Text of the determination
Determination
Case number 663624
Financial firm Gordian Runoff Limited
Determination | Case number: 663624 Page 2 of 13
Case number: 663624 21 May 2021
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the insurer. She
lodged a claim for storm damage to her home that occurred on 18 March 2016.
The insurer partially accepted the claim. The insurer says it will only cover the items
damaged from the claimed storm event.
The complainant disputes the insurer’s decision and is seeking $540,290.52 towards
repairs to the property and compensation for other costs and losses.
1.2 Issues and key findings
How should the insurer settle the building claim?
The insurer should settle the building claim by paying $50,012.25 plus interest as set
out in section 2.1.
How should the insurer settle the remaining aspects?
Excluding the costs for storage and accommodation, the insurer should pay $29,615
plus interest to settle the remaining aspects of the claim.
The costs for storage and accommodation should be settled in the manner set out in
section 2.2.
1.3 Determination
This determination is partially in favour of the complainant.
If the complainant accepts this determination, the insurer should settle the claim in full
as set out in sections 2.1 and 2.2.
Determination | Case number: 663624 Page 3 of 13
2 Reasons for determination
2.1 How should the insurer settle the building claim?
Complainant bears the onus to establish a claimable loss
While lodging a claim, the complainant bears the onus of establishing a claimable
loss. That is, she must show her loss falls within the insuring provision of her policy.
The complainant’s policy is an insured events policy covering home and contents for
listed events including storm, subject to certain specific and general exclusions. The
policy does not provide cover for accidental damage to the property. It also does not
cover any loss or damage which is not directly caused by an insured event or which is
resulting from a pre-existing loss or damage.
The policy also specifically excludes:
any loss or damage directly or indirectly caused by, contributed to by, resulting
from or arising out of or connected with erosion, subsidence, shrinkage, settling or
any other earth movement except when caused by earthquake, storm or
rainwater, explosion or escape of liquid and occurring within 72 hours after the
event
damage from inherent defects, faulty workmanship and or design and structural
defects, corrosion, rust, mould and rot.
The complainant says the damage occurred on 18 March 2016. The insurer engaged
an assessor who visited the property on 24 March 2016. The assessor confirmed
water ingress from a rain event had caused damage to the property. The assessor
also mentioned the Bureau of Meteorolog y recorded only 13.4mm of rainfall on the
date of loss.
The insurer has agreed to cover some of the damage. However, the insurer disputes
that all of the damage being claimed by the complainant was caused by the storm on
18 March 2016.
Fair for the insurer to pay for the internal works it agreed to accept
During the claim and dispute, the insurer accepted liability for various internal works.
This was confirmed several times. In line with this, the insurer agreed to cash settle
the claim based on the scope of works set out in S’s quote dated 20 April 2017 and
an email dated 30 August 2019 for the garage. This totalled $18,428.06.
During the dispute, the insurer obtained an updated quote from H dated 6 May 2020.
H quoted $32,122.50 for these scope of works.
Determination | Case number: 663624 Page 4 of 13
In a submission dated 10 February 2021, the insurer says none of the internal
damage was covered by the policy. However, this position is inconsistent to previous
correspondence and offers made. In those previous communications, it is clear the
insurer acc epted liability for the internal damage and the repairs set out in S’s quote
and email. Therefore it is neither fair, nor consistent with utmost good faith, for the
insurer to take a different approach, particularly given the timeframe that passed.
Instead, it is fair for the insurer to be liable for the internal works it has accepted and
agreed to pay.
Reports and quotes received from both parties
The items and quantum in dispute are significant.
The complainant provided a final quote for $540,290.52 towards building repairs. This
does not include other quotes/ invoices towards contents, rectification work arising out
of damage caused by the insurer’s panel expert during soil testing and report fees.
As stated previously, the insurer obtained an updated quote from H. This almost
doubled S’s quoted amounts for the same scope of works.
The complainant’s quote includes substantively more works than allowed by the
insurer. Having carefully considered these quotes, alongside all the relevant and
exchanged i nformation, the panel does not accept the complainant’s quote fairly
reflects the repairs covered by the policy. This is due to the following.
Roof
The complainant’s quote includes substantive works to the roof and drainage.
The insurer obtained a report from RC who highlighted numerous issues with the
roof’s design and works. This included:
box gutters having no, or insufficient, overflow systems
box gutters not discharging into a sump or rainhead
non-compliant pressure flashings
non-compliant flue pipe jointing process.
In particular, RC found no evidence the roof sustained storm damage.
The complainant’s reports also provide no evidence that the roof sustained storm
damage. ML’s quote and report noted no roof damage. Whilst ML said the box gutters
could not cope with the rain, which resulted in the internal damage, ML did not
highlight any actual damage to the roof caused by the storm. Further, the works ML
included appear to involve improving the drainage capabilities, not repair storm
related damage. This was consistent with M’s quote.
The complainant has also conducted works on the roof. She provided a plumber’s
invoice dated 12 August 2016 confirming maintenance work to a box gutter,
Determination | Case number: 663624 Page 5 of 13
installation of new overflow pipes and drains on both storeys. She has included this in
her claim.
These works are not to repair claim related damage. They are not payable.
Given all this, the panel does not accept any of the amounts sought regarding the roof
are payable under the policy. This is because the available information does not show
the roof sustained storm damage. Instead, the works being claimed are either to
improve the roof drainage or maintenance related. This is not covered by the policy.
External walls and render cracking
The complainant’s quote includes re pairing cracking and movement damage due to
foundational movement. The complainant says this was caused by the storm.
The insurer obtained a report from engineer GD dated 13 May 2019. GD made the
following relevant observations:
evidence of widespread damage and distress to the external rendered wall
cladding
external walls are not adequately articulated
no evidence of water leakage in the property’s stormwater or sewer systems
GD concluded it is unlikely the storm could have resulted in sufficient water inundation
to the soils to cause foundation movement. Instead, GD concluded the cause of
movement was a combination of factors including insufficient articulation joints, highly
reactive soils, moisture content variations due to site drainage and seasonal
conditions.
The complainant obtained a report from LP dated 15 June 2020. LP made the
following relevant observations and conclusions:
damage to the north-western corner being due to the spa area or build up of water
in the balcony
concerns the current roof catchment is not suitable as it is based on outstanding
standards
concerns the presence of foam between the stud walls and external façade is
atypical and may be contributing to moisture and/or vapour ingress, thus causing
the deterioration to the plates and studs observed
Of significance, LP does not say these issues were caused by a storm on 18 March
2016. Instead, these appear to predominantly identify concerns that the construction
practices may not be adequate as they were based on superseded standards , which
is resulting in these issues. This would indicate ongoing issues rather than damage
caused by an insured event.
The insurer also says the rainfall of that day totalled 13.4mm. The insurer provided a
monthly historical extract which showed the total rainfall for March 2016 was 26.7mm.
Determination | Case number: 663624 Page 6 of 13
The complainant provided a screenshot of the weather showing there was rainfall on
that day. However, this screenshot does not show how much rain fell that day.
Given all this, the panel is persuaded by GD’s evidence that it is unlikely the storm in
18 March 2016 could have caused foundational movement. The rainfall recorded is
too low. Neither GD nor LP says this rainfall alone could have caused damage to the
foundation or movement and cracking damage to the property.
Regarding the water damage to the external walls, LP’s evidence does not say this is
consistent with a one-off event. Instead, LP highlights issues with the drainage
capability of various areas. This again appears to be due to issues with the property’s
construction being based on outdated standards that may not be fit for purpose. This
does not fall within the policy coverage.
Therefore, the insurer is not liable for this aspect of the claim.
Windows
The insurer says the windows have been undergoing damage from every rain event
and is a pre-existing issue. The insurer has provided images immediately after the
claimed event which show signs of rotting and previous attempts to seal.
The insurer’s position is further supported by reports from building co -ordinator CW.
CW provided a report dated 7 October 2016 that highlighted specific issues with the
installation of the window. These issues have not been refuted by the complainant’s
experts.
The available information shows damage has been occurring over a period of time
and is not a result of one specific claimed rain event. The insurer is not liable for this.
Balcony
CW provide d a report dated 23 April 2016 highlighting issues with the balcony’s
construction and ability to be watertight. This was further supported by RC.
Neither M nor LP contradict these concerns.
The panel is persuaded by the insurer’s position on these points . It is supported by
two experts whose opinions have not been specifically refuted by the complainant’s
experts. The panel also finds it difficult to accept that a storm of about 13.44mm
could, alone, cause such widespread damage.
Timber flooring
The complainant says the damage was caused by a downlight which has fallen from
the ceiling during the storm.
There is no contemporaneous evidence of this damage or that water had inundated
the relevant area of the downlight.
Determination | Case number: 663624 Page 7 of 13
Given this, the panel concludes there is insufficient basis to accept this flooring was
damaged by the storm.
Garage
The insurer’s quote is limited to staining, sealing and painting the south wall and
ceiling lining throughout.
The complainant quotes include re-rendering and repainting of the area.
The assessor’s report confirmed damage to the ceiling and render above the garage
door.
In this regard, the panel prefers the complainant’s scope of works because:
the insurer’s scope of works is insufficient to address the damage observed by its
loss adjuster contemporaneous to the event, and
the insurer has accepted damage to the garage area was from the claimed event.
Therefore, the panel will increase the allowance for the garage to reflect the cost set
out in M’s quote, which was $6,360 plus G ST.
Other areas
The parties’ quotes overlap in several regards.
For instance, they include works to the ground floor areas and stairwell. However, the
amounts in the complainant’s quote are significantly higher. I also note that in ML’s
quote, he refers to a recent water leak dated 19 August 2018. This would not be
covered under this event.
The panel prefers H’s quote regarding all the remaining works. H’s scope of works is
consistent with the damage observed contemporaneous to the event and recorded in
t he loss adjuster’s report. As stated above, the complainant’s quote includes
substantive works that are not covered by the policy.
There are also legitimate concerns that some of the damage accepted by the insurer
may not have been covered by the policy. The available information shows numerous
issues with the roof’s drainage which could have led to some, or most, of the damage
being claimed. This may not have fallen within the policy coverage. However, as
stated previously, the panel does not accept it is fair for the insurer to now raise this
on repairs it accepted quite some time ago.
Given all this, the panel considers it fair to prefer the insurer’s scope of works and
quote for all the accepted areas except for the garage.
Rectification/repairs necessitated by damage during soil testing
The insurer engaged an expert to conduct soil testing. They dug a bore and cut the
sandstone paving damaging various areas.
Determination | Case number: 663624 Page 8 of 13
The complainant has provided quotes for repairs. The insurer, in an email dated 27
February 2020 , agreed to accept the complainant’s quotes and costs. These totalled
$9,678. It is fair for the insurer to stand by its offer, particularly given there is no
dispute damage was caused during these works.
Total amount payable
After careful consideration of all the available information, the panel concludes the
building damage should be settled in this manner.
Except for the garage, the panel otherwise accepts the scope of works set out in S’s
quote is fair. However, in terms of the amount to be paid, the pa nel considers it is fair
to rely on H’s quote given it is an updated amount and more likely reflects current
costs.
For the damage to the garage, and the cost to rectify the damage caused by the
insurer’s contractors, the panel prefers the complainant’s q uotes.
The panel also considers it fair that a 10% allowance be provided to H’s quote. This is
because there is a realistic possibility that additional variations may apply. H’s quote
specifically noted the amount does not address this factor. This percentage is also to
address the fact the risks of the works are passing to the complainant.
This means the insurer should pay $50,012.25 which incorporates the following:
H’s quote of $32,122.50 - $1,815 (garage cost inclusive of GST) = $30,307.50
10% allowanc e on H’s quote = $3,030.75
an allowance of $6,996 for the garage
an allowance of $9,678 to rectify the insurer’s investigative works
Interest should also be payable on the above amounts pursuant to section 57 of the
Insurance Contracts Act 1984. The panel considers it fair that interest starts from 5
June 2020, being when H’s quote expires, until payment is made. This is because
most of the amount payable is based on H’s quote.
Payment should be made within 21 days of the insurer receiving notification that the
complainant has accepted this determination.
2.2 How should the other aspects be settled?
Complainant is seeking cover for other aspects
Other aspects of the complainant’s claim includes:
blinds,
sofa,
speaker,
report costs, and
Determination | Case number: 663624 Page 9 of 13
storage and accommodation
Blinds
For the blinds, the insurer sent an email dated 6 December 2019 confirming it agreed
to accept her claim for this. In a submission dated 24 February 2021, the insurer now
states it had exclusions and other options available to it which it was going to rely
upon if its offer was not accepted.
The panel does not consider this would be fair. The insurer specifically agreed and
accepted this aspect of the claim. No new information was obtained in the intervening
period. To reverse its position after such a lengthy period would neither be fair or
consistent with utmost good faith.
Therefore, the panel accepts the insurer should pay the costs associated with the
blinds. This totals $24,208.
Sofa
The complainant says the sofa was not directly damaged by the storm or rainwater
but has faded because of exposure to sunlight due to damaged blinds.
This is not covered. The sofa was not directly damaged from the claimed rain event.
The policy does not provide cover for any consequential loss. The policy specifically
excludes loss or damage that is not directly caused by an insured event.
Loudspeaker system
The insurer’s email dated 6 December 2019 agreed to this cost. However, in its
submission dated 24 February 2021, the insurer sought further information about this.
Given this aspect has been agreed, and in the interests of finalising this long,
outstanding matter, the panel considers it fair that the insurer stand by its previously
agreed position. The insurer should therefore pay for this, including the report fee.
Storage and accommodation
The complainant notes the insurer’s quote makes no allowance for storage of
furniture or temporary accommodation.
The insurer has provided no submission on this point.
The policy provides an additional benefit for storage costs to protect home contents
from further damage following a storm claim. It also provides for emergency
accommodation if the home is uninhabitable.
The works are relatively extensive and includes numerous rooms in the home. It
appears clear the furniture would need to be protected and stored.
Determination | Case number: 663624 Page 10 of 13
In terms of accommodation, this is also reasonable. The works include two bedrooms,
the kitchen and several living areas.
Therefore, the panel accepts an allowance for storage and accommodation would be
fair.
It is not clear what a fair amount is as no quotes have been provided. It is also not
clear how long the claim related works would take. However, the panel notes the
works do not include significant structural works. Most of the works involve repairs to
the skirting and walls. This should not include too many contractors. The panel
considers it fair to allow for four weeks.
Therefore, the insurer is to pay a fair amount for four weeks of temporary
accommodation and storage of furniture. The parties are to work together to
determine a fair amount for this.
Report costs
The complainant is seeking the costs of providing quotes and the final engineer
report.
None of these assisted the complainant’s position. Most of the amounts being sought
have not been s ubstantiated. Instead, the available information shows the insurer’s
position was mostly substantiated.
Given this, the panel does not accept the insurer is liable to reimburse any of these
costs.
Insurer is required to issue payment as per below
Given all this, the insurer should pay $29,615 for the contents and other amounts
being sought. This does not include storage and accommodation as the quantum for
those matters cannot be worked out.
The insurer should also pay interest on the above amount pursuant to section 57 of
the Insurance Contracts Act 1984. The panel considers it fair that interest starts from
7 August 2019, being one month after the main quote for the blinds, until payment is
made. This is because most of the amount payable is based on the blinds’ quote.
Payment should be made within 21 days of the insurer receiving notification that the
complainant has accepted this determination.
Interest is not payable for storage and accommodation. This is because any amount
payable should be based on a current cost.
Determination | Case number: 663624 Page 11 of 13
3 Supporting information
3.1 Our approach
As advised to the parties, AFCA has considered it appropriate to expedite this
complaint in accordance with the Operational Guidelines to the AFCA Rules, due to
the nature of the complaint. Accordingly, this complaint has not been the subject of a
recommendation and has proceeded directly to determination.
This complaint has been determined based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered for the purposes of this determination.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.2 Other information relied upon
Record Key points
Product Di sclosure
Statement
1 May 2013
General Exclusions
These General Exclusions apply to all sections of the policy.
In addition to these General Exclusions, sections of this policy may
be subject to specific exclusions.
This policy doe s not cover:
The amount of any excess shown in your policy schedule.
Any loss, damage, or liability:
that is not directly caused by an insured event
from pre - existing loss or damage or
Loss, damage, destruction, consequential loss or liability directly or
indirectly caused by, contributed to by, resulting from, or arising out
of or in connection with:
er osion, subsidence, landslide, settling, shrinkage, expansion,
undermining, washing a way or any other eart h movement
Determination | Case number: 663624 Page 12 of 13
Record Key points
except when loss or damage is caused by:
– eart hquake
– storm or rainwater
– explosion or
– escape of liquid
and occurring within 72 hours a fter the event
gradual deterioration, wear and tear, fading, marking,
scratching, denting, chipping or lack of upk eep or maintenance
inherent defects, faulty workmanship, structural defects, or faulty
design
corrosion, rust, mould, wet or dry rot
The Insured Events You Are Covered For
You are covered for the following insured events causing loss,
damage or destruction to your home or home contents (Sections 1
and 2), subject to the terms, conditions and exclusions of this policy.
We will settle losse s re sulting from:
9. Storm and/or rainwater
including loss or damage from:
the escape of rainwater from any water pipe, drain or gutter
surface run - off rainwater from surrounding areas, or flood.
We will not settle losse s relating to:
Loss or damage
to retai ning walls
by erosion, subsidence, landslide, mudslide, shrinkage or any
other eart h movement except when damage or destruction is
caused by soil or other debris striking or entering a permanent
structure having walls, a roof and a floor as a result of sto rm
and/or rainwater and occurring within 72 hours after the storm
and/or rainwater.
from wat er seeping into or entering your home due to:
– poor attention to maintenance
– building additions and alterations
– structural defects, faulty design or faulty wor kmanship.
Determination | Case number: 663624 Page 13 of 13
Bureau of Meteorology report