Home / IAG / Determination 671657

Determination 671657

Claim for water inundation at business premises denied under flood exclusion

FirmIAG
Decided2020-02-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a February 2019 storm event, water inundated the insured Townsville premises and the insurer denied the claim under the flood exclusion. AFCA found the insurer had not established the exclusion and ordered it to meet the damage up to 100mm above floor level, with interest if cash settled.

The insurer bears the onus of establishing the flood exclusion, and stormwater that cannot enter a full waterway is not flood under the policy definition.

Issues

Subjects and remedies

home or building damagenatural disastersmall businesspay claimpay interest

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 671657 Financial firm Insurance Australia Limited Determination | Case number: 671657 Page 2 of 8 Case number: 671657 11 February 2020 1 Determination overview 1.1 Complaint The complainant holds an insurance policy with the financial firm (insurer). The insured property is located in Railway Estate, Townsville, Queensland. A claim was lodged under the policy after the insured property was inundated with water on or about 1 February 2019. The insurer maintains the inundation was caused by flood, which is excluded from cover under the terms of the policy. 1.2 Issues and key findings Based on the available material, the insurer is not entitled to deny the claim as it has not established its application of the flood exclusion to the level of inundation of 100mm above the floor level at the property. 1.3 Determination This determination is in favour of the complainant. The insurer is required to meet the complainant’s claim under the terms of the policy and in accordance with this determination. Determination | Case number: 671657 Page 3 of 8 2 Reasons for determination 2.1 Is the damage covered under the terms of the policy? The complainant’s business policy with the in surer provides cover for property that is damaged at the premises during the period of insurance. The complainant has cover for buildings only. However, the policy specifically excludes damage caused by or arising from flood. Flood is defined in the product disclosure statement as: Flood means the covering of normally dry land by water that has escaped or been released from the normal confines of:  a lake (whether or not it has been altered or modified):  a river (whether or not it has been altered or modified):  a creek (whether or not it has been altered or modified):  another natural watercourse (whether or not it has been altered or modified):  a reservoir:  a canal:  a dam. The exchanged material confirms the complainant was aware they did not have flood cover under the policy. It is accepted insurance law that the insurer carries the onus to establish the application of its policy exclusion for damage caused by flood. Circumstances of the loss In late January and early February 2019, the city of Townsville and surrounding areas of north Queensland experienced a significant weather event. Heavy rainfall occurred over the Townsville catchment over several days and at or abo ut the complainant’s property. The insured property is located at the intersection of R Avenue and T Street. The timber floor of the building is raised on stumps. The insured property was observed by the Ombudsman during a site visit. The complainant says that on the morning of 1 February 2019, ponded stormwater was filling R Avenue and T Street near the insured property. At about 12.00pm that day, the lid of a manhole located on the road shoulder to the east of R Avenue, blew. The complainant says this was the result of the capacity of the stormwater pipe being exceeded and the force of the water within the pipe blowing off the manhole lid. Determination | Case number: 671657 Page 4 of 8 The complainant has provided video footage of water coming out of the manhole. The complainant says the maximum level of inundation was 100mm which had already been reached on 1 February 2019. A representative of the complainant (Mr B) did not observe water entering the building but does note that he waded through knee high water from the site driveway on 1 February 2019. The complainant says they first became aware of the water being absorbed into the building at around 2.00pm on 1 February 2019. Another representative of the complainant (Mr S) has provided a statement dated 26 March 2019, confirming that contents items were relocated off site at 2.00pm on 1 February 2019, due to concerns about the rising water levels. Mr S was barefoot when removing the contents and said a couple of areas felt cool and moist under foot. Mr S further says that when he was onsite, there was a constant flow of water coming up through the manhole cover. The water level on the T Street side of the building was above the height of the concrete footpath and higher than the timber skirting. Water would have filled under the building due to significant gaps around the timber stumps. In support of their position, the complainant engaged an engineer (LC) to provide a factual assessment of the inundation timelines at the insured property. LC produced a report dated 26 July 2019, following a site inspection on 6 July 2019, as well as a supplementary report (undated). LC was of the view that stormwater within the catchment backed up due to previous rainfall not being able to drain away. The capacity within the stormwater undergro und pipe networks and overland paths had become exceeded. As a result, the manhole lid “blew’ (off) and stormwater began ponding aboveground in local depressions. LC says that according to Mr S, the internal carpets were not wet and there was no observed inundation in the building at approximately 3.00pm on 1 February 2019. However, as noted, within his statement, Mr S said that he was bare foot and a couple of areas felt cool and moist under foot, whilst they were removing the contents at 2.00pm on 1 February 2019. Additionally, LC records that Mr S advised that vehicles (including army vehicles) were travelling along R Avenue, whilst he was at the property, creating bow waves. LC concluded that the insured property was never inundated by floodwaters from the Ross River. LC stated: We believe that the high water mark on this property was caused by stormwater inundation however, it is clear that this property was never inundated by the Determination | Case number: 671657 Page 5 of 8 stormwater inundation in the traditional sense (i.e. water flowed into the property) but instead that stormwater inundation has seeped through capillary action, evaporation and condensation into the floorboards over the subsequent days and making the carpet damp…There is also a possibility that bow waves may have entered the property. Insurer says inundation due to flood The insurer has provided a report from its hydrologist (BM) dated 1 April 2019, which was prepared following a site inspection on 28 February 2019, together with two supplementary reports dated 28 August 2019 and 11 December 2019, in response to further information provided by the complainant. BM stated that ground levels range from 2.6m AHD at the northeast boundary, to 3.1m AHD at the southwest boundary. T Street in front of the insured property is a similar level to the insured property, with the gutter level slightly below pavement at 2.5m AHD and the centre of the road elevated at 2.9m AHD. The manhole elevation is 2.7m AHD. According to BM, Ross Creek is 500m southwest of the insured property. Ross River is 600m south of the insured property at the Rooney’s Bridge crossing of the river. Following the site inspection and review of data from the Bureau of Meteorology, BM concluded that the water inundation of the insured property was due to flooding from Ross Creek and the Ross River. However, the panel is concerned that within its supplementary report of 11 December 2019, BM makes several significant concessions:  BM cannot confirm whether capillary action or bow waves caused inundation at floor level  BM did not know whether the manhole adjacent to the site drains towards Ross Creek or Ross River,  BM did not know whether the manhole initially surcharged due to excessive stormwater runoff exceeding the system capacity or due to water from the Ross River or Ross Creek backing up into the system. Further, BM makes the statement that: Inundation at Site was due to backing up of floodwater from local waterways, including Ross Creek and Ross River. This may have also created surcharging of the local drainage network. (emphasis added) However, the definition of flood within the policy refers to ‘…water that has escaped or been released…’ from a river or creek or natural watercourse. Determination | Case number: 671657 Page 6 of 8 The panel does not accept that stormwater that has been unable to enter a river, creek or natural watercourse because that river, creek or natural watercourse is already full, is floodwater for the purposes of the policy definition. The panel is satisfied that stormwater which cannot enter a river, creek or natural watercourse because the river, creek or natural watercourse is already full, has not escaped or been released from a river, creek or natural watercourse and therefore is not floodwater for the purposes of the policy definition of flood. As previously stated, the insurer carries the onus to establish the application of its policy flood definition, to deny the complainant’s claim. Noting that the insurer’s e xpert (BM):  cannot confirm whether capillary action or bow waves inundated at floor level,  did not know whether the manhole adjacent to the site drains towards Ross Creek or Ross River,  did not know whether the manhole initially surcharged due to excessive stormwater runoff exceeding the system capacity or due to water from the Ross River or Ross Creek backing up into the system, and given water which cannot enter a river, creek or natural watercourse, is not flood water for the purposes of the policy exclusion for flood, the panel is not satisfied that the insurer has met its obligation to establish the application of the policy exclusion for flood to deny the claim. The insurer is required to meet the cost of the damage caused by the inundation at the property, in accordance with this determination. The insurer must meet the claim for the inundation Without precise information on which to determine the level of the inundation by water, the panel can only do what is fair in all the circumstances. The available material does not allow the panel to assess the extent of the damage caused as a result of the inundation of water. Having reviewed all of the exchanged material, the panel is satisfied that the insurer is responsible for damage to the property caused by inundation up to a height of 100mm above floor level. In the circumstances, the panel also believes it is fair and reasonable that the insurer be given the opportunity to provide a scope of works and estimate as to the likely costs associated with repairs and damage sustained as a result of the inundation of the insured property to the height of 100mm above floor level. Determination | Case number: 671657 Page 7 of 8 The scope of works must be prepared within 14 days of the complainant’s acceptance of the Determination, subject to the availability of an appropriate person(s) to conduct the assessment. Upon receipt of the scope of works, the parties are asked to work cooperatively together to agree as to the extent of damage sustained as a result of such inundation and in accordance with the terms of the policy. If the insurer cash settles the claim, then the insurer is to pay interest in accordance with Section 57 of the Insurance Contracts Act 1984 (the Act) from 17 May 2019 (date of insurer’s denial letter) to the date of payment of the claim. If the complainant has already completed the repairs, the insurer is to pay interest from the date the complainant paid for the repairs. If the parties are unable to reach agreement as to any cash settlement, then the parties may return the matter to the Authority for determination as to quantum. Determination | Case number: 671657 Page 8 of 8 3 Supporting information 3.1 AFCA approach to this dispute We have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a preliminary assessment and has proceeded directly to determination. The determination is made by a panel consisting of the Ombudsman together with a consumer representative who has extensive experience in consumer claims and an industry representative who has extensive experience in the ins urance industry. The Ombudsman, who has had extensive experience with flood complaints, viewed the general area and specific site in November 2019. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. 3.2 Rainwater that mixes with flood water is flood The Courts have established that once rainwater mixes with flood water, it is all considered flood water. Where rainwater mixes with flood water and causes damage, a flood exclusion will usually apply to defeat the claim. Accordingly, when deciding complaints, consideration has been given to whether there was any rainwater runoff damage before the flood water arrived at the insured property.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.