Home / Westpac / Determination 668899
Determination 668899
Home and contents claim for water damage from gradual escape of liquid denied
Summary
The insurer denied a home and contents claim for water damage, arguing it was not an insured event, a gradual leak that was evident, and prejudice from the complainant's repairs. AFCA found the claim valid, rejected prejudice, and ordered a cash settlement of $16,032 plus interest, but no non-financial loss compensation.
Escape of liquid from a fixed pipe is covered where the gradual leak was not evident until shortly before lodgement and the insured acted reasonably to rectify it, and the insurer was not prejudiced.
Issues
- Claim denial primary · upheld
“I am satisfied the complainant has established a valid claim within the terms of the policy for the damage to the bathroom.”
- Delay secondary · upheld
“I accept that there have been some delays caused by the conduct of the insurer.”
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Determination
Case number 668899
Financial firm Westpac General Insurance Limited
Determination | Case number: 668899 Page 2 of 10
Case number: 668899 16 July 2020
1 Determination overview
1.1 Complaint
The complainant holds a Home and Contents Policy with the financial firm (insurer)
and lodged a claim on 10 August 2019 after discovering water damage to the home.
The insurer denied the claim and says the damage was not caused by an insured
event. Alternatively, if the damage was due to the gradual escape of liquid, this was
evident, and the complainant failed to rectify the damage within a reasonable time.
Further, the complainant by removing the tiles to identify the leak has prejudiced the
ins urer’s ability to determine the cause of the damage to the full extent of the claim.
This dispute was subject to a recommendation which was in favour of the insurer. The
complainant has rejected the recommendation.
1.2 Issues and key findings
Has the complainant established a claim within the terms of the policy?
I am satisfied the complainant has established a claim within the terms of the policy.
There is no dispute that the damage is due to the escape of water and the
complainant’s plumber has ident ified a leaking pipe in the bathroom. I am satisfied the
escape of water was gradual and when evident the complainant acted to rectify the
leak.
Has the insurer been prejudiced by the complainant’s actions?
I am not satisfied that the insurer has been prejudiced by the complainant’s actions.
The complainant, acted in accordance with the terms of the policy, to identify the
cause of damage and rectify the leaking pipe.
Is the complainant entitled to compensation for non-financial loss?
The complainant is not entitled to compensation for non-financial loss as I am not
satisfied the complainant has experienced an unusual degree of physical
inconvenience or time taken to resolve the claims
1.3 Determination
This determination is in favour of the complainant.
Within 14 days of the complainant’s acceptance of this determination, the insurer is to
cash settle the complainants claim for damage sustained from the escape of liquid for
$16032. Interest pursuant to Section 57 of the Insurance Contracts Act 1984 (Cth)
(the Act) is payable on the cash settlement from 7 November 2019 to date of payment
of the claim.
Determination | Case number: 668899 Page 3 of 10
The insurer may then settle the claim as set out under section 2.3 of this
determination.
Determination | Case number: 668899 Page 4 of 10
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
In rejecting the recommendation, the complainant says:
he only sought to claim for the damage to the bathroom, it is the insurer’s assessor
who identified damage to the floor
the damage was not evident until approximately one month prior to lodgement of
the claim
the insurer has been constantly slow in responding to the complaint and the delays
have caused significant inconvenience.
The insurer in response to questions following the recommendation, as to the
application of the exclusion relating to the gradual escape of liquid, has also provided
further submissions are discussed under section 2.1 and 2.2 of this determination.
The determination is based on what is fair in all the circumstances, after consideration
of all relevant information. I have had regard to relevant legal principles, terms of the
policy, good industry practice, including codes of practice and prior determinations
where applicable.
2.1 Has the complainant established a claim within the terms of the policy?
Onus is on the complainant to establish a valid claim
It is established insurance law that an insured person bears the initial onus of
establishing, on the balance of probabilities, that is, more likely than not, that the
claim falls within the terms of the policy. This is commonly called a prima facie claim.
The complainant’s policy is a Quality Care Home and Contents Policy that provides
cover for a series of listed events including escape of liquid. In a supplementary PDS
issued in 2018, the definition for escape of liquid was changed to the following:
Loss or damage caused by sudden and accidental escape of liquid from a fixed
pipe, fixed tank, water bed, fixed fish tank or fixed item used to hold liquid.
An accident is defined under the policy as an event that happens by chance and is
not expected in the normal course of events.
Policy covers escape of liquid from a shower recess
The policy does not define what is meant by the term ‘ fixed item used to hold liquid ’ . It
is not clear whether this is meant to cover a bath, a basin or a shower.
Determination | Case number: 668899 Page 5 of 10
The definition of fixtures and fittings within the policy refers to equipment permanently
connected to gas, plumbing, sewerage, drainage or electrical systems or
communication installations, in all instances for which you own or are legally
responsible for, e.g. light fittings, alarm systems, kitchen and bathroom fixtures.
I accept that a fixed item used to hold liquid could reasonably include a bath, basin or
shower recess. There are three levels of cover under the policy – essential care,
quality care, premier care. Under essential care, the policy specifically excludes loss
or damage resulting from liquid escaping from a shower recess. It does not have that
exclusion with respect to other quality care or premier care.
I note that under the definition of escape of liquid the policy provides the following
items are not covered:
loss or damage to the item from which the liquid escaped, and if the liquid escaped
from a shower recess, the cost of retiling the walls or floor of the shower recess
Considering the terms of the policy, it is fair to accept that damage caused by the
escape of liquid from a shower recess is included in cover. What is not included is the
cost of retiling the walls or floor of the shower recess.
Policy also covers gradual escape of liquid that was not evident
Under the definition of escape of liquid, the policy also provides the following items
are not covered:
repair or replacement of undamaged parts of your building and/or contents to
match the property that has been repaired or replaced or
loss or damage caused by gradual escape of liquid which is evident, and you fail to
rectify.
The policy excludes cover for loss or damage caused by the gradual escape of liquid
which is evident and which you fail to rectify. By implication, the policy will cover loss
or damage caused by the gradual escape of liquid which is not evident or if evident,
that you rectify.
Circumstances of the loss
According to the complainant approximately one month before lodging the claim, he
noticed some uneven floor boards which appeared to have warped at the door
entrance to the room adjacent to the bathroom.
The complainant considered the damage was due to either heater usage or poor
ventilation as could see no evidence of any moisture on the walls adjacent to the
bathroom. It was a friend who suggested there may have been a leak that was
causing the issue.
Determination | Case number: 668899 Page 6 of 10
The complainant then removed a few tiles, and this identified the water logged timber
and wet timber frames.
The complainant’s plumber, AP, reported observing damage to the timber frames
behind the bathroom wall, tiles. This was caused by the damaged water proofing
around the shower screen. Further wall tiles behind the bidet were removed and there
was water dripping from one of the pipe joints.
The insurer had a specialist leak detection test completed that no evidence of a leak.
The specialist attended the property after AP had removed and resealed the pipe joint
to stop the water leak. There is no information to suggest that the comments by the
AP are inaccurate or that the plumber had not completed the work as claimed.
Damage most likely occurred gradually
Both parties agree that the damage is most likely being caused by the gradual escape
of liquid over an extended period of time.
The insurer agrees that the reports and photographs provided establish that there
was a gradual escape of liquid.
The complainant says that he first observed the damage approximately one month
prior to reporting the loss. The complainant acted reasonably in appointing AP to
detect the leak and complete relevant repairs.
The insurer says the complainant had failed to rectify the damage when the loss or
damage caused by the leak would have been evident. The insurer , based on a report
from its plumber P, says the flooring would have been cupping for a period along with
the wall damage being visible for a period of over three months. P reports that the
floor would have been slowly but consistently peaking further and further across the
floor area due to the elevated moisture content.
It is unclear why the cupping of the floor would have alerted the complainant to the
leaking pipe. The complainant had said, prior to the report from P, that he had not
observed any damage to the wall.
I am not satisfied that the information from P is sufficient to say that the loss or
damage caused by the gradual escape of liquid was evident for at least three months.
Whilst it may have been identifiable by a trained expert, the complainant is not a
flooring expert or plumber. T here is no reason to question the complainant’s
information that he first observed the uneven floor boards approximately one month
prior to reporting the incident.
I am satisfied, in these circumstances, that the loss or damage caused by the gradual
escape of liquid was not evident until one month prior to the claim being lodged. I am
satisfied that the complainant has acted reasonably at that time to seek to identify the
cause of the damage and upon identifying the cause of the damage, has acted to
rectify the issue.
Determination | Case number: 668899 Page 7 of 10
I am satisfied the complainant has established a valid claim within the terms of the
policy for the damage to the bathroom arising from the escape of liquid and for the
damage to the flooring and skirting of the kitchen and hallway.
2.2 Has the insurer been prejudiced?
Insurer has not established prejudice
The insurer has argued that the complainant by removing the tiles and repairing the
leak, has prejudiced its ability to identify the cause of the damage.
The insurer relies upon the terms of the policy that require an insured to provide the
insurer with access and a reasonable time to inspect the loss or damage before they
allow anyone to fix or interfere with it.
This provision of the policy is inconsistent with the requirement that where there is a
gradual escape of liquid which is evident you must rectify it, or the policy will exclude
cover.
The complainant did not completely strip the bathroom. The complainant did not
remove the damaged timber framework. The complainant acted reasonably to repair
the dripping pipe.
I accept that by removing the whole shower recess, this may have compromised the
ability of the insurer to assess the damage, but the policy does not cover the cost of
retiling the walls or flooring of the shower recess.
Having considered the issues raised, I am not satisfied the insurer has established
that it has been prejudiced in its ability to make an informed decision about the claim.
The insurer has had the complainant’s plumber AP available and could have sought
further information from AP if it considered this necessary. It has not done so.
Insurer to settle claim in accordance with policy
In the circumstances, I am satisfied the insured is liable to meet the complainant’s
claim in accordance with the terms of the policy.
The only quote available on file is from IB dated 15 August 2019. The quote does not
include all work to the bathroom. The complainant, out of necessity, has completed
work to the bathroom including some upgrades at a cost of around $10,000.00. He
has not completed any of the other work identified by IB.
Allowing for the limitation on cover for the damage to the shower recess and to avoid
delays I believe it is fair in the circumstances to determine the insurer cash settle the
claim based on the quote from IB. While the quote does not cover all the bathroom
damage it has allowed for a 20% contingency. The complainant has indicated he is
prepared to settle based on this quote of $16032.00.
Determination | Case number: 668899 Page 8 of 10
In the circumstances, w ithin 14 days of the complainant’s acceptance of this
determination, the insurer is to cash settle the claim for $16032.00. Interest pursuant
to section 57 of the Act is payable on the cash settlement from 7 November 2019 until
date of payment of the claim.
2.3 Is the complainant entitled to compensation for non-financial loss?
AFCA can award compensation for non-financial loss
Under the AFCA Rules, AFCA can award compensation up to $5,000 if a person
suffers an unusual degree of physical inconvenience or time taken to resolve a claim.
AFCA takes a conservative view when awarding compensation for non-financial loss
and accepts in most claims, there will be some degree of inconvenience incurred.
The complainant argues that the insurer has failed to act promptly in dealing with his
dispute and has constantly delayed responding to issues raised by both himself and
through AFCA.
I accept however that the insurer in responding to the complainant’s claim, did so
within a reasonable time. It was reasonable for the insurer to obtain a copy of the
complainant’s plumber’s report and the invoice and to obtain its own expert opinions.
The claim was lodged on 10 August 2019 and the insurer denied the claim on 19
September 2019.
It would appear from the chronology provided by the insurer that there was limited
communication with the complainant. I accept that there have been some delays
caused by the conduct of the insurer. Those delays are outside the normal
timeframes that AFCA would expect an insurer to respond however those delays are
not in my view sufficient to justify an award of compensation for non-financial loss.
Determination | Case number: 668899 Page 9 of 10
3 Supporting information
3.1 Relevant policy provisions
Insured events
Depending on whether you have Building cover or Contents cover, we will insure
your building and/or contents at the site against loss or damage caused by the
following events if they occur during your period of insurance.
Covered
Loss or damage caused by accidental escape of liquid from any fixed pipe,
fixed tank, waterbed, fish tank, or fixed item used to hold liquid.
We will also pay reasonable exploratory costs in locating the source of the
damage, provided we have agreed to pay for the loss or damage caused by
the escape of liquid.
Not covered
loss or damage to the item from which the liquid escaped, and if the liquid
escaped from a shower recess, the cost of re-tiling the walls or floor of the
shower recess,
repair or replacement of undamaged parts of your building and/or contents
to match property that has been repaired or replaced, or
loss or damage caused by gradual escape of liquid which is evident and
which you fail to rectify.
General exclusions
We will not cover the cost of repairing the item that caused the escape of water or
liquid escaped from. Or the cost of fixing leaks that have not caused loss or
damage to your building or contents.
3.2 Relevant expert evidence
Record Key points
Complainant’s expert (APR)
Report
09 - 08 - 2019
Observation: We noticed damage to the timber frames behind the
bathroom wall tiles. This was caused by the damaged water
proofing around the shower screen.
We removed the wall tiles behind the Bidet and noticed water
ripping in one of the pipe joints.
Work done: We removed and resealed the pipe joint to stop the
water dripping.
We checked the wat er pressure and it was normal. We followed up
with the owner on the 10th of August to confirm that no more water
was dripping in the joint sealed on the previous day.
Determination | Case number: 668899 Page 10 of 10
Record Key points
Financial firm’s expert (PB)
Report
22 - 08 - 2019
We observed significant rot in the timber framework that was
directly adjacent to the shower recess indicati ve of long term wat er
damages. Ins ured has only removed the bottom half of the shower
recess wall and flooring indicating there may have been
waterproofing issues in the past which he is now trying to rectify.
We note an inspection for the leaking pipe and nay repair work
could have been conducted through the plasterboard wall behind
shower recess.
There was buckling of the strip flooring adjacent to the shower
recess walls.
Because the linings and shower recess had been removed prior to
our attendance we c annot be certain of all the contributing factors.
We engaged the services of a specialist contractor to conduct
further investigations and they have advised that the damages are
consistent with a membrane failure. See attached report.
Based on our site ins pection and information obtained, PB can
confirm that the claimed resultant damage is consistent with water
proofing failure and not of a sudden escape of liquid caused by a
burst pipe. However, we cannot confirm this as shower recess wall
and floor have b een removed by the insured prior to our
attendance.
Financial firm’s expert (PB)
Report
04 - 03 - 2020
The flooring would of been cupping for a period along with the wall
damage being visible, this would of been present for a period of
over 3 months as the amount of timberwork damage with in the
wall confirms the area has been subjected to long term water
saturation as this has discoloured and blackened, the floor would
be slowly but consistently peeking further and furt her across the
floor area due to the e levated moisture content which would be
both visible and felt under foot.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.