number: 671944 Page 5 of 7
On 19 May 2019, PCS provided a brief report stating it had done a full diagnostic in its
workshop, there was mainboard failure on both machines it had assessed, the
machines needed replacement, and the computers were affected by recent power
surges and had continual issues since then.
The insurer’s loss assessor J provided three reports and says:
if the computer system had been affected adversely by the power surge, it
would not be able to continue to be used
the intermittent issues with the system and its progressive failure is possibly
due to the ageing components of the system (noting nearly all of the equipment
was 7 years old at the date of the power surge)
the condition of the computers was consistent with behaviour expected for
systems of this age, including deterioration of hardware and reducing reliability
there was no uninterrupted power supply or power filtration system to protect
the equipment and there was no evidence of damage to the power supply unit
(PSU) modules
it is generally considered that an external power surge would cause
demonstrable damage to the PSU before progressing deeper into the system
to affect other components
the absence of damage to the PSU significantly reduces the likelihood of a
mains originating power surge as being a possible cause
the likelihood that a power surge event sufficient to damage the downstream
on-board systems of 13 individual computers without damaging a single PSU is
extremely low.
The complainant has established a valid claim
The parties do not dispute that a storm and a power outage/interruption occurred on
20 October 2018. The parties do no dispute that the day following these events, the
complainant’s IT system had a ‘red screen’ event , and that following the event the
complainant’s IT equipment had ongoing and various operational issues.
It is therefore not in dispute that a sudden, unexpected, or unforeseen event occurred
that, more likely than not, adversely impacted the operation of the complainant’s IT
equipment. I find it is not necessary to determine if the power interruption event was a
power ‘surge’. The power at the complainant’s business was disrupted (likely due to
the storm event) on 20 October 2018, and the next day, the IT system had operational
issues.
Therefore, the question is whether the power outage /interruption caused physical
damage to the complainant’s IT equipment.
While I acknowledge that the information provided by the complai nant’s IT experts
does not include specific details of diagnostics and physical examination of the
Determination | Case number: 671944 Page 6 of 7
relevant IT equipment, the reports of the IT experts consistently find that the power
outage/interruption event caused physical damage to the IT equipment.
Available information shows that it is more likely than not that the operation of the
complainant’s IT system/equipment was impacted by the power outage/interruption
event on 20 October 2018. It is more likely than not that the issues with the operation
of the IT system after this event were due to physical damage caused to IT
equipment. No information has been provided to show that the operational issues with
the IT equipment were occurring before 20 October 2018, and no information has
been provided to show that the operational issues were caused by damage to
software (not hardware).
While I acknowledge that more detailed diagnostics could have been provided on the
extent and nature of the physical damage to the complainant’s IT equipment, it is fair
and reasonable in the circumstances to find that the power outage/interruption event
on 20 October 2018 did cause physical damage to the complainant’s IT equipment.
On considering available information, I am therefore satisfied on the balance of
probabilities that the complainant has established that an insured peril under the
policy (that is, a sudden, unexpected, or unforeseen occurrence) caused physical
damage to its IT equipment.
Accordingly, the complainant has established a valid claim under Cover Section 1 of
the policy.
The insurer is not entitled to deny the claim.
The insurer is required to settle the complainant’s claim for Reinstatement Value (in
accordance with the relevant terms of the cover) in accordance with PCS ’s quote (22
January 2019) for replacement of damaged IT equipment, less the $250 policy
excess. This amount is $45,239.53.
The insurer is required to pay interest on this amount pursuant to section 57 of the
Insurance Contracts Act 1984 from 21 February 2019 (one month after the claim was
made) until the date the payment of the claim is made.
2.2 Is the complainant entitled to non-financial loss compensation?
AFCA’s approach to n on-financial loss compensation
AFCA may award compensation for non-financial loss in certain circumstances.
Compensation is capped at $5,000. AFCA takes a conservative approach to awarding
compensation for non-financial loss.
Compensation is only provided where the complainant has suffered from an unusual
amount of physical inconvenience or stress, or the financial firm’s conduct has meant
the time taken to resolve the situation has been unusually excessive. AFCA expects
Determination | Case number: 671944 Page 7 of 7
complainants to bear the normal degree of inconvenience experienced when a
problem occurs and to take reasonable steps to manage the situation.
Information shows the insurer managed the claim in a reasonable manner
I acknowledge that some delays were caused to the claims process due to access to
information from IT experts.
However, on considering available information, there is nothing to show that the
insurer has committed an error in handling the claim. I therefore find that the insurer
has handled the claim i n a reasonable and timely manner.
Accordingly, the complainant is not entitled to non-financial loss compensation.