Home / Westpac / Determination 671662

Determination 671662

Storm damage claim declined after rockfall damaged home

FirmWestpac
Decided2020-08-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$93,362
Non-financial loss$2,500
Amount claimed$231,710
SourceAFCA PDF

Summary

A boulder fell from a rockface behind the insured home during a storm and the insurer declined the damage claim. AFCA found the storm was the proximate cause, ordered a cash settlement, debris removal, expert costs, prop costs and interest, and $2,500 non-financial loss.

The storm was the dominant or operative cause of the rockfall, so storm cover applied and neither the gradual-deterioration nor the earth-movement exclusion barred the claim.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination Case number 671662 Financial firm Westpac General Insurance Limited Determination | Case number: 671662 Page 2 of 18 Case number: 671662 8 July 2020 1 Determination overview 1.1 Complaint The complainant holds a listed events building and contents insurance policy with the financial firm (the insurer). On 5 October 2018 he lodged a claim after a boulder fell from a rockface at the back of the house, causing damage. The complainant says the boulder fell because of the storm event. The insurer appointed an engineer whose reports state while the collapse was a single event, it was not due to an insurable event and was not the proximate cause. Rather the rockface had weakened over a period of many years. The complainant says the insurer originally accepted the claim and has acted in an unfair and unreasonable manner in declining it. The insurer has offered $5,000 as an ex-gratia payment towards engineering report costs and temporary accommodation. The complainant rejects this offer and wants the claim accepted in full. He also seeks his out of pocket expenses. 1.2 Issues and key findings Is the insurer entitled to decline the claim? The available material establishes, on the balance of probabilities, the insurer is not entitled to deny the claim for damage to the insured home because:  the proximate cause of the damage is the storm event  the policy covers damage caused by storm event  the insurer has not established a policy condition or exclusion entitling it to deny the claim. The policy provides up to 10% of the sum insured for the demolition and removal of debris. This additional benefit includes the cost of removing the rock/rocks which have fallen from the rockface damaging the home. The insurer is entitled to deny the claim for rectification of the rock face because the rockface is not a building or contents as defined in the policy, and the additional benefit relied on by the complainant does not respond to this part of the claim as the benefit is meant to cover emergency repairs and protection such as the propping of the building or emergency fencing. The nature of the claim to stabilise the rockface is not an emergency repair or protection. Determination | Case number: 671662 Page 3 of 18 Is the complainant entitled to compensation? The insurer is required to reimburse/pay for the cost of the complainant’s expert reports from the geotechnical engineer. An award of non-financial loss compensation is warranted because there has been an unusual degree of physical inconvenience and time taken to resolve the complaint which would have caused distress to the complainant. 1.3 Determination This determination is partly in favour of the complainant. Should the complainant accept this determination, then within seven days of notification of acceptance the insurer is to pay to the complainant:  $81,732 for cost of repairs to the insured home  $6,630 to remove debris and  $2,500 compensation The insurer is to reimburse the complainant for the cost of props and pay any amounts which remain outstanding for the cost of the props. The insurer is also to pay interest pursuant to section 57 of the Insurance Contracts Act (the Act) on the prop costs from the date the prop costs were paid until the date of settlement. Within seven days of notification of acceptance of the determination, the complainant is to provide to the insurer the invoices from his expert engineer for his reports. On receipt of the invoices, the insurer is to forthwith pay the cost of the expert engineer ’ s reports up to $5,000. If the complainant has already paid the expert engineer, the insurer is also to pay interest pursuant to section 57 of the Act on the cost of the reports from the date of payment for the reports until the date of settlement. Otherwise, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 671662 Page 4 of 18 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Complainant must establish a valid claim The complainant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once a valid claim is established, the insurer must show, on the balance of probabilities, the policy excludes or otherwise does not cover the loss. T he insurer’s policy provides cover for loss or damage caused by storm, including cyclone, hail, wind, snow or rain under the ‘storm’ insured event. An exclusion applies for loss or damage resulting from gradual deterioration from rain. A general exclusion applies in relation to damage caused or arising from earth or soil movement including landslide, subsidence or erosion. The relevant policy terms are set out in supporting section 3.2 of this determination. It is not in dispute:  A storm occurred on 5 October 2018  a large boulder fell from a rockface at the back of the house  damage was caused to house by the falling boulder. Circumstances of the loss The complainant says he received a call from his wife at approximately 4.45pm to say a rock or boulder had fallen from the rockface at the rear of the house. A claim was lodged with the insurer. A make-safe was to be carried out but the complainant says this never occurred. The insurer’s client file note on 15 October 2018 indicates the complainant had done a make safe and propped up the ceiling in the garage. The insurer appointed an assessor and consulting engineer (IE) to attend and report on the cause of loss. Subsequently, the complainant was advised the claim was not accepted as the rockfall was not due to the storm. The complainant requested a further assessment and a site inspection occurred on 12 November 2018 . The insurer’s representative attended with a builder and engineer. The insurer’s claim file notes show the complainant was advised although the cl aim was not one for acceptance, the resultant damage may be covered pending the findings of a geo-technical report. On 14 November 2018 the insurer offered a goodwill payment of $5,000 to assist with cost of engaging a geotechnical engineer to Determination | Case number: 671662 Page 5 of 18 begin the investigation and stabilisation process. The insurer also offered to organise and pay for two weeks temporary accommodation to allow time for the engineer to be appointed and provide a report. A walkover assessment was carried out by geo-technical engineer (QS) on 27 November 2018, but the report was not written up until February 2020. The insurer maintained the claim denial. Engineers’ reports provide conflicting opinions The parties have provided material from the Bureau of Meteorology (BOM) and reports from builders and engineers to support their position about the cause of the rockfall and ensuing damage. A summary of the reports relied on by the parties is set out in supporting section 3.3 of this determination. The insurer’s building consultant (M) en gineer says:  the sandstone rock surface was evidently weathered and deteriorated from weathering and gradual erosion being exposed to the elements. The insurer’s engineer (IE) says:  the collapse of the rock was a single event, but the cause of the rock collapse was not due to a single storm event  the collapse was due to gradual weakening of the sandstone, ultimately due to rainfall moving through the sandstone over a period of many years  the sandstone face is highly weathered and contains seams of relatively soft material  the slippage surface was noticeably dar ker than the upper ‘clean break’ area  material remaining showed evidence of moisture and erosion or weakening of the sub-vertical jointing  the sandstone face remote from the collapse has mechanical excavation marks but no evidence of stabilization to the face itself  rainfall at the time of loss was not extreme, extraordinary or unusually high and is therefore not the proximate cause. The complainant’s engineer (QS) says:  there was no other evidence of rockfalls at the site – rockfall an isolated event  the proximate cause was a high intensity rain event, not erosion  there were no visually obvious indicators of weathering on the fracture surface Determination | Case number: 671662 Page 6 of 18  IE’s observations about the rock face ‘being wet’ (containing evidence of moisture) cannot be relied upon as the assessment took place three days after the event and considerably more rain had fallen  a single boulder fell from a clean sub-vertical break and split on impact, with the sub-horizontal surface between the boulder and the rock mass marked by a clay seam  the clean break on the rock remnant indicates failure and collapse was due to sudden loss of capacity in the intact rock mass  until the time of the rockfall event there was sufficient sheer strength within the sub-vertical joints for friction to be maintained between the boulder and the rock mass. Both IE and QS have reviewed and commented on each other’s reports. They dispute the levels, and effect of, the rainfall leading up to and after the event. The complainant refers to material from BOM and the expert material from his geotechnical engineer to argue the proximate cause of the loss was the storm event. The insurer says the proximate cause of the loss is not the storm event. It says the available material indicates the rainfall on the date of the event was not unusually high. It argues it is reasonable to assume that if more significant or equal rainfall had occurred at the site prior to the collapse the moisture had previously affected the slip plane. Therefore, the insurer submits the cause of the rock collapse was not due to a single rainfall event as required by the policy but because of the cumulative effect of many rainfall events which contributed to the gradual weakening and degradation of the rock face which caused the eventual collapse. IE says QS notes rainfall as the proximate cause ‘despite any pluviography indicating the period or time in which the relatively modest ra infall was experienced’. He says the rainfall at the time of the loss was not extreme and ‘ the fact is, that the rainfall experienced was not extraordinary, or unusually high’. QS says the recorded rainfall in the 24 hours leading up the event was 48.5mm, and 35mm to 9am the next day. This data was taken from Woy Woy station, approximately two kilometres away from the property. The panel notes this is not data from the Bureau of Meteorology (BOM) but is from the Department of Environment. The insurer says data from the closest BOM stations at Palm Beach and Gosford recorded 31.6mm in the 24 hours prior to 9am on the day of the event and a further 21 – 33.4 mm during the following 24-hour period. Proximate cause of the damage to the house is the storm event Having considered all the available material, the panel is satisfied the proximate cause (or the dominant or operative cause) of the rockfall which caused the damage was the storm event accompanied by rain. Determination | Case number: 671662 Page 7 of 18 Firstly, the panel is satisfied either amount of recorded rainfall (83.5mm and 52.6 – 75mm) is heavy and high for such a short period of time. Further the panel prefers the data provided from Woy Woy station given its closer proximity to the insured property. Additionally, the insurer’s engineer describe s the rainfall as heavy in his supplementary report. Secondly, the panel notes the insurer’s expert recommended a geo -technical engineer be appointed by the complainant. The engineer appointed by the insurer is a structural engineer. The panel finds the opinion of the geo-technical engineer more persuasive as a geotechnical engineer’s qualifications and study are more specific to an analysis of the cause of the damage. Further, since 1996, QS has extensive experience with the assessment of slope instability risks. The panel is satisfied he has the necessary expertise to comment on the issue of causation. Thirdly, although the report from the geotechnical engineer was not provided until earlier this year, QS had inspected and walked over the site contemporaneously with the event. He reviewed historical air photographs, BOM data and the insurer’s expert reports. He noted no obvious indicators of weathering on the fracture site and the panel accepts this indicates the failure was probably due to a sudden loss of capacity in the rock mass which was contemporaneous with the rainfall event. Fourthly, having considered the arguments put forward by IE, the panel is satisfied QS has persuasively addressed why IE’s findings are not preferred. Taking all matters into account and for the reasons stated the panel is satisfied the storm event was the proximate cause of the rockfall which caused the damage. The panel is not satisfied the loss was caused by or resulted from gradual deterioration from rain. If there was earth or soil movement, that exclusion applies if the cause was normal earth movement. This is not the case here. The cause of the rockfall which caused the damage was the storm event. That is, the proximate cause is not normal earth movement. The insurer is not entitled to decline the claim and must pay the claim pursuant to the terms and conditions of the policy. Insurer to pay to the complainant $81,732 The insurer provided a scope of works. The scope was costed at $47,527.68. The complainant provided an assessment from U Builders dated 21 February 2020. U submitted an estimated price ($61,110 inclusive of GST) for the proposed rectification work following rock damage at the insured property. U’s prices were estimates (to remain valid for 45 days) and GST i nclusive. Determination | Case number: 671662 Page 8 of 18 The price does not include chain wire fencing to protect rockfall because U could not perform that service. He estimated it would be cost between $5,000 and $7,000. In March 2020, the insurer’s engineer reviewed the proposal from U builders and said it appears to be based on the initial reinstatement scope and appeared reasonable. The engineer also said the quote for chain wire fencing was not unreasonable given the unknowns. The engineer said the chain wire fencing may not be required if the c ontractor employed to perform the rockface stabilisation works’ scaffolding remained in place. The insurer’s policy sets out how it will settle the claim. Having reviewed the available material, the panel accepts repairs to the house cannot be safely undertaken until the rockface is stabilised or rocks removed. In the circumstances, the panel is satisfied a cash settlement of the claim is a fair outcome. The policy says if the insurer agrees to pay cash, it will pay the amount it would reasonably cost to repair the property. Given the limitations of access area and specialised nature of the works involved the insurer’s expert agrees additional repairs/cost variations may be identified and become apparent during building repairs. M states the fallen rock damaged the external cladding to the rear of the property, the garage rear wall and a wall in a bedroom and said the repairs will be dangerous and difficult. The panel acknowledges U has had the opportunity to inspect the site and would be aware of the limitations and specialised nature of the works. The panel notes the quotation was an estimate and is now out of date. As the repairs will not be carried out by the insurer, the complainant will not have the benefit of the insurer’s guarantee of works and, d ue to the nature of the work, the panel accepts it is likely there will be variations once repairs commence. In the circumstances, the panel proposes a fair cash settlement is $81,732. This includes a 20% uplift ($13,622) on the quotation provided by U builder plus $7,000 for the chain wire fencing (total $68,110). The 20% uplift is to take account of variations and contingencies which may occur once repairs commence. The insurer is not required to pay statutory interest on this amount as the cash settleme nt is based on a recent actionable quotation. Insurer to pay the complainant $6,630 for the cost of removing debris The policy provides (in addition to the building sum insured) up to 10% of the sum insured for the demolition and removal of debris. The pa nel considers this additional benefit includes the cost of removing the rock or rocks which have fallen from the rockface onto the insured property damaging the insured home. Determination | Case number: 671662 Page 9 of 18 The complainant’s quotation does not appear to include an allowance for removal of debris. The insurer’s scope of works and the insurer’s quotation included an allowance for this work. The insurer’s quotation allowed the amounts of $4,196.50 and $585 (exclusive of a management fee and GST). Making an allowance for a management fee and GST plus a 20% uplift (to take into account variations and contingencies which may occur once removal of debris commences), the panel is satisfied that it is fair the insurer pays to the complainant $6,630 to remove the fallen rocks. Insurer to reimburse the complainant for the cost of props The complainant has provided invoices showing the cost of props since the damage occurred. The insurer is to reimburse the complainant for the cost of props and pay any amounts which remain outstanding for the cost of the props. The insurer is also to pay interest pursuant to section 57 of the Insurance Contracts Act (the Act) on the prop costs from the date the prop costs were paid until the date of settlement. Insurer not liable to meet the rest of the complainant’s claims In November 2018, the insurer offered to organise and pay for two weeks’ worth of temporary accommodation. This was to assist the complainant in engaging a geotechnical engineer to begin the investigation and stabilisation process. The policy provides for emergency accommodation if the home is unliveable. Having considered the available information and photographs, the panel is not satisfied the home is unliveable. The panel is satisfied emergency accommodation is not payable pursuant to the rejected offer or the policy terms. The complainant also claims a significant amount to perform rock stabilisation works to make the area safe to complete all required repairs. He argues he should be placed back in the position he was in prior to the event. He said there was no necessity to make the premises safe prior to the claimed event and he should be put back in that position. The insurer says it is not obliged to pay this part of the claim because the rockface is not a building or contents as defined in the policy. It says the expert reports confirm no evidence of retaining or anchoring of the sandstone rocks to reinforce or stabilise at sandstone wall before the event. If this part of the claim was paid, the insurer argues this would be a significant upgrade and the policy does not cover betterment. The panel has carefully considered all the available information, the parties’ submissions and the relevant policy terms. The complainant submits the policy provides certain additional benefits if it agrees to pay a claim for loss or damage to the building. Included as an additional benefit is Determination | Case number: 671662 Page 10 of 18 cover for the reasonable costs incurred for any emergency repairs and protection necessary to prevent further loss or damage. The panel does not accept the insurer is liable to pay for the proposed rockface stabilisation works. This is because the rockface is not a building or contents as defined in the policy. In addition, the panel does not accept the additional benefit relied on by the complainant responds to this part of the claim. The panel is satisfied the additional benefit is meant to cover emergency repairs and protection such as the propping of the building or emergency fencing. The panel considers the nature of the claim to stabilise the rockface is not an emergency repair or protection. 2.2 Is the complainant entitled to compensation? Insurer to pay up to $5,000 for QS’s reports AFCA’s Rules provide AFCA may decide the insurer is to contribute to the professional costs incurred by the claimant during the complaint. Unless special circumstances apply, AFCA will not require the insurer to contribute more than $5,000 to these costs. When considering whether to require the insurer to contribute, AFCA considers the complexity of the complaint and whether the costs charged by the expert were needed to establish the complainant’s case. The issues raised by the complainant were complex. The panel is satisfied it was fair the complainant obtained an expert report in view of the expert reports relied on by the insurer. Further, the complainant’s expert reports considerably assisted the complainant in establishing his case. Should the complainant accept this determination then within seven days of notification of acceptance, the complainant is to provide to the insurer the invoices from QS for his reports. On receipt of the invoices, the insurer is to forthwith pay QS’s reports up to $5,000. If the complainant has already paid QS, the insurer is also to pay interest pursuant to section 57 of the Act on the cost of QS‘s reports from the date of payment until the date of settlement. Non-financial loss compensation paid in some circumstances The complainant makes several complaints about the way the claim was handled. The main complaints include that the make safe was not carried out by the insurer as promised, the insurer did not take responsibility for the works as promised, the IDR process was not carried out properly, the insurer mis-quoted expert reports and the insurer did not provide a copy of the PDS. Determination | Case number: 671662 Page 11 of 18 The complainant proffered information including statutory declarations in support of his contentions. The complainant says the insurer’s claims management has caused significant distress and impacted both his and his wife’s mental and physical health. The insurer says the make safe contractor attended the day after the storm event to complete a make safe but as the complainant had already installed props no further propping was needed. Otherwise, the make safe contractor has no other record of attending the insured property at any other time. It also says it did not advise the complainant the claim was accepted but rather tried to explore ways to assist the complainant with moving forward; and otherwise denies the complainant’s contentions. Insurer to pay the complainant $2,500 compensation AFCA will award compensation (capped at $5,000) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and anxiety. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. The panel has considered the parties lengthy submissions on this issue and has carefully reviewed the insurer’s claim file notes. The panel notes the claim was made on 5 October 2018. The insurer obtained expert opinion. The claim was formally denied on 26 October 2018. Having reviewed the available information, the panel does not accept it is likely the insurer accepted the claim on 12 November 2018. The panel accepts the insurer’s explanation is more likely given all the circumstances. The failure to provide the PDS has not been addressed by the insurer. In any event, in view of the panel’s finding in this determination this and the other complaints about the claims handling do not affect the outcome. The panel accepts there has been an unusual degree of physical inconvenience and time taken to resolve the complaint which would have caused distress. Having considered all the available material, the panel is satisfied an award of compensation in the amount of $2,500 is warranted. Determination | Case number: 671662 Page 12 of 18 3 Supporting information 3.1 Our Approach This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the AFCA Rules. The panel consists of an ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. Proximate cause is the dominant, efficient or operative cause of the loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common-sense evaluation of the evidence. The complainant is represented. Where relevant, references to the complainant’s representative include references to the complainant. 3.2 Extracts of relevant policy terms The relevant policy extracts are referred to below and/or are in correspondence between the parties. The policy document has been exchanged with the complainant. 4. Home and Contents cover 4.1 What’s considered a building? ✔ Building or home means: Residential building(s) on the site which includes structural improvements, fixtures and fittings including: Determination | Case number: 671662 Page 13 of 18 The basics • walls, gates, decks, patios, balconies, paths and driveways, and • fences. Fixtures and fittings, home office rooms, other structures… X Building or home does not mean: Greenery and outdoor decorations • lawn, landscaping, plants, shrubs, trees or potted plants …. • outdoor decorations, or water features …. 4.3 Insured events Depending on whether you have Building cover or Contents cover, we will insure your building and/or contents at the site against loss or damage caused by the following events if they occur during your period of insuranc e. Storm: Covered Loss or damage caused by storm, including cyclone, hail, wind, snow or rain. Not covered Loss or damage caused by or resulting from: • gradual det erioration from rain, 3. General exclusions Your policy does not cover any loss or damage that is caused by or arises from: • earth or soil movement (other than earthquake) including landslide, subsidence, or erosion, 7.3 How we settle your claim Repairing or replacing When we agree to pay a claim for loss or damage: We may choose to pay: • the reasonable cost of repair, or • the reasonable costs of replacement to new condition with property of the same size and specification or with items as near to original as is currently possible, or • a cash a mount. If we agree to pay cash, we’ll pay the amount it would reasonably cost to repair or replace the property. Where a building is not being replac ed, the amount we’ll pay will be less a reason able deduction for depreciation due to wear and tear and age of the property. Determination | Case number: 671662 Page 14 of 18 Repair guarantee We will guarant ee the repairs to your building and contents when we provide or recommend a repairer for you. However, we won’t guarantee any repairs if you choose your own repairer. Building additional benefits If we agree to pay a claim for loss or damage to your building, we will also pay for the additional benefits listed below that are directly related to that loss or damage. Some additional benefits are paid in addition to the sum insured and some are paid as part of the sum insured. Benefits paid in addition to your building sum insured: Demolition and removal of debris We will cover the cost of any necessary demolition of your home or parts of it, and the removal of resulting debris from the site (including any trees or branches that have caused damage to your building and need to be cut down). Emergency accommodation If your home is unliveable, we will cover the cost of similar alternative accommodation for you and any other insureds. This expense will only be paid if you actually incur costs for emergency accommodation, and only while your home remains unliveable. Benefits paid as part of your building sum insured: Emergency repairs and protection We will cover the reasonable costs incurred for any emergency repairs and protection necessary to prevent further loss or damage. 3.3 Extracts from key documents Record Key points Insurer’s expert engineer (IE) Report 11 October 2018  Engineer ins pected and photographed property 8 October 2018  Damage to the hous e limited to wall linings, framing and member fixity. House itself has not translated.  Repairs cannot be safely undertaken until rocks in danger of collapse have stabilised or removed. Fallen rocks need to be removed so repairs can be do ne.  Sandstone face remote from the collapse has mechanical excavation marks, but no evidence of stabilization to the face itself. There are however numerous fences and walls in place to stop rocks falling into the area below.  Sandstone face is highly weat hered in areas and contains seams of relatively soft material.  Although degradation of the rock face and indeed the rock seams themselves can be considered gradual, the eventual Determination | Case number: 671662 Page 15 of 18 Record Key points rock collapse and result ant damage can be considered a single event.  Do not bel ieve the failure mechanism can be considered land slip, which generally requires saturation of soil at the base of the slope lead to the bottom of the slope moving forward and subsequent collapse of the material above.  Makes recommendations in relation to worker’s safety and reinstatement scope. Scope is recommended course only as better safety access is gathered further evidence may require amendment to scope. Asse ssor’ s report (CC) 18 October 2018  Scope we have provided includes allowances to repair the damage that exist based on limited site inspection. Given the limitations of access area and specialised nature of works involved, additional repairs/cost variations may be identified or become apparent during building repairs or may be required to repair the property in accordance with the current local codes. Insurer’s expert (IE) Supplement ary report 23 October 2018  Report provided to comment on likely cause of rockslide and method of stabilising the rock shelf to prevent future rockslides.  Retaining w ork/ fencing may have been undert aken in January 2013  Rock slip occurred Friday afternoon 5 October 2018.  31.6 mms of rain fell up to 9am on date of loss (the rock fell at approx. 5.45pm), and a further 33.6 in the 24 hours to 9am the next day (taken fr om Gosford BOM approx. 10 kms N/E of Com property).  39.4mm was recorded in the 24 hours to 9am on 5 October at Avalon Beach 15kms south of the property.  Rainfall recordings during this period has not been published for recording stations closer to the site.  Comment ‘while these rainfalls are considered heavy, significantly higher daily rainfalls have been recorded in the area in recent years’  Likely cause of rock collapse is one of gradual weakening of the material at the interface or above the harder slip plane interface as described and phot ographed in the report. Once the weight of the rock above exceeded the resisting friction at the interface gravity caused the rock to collapse.  Degradation could be erosion by both chemical and mechanic al proc esses and ultimately due to rainfall moving through the sandstone.  Degradation has not occurred due to a single inundation or storm event rather has been occurri ng for many years.  Mechanism common in highly weathered sandstone faces and excavations like this normally require mechanical stabilisation using rock bolts or another preventative slip and rockfall measure. Engineering like this is highly specialised and requires advice from a geotechnical engineer.  Could not see any evidence of mechanical stabilisation. Insurer’s expert engineer (M) Report 12 November 2018  Inspected and photographed site 12 November 2018 with complainant, insurer, and building consulta nt.  Fallen rocks have caused direct damage to the external cladding to the rear of the property, garage rear wall and a Determination | Case number: 671662 Page 16 of 18 Record Key points wall in bedroom 1.  Remedial repairs will be dangerous and difficult.  Rockslide caused by subsidenc e, erosion and landslide.  Sandstone rock surface was evidently weathered and deteriorated from weathering from gradual erosion being exposed to the elements  No signs of retaining or anchoring of the sandstone rocks to reinforce or stabilise the sandstone walls.  Recommended the complainant en gage a geotechnical engineer to determine and recommend how to stabilize the escarpment.  Damaged wall affected the north of the building. It should be restricted until engineer advises. Southern wing habitable.  Provided a scope of works. Complainant’s ex pert geotechnical engineer (QS) Report 21 February 2020  Geotechnical engineer made a walk over assessment on 27 November 2018.  Based his opinion on his walkover assessment, discussions with the complainant, review of data gathered from historical air phot ographs, bureau of meteorology rainfall data and comments on IE’s reports:  States observations made re wet rock face cannot be relied on as report was done three days after date of loss, considerably more rain had fallen  Impact that caused damage was due to a single boulder which fell from a clean sub vertical break in the rock behind the dwelling and then split on impact  Sub horizontal surface bet ween the boulder and the rock mass was marked by a clay seam  Rockfall occurred at a time of intense rainfall d uring which rain ranging from 35mm to 48.5mm was recorded in the 24 hours to 9 am on 5 October at three climate data stations near the site namely Palm Beach, Gosford, and Woy Woy.  Record of rain at Woy Woy in the 24 hours to 9 am was 48.5mm and a further 35mm was recorded in the following 24 - hour interval.  No other evidence of rockfalls at the site – rockfall an isolated event.  Reviews rainfall data and notes rock mass is sandstone with discontinuities which contain clay soils which are susceptible to decr ease in sheer strength with increasing moisture content.  Until the rockfall event, there was sufficient sheer strength within the sub vertical joints for friction contact to be maintained  No visually obvious indicators of weathering on the fracture surfac e (clean break)  Clean break on the rock remnant indicates failure and collapse was due to sudden loss of capacity in the intact rock mass  From experience wit h assessment of slope instability risks since 1996 and interpret ation of available data proximate cause of the damage to the rear of the house was a high intensity rainfall event and not erosion which result ed in the sudden failure of the rock face behind the house. Insurer’s expert (IE)  Provides comment on QS’s report: Determination | Case number: 671662 Page 17 of 18 Record Key points Supplement ary report 4 March 2020  Disputes relevance of QS’s rain dat a around time of property construction or how the 30 - day total increases the understanding of causation.  Disputes finding that rainfall at time of loss was ‘extreme’, stating the rainfall was ‘not extraordinary or unusually high’  Questions how proximat e cause can be attributed to heavy rains when there is no pluviography (rain gauge) indicating when there was less, or modest rain  Possible entire rainfall recorded over 24 hours fell in a very short period and that t he rainfall was in fact intense.  Agrees a lack of obvious weathering present on the fracture surface and there was sufficient strengt h to support the weight of the rock prior to the sudden collapse but says this does not prove the strength of the rock was immediately compromised by the rainfall event.  When he ins pected, slippage surface was noticeably darker than the upper ‘clean break’ as shown in the photograph.  Fine material, displaced by moisture, remained present on the slip surface, evidenc e of moistu re and indeed erosion or weak ening of the sub - vertical jointing.  If more significant or equal rainfall had occurred prior to the collapse probable that moisture also previously affected the slip plane.  This erosion would have been unbeknown to anyone, howe ver gradual, and not the result of a single rain event  Methodology of MC rock face stabilisation proposal sound and financial allowance feasible.  Proximity of the house provides additional challenges and costs.  U builder’s proposal appears to be based on our reinstatement scope and appears financially reasonable.  MC proposal appears feasible and additional $36,000 contingency for structural works not yet confirmed is necessary.  Assume relevant council will have provided requirements for the site excavatio n when the extension was constructed. Complainant’s expert (QS) Supplement ary Report 9 April 2020  Reviews recent report from IE.  Clarifies findings on rainfall data - records from Woy Woy station show 48.5mm and 35mm in the 24 - hour periods before 9am on 5 October and 6 October 2018.  States there has been numerous instances of heavier rainfall between construction and date of loss, but no rockfall  Disputes relevance of IE’s statement on slip surface being darker – says this is due to presence of iron staining (chemical deposition)  During the storm the rock would’ve absorbed moisture from the heavy rainfall descending the face of the escarpment and moving under the overha nging steps above and below the rock.  After the boulder fell, remnant mass would have been subject to further wetting by rainfall, this explains IE’s finding on the slip surface  Sandstone rock mass from which the boulder fractured provided the support of t he boulder.  Its capacity to resist the weight of the boulder was exceeded as it increasingly absorbed moisture from rainfall at the site  Referenc e to ‘weakening of the sub - vertical jointing’ is not relevant because the ‘slippage surface’ was not a signific ant Determination | Case number: 671662 Page 18 of 18 Record Key points contribut or to support of the boulder  Although it may be that prior rainfall events of more significant or equivalent magnit ude affected the so - called ‘slip plane’, moisture from rainfall would not have significantly weakened the contact surface bet wee n the remnant rock mass and the boulder to the extent than any potential erosion of the surface was the cause of the rock fall.  Not sure why IE refers to AS4678 ’earth retaining structures ’ when application of this standard is to design of retaining walls. An occupation certificate would not have been issued if it was not appropriate for the development and says approval for the development construction and occupation of the house was grant ed by council.  Proximate cause was ‘one of more intense bursts of ra infall that occurred during local storm activity on 5 October 2018. Insurer’s undated quotation  Quotation to repair bedroom and garage $47,527.68. Complainant’s quotation U builders 21 February 2020  Estimated price $61,110 for proposed rectification work which are estimates only and are GST inclusive.  Do es not include chain wire fencing but includes scaffolding.  Estimated price remains valid for 45 days. Complainant’s quotation MC 21 February 2020  $ 170,600 plus GST to perform rock face stabilisation works.  Duration of works about three weeks. 3.4 Other relevant material considered and relied on  Parties’ submissions/emails and all attachments to all submissions/emails.  Parties’ expert reports.  Photographs, statutory declarations, newspaper clippings, extracts from Bureau of Meteorology, quotations and estimates, call recordings and insurer’s claim file notes.  Correspondence between the parties.