Home / Lloyd's / Determination 665612

Determination 665612

Fire damage to cabins and business interruption settlement

FirmLloyd's
Decided2020-10-14
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$13,561
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

A caravan park operator claimed for fire damage to three cabins and business interruption, rejecting the insurer's $91,239.85 offer. AFCA found the Cabin 3 assessment inadequate, ordered a further scope-of-works and settlement process, a $5,000 business interruption option, and $1,000 for non-financial loss.

The insurer must settle property damage on an adequately assessed scope of works and business interruption on proven reduction in turnover, and unreasonable handling that prolonged the claim warrants non-financial loss compensation.

Issues

Subjects and remedies

business interruptionsmall businesspay claimpay compensationpay interestpay non financial lossreassess claim

Related

All Lloyd's determinations · Find similar determinations

Text of the determination

Determination Case number 665612 Financial firm Lloyd's Australia Limited Determination | Case number: 665612 Page 2 of 13 Case number: 665612 5 October 2020 1 Determination overview 1.1 Complaint The complainant is a small business operating a caravan park. The complainant has numerous cabins available for guests to stay in. On 2 April 2019 a fire at the property destroyed one cabin, caused significant damage to another, and cracked the window of a third. The complainant lodged a claim with the financial firm (insurer) for the fire damage to the property and business interruption. The insurer offered $91,239.85 in settlement of both claims. The offer was for the replacement of one cabin, repair of the second, replacing the cracked window on the third, tree removal and business interruption. The complainant rejected the offer saying both cabins needed to be replaced. The complainant is also seeking a larger amount for business interruption. 1.2 Issues and key findings Is Cabin 3 repairable? The insurer has not adequately assessed Cabin 3 . However, there is insufficient information provided by either party to determine if Cabin 3 is repairable or not. How should the property damage claim be settled? The insurer is to settle the property damage as set out in section 2.2. Is the insurer’s business interruption settlement fair? The insurer is to settle the business interruption claim as set out in section 2.3. Is the complainant entitled to any compensation? The panel is not satisfied the insurer has handled the claim in the manner expected. The insurer is to pay $1,000 compensation for non-financial loss. 1.3 Determination This determination is partially in favour of the complainant. The property damage should be settled as set out in section 2.2. The business interruption claim should be settled as set out in section 2.3. The insurer should pay $1,000 for non-financial loss. Determination | Case number: 665612 Page 3 of 13 2 Reasons for determination 2.1 Is Cabin 3 repairable? Complainant must show extent of damage The complainant is required to show, on the balance of probabilities, it suffered a loss caused by a risk insured against under the policy. This is known as a valid claim. Once the complainant shows a valid claim, the insurer is liable for the loss unless it shows an exclusion applies or it is otherwise entitled to deny the claim. The insurer has the onus of proof in showing this. There is no dispute there was a fire causing damage to property. Further, there is no dispute there was business interruption. The insurer has accepted the claims and offered settlement. The complainant disputes the amounts offered. The complainant says its financial losses exceed this. The complainant has the onus to prove this. Insurer ’s expert says Cabin 3 is rep airable Three cabins were damaged (Cabins 3, 4, & 5). The parties agree the damage to Cabin 5 was limited to a broken window whilst Cabin 4 was completely destroyed and requires replacement. A dispute has arisen about the extent of the damage to Cabin 3 and whether it can be repaired or should be replaced The insurer appointed an assessor (PC) to assess the extent of the loss and obtain quotes. PC’s first report dated 8 April 2019 describes th e damage to Cabin 3 as: heat damage to the back, with electrical connections melted away. PC provided two further reports. In its second report dated 24 April 2019, PC says the complainant did not allow access to assess Cabin 3 to determine if it can be repaired. In its third report dated 3 June 2020, PC says it has now obtained quotes for the repairs to Cabin 3. PC’s report does not comment on whether a further assessment on Cabin 3 was done to clarify the extent of further damage. PC’s third report includ ed two quotes to repair Cabin 3 and said: Both quotes for the repairs to Cabin 3 include provisos that should additional damage be discovered, there will be variations to be submitted. Determination | Case number: 665612 Page 4 of 13 Complainant’s expert says a building consultant should be appointed The complainant says Cabin 3 has suffered significantly more damage than the insurer has quoted on. It says the insurer has not appropriately assessed Cabin 3 to determine if it can be safely repaired. The complainant says Cabin 3 requires replacement and should not be repaired. The complainant arranged for an assessor (SE) to inspect Cabin 3. In its report dated 12 December 2019, SE says:  external damage is consistent with excessive heat  windows have cracked, and frame is distorted  hot water system and air-conditioner are damaged and require replacement  all electrical wiring on the affected wall should be replaced as it could not be warranted by an electrician  the roof peaking on the eastern side, western gutter and downpipe require replacement  water ingress (from fire damage) has caused internal damage  internal wall linings in the kitchen/dining area show signs of rippling.  kitchen cabinetry needs to be removed to inspect the wall The complainant has provided various photos to support the damage identified by SE. The complainant has also provided a report from an electrician saying the electricals require exposing to assess the extent of the damage to them and see if they can be repaired or require replacement. This is consistent with SE’s report. SE recommended a building consultant be appointed to confirm the scope of works (SOW) that complies with the building requirements and regulations. This includes the Bushfire Attack Level (BAL). SE says the building consultant’s SOW should be used for tendering purposes to determine if the cabin can be repaired economically or otherwise. Insurer’s assessment of Cabin 3 is inadequate The panel is persuaded by SE’s report. This shows extensive damage to Cabin 3. T he complainant’s photos support it. It is not apparent from PC’s report that his assessment was as thorough as SE. PC only highlighted limited damage. The insurer has not provided any other reports showing its assessors completed an internal inspection of the damage or why it did not accept the items identified by SE were damaged by the fire. The panel is therefore not satisfied the available information shows the insurer assessed the damage to Cabin 3 adequately. Determination | Case number: 665612 Page 5 of 13 Further, the insurer’s quotes do not appear to accou nt for the full extent of damage or the potential cost. They both note there is a possibility of further damage being discovered. It does not appear they included builder’s margins. Given all this, the panel is not satisfied the insurer’s assessment or it s cash settlement offer for Cabin 3 is fair. 2.2 How should the property damage claim be settled? None of the quotes for Cabin 4 are appropriate to base settlement on The complainant replaced both Cabins with new ones in March 2020. The complainant says the ne w cabins are not ‘like for like’ replacements and are larger than the original ones. The complainant says whilst Cabin 3 has been replaced, the original is still on site and has been moved to a different location. The complainant recently provided a quote from Y for its ‘Budget Villa’ . The complainant says this is closest in dimension to the previous cabin. This measured 8.34m by 3.35m. The insurer has relied on a quote from R totalling $62,780 (inclusive of GST) when settling the replacement cost of Cabin 4. This is for a cabin measuring 9.0m by 3.2m. The complainant has raised concerns about R’s quote. The complainant says R was unclear about what was included in the quote. The complainant also says R did not allow for the necessary permits. In an email exchange with the complainant, R said it can easily comply with the regulations without too many modifications. The panel notes R’s quote includes concrete pier footings, site delivery and crane hire (if required) as well as electrical and plumbing connections. On balance, the panel accepts it was fair for the insurer to rely on R’s quote subject to an additional contingency of 15%. This is because:  the quote included dimensions that appear to closely reflect the damaged cabin, and  the contingency accounts for any additional modifications or works required to comply with current standards. This means the insurer should include an additional $8,560.91 towards the replacement of Cabin 4 plus interest pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest applies from 5 September 2019, being the date the insurer confirmed it would maintain its original cash settlement offer, until payment is made. Determination | Case number: 665612 Page 6 of 13 Insurer to appoint a building consultant to provide a SOW For Cabin 3, the panel considers it appropriate for the insurer to appoint an independent building consultant as recommended by SE. The building consultant should have had no prior involvement in the claim and should be provided with copies of all relevant information. The building consultant is to complete a site inspection and provide a report detailing the damage to Cabin 3. The panel acknowledges Cabin 3 has been moved since the fire. However, damage caused by being moved should be able to be distinguished from fire damage. The panel is satisfied this will not prevent a suitably qualified building consultant from providing a report. If the building consultant is satisfied Cabin 3 could be safely repaired, then it is required to provide two SOWs:  one for the repair of Cabin 3, and  one for the replacement of Cabin 3. The building consultant is to provide both options to allow an analysis if Cabin 3 is economic to repair, or not. If the building consultant is not satisfied Cabin 3 can be safely repaired, then it is only required to provide a detailed SOW for the replacement of Cabin 3. The SOW should consider all building requirements and regulations. The insurer can also choose to determine that Cabin 3 is not repairable at any point. If it does, it should proceed to settle as set out in option 2 below. Further, if the insurer does this prior to appointing the building consultant, then it is not necessary to obtain a SOW for the repair of Cabin 3. Insurer to arrange three quotes and settle on the average If Cabin 3 is safely repairable, the insurer is to arrange three builders to provide actionable quotes on both SOWs. The insurer is to then determine if Cabin 3 can be economically repaired. If Cabin 3 is not safely repairable the insurer is to arrange three builders to provide actionable quotes on the SOW for the replacement of Cabin 3. The insurer is then required to settle based on one of the below options: Option 1 – Cabin 3 economically and safely repairable If Cabin 3 is economic and safe to repair, the insurer is to settle on the average of the three appropriate quotes plus a 10% allowance for the possible variations to the works. Determination | Case number: 665612 Page 7 of 13 Option 2 – Cabin 3 not economically or safely repairable If Cabin 3 is not economic or safe to repair, the insurer is to settle on the average of the three appropriate quotes plus a 5% allowance for possible variations to the works. Regardless of which option is used, the insurer is entitled to deduct any previous payments for Cabin 3 from its settlement above as well as any applicable outstanding policy excess. The insurer should also pay for SE’s costs to provide its report. This is because SE’s evidence materially assisted the complainant’s position. 2.3 Is the insurer’s business interruption settlement fair? Complainant is seeking further amounts for business interruption The complainant is claiming loss of business for a further 300 days. The complainant says Cabins 3 and 4 had an annual occupancy rate i n 2018 of 41.65%. It says this comes to 249.9 days. With the daily rate being $122, the loss of business is $30,467.80. The policy provides cover for ‘Business Interruption’. This responds to loss of ‘G ross Profit ’ due to a reduction in turnover caused by physical damage to any building insured under the policy. The policy says the reduction in turnover is ‘the sum produced by applying the Rate of Gross Profit to the amount in which the Turnover during the Indemnity Period shall, in consequence of the damage, fall short of the Standard Turnover’. The policy defines Turnover to mean ‘the money… paid or payable to You for goods sold and delivered and for services rendered in course of the Business at the premises.’ The policy defines Standard Turnover to mean ‘The Turnover during… the twelve (12) months immediately before the date of the damage …’ The complainant has the onus to show a reduction in turnover. Insurer says there is no reduction in turnover The insurer has provided a response from assessor JJ. JJ reviewed the available financial information and did not accept that loss in cabin income had been demonstrated. JJ noted the following in supporting this:  the variations in income post April 2019 appear to be seasonal in nature  whilst December 2019 and January 2020 were down compared to the previous year, this was likely due to the widespread bushfires Determination | Case number: 665612 Page 8 of 13  income diminished significantly post March 2020, but this would be COVID-19 related. JJ attached various calculations. This was based on the complainant’s profit and loss statements as well as excel spreadsheets provided which broke down the income streams. Insufficient information provided for April 2018 to March 2019 period The parties have provided the complainant’s annual profit and loss (PL) statement for the financial year ending 30 June 2019 along with monthly PL statements for the period April 2019 to March 2020. The insurer has also provided a breakdown of the monthly income from April 2018 until March 2020. It is not clear how the insurer has obtained the monthly figures for April 2018 to June 2018. The information provided does not include finances for this period. The only information that covered part of this period is the annual PL statement and the complainant’s spreadsheets for the financial year ending 30 June 2019. Therefore, the panel is not satisfied sufficient information has been provided to accurately calculate the turnover for the period April 2018 to March 2019. Many bookings likely able to be accommodated elsewhere The insurer says bookings for Cabins 3 and 4 could have been accommodated i n other cabins. However, the insurer ’s position does not consider peak times where there would normally be one or no cabins empty. It also does not consider any times where the booking would have been for five or six people and therefore could not be accommodated in another cabin. Despite this, t he panel generally accepts the insurer’s position. The panel is satisfied that bookings used for Cabins 3 and 4 could have been accommodated elsewhere at various times. Available information is insufficient to calculate an entitlement The available information is insufficient to calculate a settlement under the policy. PL statements have been provided for the financial years ending on 2019 and 2020. The complainant also provided spreadsheets breaking down the revenue streams for these financial years. These revenue streams were ‘kiosk’, ‘Annuals payment’, ‘Powered site’, ‘Non Powered Site’, ‘Rent’ and ‘Cabin’. The fact the complainant’s income has various streams is not disputed by the insurer. JJ focused on the taki ngs for ‘Cabin’ during his assessment. This is fair. Determination | Case number: 665612 Page 9 of 13 In JJ’s calculations, he noted the complainant’s spreadsheets for its takings did not reconcile with the PL statements. For example, i n the 2019 financial year, the complainant’s spreadsheets had $22,568 more revenue than accounted for in the 2019 PL statement. For the 2020 financial year, the difference was only $4,509. This worked out roughly to a 10% and 4% variance for the 2019 and 2020 financial years respectively. These discrepancies are not explained. This therefore impacts the ability to accurately assess the actual impact, if any, the unavailability of the two cabins had on the complainant’s income . JJ’s evidence is persuasive about the impact of the bushfires and COVID-19. It seems likely that any downturn of revenue during these times were from these factors rather than the unavailability of these two cabins. In comparing the revenue for the cabins between the months of July and November, there seems to be a decrease of $8,372 in 2019. JJ says this was due to a seasonal low period between July and September. This does not explain the lower figures compared to the previous year though. However, the panel is concerned in awarding compensation based on this figure given:  the discrepancies between the complainant’s spreadsheets and the PL statements, and  the absence of the takings for April to June 2018. Claim to be resolved in this way After carefully considering the available information, the panel notes the fo llowing. The panel is not persuaded by the complainant’s figure. This is not supported by the financial documents. There is evidence of a loss of income due to the unavailability of the cabins during July and September 2019. The panel is not persuaded though by the specific amount highlighted in the complainant’s spreadsheet s given the discrepancies compared to the PL statements. The panel is also satisfied the only times when a reduction of turnover could be reasonably attributed to Cabins 3 and 4 would be when:  all undamaged cabins were full, or  the booking would have been for five or six people. To calculate the estimated number of bookings lost due to these factors requires occupancy and turnover data not provided. To then calculate the impact this had on turnover would likely require the involvement of a forensic accountant. None of this has been provided. Determination | Case number: 665612 Page 10 of 13 One option to resolve the dispute is to require the insurer to appoint a forensic accountant to calculate the impact the loss of Cabins 3 and 4 had on the turnover. In doing so, the complainant must provide all the financial information necessary to enable the insurer to assess this. The panel notes this is likely to be expensive and time consuming. The claim is already one and a half years old. There is also a possibility this could lead to a further dispute and make the claim more protracted. Given this, and in the interest of providing an option that will give finality to this claim, the panel is satisfied it is fair in all the circumstances the business interruption claim should be resolved in the following way. The complainant can choose to settle this claim by either:  having the insurer continue to assess the claim by the appointment of a forensic accountant as set out above, or  accepting $5,000 payment on top of what has already been paid. In deciding on $5,000, the panel has considered this is a fair compromise given:  the available figures show reduction in cabin turnover for the cabins between July and September 2019  the difference in the available figures is likely inflated given the discrepancies between the complainant’s spreadsheets and the PL statements  the unavailability of the April to June 2018 figures  interest would likely be payable for the outstanding sum If the complainant accepts this determination, it must communicate which option it prefers. Complainant is seeking costs of financial reports and claims preparation The complainant is seeking $2,500 towards the costs of financial reports and claims preparation. The insurer has not addressed this. The complainant has not provided evidence of these costs. The policy does respond to this cost. If the complainant can provide invoices of costs incurred in preparing the financial information for the business interruption claim, then the insurer is to assess them under this benefit. 2.4 Is the complainant entitled to any compensation? AFCA may award compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non- financial loss (capped at $5,000) where there has been an unusual amount of: Determination | Case number: 665612 Page 11 of 13  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation and expect a comp lainant to bear a normal degree of inconvenience during a claim. Insurer should pay $1,000 in non-financial loss The panel is satisfied the inadequate assessment of Cabin 3 impacted the complainant’s claim unreasonably. This led to claim being delayed and prolonged. This also likely impacted the business’s turnover. However, part of this was contributed by the complainant initially not making Cabin 3 available to PC to assess. Given this, it is fair in all the circumstances for the insurer to pay $1,000 compensation for non-financial loss. Determination | Case number: 665612 Page 12 of 13 3 Supporting information 3.1 Our approach to this complaint We have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a preliminary assessment and has proceeded directly to determination. The determination is made by a panel consisting of the ombudsman together with a consumer representative who has extensive experience in consumer claims and an industry representative who has extensive experience in the insurance industry. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish, on the balance of probabilities, they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove, on the balance of probabilities, an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy wording SECTION TWO – CONSEQUENTIAL LOSS THE I NDEMNITY In the event of any building or any other property or any part thereof used by You at the premises for the purpose of the Business being physically lost, destroyed or damaged by any cause or event not hereinafter excluded (loss, destruction or dam age so caus ed being hereinafter termed ‘Damage’) and the Business carried on by You being in consequence thereof interrupted or interfered with, We will, subject to the provisions of this Policy including the limitation on Our Liability, pay to You the amo unt of loss resulting from such interruption or interference in accordance with the applicable Basis of Settlement. BASIS OF SETTLEMENT Item No.1 The Insurance under this item is limited to loss of Gross Profit due to (a) Reduction in Turnover Determination | Case number: 665612 Page 13 of 13 SECTION TWO – CONSEQUENTIAL LOSS and (b) Increase in Cost of Working and the amount payable as indemnity thereunder shall be: a) In respect of Reduction in Turnover: the sum produced by applying the Rate of Gross Profit to the amount by which the Turnover during the Indemnity Period shall, in conseq uence of the Damage, fall short of the Standard Turnover, DEFINITIONS APPLICABLE TO SECTION TWO Turnover The money (less discounts, if any allowed) paid or payable to You for goods sold and delivered and for services rendered in course of the Business at the premises. Indemnity Period The period beginning with the occurrence of the Damage and ending not later than the number of months specified in the Schedule thereafter during which the results of the Business shall be affected in consequence of the Dam age. Shortage in Turnover The amount by which the Turnover during a period shall, in consequence of the Damage, fall short of the part of the Standard Turnover which relates to that period. Rate of Gross Profit The rate of Gross Profit earned on the Turnover during the financial year immediately before the date of the damage. Annual Turnover The Turnover during the twelve (12) months immediately before the date of the damage. Standard Turnover The Turnover during that period in the twelve (12) month s immediat ely before the date of the damage which corresponds wit h the Indemnity Period.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.