Home / Westpac / Determination 668899

Determination 668899

Home and contents claim for water damage from gradual escape of liquid denied

FirmWestpac
Decided2020-07-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$16,032
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer denied a home and contents claim for water damage, arguing it was not an insured event, a gradual leak that was evident, and prejudice from the complainant's repairs. AFCA found the claim valid, rejected prejudice, and ordered a cash settlement of $16,032 plus interest, but no non-financial loss compensation.

Escape of liquid from a fixed pipe is covered where the gradual leak was not evident until shortly before lodgement and the insured acted reasonably to rectify it, and the insurer was not prejudiced.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination Case number 668899 Financial firm Westpac General Insurance Limited Determination | Case number: 668899 Page 2 of 10 Case number: 668899 16 July 2020 1 Determination overview 1.1 Complaint The complainant holds a Home and Contents Policy with the financial firm (insurer) and lodged a claim on 10 August 2019 after discovering water damage to the home. The insurer denied the claim and says the damage was not caused by an insured event. Alternatively, if the damage was due to the gradual escape of liquid, this was evident, and the complainant failed to rectify the damage within a reasonable time. Further, the complainant by removing the tiles to identify the leak has prejudiced the ins urer’s ability to determine the cause of the damage to the full extent of the claim. This dispute was subject to a recommendation which was in favour of the insurer. The complainant has rejected the recommendation. 1.2 Issues and key findings Has the complainant established a claim within the terms of the policy? I am satisfied the complainant has established a claim within the terms of the policy. There is no dispute that the damage is due to the escape of water and the complainant’s plumber has ident ified a leaking pipe in the bathroom. I am satisfied the escape of water was gradual and when evident the complainant acted to rectify the leak. Has the insurer been prejudiced by the complainant’s actions? I am not satisfied that the insurer has been prejudiced by the complainant’s actions. The complainant, acted in accordance with the terms of the policy, to identify the cause of damage and rectify the leaking pipe. Is the complainant entitled to compensation for non-financial loss? The complainant is not entitled to compensation for non-financial loss as I am not satisfied the complainant has experienced an unusual degree of physical inconvenience or time taken to resolve the claims 1.3 Determination This determination is in favour of the complainant. Within 14 days of the complainant’s acceptance of this determination, the insurer is to cash settle the complainants claim for damage sustained from the escape of liquid for $16032. Interest pursuant to Section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) is payable on the cash settlement from 7 November 2019 to date of payment of the claim. Determination | Case number: 668899 Page 3 of 10 The insurer may then settle the claim as set out under section 2.3 of this determination. Determination | Case number: 668899 Page 4 of 10 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. In rejecting the recommendation, the complainant says:  he only sought to claim for the damage to the bathroom, it is the insurer’s assessor who identified damage to the floor  the damage was not evident until approximately one month prior to lodgement of the claim  the insurer has been constantly slow in responding to the complaint and the delays have caused significant inconvenience. The insurer in response to questions following the recommendation, as to the application of the exclusion relating to the gradual escape of liquid, has also provided further submissions are discussed under section 2.1 and 2.2 of this determination. The determination is based on what is fair in all the circumstances, after consideration of all relevant information. I have had regard to relevant legal principles, terms of the policy, good industry practice, including codes of practice and prior determinations where applicable. 2.1 Has the complainant established a claim within the terms of the policy? Onus is on the complainant to establish a valid claim It is established insurance law that an insured person bears the initial onus of establishing, on the balance of probabilities, that is, more likely than not, that the claim falls within the terms of the policy. This is commonly called a prima facie claim. The complainant’s policy is a Quality Care Home and Contents Policy that provides cover for a series of listed events including escape of liquid. In a supplementary PDS issued in 2018, the definition for escape of liquid was changed to the following: Loss or damage caused by sudden and accidental escape of liquid from a fixed pipe, fixed tank, water bed, fixed fish tank or fixed item used to hold liquid. An accident is defined under the policy as an event that happens by chance and is not expected in the normal course of events. Policy covers escape of liquid from a shower recess The policy does not define what is meant by the term ‘ fixed item used to hold liquid ’ . It is not clear whether this is meant to cover a bath, a basin or a shower. Determination | Case number: 668899 Page 5 of 10 The definition of fixtures and fittings within the policy refers to equipment permanently connected to gas, plumbing, sewerage, drainage or electrical systems or communication installations, in all instances for which you own or are legally responsible for, e.g. light fittings, alarm systems, kitchen and bathroom fixtures. I accept that a fixed item used to hold liquid could reasonably include a bath, basin or shower recess. There are three levels of cover under the policy – essential care, quality care, premier care. Under essential care, the policy specifically excludes loss or damage resulting from liquid escaping from a shower recess. It does not have that exclusion with respect to other quality care or premier care. I note that under the definition of escape of liquid the policy provides the following items are not covered:  loss or damage to the item from which the liquid escaped, and if the liquid escaped from a shower recess, the cost of retiling the walls or floor of the shower recess Considering the terms of the policy, it is fair to accept that damage caused by the escape of liquid from a shower recess is included in cover. What is not included is the cost of retiling the walls or floor of the shower recess. Policy also covers gradual escape of liquid that was not evident Under the definition of escape of liquid, the policy also provides the following items are not covered:  repair or replacement of undamaged parts of your building and/or contents to match the property that has been repaired or replaced or  loss or damage caused by gradual escape of liquid which is evident, and you fail to rectify. The policy excludes cover for loss or damage caused by the gradual escape of liquid which is evident and which you fail to rectify. By implication, the policy will cover loss or damage caused by the gradual escape of liquid which is not evident or if evident, that you rectify. Circumstances of the loss According to the complainant approximately one month before lodging the claim, he noticed some uneven floor boards which appeared to have warped at the door entrance to the room adjacent to the bathroom. The complainant considered the damage was due to either heater usage or poor ventilation as could see no evidence of any moisture on the walls adjacent to the bathroom. It was a friend who suggested there may have been a leak that was causing the issue. Determination | Case number: 668899 Page 6 of 10 The complainant then removed a few tiles, and this identified the water logged timber and wet timber frames. The complainant’s plumber, AP, reported observing damage to the timber frames behind the bathroom wall, tiles. This was caused by the damaged water proofing around the shower screen. Further wall tiles behind the bidet were removed and there was water dripping from one of the pipe joints. The insurer had a specialist leak detection test completed that no evidence of a leak. The specialist attended the property after AP had removed and resealed the pipe joint to stop the water leak. There is no information to suggest that the comments by the AP are inaccurate or that the plumber had not completed the work as claimed. Damage most likely occurred gradually Both parties agree that the damage is most likely being caused by the gradual escape of liquid over an extended period of time. The insurer agrees that the reports and photographs provided establish that there was a gradual escape of liquid. The complainant says that he first observed the damage approximately one month prior to reporting the loss. The complainant acted reasonably in appointing AP to detect the leak and complete relevant repairs. The insurer says the complainant had failed to rectify the damage when the loss or damage caused by the leak would have been evident. The insurer , based on a report from its plumber P, says the flooring would have been cupping for a period along with the wall damage being visible for a period of over three months. P reports that the floor would have been slowly but consistently peaking further and further across the floor area due to the elevated moisture content. It is unclear why the cupping of the floor would have alerted the complainant to the leaking pipe. The complainant had said, prior to the report from P, that he had not observed any damage to the wall. I am not satisfied that the information from P is sufficient to say that the loss or damage caused by the gradual escape of liquid was evident for at least three months. Whilst it may have been identifiable by a trained expert, the complainant is not a flooring expert or plumber. T here is no reason to question the complainant’s information that he first observed the uneven floor boards approximately one month prior to reporting the incident. I am satisfied, in these circumstances, that the loss or damage caused by the gradual escape of liquid was not evident until one month prior to the claim being lodged. I am satisfied that the complainant has acted reasonably at that time to seek to identify the cause of the damage and upon identifying the cause of the damage, has acted to rectify the issue. Determination | Case number: 668899 Page 7 of 10 I am satisfied the complainant has established a valid claim within the terms of the policy for the damage to the bathroom arising from the escape of liquid and for the damage to the flooring and skirting of the kitchen and hallway. 2.2 Has the insurer been prejudiced? Insurer has not established prejudice The insurer has argued that the complainant by removing the tiles and repairing the leak, has prejudiced its ability to identify the cause of the damage. The insurer relies upon the terms of the policy that require an insured to provide the insurer with access and a reasonable time to inspect the loss or damage before they allow anyone to fix or interfere with it. This provision of the policy is inconsistent with the requirement that where there is a gradual escape of liquid which is evident you must rectify it, or the policy will exclude cover. The complainant did not completely strip the bathroom. The complainant did not remove the damaged timber framework. The complainant acted reasonably to repair the dripping pipe. I accept that by removing the whole shower recess, this may have compromised the ability of the insurer to assess the damage, but the policy does not cover the cost of retiling the walls or flooring of the shower recess. Having considered the issues raised, I am not satisfied the insurer has established that it has been prejudiced in its ability to make an informed decision about the claim. The insurer has had the complainant’s plumber AP available and could have sought further information from AP if it considered this necessary. It has not done so. Insurer to settle claim in accordance with policy In the circumstances, I am satisfied the insured is liable to meet the complainant’s claim in accordance with the terms of the policy. The only quote available on file is from IB dated 15 August 2019. The quote does not include all work to the bathroom. The complainant, out of necessity, has completed work to the bathroom including some upgrades at a cost of around $10,000.00. He has not completed any of the other work identified by IB. Allowing for the limitation on cover for the damage to the shower recess and to avoid delays I believe it is fair in the circumstances to determine the insurer cash settle the claim based on the quote from IB. While the quote does not cover all the bathroom damage it has allowed for a 20% contingency. The complainant has indicated he is prepared to settle based on this quote of $16032.00. Determination | Case number: 668899 Page 8 of 10 In the circumstances, w ithin 14 days of the complainant’s acceptance of this determination, the insurer is to cash settle the claim for $16032.00. Interest pursuant to section 57 of the Act is payable on the cash settlement from 7 November 2019 until date of payment of the claim. 2.3 Is the complainant entitled to compensation for non-financial loss? AFCA can award compensation for non-financial loss Under the AFCA Rules, AFCA can award compensation up to $5,000 if a person suffers an unusual degree of physical inconvenience or time taken to resolve a claim. AFCA takes a conservative view when awarding compensation for non-financial loss and accepts in most claims, there will be some degree of inconvenience incurred. The complainant argues that the insurer has failed to act promptly in dealing with his dispute and has constantly delayed responding to issues raised by both himself and through AFCA. I accept however that the insurer in responding to the complainant’s claim, did so within a reasonable time. It was reasonable for the insurer to obtain a copy of the complainant’s plumber’s report and the invoice and to obtain its own expert opinions. The claim was lodged on 10 August 2019 and the insurer denied the claim on 19 September 2019. It would appear from the chronology provided by the insurer that there was limited communication with the complainant. I accept that there have been some delays caused by the conduct of the insurer. Those delays are outside the normal timeframes that AFCA would expect an insurer to respond however those delays are not in my view sufficient to justify an award of compensation for non-financial loss. Determination | Case number: 668899 Page 9 of 10 3 Supporting information 3.1 Relevant policy provisions Insured events Depending on whether you have Building cover or Contents cover, we will insure your building and/or contents at the site against loss or damage caused by the following events if they occur during your period of insurance. Covered  Loss or damage caused by accidental escape of liquid from any fixed pipe, fixed tank, waterbed, fish tank, or fixed item used to hold liquid.  We will also pay reasonable exploratory costs in locating the source of the damage, provided we have agreed to pay for the loss or damage caused by the escape of liquid. Not covered  loss or damage to the item from which the liquid escaped, and if the liquid escaped from a shower recess, the cost of re-tiling the walls or floor of the shower recess,  repair or replacement of undamaged parts of your building and/or contents to match property that has been repaired or replaced, or  loss or damage caused by gradual escape of liquid which is evident and which you fail to rectify. General exclusions We will not cover the cost of repairing the item that caused the escape of water or liquid escaped from. Or the cost of fixing leaks that have not caused loss or damage to your building or contents. 3.2 Relevant expert evidence Record Key points Complainant’s expert (APR) Report 09 - 08 - 2019  Observation: We noticed damage to the timber frames behind the bathroom wall tiles. This was caused by the damaged water proofing around the shower screen.  We removed the wall tiles behind the Bidet and noticed water ripping in one of the pipe joints.  Work done: We removed and resealed the pipe joint to stop the water dripping.  We checked the wat er pressure and it was normal. We followed up with the owner on the 10th of August to confirm that no more water was dripping in the joint sealed on the previous day. Determination | Case number: 668899 Page 10 of 10 Record Key points Financial firm’s expert (PB) Report 22 - 08 - 2019  We observed significant rot in the timber framework that was directly adjacent to the shower recess indicati ve of long term wat er damages. Ins ured has only removed the bottom half of the shower recess wall and flooring indicating there may have been waterproofing issues in the past which he is now trying to rectify. We note an inspection for the leaking pipe and nay repair work could have been conducted through the plasterboard wall behind shower recess.  There was buckling of the strip flooring adjacent to the shower recess walls.  Because the linings and shower recess had been removed prior to our attendance we c annot be certain of all the contributing factors.  We engaged the services of a specialist contractor to conduct further investigations and they have advised that the damages are consistent with a membrane failure. See attached report.  Based on our site ins pection and information obtained, PB can confirm that the claimed resultant damage is consistent with water proofing failure and not of a sudden escape of liquid caused by a burst pipe. However, we cannot confirm this as shower recess wall and floor have b een removed by the insured prior to our attendance. Financial firm’s expert (PB) Report 04 - 03 - 2020  The flooring would of been cupping for a period along with the wall damage being visible, this would of been present for a period of over 3 months as the amount of timberwork damage with in the wall confirms the area has been subjected to long term water saturation as this has discoloured and blackened, the floor would be slowly but consistently peeking further and furt her across the floor area due to the e levated moisture content which would be both visible and felt under foot.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.