Home / Defence Service Homes Insurance Scheme / Determination 665774
Determination 665774
Water damage claim: denial of bathroom metal frame damage and claim for full bathroom refurbishment
Summary
The insurer cash-settled part of a bathroom water damage claim and then denied the rust damage to the metal frame. AFCA found the frame damage was caused by the escape of liquid and ordered a further $5,000, but rejected the claim for a full bathroom refurbishment.
The insurer bears the onus of proving an exclusion was the proximate cause of the damage, and it could not show that gradual deterioration or rust caused the frame damage.
Issues
- Claim denial primary · upheld
“The insurer is not entitled to deny the claim. It has not established that the proximate cause of the damage to the metal frame is an excluded factor”
- Claim amount dispute secondary · not upheld
“I do not accept that it is fair and reasonable in the circumstances that the insurer should pay for the entire refurbishment/renovation of the bathroom”
Subjects and remedies
home or building damagepay claim
Text of the determination
Determination
Case number 665774
Financial firm Defence Service Homes Insurance Scheme
Determination | Case number: 665774 Page 2 of 7
Case number: 665774 29 July 2020
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (insurer). In
April 2019 he made a claim for water damage to a wall between a shower and his
garage. The insurer partially accepted the claim for the damage to the garage wall
lining caused by escape of liquid and it has cash settled the claim.
The complainant says the insurer should cover the cost of the replacement of the
bathroom, including waterproofing and remediation of rust on the wall metal frame
and mould.
The case manager provided the parties with a preliminary assessment on 23 April
2020. The preliminary assessment was substantially in favour of the insurer. The
complainant rejected the preliminary assessment.
1.2 Issues and key findings
Has the complainant established a valid claim within the terms of the policy?
I am satisfied the complainant has established a valid claim within the terms of the
policy for damage caused to his bathroom by escape of liquid from a pipe.
Is the insurer entitled to deny the claim?
The insurer is not entitled to deny the claim. It has not established that the proximate
cause of the damage to the metal frame is an excluded factor under the policy.
What is the extent of the insurer’s liability for damage?
On considering available information, I find it is fair and reasonable in the
circumstances that the insurer pays (in addition to the amount already paid in
accordance with AFCA’s preliminary assessment) a further $5,000 to the complainant
to cover the reasonable cost of repairs to the metal frame and plate in the bathroom,
the necessary removal of the asbestos sheeting in the wall and mould remediation.
1.3 Determination
This determination is substantially in favour of the complainant.
In addition to the cash settlement already paid by the insurer to the complainant, the
insurer must, within 14 days of acceptance of this determination by the complainant,
pay a further $5,000 to the complainant for the reasonable cost of repairs to the metal
frame and plate, the removal of the asbestos sheeting and mould remediation.
Determination | Case number: 665774 Page 3 of 7
2 Reasons for determination
I have decided this case based on what is fair in all the circumstances, having regard
to the relevant legal principles, good industry practice, codes of practice and prior
AFCA determinations (which are not binding) where applicable.
The case manager provided the parties with a preliminary assessment on 23 April
2020 on the issues in dispute. The preliminary assessment was substantially in favour
of the insurer. The complainant rejected the preliminary assessment.
I have taken into account all the material submitted by the parties, both before and
after the preliminary assessment. I am satisfied that the documentation I have relied
on has been provided to both parties.
2.1 Has complainant established a valid claim within terms of the policy?
The circumstances of the claim
On 23 April 2019, the complainant made a claim for water damage to a wall between
a shower and his garage. On 29 April 2019, the insurer’s plumber conducted leak
tests that showed water was leaking from:
the shower breech piece
the shower screen
the shower wall and the shower base (which indicated waterproofing absence or
failure).
The insurer’s assessor reported that the complainant would need to undertake
maintenance to rectify the bathroom and prevent further escape of liquid and this
would require the demolition and reinstatement of the bathroom.
The insurer offered a cash settlement of $2,292.84 to cover the resultant damage to
the garage wall lining form the escape of liquid (including the area damaged by the
complainant in exploring the leak initially). The insurer says the bathroom was
installed about 40 years ago without any waterproofing. It says its plumber’s report
confirms that water has been escaping from the bathroom for some time due to
maintenance and age-related issues. The insurer says the policy only covered the
resultant damage from the leak being:
dismantling the garage shelf unit
removing the damaged garage wall liner
remediating any mould in the wall cavity and
supply/install new garage wall lining.
The insurer's assessor said that, upon initial examination of the bathroom, they could
not find evidence of a waterproofing membrane.
Determination | Case number: 665774 Page 4 of 7
As noted above, the insurer offered to cash settle the resultant damage from the leak,
based on a quote dated 7 June 2019 for $2,292.84. AFCA’s preliminary assessment
found that the insurer should increase this offer by 20% to allow for any increases in
the cost of labour and materials since the date the quote was issued, and to allow for
the potential of contingencies in the repair process. The preliminary assessment also
found the insurer should pay the increased cash settlement amount with interest
pursuant to section 57 of the Insurance Contracts Act 1984 from 7 June 2019 until the
date of payment.
The insurer has advised this cash settlement has now been paid to the complainant in
accordance with the preliminary assessment.
The complainant has provided further submissions saying that the leak from the
shower breech piece (leaking pipe) has caused rust and damage to the metal
framework in the bathroom wall, and damage to the steel bottom plate of the wall. The
complainant says that the damage to the steel bottom plate of the wall has caused
damage to the waterproof membrane and the membrane then failed. The complainant
says that the reinstatement of the metal frame and removal of the asbestos sheeting
requires the entire refurbishment of the bathroom, as recommended in the report of
the insurer’s plumber.
In response to the preliminary assessment, the complainant has advised that he
removed two sections of the shower wall, and he has provided photos to show the
rust damage to the metal frame and to indicate mould damage to the opposite side of
the wall. The complainant has reiterated that the repair of the damage caused by the
leak requires the repairs to be done in accordance with the Building Code of Australia
and that this requires the installation of a fully tanked waterproof membrane.
The complainant has provided a quote (dated 31 January 2020) for various repairs to
remediate the bathroom (including $1,760 for asbestos removal) for $13,558.80.
However, the complainant has noted that this quote does not cover repairs to the
metal frame as this cannot be fully inspected until the asbestos lining is removed.
In response to the preliminary assessment, the insurer has reaffirmed that there were
three leaks, and it has advised that the claim is now a ‘full decline’ on the basis that
the leak that caused the damage accepted was gradual, and that the policy has
general exclusions for wear and tear, and rust. The insurer also says that the photos
of the metal frame show rust all over the metal frame in areas that the leak from the
shower breech could not have reached. The insurer has confirmed that it maintains its
cash settlement offer in good faith and that this payment has now been made to the
complainant.
Determination | Case number: 665774 Page 5 of 7
Complainant has onus to establish a claim falls within terms of the policy
The complainant is required to show, on the balance of probabilities, that it is more
likely than not, that he suffered a loss caused by a risk insured under the policy. This
is known as a valid (or prima facie ) claim.
The complainant’s policy covers insured events, including loss or damage caused by
escape of liquid caused by:
sudden bursting, leaking, discharging or overflowing of liquid from any shower
base or shower wall… or fixed pipe … .
The policy provides that if the insurer agrees to pay the claim for loss or damage
caused by escape of liquid, they will also pay the reasonable cost of locating the
source of the escaped liquid.
The policy also provides that it does not cover:
loss or damage that is caused by liquid splashing or gradually escaping because of
something other than a sudden leak
the costs of rep airing or replacing the defective item…that causes the loss or
damage or, any leaking shower base or shower walls.
The complainant says that damage to the bathroom waterproofing and wall frame
should be covered, and that the whole bathroom should be replaced.
In considering available information, I accept that the damage to the metal frame is
rust. However, the presence of rust is not conclusive as to whether a leak from a pipe
is sudden or gradual. The initial leak itself from the shower breech may have been
sudden. There is no persuasive information to show that the leak from the shower
breech was more likely gradual.
I am therefore satisfied on the balance of probabilities that the complainant has
established a valid claim for damage caused by escape of liquid as a result of sudden
leaking from a pipe.
The question is therefore whether the damage claimed to other parts of the bathroom
(metal frame and plate, waterproofing) was caused by an excluded factor under the
policy.
2.2 Is the insurer entitled to deny the claim?
Insurer must show damage to bathroom is caused by excluded factor
The insurer bears the onus of showing that, on the balance of probabilities, it is
entitled to deny the claim based on a policy exclusion. In this regard, the insurer must
show that an excluded factor is the proximate cause of the damage claimed.
Determination | Case number: 665774 Page 6 of 7
The proximate cause is a question of fact, depending on the circumstances in each
case. It is well established at law that the proximate cause is not necessarily the first
or the last or the sole cause of the loss. It is the effective or dominant or operative
cause of the loss. Courts have said that if one cause resulted in the harm in any case,
and the other would not have done so in the absence of the first, then the first is the
proximate cause.
The insurer says the policy will not cover damage or loss caused by general
exclusions of:
wear and tear
rust, corrosion…any gradual deterioration or process.
Evidence shows escape of liquid damaged metal frame, but not waterproofing
As noted above, in responding to the preliminary assessment, the complainant has
provided further information that he removed two sections of the wall panels in the
shower recess to show the location of the leak and the rust damage to the wall frame.
The complainant provided a number of photos that show this damage.
The complainant says that the rusting to the wall frame is directly adjacent to the
location of the leak from the shower breech and that water has pooled in the bottom
plate causing further corrosion. The complainant also says there is some mould
damage to the rear face of the opposite side of the wall.
In carefully considering this information and the photos provided by the complainant, I
am satisfied on the balance of probabilities that the leak from the shower breech is
the proximate or dominant cause of the damage (rust and corrosion) to the metal
frame and plate. While not all areas of rust on the metal frame may have been caused
by the leak, I am satisfied that the photos show that significant areas of rust are in
areas where it is likely that water has escaped from the shower breech and down the
metal frame.
The complainant also says the damage to the steel bottom plate has caused damage
to the waterproof membrane and that this damage caused the membra ne to fail.
I note that t he insurer’s plumber tested the shower base and found a waterproofing
failure. However, the available information is not sufficient to show that it is more likely
than not that damage to the steel bottom plate caused the membrane to fail. On this
matter, I accept the submission of the insurer that it is unclear if there was
waterproofing in place. The complainant has not provided any persuasive information
to show this. To the extent that waterproofing was in place in the shower recess, I
accept it is more likely than not, given the age of the complainant’s home (40 years),
that failure of waterproofing was caused by the excluded factor of gradual
deterioration.
Determination | Case number: 665774 Page 7 of 7
2.3 What is the extent of the insurer’s liability for damage?
It is fair in the circumstances for the insurer to pay for metal frame repairs
As noted above, I find that the insurer is not able to show that an excluded factor was,
on the balance of probabilities, the proximate cause of the damage to the metal frame
and plate. The proximate or dominant cause of the rust on the metal frame is escape
of liquid.
I find that the insurer is able to show that an excluded factor was, on the balance of
probabilities, the proximate cause of any damage to waterproofing.
I therefore find it fair and reasonable in the circumstances that the insurer must pay
the complainant’s claim for repairs to the metal frame and plate. It is reasonable that
the amount to be paid for these repairs includes any necessary removal of asbestos
sheeting to enable the repairs to be done, as well as any mould remediation required
in the vicinity of the damaged metal frame and plate.
As noted above, the complainant has provided a quote for works to be done to his
bathroom and this quote includes an amount of $1,760 for asbestos removal.
However, this quote does not include the repairs required for the metal frame and
plate – noting that the scope of repairs for this area can only be assessed once the
asbestos sheeting is removed.
In considering the complainant’s quote f or various works to be done to renovate the
bathroom, and in the absence of a specific quote for repairs to the metal frame and
plate, I find it is fair and reasonable in the circumstances that the insurer pays a
further $5,000 to the complainant as final settlement of this claim to cover:
removal of asbestos sheeting (noting quote provided for this work of $1,760)
repairs to the metal frame and plate, and
remediation of mould in the vicinity of the metal plate and frame.
The complainant says that the repairs to the metal frame and waterproofing and the
removal of the asbestos sheeting requires the entire refurbishment of the bathroom.
Considering all available information, including the age of the complainant’s home, I
do not accept that it is fair and reasonable in the circumstances that the insurer
should pay for the entire refurbishment/renovation of the bathroom.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.