Home / IAG / Determination 671285
Determination 671285
Insurer declined valley beam repairs and limited cash settlement for internal water damage
Summary
The complainants' insurer accepted internal water damage to their bedroom but declined the valley beam repairs and offered a limited cash settlement. AFCA found the valley beam was a pre-existing issue outside cover, but ordered the internal damage settled with a 15 per cent uplift or repaired, the $300 electrical repair paid, and $500 for poor communication after the 2010 claim.
The policy does not cover the cost of repairing the item that leaked, and the valley beam defect pre-dated the complainants' ownership, but the insurer failed to explain the 2010 inspection findings and the internal settlement needed adjusting.
Issues
- Claim denial primary · not upheld
“The complainants have therefore failed to establish a valid claim for the valley beam and the insurer was therefore entitled to decline cover for this aspect of the claim.”
- Claim amount dispute secondary · upheld
“the insurer is to pay the complainants $300 for the electrical repairs; cash settlement based on U's report, plus a 15 per cent uplift.”
- Poor communication secondary · upheld
“I consider this lack of information led to confusion and inconvenience for the complainants.”
Subjects and remedies
home or building damagepay claimpay non financial lossrepair or rectify
Text of the determination
Determination
Case number 671285
Financial firm Insurance Australia Limited
Determination | Case number: 671285 Page 1 of 6
Case number: 671285 25 February 2020
1 Determination overview
1.1 Complaint
The complainants hold a home building and contents policy with the financial firm
(insurer) and lodged a claim for water damage to their bedroom .
The insurer agreed to cover the resultant damage to the bedroom, however, it
declined cover for repairs to the valley beam.
The complainants want the insurer to cover the cost of repairing the valley beam.
1.2 Issues and key findings
Has the insurer settled the claim appropriately?
The insurer was entitled to decline cover for the valley beam, however it is required to
settle the claim based on the method addressed in section 1.3 below.
Are the complainants entitled to compensation?
I consider the insurer ’s handling of the 2010 claim led to confusion and inconvenience
for the complainants, therefore some compensation is warranted.
1.3 Determination
This determination is partially in favour of the complainants.
If the complainants accept this determination, the claim should be settled as follows:
the insurer can decline to cover repairs to the valley beam;
the insurer is to pay the complainants $300 for the electrical repairs;
the complainants are to advise the insurer whether they want to be cash settled for
the internal damages or want the insurer to complete repairs once they repair the
valley beam;
if the complainants want to be cash settled for the internal repairs, they are to
provide a fair and reasonable quotation for these damages for the insurer’s
assessment, or accept the cash set tlement based on U’s report, plus a 15 per cent
uplift on the cost, and less the excess; and
the insurer is to pay the complainants $500 in non-financial loss compensation.
Determination | Case number: 671285 Page 2 of 6
2 Reasons for determination
2.1 Has the insurer settled the claim appropriately?
Complainants say water leak caused damage to valley beam
The complainants lodged the claim on 20 May 2019, however the insurer incorrectly
recorded the date of loss as 15 July 2014. The complainants also had a previous
claim, with a date of loss of 10 December 2010, which was for water damage to a
built-in wardrobe and its contents.
The complainants provided a report from a builder (GC), which states:
there is water damage to the ceiling in bedroom two
the existing repair to the valley beam is visible, however the beam has completely
split in a second location
inspection shows a likely water leak from the valley iron has impaired the structural
adequacy of the valley member, and over time it has failed and completely split in
two.
GC also says an earlier fix to add a downpipe to the existing gutter did not affect the
area in question as the water-damaged bedroom two sits around three metres from
the gutter and is higher than the gutter itself.
The complainants say GC’s report confirm s an overflowing valley iron, which is a fixed
gutter, is the cause of the water ingress. The complainants say the policy provides
cover for liquid escaping from a fixed pipe or gutter, therefore it should be covered.
The complainants also say the insurer’s expert report from the 2010 claim did not pay
close attention to the valley beam damage and only recommended to provide an extra
downpipe. However, whilst they installed the downpipe, they say this has not helped
at all. They say due to this error, it has caused water to continue leaking over time
and cause the split in a second location.
The complainants provided an invoice for the cost of GC’s report, for $357.50. They
also provided an invoice for $300 for electrical repairs for repairing a light fitting burnt
out due to a water leak from the roof.
Insurer says complainants have not established valid claim for valley beam
The insurer says the complainants have established a valid claim for the internal
damage, but the valley beam was not damaged by an insurable event, therefore the
complainants have not established a valid claim for this damage. It also says the
damage is due to gradual deterioration, and is pre - existing, dating back to prior to the
c omplainant s owning the property . It says the policy excludes cover for damage in
t hese circumstances.
Determination | Case number: 671285 Page 3 of 6
The insurer also says the information from the original claim in 2010 shows the
complainants were aware of the issues with the valley beam, which indicates it was
present prior to the original claim and is a maintenance issue. It says even if the
complainants were unaware of the issue with the valley beam, it was still a pre-
existing issue.
The insurer provided a report from a builder (K) that inspected the property on 16
December 2010. K stated:
the complainants reported water damage i n the built-in robe
the complainants believed the water ingress was due to a fractured and repaired
valley beam
the damage to the beam has happened over time and is a maintenance issue
damage is consistent with overflowing valley gutter and perimeter guttering as the
gutters were not able to cope with the volume of rain.
K recommended acceptance of repairs to the bedroom and stated the complainants
had to provide an extra downpipe at the front left corner of the house.
The insurer also provided a report from another builder (U) that inspected the property
on 22 May 2019. U stated:
it gained access to the roof space and found a valley rafter had been repaired
directly above the area of damage, but not repaired sufficiently and has caused a
deflection in the roof valley
this deflection has exposed gaps in the roof tiles and valley iron, potentially
allowing rain water to enter the roof space.
The insurer says it is willing to repair the internal damages, subject to the
complainants completing repairs to the valley beam, or it is willing to cash settle the
complainants for the accepted damage. The insurer also agreed to accept the
electrical repair invoice for $300.
Insurer entitled to decline claim for valley beam
The complainants hold a home insurance policy, providing cover for a number of
listed events, including storm and water or liquid damage.
GC’s report indicates a leak from a gutter caused the valley beam’s damage , however
it states this has occurred gradually over time. It also confirms there was a previous
repair attempt on the beam.
The available information establishes the valley beam had been previously repaired
when inspected in 2010. The complainants say they did not do these repairs and it
must have been done by previous owners. Therefore, on balance, I consider the
issues with the valley beam pre-existed the claim in 2010 and the complainants
owning the property. This means even if I were to accept a water leak caused the
Determination | Case number: 671285 Page 4 of 6
damage to the valley beam, on balance this damage occurred prior to the
complainants owning the property and before the insurer was on risk.
The complainants have therefore failed to establish a valid claim for the valley beam
and the insurer was therefore entitled to decline cover for this aspect of the claim .
Insurer’s offer to complainant s to be increased
Whilst the complainants have not established a valid claim for the valley beam, the
insurer accepted the resultant damage . The insurer offered to cash settle the internal
damages for $850 less the $250 excess based on U’s report or repair the damage
after the complainants repair the valley beam.
The complainants say the amount offered to repair the internal damage is inadequate.
They say U’s report has only quoted to apply ‘stain seal’ paint to the water stai ned
area and repaint the ceiling, however this is only a superficial repair and will not repair
the damaged areas sufficiently.
Regarding the internal damages, I consider it fair in all the circumstances for the
complainants to choose whether the insurer cash settles the internal damages or
repairs the damages once the complainants repairs the valley beam.
If the complainants accept this determination, the claim should be settled as follows:
the insurer can decline to cover repairs to the valley beam;
the insurer is to pay the complainants $300 for the electrical repairs, given the
insurer has already accepted this aspect of the claim;
the complainants are to advise the insurer whether they want to be cash settled fo r
the internal damages or want the insurer to complete repairs once they have
repaired the valley beam;
if the complainants want to be cash settled for the internal repairs, they are to
provide a fair and reasonable quotation for these damages for the insurer’s
assessment, or accept the cash settlement based on U’s report, plus a 15 per cent
uplift on the cost, given the transfer of risk to the complainants and potential for
additional damage being discovered once repairs commence.
2.2 Are the complainants entitled to compensation?
Compensation may be awarded in certain circumstances
Under our Rules, the Australian Financial Complaints Authority (AFCA) may award
compensation for non-financial loss (capped at $5,000) where there has been an
unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with a complainant’s expectation of enjoyment or peace of mind.
Determination | Case number: 671285 Page 5 of 6
AFCA takes a conservative approach to compensation and expects a complainant to
bear a normal degree of inconvenience during the course of a claim.
The comp lainants raise concerns with K’s inspection in 2010 and the insurer not
identifying the correct cause of damage. They also raise concerns with the insurer
providing the incorrect dates in their correspondence.
The insurer says it acknowledges different dates were provided to the complainants,
however it says when the claim was lodged, the complainants advised the issue was
four to five years old, which is why it included the date of 15 July 2014. However, it
says the actual date of loss for the original claim was 10 December 2010.
Compensation warranted in the circumstances
The complainants say the insurer is liable for the damage to the beam for failing to
identify the correct cause of damage in 2010.
There is insufficient information to show the insurer caused the complainants to suffer
any direct financial loss following the 2010 claim, as there is not enough information
to show the insurer incorrectly assessed the claim at that time.
However, it appears the information from K’s report was not sufficiently explained to
the complainants following the claim. The insurer says K did not provide a full report,
and the details were put into a claims management system. It appears the insurer
advised the complainants to install an extra downpipe but did not advise the
complainants of the need to repair or replace the valley beam at this stage.
I consider this lack of information led to confusion and inconvenience for the
complainants. In the circumstances I consider the insurer is required to pay the
complainants $500 for this inconvenience.
Determination | Case number: 671285 Page 6 of 6
3 Supporting information
3.1 Relevant policy wording
Storm, flood, rainwater or wind
We will cover your buildings or contents for loss or damage as a result of storm,
flood, rainwater or wind.
…
Water or liquid damage
We will cover your buildings or contents for loss or damage caused by water or
liquid. We will also cover the cost of finding where the water or liquid escaped
from, including the cost of repairing any damage that occurs while looking for the
cause.
We will only cover loss or damage as a result of water or liquid escaping from:
• a fixed pipe or an object attached to a pipe, fixed gutter, fixed tank or a drain
• a bath, basin, sauna, spa, shower base or shower wall, sink, toilet or tiled floor
that has drainage holes
• a washing machine or dishwasher
• an aquarium
• a waterbed.
We will not cover the cost of repairing the item that caused the escape of water or
liquid escaped from. Or the cost of fixing or finding leaks that have not caused
loss or damage to your buildings or contents.
…
Exclusions to Your Cover
…
Listed events cover, additional cover and Strata Title Mortgagee Protection
exclusions
We will not cover any loss or damage as a result of, or caused by:
…
• erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear
…
General exclusions
We will not cover any loss or damage, or liability as a result of, or arising from:
• any incident that does not occur within your period of insurance
3.2 AFCA approach to this complaint
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions of AFCA or its predecessor schemes (which are not binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted only to those issues considered relevant to the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.