Insurer denied most storm damage to the home and declined to renew the policy while the claim was disputed
Text of the determination
Determination
Case number 663138
Financial firm AAI Limited
Determination | Case number: 663138 Page 2 of 5
Case number: 663138 4 June 2020
1 Determination overview
1.1 Complaint
The complainant held a home and contents insurance policy with the financial firm
(insurer) and submitted a claim for damage to her roof, stumps, walls and ceiling
because of a storm event on 11 February 2019.
The insurer denied the claim, saying the damage to the roof was caused by gradual
deterioration, and the balance of the damage was due to ground movement. The
complainant also raised concerns as to the applicable excess , as well as the insurer‟s
decision not to renew the insurance policy over the property.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the complainant. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered. I agree with the case manager‟s reasons for the rec ommendation and
broadly with the recommended outcome, although it should be recorded as being only
partly in favour of the complainant.
Is the insurer entitled to apply an exclusion to reduce its liability?
Yes. The insurer has shown exclusions for ground movement and long-term
deterioration apply to much of the damage claimed, but it is liable for the laundry roof
and the subsequent internal damage due to water ingress.
Is the complainant entitled to compensation for non-financial loss?
Yes. The insurer could have accepted liability for part of the claim earlier than it did. It
also refused to renew the complainant‟s insurance while the dispute over liability was
continuing. This caused the complainant significant concern and distress.
1.3 Determination
This determination is partly in favour of the complainant. The insurer is required to
obtain a quote actionable by the complainant for the laundry roof and internal storm
damage, and cash settle the claim as set out in section 2.2 below, subject to the
excess. It is also required to pay the complainant $3,000 as compensation for non-
financial loss.
Determination | Case number: 663138 Page 3 of 5
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case based on what I consider is fair in the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
AFCA decisions. I have taken into account all the material submitted by the parties,
both before and after the recommendation. I am satisfied that the documentation I
have relied on has been provided to both parties.
I am satisfied that the case manager‟s recommendation contains an accurate
summary of the complaint, the issues to be determined, any applicable paragraphs of
the Rules and any relevant law.
2.2 Is the insurer entitled to apply an exclusion to reduce its liability?
Excess of $5,000 applies to the claim
I am satisfied the complainant has established a valid claim for storm and impact
damage, and I consider the insurer was correct in eventually accepting that part of the
claim relating to damage from a tree falling on the laundry roof and the resultant water
entry into the rear of the property. However, the insurer said the cost of repairs would
be less than the applicable policy excess of $5,000.
I acknowledge the complainant‟s concerns about the level of the excess, and
appreciate she says she changed the excess back from $5,000 to $1,000 on 18
January 2019. However, there is no evidence which records any such change. The
available evidence shows a phone conversation between the complainant and the
insurer on 18 January 2017 in which $5,000 was confirmed as the excess, and there
is nothing to confirm any changes after that date.
The policy schedule for the year commencing on 23 January 2019 (during which the
claim arose) shows the excess of $5,000 applies. If that was incorrect or not what she
wanted, the complainant did have the opportunity to raise that with the insurer, but
there is nothing to indicate she did.
Evidence shows, on balance, exclusions apply to balance of claim
When making the claim, the complainant is reported as having referred to water under
the house and entering through the roof during the storm.
While now accepting the impact of the falling tree and resulting water ingress, t he
insurer maintains it was entitled to deny the balance of the damage, which includes
the remainder of the roof and cracking in the walls, ceilings and externally, as well as
to columns/stumps under the house. It relies on exclusions for damage caused by
wear and tear, gradual deterioration, subsidence and earth movement; as well as pre-
existing and maintenance issues.
Determination | Case number: 663138 Page 4 of 5
I am not satisfied the reports submitted by the complainant show the damage to the
remainder of the roof (that is, the area not affected by the impact of the tree) was from
storm. Most provided no opinion as to the actual cause of the damage, although
carpenter C noted roof repairs were needed because of building movement.
The evidence from the insurer‟s experts (including from engineers J and S) also
establishes, on balance, that long-term building movement was the cause of the
remaining damage. The available information refers to signs of pre-existing damage
and repairs, and long-term issues relating to drainage and maintenance requirements.
In particular, it is worth noting that engineer J had previously attended the property in
relation to a claim made in 2011, and so was in a position to assess any more recent
signs of damage by reference to his earlier observations. He concluded the damage
he saw in 2019 was not from the 2019 rain event. Instead, he found „significant and
excessive foundation movement‟. Engineer S also concluded the damage was from
general foundation movement over time.
I am satisfied, on balance, the insurer has shown exclusions apply for ground
movement and wear and tear, and it is entitled to decline the claim for that damage
(including to the stumps/columns beneath the property).
Storm/impact damage to be cash settled, subject to excess
Since it is likely there will be some inter-connectedness between the repairs for which
the complainant is responsible, and those which are the insurer‟s responsibility , it is
fair and reasonable that the claim be cash settled. That is, to the extent the cost of
repairs for which the insurer is liable exceeds the policy excess of $5,000.
The complainant has provided a quote for the repair of the laundry roof at $1,600 but
none for the repair of the related internal water damage. The insurer is required to
obtain a quote for the internal damage, and use that as a basis for calculating that
component of the repairs. To be clear, the insurer ‟s quote needs to be one that is
reasonable and actionable by the complainant as a retail customer.
I consider it fair that this opportunity be provided to ensure the complainant both
receives any settlement amount to which she is entitled under the terms of the policy,
but also so that she receives clear confirmation of the cost of repairs and how that sits
by comparison to the excess for which she would be liable.
The final cash settlement, however, is to be based on the $1,600 for the roof plus the
amount of the actionable quote for the internal water damage; and the total of those
two amounts is then to be increased by a further 15% to allow for contingencies, the
passing of risk to the complainant and any increase in labour/materials costs since
the complainant obtained her quote.
If the final cash settlement figure is more than the $5,000 excess, then the insurer is
required to settle the claim by paying the complainant the amount by which the
excess is exceeded.
Determination | Case number: 663138 Page 5 of 5
If the final cash settlement figure is less than $5,000, then the insurer is not required
to make any payment for the claim and the complainant is not required to pay the
excess.
2.3 Is the complainant entitled to compensation for non-financial loss?
Awards of compensation for non-financial loss may be made where there has been
an unusual degree of inconvenience or upset caused to the complainant by the
actions of the insurer. In assessing such awards, we take account of the
complainant‟s particular circumstances and the effect on them of the way the claim
has been handled.
In this case, I consider the matter could have been concluded sooner and with less
upset to the complainant, including if the issues in A‟s report (as to the overall
condition of the roof, and the laundry roof/resulting damage in particular) had been
correctly identified.
There was also the additional concern to the complainant of the insurer not renewing
her policy when it fell due while the claim and complaint were still being dealt with. I
appreciate the insurer has the right to decide whether to offer renewal, and that
certain relevant considerations may apply (including the current condition of the
property, and an insured‟s claims history).
In the particular circumstances, however (most significantly, given the unresolved
dispute about liability for the current claim), I do not consider it was fair or reasonable
for the insurer to place the complainant under the additional pressure of needing to
somehow deal with the damage and worry about obtaining alternative cover, when
that was likely to be difficult to obtain.
I accept that the complainant has experienced considerable upset and anxiety as a
consequence of the insurer‟s actions , and I consider an award of $3,000
compensation for non-financial loss is fair in the circumstances.
Recommendation
Case number 663138
Financial firm AAI Limited
Recommendation | Case number: 663138 Page 2 of 8
Case number: 663138 20 May 2020
3 Overview
3.1 Complaint
The complainant held a home and contents insurance policy with the financial firm
(insurer) and submitted a claim for damage to her roof, stumps, walls and ceiling
because of a storm event on 11 February 2019.
The insurer denied the claim alleging the damage to the roof was caused by gradual
deterioration and the balance of the damage was due to ground movement. The
insurer referred to multiple claims submitted by the complainant where similar
damage was previously discovered as background to the recent denial.
The complainant also raised concerns as to the applicable excess and subsequently
the insurer‟s decision to not renew the insurance policy over the property.
3.2 Issues and key findings
Is the insurer entitled to apply an exclusion to reduce its liability on the claim?
Yes. Not all damage claimed by the complainant was caused by the insured event.
The insurer is entitled to exclude all damage other than damage to the laundry roof
and the subsequent internal damage due to water ingress.
Is the complainant entitled to compensation for non-financial loss?
Yes. The insurer could have accepted liability for the claim earlier than it did and
refused to renew the complainant‟s insurance while the dispute over liability was
continuing. Such circumstances caused the complainant significant aggravation and
distress.
3.3 Recommendation
This recommendation is in favour of the complainant.
The insurer is required to:
Arrange for a quote for the internal damage caused by the storm and provide the
complainant with a cash settlement (plus an allowance of 15% for contingencies
and transfer of risk) for the repair to the roof above the laundry and the internal
damage, less the excess of $5,000.
Pay the complainant the sum of $3,000 in compensation for non-financial loss.
Recommendation | Case number: 663138 Page 3 of 8
4 Reasons for recommendation
4.1 Is the insurer entitled to apply an exclusion to reduce its liability on the
claim?
Complainant has established a valid claim
The complainant submitted a claim on her home and contents insurance policy
following the “Townsville floods‟ on 11 February 2019.
The insurer initially declined the claim and maintained the denial of the claim through
the Internal Dispute Resolution (IDR) Phase. When the complainant submitted a
complaint to AFCA the insurer maintained the denial until its further response on 16
March 2020.
The insurer accepted a valid claim for some damage to the complainant‟s home u nder
insured events „storm‟ and „impact‟. The insurer accepted damage to the laundry roof
and the resultant water entry into the rear of the property but claimed the loss was
uneconomical to pursue given the excess.
The insurer sought quotes from the complainant to repair the damage to the rear of
the property.
The insurer maintained it was entitled to deny the balance of the damage.
Expert evidence supports the denial of most of the claimed damage
The complainant lodged with AFCA seeking the acceptance of damage to her roof
caused by a storm and a tree branch falling on the laundry roof on 11 February 2019.
The complainant says the damage extended beyond the roof into the laundry and
bathroom as well as causing cracking in the walls. The complainant refer red to water
pooling in the foundations from a 2009 and the 2019 storm event.
The complainant has submitted reports from two carpenters, (C) and (T) commenting
on the damage to the roof. The complainant also submitted a report from a specialist
on the repair and replacement of the columns under the house said to have been
damaged because of flood (P). A further report was submitted by builder (K) on the
repair of the roof and to re-stump the house.
C concluded part of the roof was damaged due to a falling tree branch which caused
internal damage following water ingress. C also concluded the balance of the roof
was in good condition but needed repairs due to building movement.
T provided a report and quote for the replacement of the entire roof including the area
above the laundry where the tree branch struck. The roof above the laundry was
quoted at $1,600 to repair and the balance of the roof at $11,070.
Recommendation | Case number: 663138 Page 4 of 8
P and K quoted various repair options but did not provided an opinion on the cause of
the damage. K did suggest repairs were required to cyclone proof the house. This
was consistent with the opinion of T who also submitted much of the required roof
repairs were to protect against cyclones. This is not suggestive of repairs caused by
the insured event but of maintenance issues.
The insurer recorded the complainant advising of water damage through the roof and
under the house due to the storm.
The insurer denied damage to the roof, walls, ceilings and external cracking as it says
it was not related to the insured event and relied upon multiple exclusions under the
policy. It excluded damage caused by wear and tear, gradual deterioration,
subsidence and earth movement.
The insurer relied upon evidence provided by builder (A) and two engineers (J) and
(S).
A inspected the property in March 2019 and said the roof was not in good condition. A
recommended denial of the entire claim alleging all the damage was caused by wear
and tear over time and ground movement. A noted the bathroom tiles were lifting and
moving and had been for some time given water had flooded the areas where the tiles
had popped and the floorboards had rotted.
J was the first engineer to attend in April 2019 and this was not J‟s first attendance at
the property. J had previously provided an assessment in 2011 following a previous
claim. J noted water from the insured event had flooded under the house. J noted
previous repairs. J concluded there was evidence of significant and excessive
foundation movement and poor site drainage. J says the damage to the house was
not caused by the January/February 2019 rain event.
The insurer arranged for S to attend for a further engineering assessment in July
2019. S agreed with J and concluded the major damage to the house was from
general foundation movement over time.
I accept the engineering assessments as to the cause of damage to the internal and
external walls, bathroom, roof and ceilings, particularly given J had previously been to
the property in 2011. The engineering assessments are consistent with C‟s r eport
submitted by the complainant who says the roof was damaged due to building
movement.
Despite A saying the roof was not in good condition this opinion has been
contradicted by C and T and ultimately discounted by the insurer who now accepts
the roof was in good condition and damaged above the laundry by a falling a tree
branch.
Recommendation | Case number: 663138 Page 5 of 8
As such I accept the insurer is liable to pay for the repair of the laundry roof and the
consequential internal damage. It is otherwise entitled to deny the balance of the
damage.
There is a quote for the repair of the laundry roof at $1,600 but there is no quote for
the repair of the internal damage. This will need to be obtained by the parties. This
quote will determine the economic viability of the claim based on the excess payable.
As the insurer is to make a cash settlement it will need to add 15% to the cash
settlement for contingencies and the transfer of risk to the complainant.
The applicable excess is $5,000
The insurer has provided insurance schedules detailing the applicable excess. These
are outlines in section 3 below. The insurer has also provided policy notes and a
relevant call recording.
From 24 March 2015 the “Plus Flexi - Premium Excess” applicable is $5,000. The
policy notes record the complainant calling to increase the excess. This had changed
from the first renewal notice provided by the insurer from 23 January 2011. The “Plus
Flexi- Premium Excess” then was $200.
On 18 January 2017 the policy notes record a telephone conversation with the
complainant where the excess was confirmed at $5,000.
The complainant says she changed the excess on 18 January 2019 back to $1,000.
The insurer has not been able to locate a call from the complainant on this date, or
any other notes, confirming the change. The insurance renewal schedules remained
at $5,000.
Any change in the excess would be reflected in the renewal notice, along with the
altered premium. It is the complainant‟s responsibility to ensure the details in the
renewal are correct. If there was a call made to the insurer to change the excess, it
was up to the complainant to check the insurance documents to ensure they reflected
the change.
In the absence of contradictory information, I am compelled to accept the renewal
notice as evidence of the excess.
4.2 Is the complainant entitled to compensation for non-financial loss?
We have a conservative approach to compensation
Non-financial loss includes claims for stress or inconvenience caused by an error of
the insurer. The maximum amount we can award for non-financial loss is $5,000 for
each claim of loss.
Recommendation | Case number: 663138 Page 6 of 8
We will only award this type of compensation if there has been an unusual degree or
extent of inconvenience. We will not award compensation for loss that a complainant
may incur because of pursuing a complaint or rectifying an insurer‟s error.
When assessing whether the circumstances are of an unusual nature we review:
the degree or extent of physical inconvenience suffered
the general time taken to resolve the complaint
the extent to which the insurer‟s actions interf ered with the complainant ‟s
expectation of enjoyment or peace of mind.
AFCA assesses any claims for non-financial loss in accordance with the AFCA Rules.
If we do award compensation, it is unlikely to be substantial.
The complainant is entitled to compensation for non-financial loss
The original assessment of the damage to the roof was the catalyst for a very difficult
claims experience for the complainant. A concluded the roof was in generally poor
condition and the damage to the house was long term and no t event related.
Although the available material suggests a significant amount of damage to the house
was not caused by the insured event, it is clear the initial assessment of A was
incorrect in two significant respects.
The insurer accepts A was wrong about the state of the roof. The insurer also accepts
there was damage to the laundry roof caused by the storm and related internal
damage following water ingress.
Although it is not likely the entire claim would have been accepted if A‟s opinion was
more accurate, the opinion led to the complete denial of the claim and ultimately to
the insurer taking a position it could not offer the complainant ongoing insurance; a
position they have recently reversed.
The complainant has had to pursue her claim with extra effort because of the
unreasonable refusal of the claim and the decision to not offer a renewal of insurance
whilst the claim was in dispute.
AFCA is not in a position to tell the insurer it is required to offer a renewal of
insurance in circumstances where the insurer has evidence of significant outstanding
maintenance or repairs. Having said that, AFCA expects the insurer to take a fair
approach to the management of complaints. A significant reason for not offering a
renewal was in dispute. Ultimately the insurer accepted it was not correct to take this
action and in March 2020 agreed it would welcome a renewal application.
As a consequence of the insurer‟s actions the complainant has experienced undue
aggravation during the claims process and is entitled to an award of non-financial loss
compensation. I consider an award of $3,000 to be appropriate.
Recommendation | Case number: 663138 Page 7 of 8
5 Supporting information
5.1 Key policy references
Exclusion Key points
Ground movement Erosion, vibration, subsidence, landslip, landslide, mudslide,
collaps e, shrinkage or any other ground movement, but we will
cover landslide or subsidence that is specifically covered under the
following insured events
Storm
Flood (but only if you have cover for the insured event „flood‟)
Earthquake and Tsunami
Explosion
Storm
We do not cover…
Loss or damage caused by erosion, vibration, subsidence, landslip,
landslide, mudslide, collapse, shrinkage or any other ground
movement, but we will cover , loss or damage to the building
caused by a landslide or subsidence proved to have occurred
within 72 hours or, and directly because of, a storm and not
because of erosion over time, structural fault or design fault.
Wear, tear and gradual
deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot,
action of light, atmospheric or climatic conditions or gradual
deterioration such as, but not limited to :
tiles and their adhesive or grouting breaking down;
weat hering of roof tiles or roof ridge capping;
gradual weathering and breakdown of bricks, mortar or concrete
5.2 ‘Plus Flexi - Premium Excess history’
Year Exce ss
23 January 2011 – 23
January 2012 Building
Standard Excess $0
Plus Flexi - Premium Excess $200
Plus Unoccupied Excess $1,000
23 January 2015 – 23
January 2016
Building
Standard Excess n/a
Plus Flexi - Premium Excess $5,000
Plus Unoccupied Excess $1,000
Recommendation | Case number: 663138 Page 8 of 8
Year Exce ss
23 January 2016 – 23
January 2017
Building
Standard Excess n/a
Plus Flexi - Premium Excess $5,000
Plus Unoccupied Excess $1,000
23 January 2017 – 23
January 2018
Building
Standard Excess n/a
Plus Flexi - Premium Excess $5,000
Plus Unoccupied Excess $1,000
23 January 2018 – 23
January 2019 Building
Standard Excess n/a
Plus Flexi - Premium Excess $5,000
Plus Unoccupied Excess $1,000
23 January 2019 – 23
January 2020
Building
Standard Excess n/a
Plus Flexi - Premium Excess $5,000
Plus Unoccupied Excess $1,000
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.