Home / Suncorp Group / Determination 663138

Determination 663138

Insurer denied most storm damage to the home and declined to renew the policy while the claim was disputed

FirmSuncorp Group
Decided2020-06-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

After a February 2019 storm the insurer initially denied the complainant's home damage claim, later accepting only the laundry roof and resulting water damage. AFCA upheld most exclusions, required a cash settlement of the accepted damage less the $5,000 excess and ordered $3,000 for non-financial loss.

Expert engineering evidence shows most damage was from ground movement and deterioration, but the insurer's delayed acceptance and non-renewal during the dispute caused unusual distress warranting compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 663138 Financial firm AAI Limited Determination | Case number: 663138 Page 2 of 5 Case number: 663138 4 June 2020 1 Determination overview 1.1 Complaint The complainant held a home and contents insurance policy with the financial firm (insurer) and submitted a claim for damage to her roof, stumps, walls and ceiling because of a storm event on 11 February 2019. The insurer denied the claim, saying the damage to the roof was caused by gradual deterioration, and the balance of the damage was due to ground movement. The complainant also raised concerns as to the applicable excess , as well as the insurer‟s decision not to renew the insurance policy over the property. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the complainant. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. Further submissions provided after the recommendation have been considered. I agree with the case manager‟s reasons for the rec ommendation and broadly with the recommended outcome, although it should be recorded as being only partly in favour of the complainant. Is the insurer entitled to apply an exclusion to reduce its liability? Yes. The insurer has shown exclusions for ground movement and long-term deterioration apply to much of the damage claimed, but it is liable for the laundry roof and the subsequent internal damage due to water ingress. Is the complainant entitled to compensation for non-financial loss? Yes. The insurer could have accepted liability for part of the claim earlier than it did. It also refused to renew the complainant‟s insurance while the dispute over liability was continuing. This caused the complainant significant concern and distress. 1.3 Determination This determination is partly in favour of the complainant. The insurer is required to obtain a quote actionable by the complainant for the laundry roof and internal storm damage, and cash settle the claim as set out in section 2.2 below, subject to the excess. It is also required to pay the complainant $3,000 as compensation for non- financial loss. Determination | Case number: 663138 Page 3 of 5 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case based on what I consider is fair in the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous AFCA decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the case manager‟s recommendation contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the Rules and any relevant law. 2.2 Is the insurer entitled to apply an exclusion to reduce its liability? Excess of $5,000 applies to the claim I am satisfied the complainant has established a valid claim for storm and impact damage, and I consider the insurer was correct in eventually accepting that part of the claim relating to damage from a tree falling on the laundry roof and the resultant water entry into the rear of the property. However, the insurer said the cost of repairs would be less than the applicable policy excess of $5,000. I acknowledge the complainant‟s concerns about the level of the excess, and appreciate she says she changed the excess back from $5,000 to $1,000 on 18 January 2019. However, there is no evidence which records any such change. The available evidence shows a phone conversation between the complainant and the insurer on 18 January 2017 in which $5,000 was confirmed as the excess, and there is nothing to confirm any changes after that date. The policy schedule for the year commencing on 23 January 2019 (during which the claim arose) shows the excess of $5,000 applies. If that was incorrect or not what she wanted, the complainant did have the opportunity to raise that with the insurer, but there is nothing to indicate she did. Evidence shows, on balance, exclusions apply to balance of claim When making the claim, the complainant is reported as having referred to water under the house and entering through the roof during the storm. While now accepting the impact of the falling tree and resulting water ingress, t he insurer maintains it was entitled to deny the balance of the damage, which includes the remainder of the roof and cracking in the walls, ceilings and externally, as well as to columns/stumps under the house. It relies on exclusions for damage caused by wear and tear, gradual deterioration, subsidence and earth movement; as well as pre- existing and maintenance issues. Determination | Case number: 663138 Page 4 of 5 I am not satisfied the reports submitted by the complainant show the damage to the remainder of the roof (that is, the area not affected by the impact of the tree) was from storm. Most provided no opinion as to the actual cause of the damage, although carpenter C noted roof repairs were needed because of building movement. The evidence from the insurer‟s experts (including from engineers J and S) also establishes, on balance, that long-term building movement was the cause of the remaining damage. The available information refers to signs of pre-existing damage and repairs, and long-term issues relating to drainage and maintenance requirements. In particular, it is worth noting that engineer J had previously attended the property in relation to a claim made in 2011, and so was in a position to assess any more recent signs of damage by reference to his earlier observations. He concluded the damage he saw in 2019 was not from the 2019 rain event. Instead, he found „significant and excessive foundation movement‟. Engineer S also concluded the damage was from general foundation movement over time. I am satisfied, on balance, the insurer has shown exclusions apply for ground movement and wear and tear, and it is entitled to decline the claim for that damage (including to the stumps/columns beneath the property). Storm/impact damage to be cash settled, subject to excess Since it is likely there will be some inter-connectedness between the repairs for which the complainant is responsible, and those which are the insurer‟s responsibility , it is fair and reasonable that the claim be cash settled. That is, to the extent the cost of repairs for which the insurer is liable exceeds the policy excess of $5,000. The complainant has provided a quote for the repair of the laundry roof at $1,600 but none for the repair of the related internal water damage. The insurer is required to obtain a quote for the internal damage, and use that as a basis for calculating that component of the repairs. To be clear, the insurer ‟s quote needs to be one that is reasonable and actionable by the complainant as a retail customer. I consider it fair that this opportunity be provided to ensure the complainant both receives any settlement amount to which she is entitled under the terms of the policy, but also so that she receives clear confirmation of the cost of repairs and how that sits by comparison to the excess for which she would be liable. The final cash settlement, however, is to be based on the $1,600 for the roof plus the amount of the actionable quote for the internal water damage; and the total of those two amounts is then to be increased by a further 15% to allow for contingencies, the passing of risk to the complainant and any increase in labour/materials costs since the complainant obtained her quote. If the final cash settlement figure is more than the $5,000 excess, then the insurer is required to settle the claim by paying the complainant the amount by which the excess is exceeded. Determination | Case number: 663138 Page 5 of 5 If the final cash settlement figure is less than $5,000, then the insurer is not required to make any payment for the claim and the complainant is not required to pay the excess. 2.3 Is the complainant entitled to compensation for non-financial loss? Awards of compensation for non-financial loss may be made where there has been an unusual degree of inconvenience or upset caused to the complainant by the actions of the insurer. In assessing such awards, we take account of the complainant‟s particular circumstances and the effect on them of the way the claim has been handled. In this case, I consider the matter could have been concluded sooner and with less upset to the complainant, including if the issues in A‟s report (as to the overall condition of the roof, and the laundry roof/resulting damage in particular) had been correctly identified. There was also the additional concern to the complainant of the insurer not renewing her policy when it fell due while the claim and complaint were still being dealt with. I appreciate the insurer has the right to decide whether to offer renewal, and that certain relevant considerations may apply (including the current condition of the property, and an insured‟s claims history). In the particular circumstances, however (most significantly, given the unresolved dispute about liability for the current claim), I do not consider it was fair or reasonable for the insurer to place the complainant under the additional pressure of needing to somehow deal with the damage and worry about obtaining alternative cover, when that was likely to be difficult to obtain. I accept that the complainant has experienced considerable upset and anxiety as a consequence of the insurer‟s actions , and I consider an award of $3,000 compensation for non-financial loss is fair in the circumstances. Recommendation Case number 663138 Financial firm AAI Limited Recommendation | Case number: 663138 Page 2 of 8 Case number: 663138 20 May 2020 3 Overview 3.1 Complaint The complainant held a home and contents insurance policy with the financial firm (insurer) and submitted a claim for damage to her roof, stumps, walls and ceiling because of a storm event on 11 February 2019. The insurer denied the claim alleging the damage to the roof was caused by gradual deterioration and the balance of the damage was due to ground movement. The insurer referred to multiple claims submitted by the complainant where similar damage was previously discovered as background to the recent denial. The complainant also raised concerns as to the applicable excess and subsequently the insurer‟s decision to not renew the insurance policy over the property. 3.2 Issues and key findings Is the insurer entitled to apply an exclusion to reduce its liability on the claim? Yes. Not all damage claimed by the complainant was caused by the insured event. The insurer is entitled to exclude all damage other than damage to the laundry roof and the subsequent internal damage due to water ingress. Is the complainant entitled to compensation for non-financial loss? Yes. The insurer could have accepted liability for the claim earlier than it did and refused to renew the complainant‟s insurance while the dispute over liability was continuing. Such circumstances caused the complainant significant aggravation and distress. 3.3 Recommendation This recommendation is in favour of the complainant. The insurer is required to:  Arrange for a quote for the internal damage caused by the storm and provide the complainant with a cash settlement (plus an allowance of 15% for contingencies and transfer of risk) for the repair to the roof above the laundry and the internal damage, less the excess of $5,000.  Pay the complainant the sum of $3,000 in compensation for non-financial loss. Recommendation | Case number: 663138 Page 3 of 8 4 Reasons for recommendation 4.1 Is the insurer entitled to apply an exclusion to reduce its liability on the claim? Complainant has established a valid claim The complainant submitted a claim on her home and contents insurance policy following the “Townsville floods‟ on 11 February 2019. The insurer initially declined the claim and maintained the denial of the claim through the Internal Dispute Resolution (IDR) Phase. When the complainant submitted a complaint to AFCA the insurer maintained the denial until its further response on 16 March 2020. The insurer accepted a valid claim for some damage to the complainant‟s home u nder insured events „storm‟ and „impact‟. The insurer accepted damage to the laundry roof and the resultant water entry into the rear of the property but claimed the loss was uneconomical to pursue given the excess. The insurer sought quotes from the complainant to repair the damage to the rear of the property. The insurer maintained it was entitled to deny the balance of the damage. Expert evidence supports the denial of most of the claimed damage The complainant lodged with AFCA seeking the acceptance of damage to her roof caused by a storm and a tree branch falling on the laundry roof on 11 February 2019. The complainant says the damage extended beyond the roof into the laundry and bathroom as well as causing cracking in the walls. The complainant refer red to water pooling in the foundations from a 2009 and the 2019 storm event. The complainant has submitted reports from two carpenters, (C) and (T) commenting on the damage to the roof. The complainant also submitted a report from a specialist on the repair and replacement of the columns under the house said to have been damaged because of flood (P). A further report was submitted by builder (K) on the repair of the roof and to re-stump the house. C concluded part of the roof was damaged due to a falling tree branch which caused internal damage following water ingress. C also concluded the balance of the roof was in good condition but needed repairs due to building movement. T provided a report and quote for the replacement of the entire roof including the area above the laundry where the tree branch struck. The roof above the laundry was quoted at $1,600 to repair and the balance of the roof at $11,070. Recommendation | Case number: 663138 Page 4 of 8 P and K quoted various repair options but did not provided an opinion on the cause of the damage. K did suggest repairs were required to cyclone proof the house. This was consistent with the opinion of T who also submitted much of the required roof repairs were to protect against cyclones. This is not suggestive of repairs caused by the insured event but of maintenance issues. The insurer recorded the complainant advising of water damage through the roof and under the house due to the storm. The insurer denied damage to the roof, walls, ceilings and external cracking as it says it was not related to the insured event and relied upon multiple exclusions under the policy. It excluded damage caused by wear and tear, gradual deterioration, subsidence and earth movement. The insurer relied upon evidence provided by builder (A) and two engineers (J) and (S). A inspected the property in March 2019 and said the roof was not in good condition. A recommended denial of the entire claim alleging all the damage was caused by wear and tear over time and ground movement. A noted the bathroom tiles were lifting and moving and had been for some time given water had flooded the areas where the tiles had popped and the floorboards had rotted. J was the first engineer to attend in April 2019 and this was not J‟s first attendance at the property. J had previously provided an assessment in 2011 following a previous claim. J noted water from the insured event had flooded under the house. J noted previous repairs. J concluded there was evidence of significant and excessive foundation movement and poor site drainage. J says the damage to the house was not caused by the January/February 2019 rain event. The insurer arranged for S to attend for a further engineering assessment in July 2019. S agreed with J and concluded the major damage to the house was from general foundation movement over time. I accept the engineering assessments as to the cause of damage to the internal and external walls, bathroom, roof and ceilings, particularly given J had previously been to the property in 2011. The engineering assessments are consistent with C‟s r eport submitted by the complainant who says the roof was damaged due to building movement. Despite A saying the roof was not in good condition this opinion has been contradicted by C and T and ultimately discounted by the insurer who now accepts the roof was in good condition and damaged above the laundry by a falling a tree branch. Recommendation | Case number: 663138 Page 5 of 8 As such I accept the insurer is liable to pay for the repair of the laundry roof and the consequential internal damage. It is otherwise entitled to deny the balance of the damage. There is a quote for the repair of the laundry roof at $1,600 but there is no quote for the repair of the internal damage. This will need to be obtained by the parties. This quote will determine the economic viability of the claim based on the excess payable. As the insurer is to make a cash settlement it will need to add 15% to the cash settlement for contingencies and the transfer of risk to the complainant. The applicable excess is $5,000 The insurer has provided insurance schedules detailing the applicable excess. These are outlines in section 3 below. The insurer has also provided policy notes and a relevant call recording. From 24 March 2015 the “Plus Flexi - Premium Excess” applicable is $5,000. The policy notes record the complainant calling to increase the excess. This had changed from the first renewal notice provided by the insurer from 23 January 2011. The “Plus Flexi- Premium Excess” then was $200. On 18 January 2017 the policy notes record a telephone conversation with the complainant where the excess was confirmed at $5,000. The complainant says she changed the excess on 18 January 2019 back to $1,000. The insurer has not been able to locate a call from the complainant on this date, or any other notes, confirming the change. The insurance renewal schedules remained at $5,000. Any change in the excess would be reflected in the renewal notice, along with the altered premium. It is the complainant‟s responsibility to ensure the details in the renewal are correct. If there was a call made to the insurer to change the excess, it was up to the complainant to check the insurance documents to ensure they reflected the change. In the absence of contradictory information, I am compelled to accept the renewal notice as evidence of the excess. 4.2 Is the complainant entitled to compensation for non-financial loss? We have a conservative approach to compensation Non-financial loss includes claims for stress or inconvenience caused by an error of the insurer. The maximum amount we can award for non-financial loss is $5,000 for each claim of loss. Recommendation | Case number: 663138 Page 6 of 8 We will only award this type of compensation if there has been an unusual degree or extent of inconvenience. We will not award compensation for loss that a complainant may incur because of pursuing a complaint or rectifying an insurer‟s error. When assessing whether the circumstances are of an unusual nature we review:  the degree or extent of physical inconvenience suffered  the general time taken to resolve the complaint  the extent to which the insurer‟s actions interf ered with the complainant ‟s expectation of enjoyment or peace of mind. AFCA assesses any claims for non-financial loss in accordance with the AFCA Rules. If we do award compensation, it is unlikely to be substantial. The complainant is entitled to compensation for non-financial loss The original assessment of the damage to the roof was the catalyst for a very difficult claims experience for the complainant. A concluded the roof was in generally poor condition and the damage to the house was long term and no t event related. Although the available material suggests a significant amount of damage to the house was not caused by the insured event, it is clear the initial assessment of A was incorrect in two significant respects. The insurer accepts A was wrong about the state of the roof. The insurer also accepts there was damage to the laundry roof caused by the storm and related internal damage following water ingress. Although it is not likely the entire claim would have been accepted if A‟s opinion was more accurate, the opinion led to the complete denial of the claim and ultimately to the insurer taking a position it could not offer the complainant ongoing insurance; a position they have recently reversed. The complainant has had to pursue her claim with extra effort because of the unreasonable refusal of the claim and the decision to not offer a renewal of insurance whilst the claim was in dispute. AFCA is not in a position to tell the insurer it is required to offer a renewal of insurance in circumstances where the insurer has evidence of significant outstanding maintenance or repairs. Having said that, AFCA expects the insurer to take a fair approach to the management of complaints. A significant reason for not offering a renewal was in dispute. Ultimately the insurer accepted it was not correct to take this action and in March 2020 agreed it would welcome a renewal application. As a consequence of the insurer‟s actions the complainant has experienced undue aggravation during the claims process and is entitled to an award of non-financial loss compensation. I consider an award of $3,000 to be appropriate. Recommendation | Case number: 663138 Page 7 of 8 5 Supporting information 5.1 Key policy references Exclusion Key points Ground movement Erosion, vibration, subsidence, landslip, landslide, mudslide, collaps e, shrinkage or any other ground movement, but we will cover landslide or subsidence that is specifically covered under the following insured events  Storm  Flood (but only if you have cover for the insured event „flood‟)  Earthquake and Tsunami  Explosion Storm We do not cover… Loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other ground movement, but we will cover , loss or damage to the building caused by a landslide or subsidence proved to have occurred within 72 hours or, and directly because of, a storm and not because of erosion over time, structural fault or design fault. Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to :  tiles and their adhesive or grouting breaking down;  weat hering of roof tiles or roof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete 5.2 ‘Plus Flexi - Premium Excess history’ Year Exce ss 23 January 2011 – 23 January 2012 Building  Standard Excess $0  Plus Flexi - Premium Excess $200 Plus Unoccupied Excess $1,000 23 January 2015 – 23 January 2016 Building  Standard Excess n/a  Plus Flexi - Premium Excess $5,000 Plus Unoccupied Excess $1,000 Recommendation | Case number: 663138 Page 8 of 8 Year Exce ss 23 January 2016 – 23 January 2017 Building  Standard Excess n/a  Plus Flexi - Premium Excess $5,000 Plus Unoccupied Excess $1,000 23 January 2017 – 23 January 2018 Building  Standard Excess n/a  Plus Flexi - Premium Excess $5,000 Plus Unoccupied Excess $1,000 23 January 2018 – 23 January 2019 Building  Standard Excess n/a  Plus Flexi - Premium Excess $5,000 Plus Unoccupied Excess $1,000 23 January 2019 – 23 January 2020 Building  Standard Excess n/a  Plus Flexi - Premium Excess $5,000 Plus Unoccupied Excess $1,000

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.