Summary

A pleasure craft owner claimed hull damage after partial submersion and the insurer denied the claim. The panel found the stern gland failed through wear, deterioration and lack of maintenance, which the policy excludes, and ordered no payment despite the wrong policy wording supplied at renewal.

The loss fell within the policy exclusions for wear and tear, gradual deterioration and lack of maintenance in the applicable wording.

Issues

Subjects and remedies

no remedy

Related

All NM Insurance Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 671280 Financial firm NM Insurance Pty Ltd Determination | Case number: 671280 Page 2 of 12 Case number: 671280 8 October 2020 1 Determination overview 1.1 Complaint The complainant is represented by his broker (PC). For ease of reference, the determination will refer to the complainant and PC as ‘the complainant’. The complainant holds a comprehensive Pleasure Craft policy with the financial firm (insurer). On 18 January 2019, the complainant lodged a claim for damage sustained to his vessel following its partial submersion. The insurer assessed the claim and subsequently denied it. In doing so, the insurer says the stern glad shaft which is worn has mechanically failed. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The insurer is entitled to deny the claim because:  the expert evidence shows the effective cause of the damage is the failure of the portside propeller shaft stern gland and stuffing box  the policy excludes loss or damage as a result of gradual deterioration, wear and tear  even though the insurer has provided the incorrect policy to the complainant at renewal, the loss is excluded under the terms and conditions of this policy. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to deny the claim and is not required to take any further action. Determination | Case number: 671280 Page 3 of 12 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Policy provides cover for ‘all risks’ of direct physical loss or damage The complainant is required to show, on the balance of probabilities, he suffered a loss caused by a risk insured against under the policy. This is known as a valid claim. There is no dispute the complainant’s vessel was damaged in an incident on 18 January 2019, where the boat has partially submerged in water. The insurer’s policy provides cover for hull and property damage against all risks of direct physical loss or damage to the vessel occurring during the policy period subject to policy terms and conditions. The panel is satisfied the vessel suffered direct physical loss or damage when the event occurred which was during the period of insurance. The panel is also satisfied that the complainant has established on the balance of probabilities a loss caused by a risk insured against under the policy; a valid claim under the policy. Accordingly, the onus shifts to the insurer to establish the application of an exclusion or otherwise on which it is entitled to deny the claim. The gland packing requires regular maintenance Following the claim’s lodgement, the insurer engaged a marine surveyor (MLA) to assess the cause and extent of the damage. In his report, MLA says the cause and the point of water ingress is the port side propeller shaft stern gland. MLA says this item is considered a service related item requiring:  periodic replacement throughout the life of the vessel  regular adjustments to stem the flow of raw cooling water to the rope seals with consideration to wear over time. MLA concluded the depletion of the battery charge is due to continuous bilge pump duty to stem the water ingress. This has resulted in the eventual partial submission. In addressing the engine’s and vessel’s servicing, MLA says the manufacturer advised the maintenance are scheduled every 250 hours of operation or every 12 months whichever comes first. In addressing the service requirement to the stern gland, MLA tendered an article from a marine service provider (BM). In the article BM recommends the gland packing replacement every 12 to 24 months. Determination | Case number: 671280 Page 4 of 12 Further, MLA contacted several suppliers for their views on the frequency of the maintenance required. All the opinions provided recommend the gland packing to be periodically serviced and replaced. The panel notes in his letter, CMA says:  the gland packing wears and its performance deteriorates overtime, so it needs to be replaced every 12 months  the generic gland packing material is derived from flax sees which is a plant-based wheat style product and can be prone to rot when submerged in water for long periods of time. CMA says care should be taken when adjustments are made to the compression coupling, as over tightening can lead to overheating of the package. Further, should a previous leak have been evident requiring adjustments, this adjustment may exacerbate the issue and lead to further increased water ingress if not monitored correctly. CMA adds that wear and tear to the shaft and stuffing box by either corrosion, pitting, electrolysis and or wear of the shaft through normal use can also have a bearing on water ingress. Components should be checked annually when replacing the package to ensure they do not exhibit these faults. MLA outlines the effective cause and the mechanism of the loss In a subsequent email to the insurer, MLA says:  the failed item does not have an infinite life span and has potentially reached its life expectancy  impregnated gland packing lubricant depletes overtime. Complete replacement is the only way to ensure adequate lubrication and correct operation is maintained  stern gland assembly is not cooled by engine water flow nor was a greaseable facility evident, meaning this item requires higher levels of maintenance and attention  item was noted to be leaking 12 months prior to the loss and the repairer should have raised concerns of the item’s potential failure  the rudder gland packing was addressed and replaced at this time however the propeller shaft gland packing was tightened. MLA argues no service history was presented for the vessel or engines, only engine and oil changes advised with no receipts for service related parts provided. The vessel was lastly lifted on 16 October 2017 and the hours on the port side machinery identified as 3,208 hours. Determination | Case number: 671280 Page 5 of 12 MLA says without the stern gland being disabled, there is potential for corrosion and excessive wear to be present on associated items including the propeller shaft. MLA notes the boat is 20 years old. In outlining the mechanism of the damage, MLA says the consistent, solid water flow from the failed stern gland triggered the constant cycling of the bilge pumps. These pumps operated by 12-volt batteries requiring constant charge from a battery charger. MLA asserts the 12 volt operated fridges and freezers potentially adding load to the battery charger. This potentially overloading to the battery charger resulted in the tripping of the shore-based circuit breaker. Eventually the loss occurred given the water ingress had not been addressed. MLA says there is little information presented regarding the machinery maintenance. Following the complainant’s disagreement with his findings, MLA provided further comments regarding the mechanism of the s tern gland’s failure:  periodic adjustment is required as the impregnated material depletes, deteriorates and wears over time  when not replaced for many years and fitted to a vessel used regularly with high hours, as is the case with the subject vessel, maintenance and replacement of this material is required more frequently  when leakage occurs and packing not replaced for several years as identified in 2018, it would be considered good business practice and considered due diligence to replace this item to ensure the future safety of the operator and reliability of the vessel. In his assessment, MLA identified an operational defect in the port side motor. MLA says to shut the motor, the engine bay required accessing where dangerous rotating components are present. MLA noted a temporary, makeshift pullcord was installed to shut fuel down to the diesel injector pump to eventually shut the motor. This operation was required every time the motor was started. The complainant says this measure was to address a failed solenoid. Whilst this issue does not appear to be relevant to the cause of the subject loss, the panel accepts it highlights other failure issues identified in the vessel. The complainant has serviced the vessel in January 2018 The complainant provided an invoice dated 18 January 2018, from a shipwright (BB) for $540. Havi ng reviewed the invoice, BB outlined the service he carried out as Loosen rudder glands, fit packing to glands and adjust. Remove exhaust hose assembly. Loosen port shaft gland. Clean threads on bolts and packer. Assemble gland and adjust. Replace exhaust hose assembly. Determination | Case number: 671280 Page 6 of 12 The panel notes the repairer has serviced the existing packing and has not installed a new one. The insurer argues that given issues were identified with the existing packing, BB should have fitted a new packing. In addressing the service in 2018, BB subsequently says: The shaft gland adjustor nuts were obviously ceased which was preventing the packing gland adjustor from operating correctly. The owner during his good maintenance check noticed this and requested we free up the adjustor. Once serviced the adjustor was functioning correctly and the shaft gland was adjusted accordingly. In elaborating on his decision not to change the packing, BB says It was our opinion at the time that the amount and condition of the packing was adequate, therefore at the time and in our opinion new packing was not required. The panel notes BB has not elaborated on the adequate condition of the packing and did not explain the reasons a new one was not required. In addressing the frequency of the required servicing to the shaft gland packing, BB says Quality shaft gland packing, installed correctly requires regular checks for signs of leakage outside acceptable tolerance. If excessive leakage is observed adjustment is required with the gland packing adjustor. If this fails to reduce leakage the shaft gland packing requires replacement. As outlined above good and regular maintenance is required for this style of shaft gland. The complainant’s exp ert s’ reports conclude mechanical failure is causative The complainant says there is no documented advice from the manufacturer of the vessel engine stating the gland shaft must be resealed, serviced and the packing replaced every two years. The complainant engaged a boat surveyor (SSM) who conducted a desktop assessment regarding the circumstances leading to the loss. In his report, SSM says:  the cause of the water ingression is the port shaft seal  BB serviced the port stern gland where a professional call was made to clean and adjust the port stuffing box without replacing the gland packing  the photo contained in MLA’s report shows there is an adequate adjustment remaining on the stuffing box  once the gland was readjusted after the incident, it remained solid without leaks  this reaffirms BB’s opinion to adjust over replacement. Determination | Case number: 671280 Page 7 of 12 SSM says given the port stern staffing was adjusted 12 months prior to the subject incident, MLA did not eliminate external blockage causing the gland packing to become hot and worn. Further, SSM says the vessel was not slipped to investigate the possibility of running gear being damaged, bent or misaligned from a previous incident. SSM suggests these might be plausible reasons for the gla nd packing becoming worn and allowing sea water into the bilges. SSM has proposed possible causes to the failure of the sterns gland  impact damage to running gear or similar incident  previous rope winding on running gear leading to bent shaft or similar  an external blockage causing gland packing to become hot and wear abnormally. The panel notes SSM has not provided any evidence to establish an external force or incident has led to the failure of the stern gland. The complainant engaged a technician (LC). In his report LC says no investigation was undertaken by MLA to investigate the cause or the reason for the disabled shore power. LC says It is likely that the shore power tripped, either due to marina management testing (periodic testing is mandated), or an external influence occurred, and the vessels shore power has not been re-engaged to maintain the additional power requirements of the consistent water ingress. Having reviewed the exchanged information, the panel accepts the effective cause of the damage is the failed shaft stern gland. The panel does not consider the eventuated failure of the bilge pumps because of the inadequate shore power to be the effective cause of the damage. This is because:  the pumps and the shore power are neither designed nor expected to operate indefinitely  but for the failed gland, the water would not have entered the vessel at the rate depicted in the video supplied by the complainant. In addressing SSM’s and LC’s reports, MLA says both reports revealed the loss was due to stern gland becoming either ‘loose’ or ‘worn’. In MLA’s opinion the ‘loosing’ of a mechanical component as a mechanical failure and maintenance related issue. Further, MLA considers a ‘worn’ item as the wearing of the stern gland/stuffing box. MLA says, in BB’s subsequent statement to the com plainant, he identifies the subject stern gland and stuffing box was leaking for an extended period and seized prior to January 2018. Further, the long-term leaking stern gland ultimately resulted in seizure of the marine grade stainless steel components that allow for adjustment. Determination | Case number: 671280 Page 8 of 12 The panel notes this statement is in line with MLA’s comments regarding the poor and irregular maintenance of the vessel. Further, the panel notes BB decided to adjust the failed item in 2018, rather than replace it. MLA asserts a potential blockage as the cause of loss is a redundant argument. This is because:  the stern in question does not have a water feed and therefore blockage cannot occur . The panel notes MLA’s comment that a stationary shaft should not leak. The video provided by the complainant shows the ingress of the water at a significant rate leading to the loss  the lack of this feature results in higher wear rate requiring additional maintenance. In addressing MLA’s comments, SSM provided a supplementary rep ort. In his report, SSM says there is no dispute the port stern gland was causative to the water ingress. The panel accepts MLA’s comment, on balance , had the failed item been replaced in 2018, the loss of 2019 would not have occurred. The panel notes SSM’s and LC’s reports mirror each other including the choice or words. The panel accepts given the age of the vessel and the operating hours , the vessel required regular maintenance service. There is no evidence the complainant has engaged a marine mechanic to conduct adequate and regular servicing or maintenance works. There is no evidence to show the failed items has been replaced since the complainant owned the vessel. The complainant says he has been doing the maintenance services. Further , the complainant has provided evidence he holds a certificate as a heavy vehicle mechanic. The complainant has provided several statutory declarations from different parties regarding the vessel’s condition and the complainant’s level of care. Whilst SSM suggest several causative scenarios to the port stern gland allowing water ingress following an external force, he has not provided any evidence to substantiate his theories. Further, the panel notes SSM only conducted a desktop assessment whereas MLA has conducted a site assessment. The exchanged evidence shows the failure has occurred during the normal course of events and there is no evidence of an external factor or force causing such loss. The panel accepts the failure is excluded from the policy’s scope of cover. The panel accepts the complainant holds mechanical qualification which enables him to attend to the service of the vessel and its motor to some degree. In saying that, the panel considers the circumstances in which a marine motor operates is different from the circumstances in which a vehicle’s motor operates. The marine environment is highly corrosive and in the panel’s opinion requires the appropriate marine expertise. Determination | Case number: 671280 Page 9 of 12 There is no dispute the complainant took reasonable steps in 2018 and engaged BB to ad dress the leak in the stern gland where in BB’s expert opinion an adjust ment was more appropriate than a replacement. There is no information regarding the condition of the stern gland in 2018, further there is no evidence it has been changed since the complainant owned the vessel. However, the panel accepts the very same item which was adjusted in 2018, failed again in 2019. The panel notes SSM assertion that the stern gland was adjusted following the loss and there are no evident issues with it. The panel does not accept this assertion indicates the nonexistence of an issue with the stern gland, given the loss that occurred. Further the panel accepts that the worn stern gland has eventually failed whilst the vessel was stationary and not whilst it was in use. Further, the failed item is mounted inboard and is not subject to impact or external blockage as suggested by SSM. There is no evidence of such an incident. The complainant argues, the policy does not require him to undertake annual service and document it. Whilst the policy does not specifically require the complainant to do so, the policy requires the complainant to keep the vessel in good condition and repair. The panel is also satisfied that it is prudent for the complainant to undertake adequate and appropriate regular checks and service on the vessel. Whilst the complainant has provided a statutory declaration of the service he has undertaken himself to the vessel, this does not change the fact the stern gla nd has failed in the absence of any ext ernal force. In the panel’s opinion, whether the complainant ’s maintenance services were adequate or not, it does not alter the outcome of this determination. The insurer is entitled to deny the claim Having reviewed the evidence, the panel is satisfied the insurer is entitled to deny the claim. The applicable policy clearly and unequivocally excludes loss or damage expense attributable to or resulting directly or indirectly, rust, corrosion or oxidation, marine life, marine borers, warping or shrinkage, change of temperature or humidity, deterioration, lack of maintenance, lack of reasonable care, lack of reasonable protection and/or security, wear and tear or inherent vice. To determine whether the relevant exclusion clauses is applicable, it is necessary to examine the intent and meaning of the clause. There is no evidence to show the damage to the complainant’s vessel was caused by an external extraordinary and unforeseen event and is beyond the depreciation that would be expected to occur in the ordinary course of events. Firstly, the stern gland has failed on its own accord. Whilst the complainant’s experts suggest impact, no substantiation has been provided. Determination | Case number: 671280 Page 10 of 12 Secondly, the failed item does not have a n infinite life span. There is no evidence the rudder gland packing has been replaced since the complainant has owned the vessel from 2011. Thirdly, the panel accepts plant-based packing material which wraps around a spinning propeller shaft and is mechanically compressed within a stuffing box, deteriorates and wears over time. This is con sistent with SSM’s comments of the stern gland becoming loose or worn. This is also consistent with MLA’s findings that the subject stern gland/stuffing box component has simply worn due to normal use, age, wear, tear and gradual deterioration Fourthly, the panel considers the effective cause being either the wearing or loosing of the stern glands as a failure which the policy clearly excludes. Further, the panel is satisfied the exchanged evidence shows the stern gland became damaged through the normal course of wear and tear which is also excluded under the policy. Finally, the failure of the shore power was a consequence of the failure of the stern gland/stuffing box component. The failure of the shore power was not the effective cause of the vessel loss. The panel is satisfied the loss falls within the above-named exclusions and the insurer is entitled to deny the claim. The supplied policy at renewal does not advance the complainant’s position The complainant argues the insurer is relying on the incorrect policy wording. Having reviewed the policy schedule, the panel notes the policy’s code which was applicable at the time of the loss ends with xxx815B. The exchanged information shows the insurer has provided the complainant with the incorrect policy wording at renewal. The panel notes the code for this product disclosure statement ends with xxx0815. The insurer is required to clearly inform the complainant with the terms and conditions of his policy. Once, the insurer meets this onus, it is then entitled to rely on these terms and conditions in assessing its liability following a claim. The panel considers it fair to assess the loss under both policy wordings given the identified error. The panel notes the policy provides cover for accidental loss or damage including the following major events (subject to exclusions and conditions):  theft  impact  sinking  fire  storm  malicious damage  transit damage. Determination | Case number: 671280 Page 11 of 12 The panel accepts the complainant has established a valid claim under the terms and conditions of the policy noting the broad scope of cover given the partial submersion was sudden and unexpected from the complainant’s point of view. Having reviewed the supplied policy at renewal (ending with xxx0815), the panel notes the following exclusions  wear and tear, mould, gradual deterioration, timber rot, delamination, vermin, corrosion, rust, electrolysis, osmosis or marine growth  mechanical, structural, electrical or electronic breakdown or malfunction unless directly caused by one of the insured events listed earlier in this policy. Having carefully considered the policy wording, the panel is satisfied the insurer is entitled to deny the claim given the operation of the above e xclusions. As stated above, the effective cause of loss is wear and tear, gradual deterioration, which are excluded under the policy. Determination | Case number: 671280 Page 12 of 12 3 Supporting information 3.1 AFCA’s approach to the determination This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the AFCA Rules. The panel consists of an ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their substantial submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.