Determination 664017

Settlement amount for flood repairs and cessation of loss of rent payments during storm claim

FirmStrata Community Insurance Agencies Pty Ltd
Decided2020-08-14
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$141,949
Non-financial loss$5,000
Amount claimed$97,387
SourceAFCA PDF

Summary

A storm flooded the complainant's rental strata property and the insurer delayed the claim, stopped loss of rent payments and offered a lower repair figure. AFCA ordered cash settlement of $103,701.48 for repairs, loss of rent, reletting, medical and other costs, plus $5,000 non-financial loss and interest.

Where the insurer's communication failures caused the delay, the insurer must pay the reasonable repair quote including mould remediation, and loss of rent cover under the policy applies whoever organises the repairs.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All Strata Community Insurance Agencies Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 664017 Financial firm Strata Community Insurance Agencies Pty Ltd Determination | Case number: 664017 Page 2 of 13 Case number: 664017 10 August 2020 1 Determination overview 1.1 Complaint In December 2018 the complainant’s rental property flooded as a result of a storm , and he made a claim under his residential strata insurance policy. The financial firm (insurer) organised assessments to determine the extent of the damage. Due to a communication breakdown, the assessment was left to the complainant to finalise. During this time, the insurer ceased payments for loss of rent, saying the complainant was delaying the claim unnecessarily. The complainant says he was only asking reasonable questions to determine the insurer’s intentions and that the insurer acted inappropriately during this period of the claim. The claim was accepted; however the parties have not been able to agree on a fair settlement. The insurer has not made any further rental loss payments since February 2019. The complainant is also claiming other costs and non-financial loss associated with the stress and difficulties of dealing with the claim. 1.2 Issue and key findings What is the fair and appropriate settlement for property repairs? The insurer is required to pay the complainant’s quote for repairs to the property (excluding the storage room and cleaning of the air conditioning units), as well as the cost to replace the vinyl floor coverings and the air conditioning units, and additional post-mould remediation assessment. This totals $86,417.90. The insurer is also required to pay a further 20% of this amount to account for any necessary variations/contingencies, the passage of time since the quote was issued, and the transfer of risk to the complainant. This brings the total cash settlement for repairs to $103,701.48. As well, the i nsurer is required to complete storage room repairs as per its quote for that work. The insurer is not required to pay for contents removal and storage or architect fees, as these have not been shown to be necessary in dealing with the claim-related repairs. What is the period for which loss of rent should be paid? The insurer is required to pay loss of rent from the date of loss, 14 December 2018, to the date the property is re-let. The insurer has already paid loss of rent for the period up to 17 February 2019. As at the date of this determination, the insurer is liable for and required to pay an Determination | Case number: 664017 Page 3 of 13 additional 18 months of rent, at $2,021 per month. Payments are then to continue monthly until the property is re-let. The insurer is also required to cover the complainant’s re -letting costs, up to $1,500 upon the provision of receipts when available. Is the complainant entitled to any other costs or compensation? The complainant is entitled to be reimbursed for medical fees of $370; utility fees, up to the policy limit of $2,000 or until the property is relet, upon the provision of invoices; and body corporate fees, up to the policy limit of $2,000 or until the property is relet, upon the provision of invoices. The insurer is not required to pay for travel costs. The complainant is also entitled to $5,000 as compensation for non-financial loss for the stress and inconvenience caused by the insurer’s handling of the claim. 1.3 Determination This determination is in favour of the complainant. The insurer is required to promptly:  pay the complainant $103,701.48 for repairs to the property (including mould remediation, vinyl flooring, air conditioners), plus statutory interest on that amount calculated from the date of the complainant’s quote (11 September 2019) to the date of settlement  schedule repairs to the storage area, if not already completed (and then complete those repairs as soon as possible)  pay the complainant loss of rent for the full period since the last payment was made (in February 2019), plus the statutory interest on the amount, calculated based on when each month ’ s rental payment should have been made, and continue with loss of rent payments until the property is re-let  pay the complainant’s re -letting fees up to $1,500 upon provision of receipts  pay the complainant $370 for medical fees, plus the statutory interest on that amount calculated from the date the cost was incurred (29 January 2020) to the date of settlement  r eimburse the complainant’s utility fees to date and continue to cover these costs up to the policy limit of $2,000 or until the property is relet, upon provision of receipts  reimburse the complainant’s body corporate fees up to the policy limit of $2,000 or until the property is relet, upon provision of receipts, and  pay $5,000 as compensation for non-financial loss. Determination | Case number: 664017 Page 4 of 13 2 Reasons for determination There has been a full exchange of material between the parties, and each party has had the opportunity to address the issues arising from that. Due to the nature of/complexities involved in this dispute, it has been referred to a Panel for determination. This determination follows consideration of all the information exchanged and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous AFCA decisions where applicable. While both parties have made numerous submissions, for the purposes of this determination, commentary has been restricted to those issues which have a direct bearing on the outcome of the complaint. 2.1 What is the fair and appropriate settlement for property repairs? Poor communication by insurer has inhibited the settlement of the claim The complainant’s investment property suffered damage following a storm event in December 2018 when water ran off from a neighbouring property and flooded the apartment. While there has been no dispute the event was covered by the policy at any point in the claim, the complainant was not formally advised of that until April 2019. Early in the claim, an engineer (CS) was appointed by the insurer to determine the extent of the scope of works required. This involved investigating the subfloor to see the method of construction. From a review of the insurer’s submissions, the panel does not consider the insurer had reason to question the validity of the claim or extent of the cover, and merely needed to understand whether the construction of the subfloor was to code and how it needed to be repaired. To do this, multiple holes were required to be cut into the particle board flooring to see beneath it. The complainant wrote to the insurer asking questions about this, including who would be liable to repair the flooring if the claim was not accepted. Initially the insurer directed the engineer to respond to the q uestions, to the extent they related to the destructive works that were required, but they could not co nfirm who was liable for the resultant damage. At that stage in the claim, no-one had communicated to the complainant that the flooring would be repaired as part of the claim, so the complainant’s concerns were valid. Ultimately the assessor (SH) managing the claim wrote to the complainant on 22 February 2019 to say that the insurer would no longer organise destructive works; Determination | Case number: 664017 Page 5 of 13 instead they charged the complainant with this task, advising that no rental payments would be made while this was organised. The reason given for this was that the complainant had refused to cooperate. The panel notes that, in this exchange, SH advised the complainant that the claim was not yet accepted. The panel accepts the complainant was asking reasonable questions about the method and rectification of the destructive works, which were not answered by the insurer. Had the insurer taken steps to explain to the complainant whose liability it would be to repair the floor after exploratory works were completed, whether the claim was accepted or not, the matter would likely not have been delayed in this manner. I nsurer’s quoting builder did not attend the property The insurer has provided a quote from a builder (HO) for repairs to the property, totalling $32,604. This was based on the engineer’s scope of works rather than from the builder’s own inspection of the property. The insurer tried to arrange a second quote using another builder (PB) who attempted to organise an inspection of the property by emailing the complainant. This commenced on 11 June 2019. On 31 July 2019, the insurer’s assessor SH sent the complainant a letter advising that as he had not responded to the builder ’ s attempts to inspect the property, they assumed he did not want to proceed with the claim and they intended to close it after 14 days. On 1 August 2019, the complainant advised he had received no emails from PB. It was discovered that the builders had not been emailing the correct address. As a result, for over seven weeks there had been no progress on the claim. It was also found that SH too had sent its letter to the wrong email address. The complainant was only notified of this letter because another party was copied into the communication, and they then forwarded the letter to the complainant’s correct email address. After this error was identified, it is unclear what steps the insurer took to attempt to rectify it and proceed with obtaining the quotes it required. In its initial submission to AFCA the insurer said the complainant ‘failed to provide access’ to both HO and PB, delaying the claim further. The panel does not accept the evidence shows that was what happened. There has been no information submitted showing HO attempted to gain access to the property and no information showing PB ever made successful contact with the complainant following its communication error. The panel notes that engineer CS specifically recommended in its report that any contractors attend the property and make their own assessment of the extent of the damage. This therefore calls into question the accuracy and suitability of HO’s quotation. Determination | Case number: 664017 Page 6 of 13 C omplainant’s quotes are fair and reasonable The insurer has obtained multiple quotes from several repairers. The insurer has maintained that its quote is the fairest, specifically saying mould was not evident at the time of its inspection and any additional damage relating to mould or deterioration is due to the complainant’s delays. The earlier report from CS explains the possible presence of mould and does allow for an investigation into the presence of mould in its scope of works. The panel does not accept the insurer ’ s position on this matter is reasonable or appropriate in the circumstances. The insurer compares its $32,604 quote from HO with the complainant’s 11 September 2019 quote from his builder (ST), which totals $77,691.90. It says the main differences are the inclusion of mould remediation, the structural drying, the storage room repairs and the air conditioning repairs. The panel accepts that mould remediation and associated structural drying is required under the circumstances and is a reasonable inclusion in the quoted scope of works for which the insurer should be liable under the claim. The panel notes, however, that no specific allowance was made in ST’s quote for a post -remediation assessment and certification, which should be included (and has been costed in a separate specialist mould remediation quote at about $1,200). In addition , the complainant’s builder specifically refers to the requirement for careful disposal of all water-affected material on site. It is therefore reasonable to expect their costs would exceed HO’s , as HO’s did not allow for mould presence and the critical issue of dealing with that appropriately. Storage room to be repaired by insurer The insurer says the repairs to the storage room were included in the common area quotation for the building. A review of this quote from HO shows it refers to common area storage cupboards and does include the same works to the storage room referred to in ST’s quotation. The panel accepts that the insurer’s quot e for this is reasonable and works should be carried out as soon as possible, if that has not already occurred. Air-conditioning units to be replaced Regarding the air conditioning repairs, the complainant has submitted two quotations which explain that the air conditioning units are beyond repair due to flood damage. The insurer asserts that this must have occurred some time after the storm event, however it has not provided any reports showing the units were operational immediately after the event, only that they ‘should’ be. As the complainant has provided a quotation from an air conditioning supplier explaining the units are not repairable, the panel considers it fair to accept the quote to replace is reasonable. Determination | Case number: 664017 Page 7 of 13 This amount totals $7,645. The amount referred to in ST’s quote for cleaning (rather than replacement) of the air conditioning units therefore is no longer applicable. Settlement to be broadly based on ST’s quote The panel accepts that ST’s quote is the most suitable and reasonable point of reference for repairs in the circumstances, as it accounts for mould remediation and special treatment of mould-affected materials. It is also based on a physical site inspection. The total is $77,691.90, however the amounts for the storage room and the air conditioning cleaning should be removed from that, as explained above; and an additional allowance of $1,200 for post-mould remediation assessment and verification should be added. So the balance payable based broadly on that quote is $74,922.90. Vinyl flooring to be covered T he insurer’s position regarding replacement of the vinyl floors is that the flooring is not fixed and is therefore not covered as part of the insured ‘building’, which includes ‘floor coverings but [excludes]...Floating Floors’. However, the certificate of insurance shows that the optional extra cover for Floating Floors had been taken out. The term ‘Floating Floors’ is defined in the policy as being ‘ engineered, laminated, veneered or similar (pre-finished) type flooring not fixed or attached to the sub-floor but held in position by its own weight and/or skirting boards at perimeter walls ’ . The panel notes that assessor SH does not comment on whether the vinyl is fixed or not in any of its reports. The complainant submitted invoices for the removal of vinyl floor coverings dated 18 December 2018, before the initial inspection from SH in January 2019. The complainant has referred to the vinyl as ‘fixed’ throughout the claim. The panel accepts that, in the absence of clear confirmation that the vinyl was specifically temporary, ‘loose laid’ or floating, it is not unreasonable to accept the complainant’s assertions that it was fixed . The insurer is to pay the complainant’s quote of $3,850 for the replacement of the vinyl floor coverings. Storage of contents not shown to be necessary The complainant is also claiming the cost of contents removal and storage. The insurer says the only items required to be removed and stored can be stored on site. There has been no other explanation provided for the requirement of removalists and storage, and the panel therefore is not satisfied this cost is required. Architect’s fees not shown to be necessarily incurred As well, the complainant has asked to be reimbursed for the cost of an architect inspection, totalling $695. The insurer has refused this, and the panel notes that no report has been provided to explain or justify that requirement. The panel is not satisfied the insurer should be liable for this cost. Determination | Case number: 664017 Page 8 of 13 Cash settlement amount needs to allow for contingencies etc The base amount to be paid by the insurer for the repairs to the property is $86,417.90, being the cost to appropriately deal with:  property damage, less the storage room repairs on the basis the insurer has already completed those, or will complete them  replacing the air conditioning units  vinyl flooring  and post-mould remediation assessment and certification. As this is to be a cash settlement, it is also fair and reasonable that the settlement amount be increased by a further 20% to allow for any contingencies or unforeseen claim-related damage, to reflect the fact that the quote itself was dated and valid as at 11 September 2019 (almost 12 months ago); as well as to take account of the fact that the complainant will be taking on the risk of the work, for which the repairer would otherwise be responsible. The total payable for these repairs is therefore $103,701.48. 2.2 What is the period for which loss of rent should be paid? Loss of rent is covered under the claim Following the event in December 2018, the insurer accepted the claim for loss of rent and made payments to cover rent up to the middle of February 2019 . The insurer’s position is that the complainant delayed the claim process from February 2019, which is when the email exchange between the insurer’s assessor and the complainant occurred. The insurer says that beyond this, it will cover the loss of rent for the repair period only. A review of the various exchanges between the complainant and the insurer shows that the complainant’s questions regarding the destructive investigative works to the property were not satisfactorily answered until 10 April 2019, when the insurer advised the complainant it would ‘reinstate’ the flooring system. On 24 April 2019 it advised the claim had been accepted completely. On 14 May 2019, the complainant provided the required investigative report to the insurer. The panel does not accept that the complainant unreasonably delayed the claim. On the contrary, the panel believes the insurer’s actions in not adequately addressing the complainant’s questions and concerns in a timely manner (or at all) is responsible for the significant and unjustifiable delay. The insurer then had carriage of the claim until 1 Aug ust 2019, when it discovered its builder and assessor had not been contacting the complainant for some time due to an error in their email correspondence. The complainant then contacted AFCA to lodge a complaint about the claim and there has been no further contact between the Determination | Case number: 664017 Page 9 of 13 parties to attempt to resolve the matter other than through communications to and from AFCA. The panel does not accept that the insurer is justified in denying the complainant ’s loss of rent cover for the period since February 2019. The policy says, where the property is being rebuilt or repaired, the insurer will cover loss of rent from the date of loss to the date the lot owner (complainant) relets the property. The wording does not limit the application of this provision based on which party is organising the repairs, so the panel accepts cover applies in this case where the complainant is conducting the repairs (on the understanding that there are no unreasonable or avoidable delays in commencing and completing the work). The complainant’s builder has indicated an 8-week repair time would be needed, with a 4- week lead time. The insurer is to pay the complainant’s loss of rent, being $2,021 per month according to the lease agreement, up to the date the property is relet. As at the date of this determination, August 2020, the insurer is liable for 18 months’ rent, totalling $36,378; and that liability continues until the relevant date. In the meantime, the insurer is required to pay the complainant $36,378, together with statutory interest calculated based on when each month’s rental payment should have been made. The policy also covers reletting costs up to $1,500. The insurer is to cover the complainant’s reletting costs up to this amount , upon the complainant providing relevant receipts/invoices. 2.3 Is the complainant entitled to any other costs or compensation? Complainant is not entitled to travel costs The complainant is claiming travel costs associated with management of the claim. The policy does provide for up to $250 for reasonable travel costs incurred by the lot owner visiting their lot for the purposes of consulting with claims assessors and/or repairers. That is subject to obtaining the insurer’s prior consent to incurring those costs. There have been no invoices provided in support of this, and no evidence of the insurer’s prior consent being sought or obtained. On the available evidence, the panel is not satisfied the insurer should be liable for any travel costs. Complainant is entitled to certain other costs Medical costs to be covered The complainant has submitted a letter from his doctor detailing the stress the claim process and significant delay in settlement has caused him. In the particular circumstances, the panel considers the associated invoices from his doctor, totalling $370, can reasonably be accepted as relating to th e insurer’s handling of the claim. Determination | Case number: 664017 Page 10 of 13 The insurer is to pay the complainant $370 for this, together with statutory interest on that amount, calculates from 29 January 2020 until the date of settlement. Utilities to be covered The complainant is claiming electricity and gas charges incurred during the period of the claim. The policy allows for up to $2,000 for ‘excess’ costs associated with a claimed event. The insurer has said it will no t pay these charges as it is from the complainant’s usage. The panel is not satisfied by this explanation as the property is not currently lived in. Considering the charges are associated with the property being untenanted due to the event, although still requiring utilities, it is fair in the circumstances that the insurer pays these costs up to the policy maximum upon the provision of all relevant invoices. The complainant has already provided a number of invoices, and should continue to do so up to the policy limit or until the property is relet, whichever is sooner. Body Corporate levies The complainant is claiming body corporate levy fees. The policy wording allows cover up to $2,000 for these, where the property is uninhabitable due to a claimed event. The panel accepts that the insurer should pay these fees upon provision of invoices, up to $2,000 or until the property is relet, whichever is sooner. Complainant is entitled to compensation for non-financial loss The complainant is claiming $19,000 for stress, time and inconvenience associated with managing the claim, a nd due to the insurer’s mismanagement of the claim . He cites over 50 on-site meetings and over 100 calls associated with the management of the claim. As well, he refers to the frustration over the miscommunications relating to the initial assessment and the organisation of the quotes for repair , as well as the extensive delay in reimbursing costs incurred at the initial event. Under the AFCA Rules, we can award up to $5,000 compensation for non-financial loss. We will only award this type of compensation if the complainant suffers an unusual degree of stress, inconvenience, or delay because the insurer mishandled the claim. We recognise that making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making and dealing with a claim. In this case, however, the panel is satisfied the insurer ’ s actions caused the complainant a significant degree of unnecessary stress and inconvenience over and above what would normally be expected for a claim of this complexity. That includes withholding rental payments unreasonably, the insurer ’ s reluctance to proactively manage the complainant’s concerns , and the delay caused by the error in email Determination | Case number: 664017 Page 11 of 13 contact with the complainant and subsequent refusal to apologise for or rectify this error. The panel is satisfied it is fair in the circumstances that the insurer should pay the complainant $5,000 as compensation for non-financial loss. Determination | Case number: 664017 Page 12 of 13 3 Supporting information 3.1 Policy provisions Loss of rent cover, page 25: Section 1 – Part B 1(a) Rent When the Common Area or a Lot has been leased out, or can be substantiated by means of a signed agreement that the Common Area or Lot would have leased out, We will pay You and/or the Lot Owner for the Rent that is lost or would have been lost if the Common Area or Lot is made unfit to be occupied for its intended purpose by: (i) Loss or Damage that is admitted as a claim under Section 1; … We will pay: - Under a) i) from the time of the Event until the time the Common Area or Lot is relet following completion of rebuilding, repairs or replacement provided You or they demonstrate that all reasonable actions have been taken to obtain a new Tenant; 3.2 Reports Record Key points Insurer’s expert ( CS ) Scope of works 3 June 2019  5.3 – A site visit by the Contractor is recommended so as to make their own assessment of the extent of the work, access requirements, and the quantities and wastage that will be incurred to execute the necessary remedial works for this project.  Notes (p a g e 9) a) It is expressly understood all Tenderers shall visit the site prior to submitting their quotation.  16.3 Cleaning (p a g e 15) Check for any remaining mould after floor removal. Insurer ’s expert ( CS ) Report 3 June 2020  4.8 b) (Page 7) Mould. Some mould is evident in the flooring and is at risk. This will be addressed in the Scope of works.  7.0 Cautions (Page 24) 7.1 Mould Caution. We draw the attention of all parties involved in this matter to the possible presence of mould at the site in question. Mould is extremely dangerous when toxic and should be handled wit h the utmost care and under the control or supervision of licensed toxic materials handers or commercially registered hygienists. The occupants and their Insurers must be warned of the risk and remedial action put in place immediately. [CS] accepts no responsibility whatsoever for loss, damage or injury that occurs as a result of the inappropriate handling or treatment of any hazardous or toxic or co ntaminated items from this site. Determination | Case number: 664017 Page 13 of 13 Record Key points