Home / Search / Determination 663624

Determination 663624

Storm damage claim partly declined and partly settled

FirmGordian Runoff Limited
Decided2021-09-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$79,627
Non-financial loss—
Amount claimed$540,291
SourceAFCA PDF

Summary

The complainant claimed $540,290.52 for storm damage to her home and other losses, and the insurer had earlier agreed to cash settle $18,428.06 for internal works. AFCA declined the roof, wall, window, balcony and flooring elements but ordered payment of $79,627.25 plus interest, with storage and accommodation costs to be agreed.

The complainant had the onus to show a covered storm loss, but the insurer's previously accepted internal works and blinds could not be reversed after a lengthy period, and the amounts were determined by the more current quote.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

Find similar determinations

Text of the determination

Determination Case number 663624 Financial firm Gordian Runoff Limited Determination | Case number: 663624 Page 2 of 13 Case number: 663624 21 May 2021 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the insurer. She lodged a claim for storm damage to her home that occurred on 18 March 2016. The insurer partially accepted the claim. The insurer says it will only cover the items damaged from the claimed storm event. The complainant disputes the insurer’s decision and is seeking $540,290.52 towards repairs to the property and compensation for other costs and losses. 1.2 Issues and key findings How should the insurer settle the building claim? The insurer should settle the building claim by paying $50,012.25 plus interest as set out in section 2.1. How should the insurer settle the remaining aspects? Excluding the costs for storage and accommodation, the insurer should pay $29,615 plus interest to settle the remaining aspects of the claim. The costs for storage and accommodation should be settled in the manner set out in section 2.2. 1.3 Determination This determination is partially in favour of the complainant. If the complainant accepts this determination, the insurer should settle the claim in full as set out in sections 2.1 and 2.2. Determination | Case number: 663624 Page 3 of 13 2 Reasons for determination 2.1 How should the insurer settle the building claim? Complainant bears the onus to establish a claimable loss While lodging a claim, the complainant bears the onus of establishing a claimable loss. That is, she must show her loss falls within the insuring provision of her policy. The complainant’s policy is an insured events policy covering home and contents for listed events including storm, subject to certain specific and general exclusions. The policy does not provide cover for accidental damage to the property. It also does not cover any loss or damage which is not directly caused by an insured event or which is resulting from a pre-existing loss or damage. The policy also specifically excludes: any loss or damage directly or indirectly caused by, contributed to by, resulting from or arising out of or connected with erosion, subsidence, shrinkage, settling or any other earth movement except when caused by earthquake, storm or rainwater, explosion or escape of liquid and occurring within 72 hours after the event damage from inherent defects, faulty workmanship and or design and structural defects, corrosion, rust, mould and rot. The complainant says the damage occurred on 18 March 2016. The insurer engaged an assessor who visited the property on 24 March 2016. The assessor confirmed water ingress from a rain event had caused damage to the property. The assessor also mentioned the Bureau of Meteorolog y recorded only 13.4mm of rainfall on the date of loss. The insurer has agreed to cover some of the damage. However, the insurer disputes that all of the damage being claimed by the complainant was caused by the storm on 18 March 2016. Fair for the insurer to pay for the internal works it agreed to accept During the claim and dispute, the insurer accepted liability for various internal works. This was confirmed several times. In line with this, the insurer agreed to cash settle the claim based on the scope of works set out in S’s quote dated 20 April 2017 and an email dated 30 August 2019 for the garage. This totalled $18,428.06. During the dispute, the insurer obtained an updated quote from H dated 6 May 2020. H quoted $32,122.50 for these scope of works. Determination | Case number: 663624 Page 4 of 13 In a submission dated 10 February 2021, the insurer says none of the internal damage was covered by the policy. However, this position is inconsistent to previous correspondence and offers made. In those previous communications, it is clear the insurer acc epted liability for the internal damage and the repairs set out in S’s quote and email. Therefore it is neither fair, nor consistent with utmost good faith, for the insurer to take a different approach, particularly given the timeframe that passed. Instead, it is fair for the insurer to be liable for the internal works it has accepted and agreed to pay. Reports and quotes received from both parties The items and quantum in dispute are significant. The complainant provided a final quote for $540,290.52 towards building repairs. This does not include other quotes/ invoices towards contents, rectification work arising out of damage caused by the insurer’s panel expert during soil testing and report fees. As stated previously, the insurer obtained an updated quote from H. This almost doubled S’s quoted amounts for the same scope of works. The complainant’s quote includes substantively more works than allowed by the insurer. Having carefully considered these quotes, alongside all the relevant and exchanged i nformation, the panel does not accept the complainant’s quote fairly reflects the repairs covered by the policy. This is due to the following. Roof The complainant’s quote includes substantive works to the roof and drainage. The insurer obtained a report from RC who highlighted numerous issues with the roof’s design and works. This included:  box gutters having no, or insufficient, overflow systems  box gutters not discharging into a sump or rainhead  non-compliant pressure flashings  non-compliant flue pipe jointing process. In particular, RC found no evidence the roof sustained storm damage. The complainant’s reports also provide no evidence that the roof sustained storm damage. ML’s quote and report noted no roof damage. Whilst ML said the box gutters could not cope with the rain, which resulted in the internal damage, ML did not highlight any actual damage to the roof caused by the storm. Further, the works ML included appear to involve improving the drainage capabilities, not repair storm related damage. This was consistent with M’s quote. The complainant has also conducted works on the roof. She provided a plumber’s invoice dated 12 August 2016 confirming maintenance work to a box gutter, Determination | Case number: 663624 Page 5 of 13 installation of new overflow pipes and drains on both storeys. She has included this in her claim. These works are not to repair claim related damage. They are not payable. Given all this, the panel does not accept any of the amounts sought regarding the roof are payable under the policy. This is because the available information does not show the roof sustained storm damage. Instead, the works being claimed are either to improve the roof drainage or maintenance related. This is not covered by the policy. External walls and render cracking The complainant’s quote includes re pairing cracking and movement damage due to foundational movement. The complainant says this was caused by the storm. The insurer obtained a report from engineer GD dated 13 May 2019. GD made the following relevant observations:  evidence of widespread damage and distress to the external rendered wall cladding  external walls are not adequately articulated  no evidence of water leakage in the property’s stormwater or sewer systems GD concluded it is unlikely the storm could have resulted in sufficient water inundation to the soils to cause foundation movement. Instead, GD concluded the cause of movement was a combination of factors including insufficient articulation joints, highly reactive soils, moisture content variations due to site drainage and seasonal conditions. The complainant obtained a report from LP dated 15 June 2020. LP made the following relevant observations and conclusions:  damage to the north-western corner being due to the spa area or build up of water in the balcony  concerns the current roof catchment is not suitable as it is based on outstanding standards  concerns the presence of foam between the stud walls and external façade is atypical and may be contributing to moisture and/or vapour ingress, thus causing the deterioration to the plates and studs observed Of significance, LP does not say these issues were caused by a storm on 18 March 2016. Instead, these appear to predominantly identify concerns that the construction practices may not be adequate as they were based on superseded standards , which is resulting in these issues. This would indicate ongoing issues rather than damage caused by an insured event. The insurer also says the rainfall of that day totalled 13.4mm. The insurer provided a monthly historical extract which showed the total rainfall for March 2016 was 26.7mm. Determination | Case number: 663624 Page 6 of 13 The complainant provided a screenshot of the weather showing there was rainfall on that day. However, this screenshot does not show how much rain fell that day. Given all this, the panel is persuaded by GD’s evidence that it is unlikely the storm in 18 March 2016 could have caused foundational movement. The rainfall recorded is too low. Neither GD nor LP says this rainfall alone could have caused damage to the foundation or movement and cracking damage to the property. Regarding the water damage to the external walls, LP’s evidence does not say this is consistent with a one-off event. Instead, LP highlights issues with the drainage capability of various areas. This again appears to be due to issues with the property’s construction being based on outdated standards that may not be fit for purpose. This does not fall within the policy coverage. Therefore, the insurer is not liable for this aspect of the claim. Windows The insurer says the windows have been undergoing damage from every rain event and is a pre-existing issue. The insurer has provided images immediately after the claimed event which show signs of rotting and previous attempts to seal. The insurer’s position is further supported by reports from building co -ordinator CW. CW provided a report dated 7 October 2016 that highlighted specific issues with the installation of the window. These issues have not been refuted by the complainant’s experts. The available information shows damage has been occurring over a period of time and is not a result of one specific claimed rain event. The insurer is not liable for this. Balcony CW provide d a report dated 23 April 2016 highlighting issues with the balcony’s construction and ability to be watertight. This was further supported by RC. Neither M nor LP contradict these concerns. The panel is persuaded by the insurer’s position on these points . It is supported by two experts whose opinions have not been specifically refuted by the complainant’s experts. The panel also finds it difficult to accept that a storm of about 13.44mm could, alone, cause such widespread damage. Timber flooring The complainant says the damage was caused by a downlight which has fallen from the ceiling during the storm. There is no contemporaneous evidence of this damage or that water had inundated the relevant area of the downlight. Determination | Case number: 663624 Page 7 of 13 Given this, the panel concludes there is insufficient basis to accept this flooring was damaged by the storm. Garage The insurer’s quote is limited to staining, sealing and painting the south wall and ceiling lining throughout. The complainant quotes include re-rendering and repainting of the area. The assessor’s report confirmed damage to the ceiling and render above the garage door. In this regard, the panel prefers the complainant’s scope of works because:  the insurer’s scope of works is insufficient to address the damage observed by its loss adjuster contemporaneous to the event, and  the insurer has accepted damage to the garage area was from the claimed event. Therefore, the panel will increase the allowance for the garage to reflect the cost set out in M’s quote, which was $6,360 plus G ST. Other areas The parties’ quotes overlap in several regards. For instance, they include works to the ground floor areas and stairwell. However, the amounts in the complainant’s quote are significantly higher. I also note that in ML’s quote, he refers to a recent water leak dated 19 August 2018. This would not be covered under this event. The panel prefers H’s quote regarding all the remaining works. H’s scope of works is consistent with the damage observed contemporaneous to the event and recorded in t he loss adjuster’s report. As stated above, the complainant’s quote includes substantive works that are not covered by the policy. There are also legitimate concerns that some of the damage accepted by the insurer may not have been covered by the policy. The available information shows numerous issues with the roof’s drainage which could have led to some, or most, of the damage being claimed. This may not have fallen within the policy coverage. However, as stated previously, the panel does not accept it is fair for the insurer to now raise this on repairs it accepted quite some time ago. Given all this, the panel considers it fair to prefer the insurer’s scope of works and quote for all the accepted areas except for the garage. Rectification/repairs necessitated by damage during soil testing The insurer engaged an expert to conduct soil testing. They dug a bore and cut the sandstone paving damaging various areas. Determination | Case number: 663624 Page 8 of 13 The complainant has provided quotes for repairs. The insurer, in an email dated 27 February 2020 , agreed to accept the complainant’s quotes and costs. These totalled $9,678. It is fair for the insurer to stand by its offer, particularly given there is no dispute damage was caused during these works. Total amount payable After careful consideration of all the available information, the panel concludes the building damage should be settled in this manner. Except for the garage, the panel otherwise accepts the scope of works set out in S’s quote is fair. However, in terms of the amount to be paid, the pa nel considers it is fair to rely on H’s quote given it is an updated amount and more likely reflects current costs. For the damage to the garage, and the cost to rectify the damage caused by the insurer’s contractors, the panel prefers the complainant’s q uotes. The panel also considers it fair that a 10% allowance be provided to H’s quote. This is because there is a realistic possibility that additional variations may apply. H’s quote specifically noted the amount does not address this factor. This percentage is also to address the fact the risks of the works are passing to the complainant. This means the insurer should pay $50,012.25 which incorporates the following:  H’s quote of $32,122.50 - $1,815 (garage cost inclusive of GST) = $30,307.50  10% allowanc e on H’s quote = $3,030.75  an allowance of $6,996 for the garage  an allowance of $9,678 to rectify the insurer’s investigative works Interest should also be payable on the above amounts pursuant to section 57 of the Insurance Contracts Act 1984. The panel considers it fair that interest starts from 5 June 2020, being when H’s quote expires, until payment is made. This is because most of the amount payable is based on H’s quote. Payment should be made within 21 days of the insurer receiving notification that the complainant has accepted this determination. 2.2 How should the other aspects be settled? Complainant is seeking cover for other aspects Other aspects of the complainant’s claim includes:  blinds,  sofa,  speaker,  report costs, and Determination | Case number: 663624 Page 9 of 13  storage and accommodation Blinds For the blinds, the insurer sent an email dated 6 December 2019 confirming it agreed to accept her claim for this. In a submission dated 24 February 2021, the insurer now states it had exclusions and other options available to it which it was going to rely upon if its offer was not accepted. The panel does not consider this would be fair. The insurer specifically agreed and accepted this aspect of the claim. No new information was obtained in the intervening period. To reverse its position after such a lengthy period would neither be fair or consistent with utmost good faith. Therefore, the panel accepts the insurer should pay the costs associated with the blinds. This totals $24,208. Sofa The complainant says the sofa was not directly damaged by the storm or rainwater but has faded because of exposure to sunlight due to damaged blinds. This is not covered. The sofa was not directly damaged from the claimed rain event. The policy does not provide cover for any consequential loss. The policy specifically excludes loss or damage that is not directly caused by an insured event. Loudspeaker system The insurer’s email dated 6 December 2019 agreed to this cost. However, in its submission dated 24 February 2021, the insurer sought further information about this. Given this aspect has been agreed, and in the interests of finalising this long, outstanding matter, the panel considers it fair that the insurer stand by its previously agreed position. The insurer should therefore pay for this, including the report fee. Storage and accommodation The complainant notes the insurer’s quote makes no allowance for storage of furniture or temporary accommodation. The insurer has provided no submission on this point. The policy provides an additional benefit for storage costs to protect home contents from further damage following a storm claim. It also provides for emergency accommodation if the home is uninhabitable. The works are relatively extensive and includes numerous rooms in the home. It appears clear the furniture would need to be protected and stored. Determination | Case number: 663624 Page 10 of 13 In terms of accommodation, this is also reasonable. The works include two bedrooms, the kitchen and several living areas. Therefore, the panel accepts an allowance for storage and accommodation would be fair. It is not clear what a fair amount is as no quotes have been provided. It is also not clear how long the claim related works would take. However, the panel notes the works do not include significant structural works. Most of the works involve repairs to the skirting and walls. This should not include too many contractors. The panel considers it fair to allow for four weeks. Therefore, the insurer is to pay a fair amount for four weeks of temporary accommodation and storage of furniture. The parties are to work together to determine a fair amount for this. Report costs The complainant is seeking the costs of providing quotes and the final engineer report. None of these assisted the complainant’s position. Most of the amounts being sought have not been s ubstantiated. Instead, the available information shows the insurer’s position was mostly substantiated. Given this, the panel does not accept the insurer is liable to reimburse any of these costs. Insurer is required to issue payment as per below Given all this, the insurer should pay $29,615 for the contents and other amounts being sought. This does not include storage and accommodation as the quantum for those matters cannot be worked out. The insurer should also pay interest on the above amount pursuant to section 57 of the Insurance Contracts Act 1984. The panel considers it fair that interest starts from 7 August 2019, being one month after the main quote for the blinds, until payment is made. This is because most of the amount payable is based on the blinds’ quote. Payment should be made within 21 days of the insurer receiving notification that the complainant has accepted this determination. Interest is not payable for storage and accommodation. This is because any amount payable should be based on a current cost. Determination | Case number: 663624 Page 11 of 13 3 Supporting information 3.1 Our approach As advised to the parties, AFCA has considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a recommendation and has proceeded directly to determination. This complaint has been determined based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. 3.2 Other information relied upon Record Key points Product Di sclosure Statement 1 May 2013 General Exclusions These General Exclusions apply to all sections of the policy. In addition to these General Exclusions, sections of this policy may be subject to specific exclusions. This policy doe s not cover: The amount of any excess shown in your policy schedule. Any loss, damage, or liability:  that is not directly caused by an insured event  from pre - existing loss or damage or Loss, damage, destruction, consequential loss or liability directly or indirectly caused by, contributed to by, resulting from, or arising out of or in connection with:  er osion, subsidence, landslide, settling, shrinkage, expansion, undermining, washing a way or any other eart h movement Determination | Case number: 663624 Page 12 of 13 Record Key points except when loss or damage is caused by: – eart hquake – storm or rainwater – explosion or – escape of liquid and occurring within 72 hours a fter the event  gradual deterioration, wear and tear, fading, marking, scratching, denting, chipping or lack of upk eep or maintenance  inherent defects, faulty workmanship, structural defects, or faulty design  corrosion, rust, mould, wet or dry rot The Insured Events You Are Covered For You are covered for the following insured events causing loss, damage or destruction to your home or home contents (Sections 1 and 2), subject to the terms, conditions and exclusions of this policy. We will settle losse s re sulting from: 9. Storm and/or rainwater including loss or damage from:  the escape of rainwater from any water pipe, drain or gutter  surface run - off rainwater from surrounding areas, or flood. We will not settle losse s relating to: Loss or damage  to retai ning walls  by erosion, subsidence, landslide, mudslide, shrinkage or any other eart h movement except when damage or destruction is caused by soil or other debris striking or entering a permanent structure having walls, a roof and a floor as a result of sto rm and/or rainwater and occurring within 72 hours after the storm and/or rainwater.  from wat er seeping into or entering your home due to: – poor attention to maintenance – building additions and alterations – structural defects, faulty design or faulty wor kmanship. Determination | Case number: 663624 Page 13 of 13 Bureau of Meteorology report

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.