Home / Westpac / Determination 671662
Determination 671662
Storm damage claim declined after rockfall damaged home
Summary
A boulder fell from a rockface behind the insured home during a storm and the insurer declined the damage claim. AFCA found the storm was the proximate cause, ordered a cash settlement, debris removal, expert costs, prop costs and interest, and $2,500 non-financial loss.
The storm was the dominant or operative cause of the rockfall, so storm cover applied and neither the gradual-deterioration nor the earth-movement exclusion barred the claim.
Issues
- Claim denial primary · upheld“The insurer is not entitled to decline the claim and must pay the claim pursuant to the terms and conditions of the policy.”
- Claim amount dispute secondary · upheld“the panel proposes a fair cash settlement is $81,732, rather than the insurer's costed scope of $47,527.68.”
- Poor claim handling secondary · upheld“there has been an unusual degree of physical inconvenience and time taken to resolve the complaint which would have caused distress”
- Failure to disclose secondary · unclear“The failure to provide the PDS has not been addressed by the insurer.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss
Related
Text of the determination
Determination
Case number 671662
Financial firm Westpac General Insurance Limited
Determination | Case number: 671662 Page 2 of 18
Case number: 671662 8 July 2020
1 Determination overview
1.1 Complaint
The complainant holds a listed events building and contents insurance policy with the
financial firm (the insurer).
On 5 October 2018 he lodged a claim after a boulder fell from a rockface at the back
of the house, causing damage. The complainant says the boulder fell because of the
storm event.
The insurer appointed an engineer whose reports state while the collapse was a
single event, it was not due to an insurable event and was not the proximate cause.
Rather the rockface had weakened over a period of many years.
The complainant says the insurer originally accepted the claim and has acted in an
unfair and unreasonable manner in declining it.
The insurer has offered $5,000 as an ex-gratia payment towards engineering report
costs and temporary accommodation.
The complainant rejects this offer and wants the claim accepted in full. He also seeks
his out of pocket expenses.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
The available material establishes, on the balance of probabilities, the insurer is not
entitled to deny the claim for damage to the insured home because:
the proximate cause of the damage is the storm event
the policy covers damage caused by storm event
the insurer has not established a policy condition or exclusion entitling it to deny
the claim.
The policy provides up to 10% of the sum insured for the demolition and removal of
debris. This additional benefit includes the cost of removing the rock/rocks which have
fallen from the rockface damaging the home.
The insurer is entitled to deny the claim for rectification of the rock face because the
rockface is not a building or contents as defined in the policy, and the additional
benefit relied on by the complainant does not respond to this part of the claim as the
benefit is meant to cover emergency repairs and protection such as the propping of
the building or emergency fencing. The nature of the claim to stabilise the rockface is
not an emergency repair or protection.
Determination | Case number: 671662 Page 3 of 18
Is the complainant entitled to compensation?
The insurer is required to reimburse/pay for the cost of the complainant’s expert
reports from the geotechnical engineer.
An award of non-financial loss compensation is warranted because there has been an
unusual degree of physical inconvenience and time taken to resolve the complaint
which would have caused distress to the complainant.
1.3 Determination
This determination is partly in favour of the complainant.
Should the complainant accept this determination, then within seven days of
notification of acceptance the insurer is to pay to the complainant:
$81,732 for cost of repairs to the insured home
$6,630 to remove debris and
$2,500 compensation
The insurer is to reimburse the complainant for the cost of props and pay any
amounts which remain outstanding for the cost of the props.
The insurer is also to pay interest pursuant to section 57 of the Insurance Contracts
Act (the Act) on the prop costs from the date the prop costs were paid until the date of
settlement.
Within seven days of notification of acceptance of the determination, the complainant
is to provide to the insurer the invoices from his expert engineer for his reports. On
receipt of the invoices, the insurer is to forthwith pay the cost of the expert engineer ’ s
reports up to $5,000.
If the complainant has already paid the expert engineer, the insurer is also to pay
interest pursuant to section 57 of the Act on the cost of the reports from the date of
payment for the reports until the date of settlement.
Otherwise, the insurer is not required to take any further action in relation to the claim
or the complaint.
Determination | Case number: 671662 Page 4 of 18
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Complainant must establish a valid claim
The complainant must establish on the balance of probabilities he has suffered a loss
caused by an event to which the policy responds. This is known as a prima facie
claim.
Once a valid claim is established, the insurer must show, on the balance of
probabilities, the policy excludes or otherwise does not cover the loss.
T he insurer’s policy provides cover for loss or damage caused by storm, including
cyclone, hail, wind, snow or rain under the ‘storm’ insured event. An exclusion applies
for loss or damage resulting from gradual deterioration from rain.
A general exclusion applies in relation to damage caused or arising from earth or soil
movement including landslide, subsidence or erosion.
The relevant policy terms are set out in supporting section 3.2 of this determination.
It is not in dispute:
A storm occurred on 5 October 2018
a large boulder fell from a rockface at the back of the house
damage was caused to house by the falling boulder.
Circumstances of the loss
The complainant says he received a call from his wife at approximately 4.45pm to say
a rock or boulder had fallen from the rockface at the rear of the house. A claim was
lodged with the insurer. A make-safe was to be carried out but the complainant says
this never occurred. The insurer’s client file note on 15 October 2018 indicates the
complainant had done a make safe and propped up the ceiling in the garage.
The insurer appointed an assessor and consulting engineer (IE) to attend and report
on the cause of loss. Subsequently, the complainant was advised the claim was not
accepted as the rockfall was not due to the storm.
The complainant requested a further assessment and a site inspection occurred on
12 November 2018 . The insurer’s representative attended with a builder and
engineer.
The insurer’s claim file notes show the complainant was advised although the cl aim
was not one for acceptance, the resultant damage may be covered pending the
findings of a geo-technical report. On 14 November 2018 the insurer offered a
goodwill payment of $5,000 to assist with cost of engaging a geotechnical engineer to
Determination | Case number: 671662 Page 5 of 18
begin the investigation and stabilisation process. The insurer also offered to organise
and pay for two weeks temporary accommodation to allow time for the engineer to be
appointed and provide a report.
A walkover assessment was carried out by geo-technical engineer (QS) on 27
November 2018, but the report was not written up until February 2020.
The insurer maintained the claim denial.
Engineers’ reports provide conflicting opinions
The parties have provided material from the Bureau of Meteorology (BOM) and
reports from builders and engineers to support their position about the cause of the
rockfall and ensuing damage.
A summary of the reports relied on by the parties is set out in supporting section 3.3
of this determination.
The insurer’s building consultant (M) en gineer says:
the sandstone rock surface was evidently weathered and deteriorated from
weathering and gradual erosion being exposed to the elements.
The insurer’s engineer (IE) says:
the collapse of the rock was a single event, but the cause of the rock collapse was
not due to a single storm event
the collapse was due to gradual weakening of the sandstone, ultimately due to
rainfall moving through the sandstone over a period of many years
the sandstone face is highly weathered and contains seams of relatively soft
material
the slippage surface was noticeably dar ker than the upper ‘clean break’ area
material remaining showed evidence of moisture and erosion or weakening of the
sub-vertical jointing
the sandstone face remote from the collapse has mechanical excavation marks but
no evidence of stabilization to the face itself
rainfall at the time of loss was not extreme, extraordinary or unusually high and is
therefore not the proximate cause.
The complainant’s engineer (QS) says:
there was no other evidence of rockfalls at the site – rockfall an isolated event
the proximate cause was a high intensity rain event, not erosion
there were no visually obvious indicators of weathering on the fracture surface
Determination | Case number: 671662 Page 6 of 18
IE’s observations about the rock face ‘being wet’ (containing evidence of moisture)
cannot be relied upon as the assessment took place three days after the event and
considerably more rain had fallen
a single boulder fell from a clean sub-vertical break and split on impact, with the
sub-horizontal surface between the boulder and the rock mass marked by a clay
seam
the clean break on the rock remnant indicates failure and collapse was due to
sudden loss of capacity in the intact rock mass
until the time of the rockfall event there was sufficient sheer strength within the
sub-vertical joints for friction to be maintained between the boulder and the rock
mass.
Both IE and QS have reviewed and commented on each other’s reports. They dispute
the levels, and effect of, the rainfall leading up to and after the event.
The complainant refers to material from BOM and the expert material from his
geotechnical engineer to argue the proximate cause of the loss was the storm event.
The insurer says the proximate cause of the loss is not the storm event. It says the
available material indicates the rainfall on the date of the event was not unusually
high. It argues it is reasonable to assume that if more significant or equal rainfall had
occurred at the site prior to the collapse the moisture had previously affected the slip
plane. Therefore, the insurer submits the cause of the rock collapse was not due to a
single rainfall event as required by the policy but because of the cumulative effect of
many rainfall events which contributed to the gradual weakening and degradation of
the rock face which caused the eventual collapse.
IE says QS notes rainfall as the proximate cause ‘despite any pluviography indicating
the period or time in which the relatively modest ra infall was experienced’. He says
the rainfall at the time of the loss was not extreme and ‘ the fact is, that the rainfall
experienced was not extraordinary, or unusually high’.
QS says the recorded rainfall in the 24 hours leading up the event was 48.5mm, and
35mm to 9am the next day. This data was taken from Woy Woy station,
approximately two kilometres away from the property. The panel notes this is not data
from the Bureau of Meteorology (BOM) but is from the Department of Environment.
The insurer says data from the closest BOM stations at Palm Beach and Gosford
recorded 31.6mm in the 24 hours prior to 9am on the day of the event and a further
21 – 33.4 mm during the following 24-hour period.
Proximate cause of the damage to the house is the storm event
Having considered all the available material, the panel is satisfied the proximate
cause (or the dominant or operative cause) of the rockfall which caused the damage
was the storm event accompanied by rain.
Determination | Case number: 671662 Page 7 of 18
Firstly, the panel is satisfied either amount of recorded rainfall (83.5mm and 52.6 –
75mm) is heavy and high for such a short period of time. Further the panel prefers the
data provided from Woy Woy station given its closer proximity to the insured property.
Additionally, the insurer’s engineer describe s the rainfall as heavy in his
supplementary report.
Secondly, the panel notes the insurer’s expert recommended a geo -technical
engineer be appointed by the complainant. The engineer appointed by the insurer is a
structural engineer. The panel finds the opinion of the geo-technical engineer more
persuasive as a geotechnical engineer’s qualifications and study are more specific to
an analysis of the cause of the damage. Further, since 1996, QS has extensive
experience with the assessment of slope instability risks. The panel is satisfied he has
the necessary expertise to comment on the issue of causation.
Thirdly, although the report from the geotechnical engineer was not provided until
earlier this year, QS had inspected and walked over the site contemporaneously with
the event. He reviewed historical air photographs, BOM data and the insurer’s expert
reports. He noted no obvious indicators of weathering on the fracture site and the
panel accepts this indicates the failure was probably due to a sudden loss of capacity
in the rock mass which was contemporaneous with the rainfall event.
Fourthly, having considered the arguments put forward by IE, the panel is satisfied
QS has persuasively addressed why IE’s findings are not preferred.
Taking all matters into account and for the reasons stated the panel is satisfied the
storm event was the proximate cause of the rockfall which caused the damage.
The panel is not satisfied the loss was caused by or resulted from gradual
deterioration from rain.
If there was earth or soil movement, that exclusion applies if the cause was normal
earth movement. This is not the case here. The cause of the rockfall which caused
the damage was the storm event. That is, the proximate cause is not normal earth
movement.
The insurer is not entitled to decline the claim and must pay the claim pursuant to the
terms and conditions of the policy.
Insurer to pay to the complainant $81,732
The insurer provided a scope of works. The scope was costed at $47,527.68.
The complainant provided an assessment from U Builders dated 21 February 2020. U
submitted an estimated price ($61,110 inclusive of GST) for the proposed rectification
work following rock damage at the insured property.
U’s prices were estimates (to remain valid for 45 days) and GST i nclusive.
Determination | Case number: 671662 Page 8 of 18
The price does not include chain wire fencing to protect rockfall because U could not
perform that service. He estimated it would be cost between $5,000 and $7,000.
In March 2020, the insurer’s engineer reviewed the proposal from U builders and said
it appears to be based on the initial reinstatement scope and appeared reasonable.
The engineer also said the quote for chain wire fencing was not unreasonable given
the unknowns. The engineer said the chain wire fencing may not be required if the
c ontractor employed to perform the rockface stabilisation works’ scaffolding remained
in place.
The insurer’s policy sets out how it will settle the claim. Having reviewed the available
material, the panel accepts repairs to the house cannot be safely undertaken until the
rockface is stabilised or rocks removed.
In the circumstances, the panel is satisfied a cash settlement of the claim is a fair
outcome. The policy says if the insurer agrees to pay cash, it will pay the amount it
would reasonably cost to repair the property.
Given the limitations of access area and specialised nature of the works involved the
insurer’s expert agrees additional repairs/cost variations may be identified and
become apparent during building repairs.
M states the fallen rock damaged the external cladding to the rear of the property, the
garage rear wall and a wall in a bedroom and said the repairs will be dangerous and
difficult.
The panel acknowledges U has had the opportunity to inspect the site and would be
aware of the limitations and specialised nature of the works.
The panel notes the quotation was an estimate and is now out of date. As the repairs
will not be carried out by the insurer, the complainant will not have the benefit of the
insurer’s guarantee of works and, d ue to the nature of the work, the panel accepts it is
likely there will be variations once repairs commence.
In the circumstances, the panel proposes a fair cash settlement is $81,732. This
includes a 20% uplift ($13,622) on the quotation provided by U builder plus $7,000 for
the chain wire fencing (total $68,110). The 20% uplift is to take account of variations
and contingencies which may occur once repairs commence. The insurer is not
required to pay statutory interest on this amount as the cash settleme nt is based on a
recent actionable quotation.
Insurer to pay the complainant $6,630 for the cost of removing debris
The policy provides (in addition to the building sum insured) up to 10% of the sum
insured for the demolition and removal of debris. The pa nel considers this additional
benefit includes the cost of removing the rock or rocks which have fallen from the
rockface onto the insured property damaging the insured home.
Determination | Case number: 671662 Page 9 of 18
The complainant’s quotation does not appear to include an allowance for removal of
debris. The insurer’s scope of works and the insurer’s quotation included an
allowance for this work. The insurer’s quotation allowed the amounts of $4,196.50
and $585 (exclusive of a management fee and GST).
Making an allowance for a management fee and GST plus a 20% uplift (to take into
account variations and contingencies which may occur once removal of debris
commences), the panel is satisfied that it is fair the insurer pays to the complainant
$6,630 to remove the fallen rocks.
Insurer to reimburse the complainant for the cost of props
The complainant has provided invoices showing the cost of props since the damage
occurred. The insurer is to reimburse the complainant for the cost of props and pay
any amounts which remain outstanding for the cost of the props.
The insurer is also to pay interest pursuant to section 57 of the Insurance Contracts
Act (the Act) on the prop costs from the date the prop costs were paid until the date of
settlement.
Insurer not liable to meet the rest of the complainant’s claims
In November 2018, the insurer offered to organise and pay for two weeks’ worth of
temporary accommodation. This was to assist the complainant in engaging a
geotechnical engineer to begin the investigation and stabilisation process.
The policy provides for emergency accommodation if the home is unliveable. Having
considered the available information and photographs, the panel is not satisfied the
home is unliveable. The panel is satisfied emergency accommodation is not payable
pursuant to the rejected offer or the policy terms.
The complainant also claims a significant amount to perform rock stabilisation works
to make the area safe to complete all required repairs. He argues he should be
placed back in the position he was in prior to the event. He said there was no
necessity to make the premises safe prior to the claimed event and he should be put
back in that position.
The insurer says it is not obliged to pay this part of the claim because the rockface is
not a building or contents as defined in the policy. It says the expert reports confirm
no evidence of retaining or anchoring of the sandstone rocks to reinforce or stabilise
at sandstone wall before the event. If this part of the claim was paid, the insurer
argues this would be a significant upgrade and the policy does not cover betterment.
The panel has carefully considered all the available information, the parties’
submissions and the relevant policy terms.
The complainant submits the policy provides certain additional benefits if it agrees to
pay a claim for loss or damage to the building. Included as an additional benefit is
Determination | Case number: 671662 Page 10 of 18
cover for the reasonable costs incurred for any emergency repairs and protection
necessary to prevent further loss or damage.
The panel does not accept the insurer is liable to pay for the proposed rockface
stabilisation works. This is because the rockface is not a building or contents as
defined in the policy.
In addition, the panel does not accept the additional benefit relied on by the
complainant responds to this part of the claim. The panel is satisfied the additional
benefit is meant to cover emergency repairs and protection such as the propping of
the building or emergency fencing. The panel considers the nature of the claim to
stabilise the rockface is not an emergency repair or protection.
2.2 Is the complainant entitled to compensation?
Insurer to pay up to $5,000 for QS’s reports
AFCA’s Rules provide AFCA may decide the insurer is to contribute to the
professional costs incurred by the claimant during the complaint. Unless special
circumstances apply, AFCA will not require the insurer to contribute more than $5,000
to these costs.
When considering whether to require the insurer to contribute, AFCA considers the
complexity of the complaint and whether the costs charged by the expert were
needed to establish the complainant’s case.
The issues raised by the complainant were complex. The panel is satisfied it was fair
the complainant obtained an expert report in view of the expert reports relied on by
the insurer. Further, the complainant’s expert reports considerably assisted the
complainant in establishing his case.
Should the complainant accept this determination then within seven days of
notification of acceptance, the complainant is to provide to the insurer the invoices
from QS for his reports.
On receipt of the invoices, the insurer is to forthwith pay QS’s reports up to $5,000.
If the complainant has already paid QS, the insurer is also to pay interest pursuant to
section 57 of the Act on the cost of QS‘s reports from the date of payment until the
date of settlement.
Non-financial loss compensation paid in some circumstances
The complainant makes several complaints about the way the claim was handled.
The main complaints include that the make safe was not carried out by the insurer as
promised, the insurer did not take responsibility for the works as promised, the IDR
process was not carried out properly, the insurer mis-quoted expert reports and the
insurer did not provide a copy of the PDS.
Determination | Case number: 671662 Page 11 of 18
The complainant proffered information including statutory declarations in support of
his contentions.
The complainant says the insurer’s claims management has caused significant
distress and impacted both his and his wife’s mental and physical health.
The insurer says the make safe contractor attended the day after the storm event to
complete a make safe but as the complainant had already installed props no further
propping was needed. Otherwise, the make safe contractor has no other record of
attending the insured property at any other time.
It also says it did not advise the complainant the claim was accepted but rather tried
to explore ways to assist the complainant with moving forward; and otherwise denies
the complainant’s contentions.
Insurer to pay the complainant $2,500 compensation
AFCA will award compensation (capped at $5,000) if there has been an unusual
degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and
anxiety. AFCA expects complainants to be moderately robust and to bear the normal
degree of inconvenience experienced when a problem occurs and to take reasonable
steps to manage the situation.
The panel has considered the parties lengthy submissions on this issue and has
carefully reviewed the insurer’s claim file notes.
The panel notes the claim was made on 5 October 2018. The insurer obtained expert
opinion. The claim was formally denied on 26 October 2018. Having reviewed the
available information, the panel does not accept it is likely the insurer accepted the
claim on 12 November 2018. The panel accepts the insurer’s explanation is more
likely given all the circumstances.
The failure to provide the PDS has not been addressed by the insurer. In any event,
in view of the panel’s finding in this determination this and the other complaints about
the claims handling do not affect the outcome.
The panel accepts there has been an unusual degree of physical inconvenience and
time taken to resolve the complaint which would have caused distress. Having
considered all the available material, the panel is satisfied an award of compensation
in the amount of $2,500 is warranted.
Determination | Case number: 671662 Page 12 of 18
3 Supporting information
3.1 Our Approach
This complaint has not been the subject of a recommendation. Due to the nature of
the complaint, it has been referred directly to a panel for determination, in line with the
Operational Guidelines to the AFCA Rules. The panel consists of an ombudsman and
two representatives with consumer and insurance experience.
The panel has decided this complaint based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. The panel has reviewed and considered all the material provided
by the parties. While the parties have raised numerous issues in their submissions,
for the purposes of this determination the panel has restricted its commentary to
those issues that it considers directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
Proximate cause is the dominant, efficient or operative cause of the loss. It is not
required to be last in time or the sole cause. It is a question of fact that depends on
the circumstances of each case. It requires a common-sense evaluation of the
evidence.
The complainant is represented. Where relevant, references to the complainant’s
representative include references to the complainant.
3.2 Extracts of relevant policy terms
The relevant policy extracts are referred to below and/or are in correspondence
between the parties. The policy document has been exchanged with the complainant.
4. Home and Contents cover
4.1 What’s considered a building?
✔ Building or home means:
Residential building(s) on the site which includes structural improvements, fixtures and
fittings including:
Determination | Case number: 671662 Page 13 of 18
The basics
• walls, gates, decks, patios, balconies, paths and driveways, and
• fences.
Fixtures and fittings, home office rooms, other structures…
X Building or home does not mean:
Greenery and outdoor decorations
• lawn, landscaping, plants, shrubs, trees or potted plants ….
• outdoor decorations, or water features ….
4.3 Insured events
Depending on whether you have Building cover or Contents cover, we will insure your
building and/or contents at the site against loss or damage caused by the following events
if they occur during your period of insuranc e.
Storm:
Covered
Loss or damage caused by storm, including cyclone, hail, wind, snow or rain.
Not covered
Loss or damage caused by or resulting from:
• gradual det erioration from rain,
3. General exclusions
Your policy does not cover any loss or damage that is caused by or arises from:
• earth or soil movement (other than earthquake) including landslide, subsidence, or
erosion,
7.3 How we settle your claim
Repairing or replacing
When we agree to pay a claim for loss or damage:
We may choose to pay:
• the reasonable cost of repair, or
• the reasonable costs of replacement to new condition with property of the same size
and specification or with items as near to original as is currently possible, or
• a cash a mount. If we agree to pay cash, we’ll pay the amount it would reasonably cost
to repair or replace the property.
Where a building is not being replac ed, the amount we’ll pay will be less a reason able
deduction for depreciation due to wear and tear and age of the property.
Determination | Case number: 671662 Page 14 of 18
Repair guarantee
We will guarant ee the repairs to your building and contents when we provide or
recommend a repairer for you. However, we won’t guarantee any repairs if you choose
your own repairer.
Building additional benefits
If we agree to pay a claim for loss or damage to your building, we will also pay for the
additional benefits listed below that are directly related to that loss or damage.
Some additional benefits are paid in addition to the sum insured and some are paid as
part of the sum insured.
Benefits paid in addition to your building sum insured:
Demolition and removal of debris
We will cover the cost of any necessary demolition of your home or parts of it, and the
removal of resulting debris from the site (including any trees or branches that have caused
damage to your building and need to be cut down).
Emergency accommodation
If your home is unliveable, we will cover the cost of similar alternative accommodation for
you and any other insureds.
This expense will only be paid if you actually incur costs for emergency accommodation,
and only while your home remains unliveable.
Benefits paid as part of your building sum insured:
Emergency repairs and protection
We will cover the reasonable costs incurred for any emergency repairs and protection
necessary to prevent further loss or damage.
3.3 Extracts from key documents
Record Key points
Insurer’s expert engineer (IE)
Report
11 October 2018
Engineer ins pected and photographed property 8 October
2018
Damage to the hous e limited to wall linings, framing and
member fixity. House itself has not translated.
Repairs cannot be safely undertaken until rocks in danger of
collapse have stabilised or removed. Fallen rocks need to be
removed so repairs can be do ne.
Sandstone face remote from the collapse has mechanical
excavation marks, but no evidence of stabilization to the face
itself. There are however numerous fences and walls in
place to stop rocks falling into the area below.
Sandstone face is highly weat hered in areas and contains
seams of relatively soft material.
Although degradation of the rock face and indeed the rock
seams themselves can be considered gradual, the eventual
Determination | Case number: 671662 Page 15 of 18
Record Key points
rock collapse and result ant damage can be considered a
single event.
Do not bel ieve the failure mechanism can be considered
land slip, which generally requires saturation of soil at the
base of the slope lead to the bottom of the slope moving
forward and subsequent collapse of the material above.
Makes recommendations in relation to worker’s safety and
reinstatement scope. Scope is recommended course only as
better safety access is gathered further evidence may
require amendment to scope.
Asse ssor’ s report (CC)
18 October 2018
Scope we have provided includes allowances to repair the
damage that exist based on limited site inspection. Given the
limitations of access area and specialised nature of works
involved, additional repairs/cost variations may be identified
or become apparent during building repairs or may be
required to repair the property in accordance with the current
local codes.
Insurer’s expert (IE)
Supplement ary report
23 October 2018
Report provided to comment on likely cause of rockslide and
method of stabilising the rock shelf to prevent future
rockslides.
Retaining w ork/ fencing may have been undert aken in
January 2013
Rock slip occurred Friday afternoon 5 October 2018.
31.6 mms of rain fell up to 9am on date of loss (the rock fell
at approx. 5.45pm), and a further 33.6 in the 24 hours to
9am the next day (taken fr om Gosford BOM approx. 10 kms
N/E of Com property).
39.4mm was recorded in the 24 hours to 9am on 5 October
at Avalon Beach 15kms south of the property.
Rainfall recordings during this period has not been published
for recording stations closer to the site.
Comment ‘while these rainfalls are considered heavy,
significantly higher daily rainfalls have been recorded in the
area in recent years’
Likely cause of rock collapse is one of gradual weakening of
the material at the interface or above the harder slip plane
interface as described and phot ographed in the report. Once
the weight of the rock above exceeded the resisting friction
at the interface gravity caused the rock to collapse.
Degradation could be erosion by both chemical and
mechanic al proc esses and ultimately due to rainfall moving
through the sandstone.
Degradation has not occurred due to a single inundation or
storm event rather has been occurri ng for many years.
Mechanism common in highly weathered sandstone faces
and excavations like this normally require mechanical
stabilisation using rock bolts or another preventative slip and
rockfall measure. Engineering like this is highly specialised
and requires advice from a geotechnical engineer.
Could not see any evidence of mechanical stabilisation.
Insurer’s expert engineer (M)
Report
12 November 2018
Inspected and photographed site 12 November 2018 with
complainant, insurer, and building consulta nt.
Fallen rocks have caused direct damage to the external
cladding to the rear of the property, garage rear wall and a
Determination | Case number: 671662 Page 16 of 18
Record Key points
wall in bedroom 1.
Remedial repairs will be dangerous and difficult.
Rockslide caused by subsidenc e, erosion and landslide.
Sandstone rock surface was evidently weathered and
deteriorated from weathering from gradual erosion being
exposed to the elements
No signs of retaining or anchoring of the sandstone rocks to
reinforce or stabilise the sandstone walls.
Recommended the complainant en gage a geotechnical
engineer to determine and recommend how to stabilize the
escarpment.
Damaged wall affected the north of the building. It should be
restricted until engineer advises. Southern wing habitable.
Provided a scope of works.
Complainant’s ex pert
geotechnical engineer (QS)
Report
21 February 2020
Geotechnical engineer made a walk over assessment on 27
November 2018.
Based his opinion on his walkover assessment, discussions
with the complainant, review of data gathered from historical
air phot ographs, bureau of meteorology rainfall data and
comments on IE’s reports:
States observations made re wet rock face cannot be relied
on as report was done three days after date of loss,
considerably more rain had fallen
Impact that caused damage was due to a single boulder
which fell from a clean sub vertical break in the rock behind
the dwelling and then split on impact
Sub horizontal surface bet ween the boulder and the rock
mass was marked by a clay seam
Rockfall occurred at a time of intense rainfall d uring which
rain ranging from 35mm to 48.5mm was recorded in the 24
hours to 9 am on 5 October at three climate data stations
near the site namely Palm Beach, Gosford, and Woy Woy.
Record of rain at Woy Woy in the 24 hours to 9 am was
48.5mm and a further 35mm was recorded in the following
24 - hour interval.
No other evidence of rockfalls at the site – rockfall an
isolated event.
Reviews rainfall data and notes rock mass is sandstone with
discontinuities which contain clay soils which are susceptible
to decr ease in sheer strength with increasing moisture
content.
Until the rockfall event, there was sufficient sheer strength
within the sub vertical joints for friction contact to be
maintained
No visually obvious indicators of weathering on the fracture
surfac e (clean break)
Clean break on the rock remnant indicates failure and
collapse was due to sudden loss of capacity in the intact
rock mass
From experience wit h assessment of slope instability risks
since 1996 and interpret ation of available data proximate
cause of the damage to the rear of the house was a high
intensity rainfall event and not erosion which result ed in the
sudden failure of the rock face behind the house.
Insurer’s expert (IE) Provides comment on QS’s report:
Determination | Case number: 671662 Page 17 of 18
Record Key points
Supplement ary report
4 March 2020
Disputes relevance of QS’s rain dat a around time of property
construction or how the 30 - day total increases the
understanding of causation.
Disputes finding that rainfall at time of loss was ‘extreme’,
stating the rainfall was ‘not extraordinary or unusually high’
Questions how proximat e cause can be attributed to heavy
rains when there is no pluviography (rain gauge) indicating
when there was less, or modest rain
Possible entire rainfall recorded over 24 hours fell in a very
short period and that t he rainfall was in fact intense.
Agrees a lack of obvious weathering present on the fracture
surface and there was sufficient strengt h to support the
weight of the rock prior to the sudden collapse but says this
does not prove the strength of the rock was immediately
compromised by the rainfall event.
When he ins pected, slippage surface was noticeably darker
than the upper ‘clean break’ as shown in the photograph.
Fine material, displaced by moisture, remained present on
the slip surface, evidenc e of moistu re and indeed erosion or
weak ening of the sub - vertical jointing.
If more significant or equal rainfall had occurred prior to the
collapse probable that moisture also previously affected the
slip plane.
This erosion would have been unbeknown to anyone, howe ver
gradual, and not the result of a single rain event
Methodology of MC rock face stabilisation proposal sound and
financial allowance feasible.
Proximity of the house provides additional challenges and costs.
U builder’s proposal appears to be based on our reinstatement
scope and appears financially reasonable.
MC proposal appears feasible and additional $36,000 contingency
for structural works not yet confirmed is necessary.
Assume relevant council will have provided requirements for the
site excavatio n when the extension was constructed.
Complainant’s expert (QS)
Supplement ary Report
9 April 2020
Reviews recent report from IE.
Clarifies findings on rainfall data - records from Woy Woy
station show 48.5mm and 35mm in the 24 - hour periods
before 9am on 5 October and 6 October 2018.
States there has been numerous instances of heavier rainfall
between construction and date of loss, but no rockfall
Disputes relevance of IE’s statement on slip surface being
darker – says this is due to presence of iron staining
(chemical deposition)
During the storm the rock would’ve absorbed moisture from
the heavy rainfall descending the face of the escarpment
and moving under the overha nging steps above and below
the rock.
After the boulder fell, remnant mass would have been
subject to further wetting by rainfall, this explains IE’s finding
on the slip surface
Sandstone rock mass from which the boulder fractured
provided the support of t he boulder.
Its capacity to resist the weight of the boulder was exceeded
as it increasingly absorbed moisture from rainfall at the site
Referenc e to ‘weakening of the sub - vertical jointing’ is not
relevant because the ‘slippage surface’ was not a signific ant
Determination | Case number: 671662 Page 18 of 18
Record Key points
contribut or to support of the boulder
Although it may be that prior rainfall events of more
significant or equivalent magnit ude affected the so - called
‘slip plane’, moisture from rainfall would not have
significantly weakened the contact surface bet wee n the
remnant rock mass and the boulder to the extent than any
potential erosion of the surface was the cause of the rock
fall.
Not sure why IE refers to AS4678 ’earth retaining structures ’
when application of this standard is to design of retaining
walls. An occupation certificate would not have been issued
if it was not appropriate for the development and says
approval for the development construction and occupation of
the house was grant ed by council.
Proximate cause was ‘one of more intense bursts of ra infall
that occurred during local storm activity on 5 October 2018.
Insurer’s undated quotation Quotation to repair bedroom and garage $47,527.68.
Complainant’s quotation
U builders
21 February 2020
Estimated price $61,110 for proposed rectification work
which are estimates only and are GST inclusive.
Do es not include chain wire fencing but includes scaffolding.
Estimated price remains valid for 45 days.
Complainant’s quotation MC
21 February 2020
$ 170,600 plus GST to perform rock face stabilisation works.
Duration of works about three weeks.
3.4 Other relevant material considered and relied on
Parties’ submissions/emails and all attachments to all submissions/emails.
Parties’ expert reports.
Photographs, statutory declarations, newspaper clippings, extracts from Bureau of
Meteorology, quotations and estimates, call recordings and insurer’s claim file
notes.
Correspondence between the parties.