Determination 667460

Insurer offer for underpinning, turf, fence and verandah repairs

FirmSuncorp Group
Decided2020-09-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$9,324
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

A homeowner's first claim for movement damage was declined, and a later underground leak was found. AFCA found the insurer's offer largely fair but ordered payment of additional repair costs, the scope of works with a 15% uplift if cash settled, and $2,000 for non-financial loss.

The insurer failed to discover the cause of damage in the first claim and caused confusion about underpinning, so it must meet the additional repair costs and pay non-financial loss.

Issues

Subjects and remedies

home or building damagepay claimpay non financial lossrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 667460 Financial firm AAI Limited Determination | Case number: 667460 Page 2 of 7 Case number: 667460 20 August 2020 1 Determination overview 1.1 Complaint The complainant held a Building and Contents policy with the financial firm (insurer). The complainant lodged a claim, in March 2015 for movement damage to his house. The insurer declined the claim. In November 2018, the complainant commenced underpinning of the house and discovered an underground water leak. The insurer accepted the claim for the damage caused by the leak. The complainant says the insurer led him to believe that the underpinning would be paid by the insurer. The insurer has paid for the underpinning and incidental costs. The complainant also claims increase use of electricity and water but has not provided any information that confirms this. The case analyst provided the parties with a preliminary view which was substantially in favour of the insurer. The complainant disputes this and the matter has been referred for determination. 1.2 Issues and key findings Is the offer by the insurer reasonable? On the information provided to me, on balance, I am satisfied that the offer made by the insurer, together with the amount paid of $20,201.88 is fair and reasonable and meets the obligations under the policy. However, the insurer is required to pay the additional costs associated with underpinning. Is the complainant entitled to non-economic loss? On the information provided to me, I am satisfied the insurer’s conduct in this matter was not satisfactory. The insurer has attempted to rectify this by making payments for repairs which, they say, may not have been necessary. The insurer should pay the complainant $2,000 for non-financial loss. 1.3 Determination This determination is partially in favour of the insurer. If the insurer has not yet done so, it is to:  reimburse the cost to relay turf  reimburse the cost to reinstate the boundary fence  reimburse the cost to reinstate the neighbour’s fence Determination | Case number: 667460 Page 3 of 7  reinstate the concrete verandah  repair the property pursuant to IL’S scope of works. If the insurer choses to cash settle the scope of works, it is to add a 15% uplift  pay the complainant $2,000 non-financial loss. Determination | Case number: 667460 Page 4 of 7 2 Reasons for determination I have decided this case on what is fair in all the circumstances, having regard to the relevant legal principles, good industry practice, industry codes of practice and previous relevant decisions of AFCA and predecessor schemes. I have considered all the material submitted by the parties, both before and after the preliminary assessment. I am satisfied the documentation I have relied upon has been provided to both parties. 2.1 Is the offer by the insurer reasonable? Onus on complainant To successfully claim the disputed damage, the complainant must establish, on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. The complainant held a Home and Contents policy. The policy provided cover for damage caused by a liquid leaking, overflowing or bursting from drainage and sewerage systems. The complainant says the leaking pipes caused the damage. I am satisfied the complainant has established a prima facie claim and the onus now shifts to the insurer to prove the loss is excluded by the policy or falls outside the cover provided. Complainant lodges first claim March 2015 The insurer appointed plumbing investigation by (AL). AL found faults to the stormwater line. The insurer then appointed engineers (FM). FM did not consider the movement and damage was caused by faults to the stormwater line. Instead, FM found the damage due to differential founding soil movement. The insurer declined the claim on 22 July 2015. It is noted that there were no leaks found by the insurer’s experts, and the insurer denied the claim on the basis that the damage was not caused in a manner that the policy responded. The complainant having disputed the claim, took the matter no further at that time. Second claim November 2018 On 12 November 2018, the complainant advised the insurer that a water leak had been discovered during the excavations of footings of the property. The complainant lodged a claim. The insurer appointed several experts. An investigation by a plumber found the sewerage and stormwater pipes were damaged and were leaking. The insurer then appointed an engineer (IL). IL concluded that the cracking and movement to the home had been caused by long term defects to the stormwater and sewer drains, allowing water to saturate the founding soils and causing a loss of Determination | Case number: 667460 Page 5 of 7 bearing capacity. Importantly, IL said the saturation of the soil existed at the time of the 2015 claim. It was then recommended that the pipes be repaired and that a period of 12 months drying stabilisation should occur before repairs were completed. In the meantime, the complainant had undertaken the underpinning. IL considered the underpinning should have been the last resort for the damage. IL also stated that there should have been a geo-technical investigation which in his opinion would have shown the underpinning was not an appropriate methodology for re mediation of the movement issues at the property. On 31 January 2019, the insurer accepted the second claim however, they advised the complainant that the underpinning was unnecessary. The plumbing defects, themselves, were not covered by the policy. The complainant undertook these repairs. A dispute then arose as to whether the underpinning repairs were necessary. The complainant maintained as follows:  the insurer had committed to the cost of underpinning  he was entitled electricity and water bills that had increased due to movement damage and plumbing defect  the insurer had not repaired the damage caused by the plumbing defects. Subsequently, the insurer agreed to cover the cost of the underpinning works. The complainant lodged an invoice from the underpinning company in the sum of $16,000. He also lodged a claim for associated costs including materials, debris removal, totalling $4,201.88. The insurer accepted these costs and made a payment of $20,201.88 to the complainant on 30 October 2019. Initially, the insurer stated it would consider the costs to relay turf and reinstate the boundary fence. The insurer was waiting for the complainant to supply the invoices. The insurer subsequently declined the additional costs including costs for the veranda and the neighbour’s drivewa y. In the circumstances, I think it is fair that the insurer pays for these expenses. The insurer is required to pay the costs to:  relay turf  reinstate the boundary fence  reinstate neighbour’s driveway  reinstate concrete verandah. Determination | Case number: 667460 Page 6 of 7 The complainant has provided some information in relation to the extra electricity used, which they say was due to gaps in the windows and doors. The information provided is insufficient to assess whether there was an increase in electricity usage or water usage because of the damage. On 26 November 2019, the insurer’s assessor (SE), building coordinator (CM) together with A1 assessor and engineer IL attended the site. IL then compiled a scope of works for the repairs of the damage caused by the plumbing defects. A1 prepared a quotation based on this scope of works. The scope of works amounted to the sum of $8,108.10. The complainant says that this scope of works does not cover all the damage that was caused. He has raised issues with the flooring in the premises. In response to this, IL has stated that the flooring is normal movement caused by seasonal variations and not as a result of the damage caused from the leaking pipes. The complainant has said that they would obtain a report from another party, but they have not provided this to date. On the information provided to me, I am satisfied, on balance, that the assessment made by the insurer and the scope of works provided are an accurate assessment of what is required to meet the terms and conditions of the policy. There is nothing provided by the complainant that convinces me that there are other items that have not yet been assessed or there are repairs that are yet to be undertaken that were not contained in the scope of works. If the insurer has not yet done so, it is to:  reimburse the cost to relay turf , boundary fence and neighbour’s driveway  reinstate the concrete verandah  repair the property pursuant to IL’S scope of works . If the insurer choses to cash settle the scope of works, it is to add a 15% uplift to cover contingencies and loss of any guarantees. 2.2 Is the complainant entitled to non-economic loss? The amount AFCA can award for non-financial loss is $5,000 per claim. Assessing an award for non-financial loss, AFCA will take into account the following:  physical inconvenience.  time taken to resolve a situation.  i nterference with the complainant’s expectation of enjoyment or peace of mind. AFCA take a conservative approach to assessing compensation for non-financial loss. Determination | Case number: 667460 Page 7 of 7 AFCA expects complainants to:  be moderately robust  bear the normal degree of inconvenience experienced when a problem occurs  take reasonable steps to minimise the inconvenience suffered. In the current circumstances, the insurer failed to discover the cause of the damage claimed in 2015. The claim was denied, and the complainant went ahead to undertake underpinning of the property, as he believed that this was the appropriate process. During the underpinning operations, it was discovered that there was substantial dampness and upon further investigation by the insurer, the broken pipes were ascertained. Had an appropriate assessment been carried out during the first claim, it is likely that the leaking pipes would have been discovered. I am satisfied that the complainant has suffered physical inconvenience and interference with their expectation and enjoyment or peace of mind, particularly given the time taken to resolve the situation. I also note that there was confusion about whether the insurer had agreed to pay the complainant for the underpinning. The insurer says that underpinning is not the appropriate process in the first instance. In spite of this, the insurer subsequently agreed to pay for the underpinning and that has taken place. I am satisfied that the insurer has endeavoured to rectify these issues, but the complainant still requires compensation for non-financial loss. In the circumstances, I find it is appropriate that the insurer pays the sum of $2,000 for non-financial loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.