Determination 662208

Cash settlement amount for hail damage to roof

FirmQBE
Decided2020-05-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$10,939
Non-financial loss—
Amount claimed$25,457
SourceAFCA PDF

Summary

A homeowner's hail-damaged roof claim was partly settled by the insurer's cash offer of $10,518.33. AFCA found the complainant had not shown all claimed damage was hail-caused and increased the cash settlement to $10,939.07 plus interest.

The complainant must establish that all claimed damage was caused by the insured event, and the insurer's expert evidence was found more persuasive, with a 30% contingency uplift allowed.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 662208 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 662208 Page 2 of 10 Case number: 662208 20 May 2020 1 Determination overview 1.1 Complaint On 12 October 2018, the complainant lodged a claim for damage to her property following a storm. The financial firm (the insurer) accepted the claim and authorised its repairer to fix the damage. Some repairs were undertaken, but, as the parties could not agree on the extent of damage caused by the hail event, the insurer offered to cash-settle the rest of the claim by paying $10,518.33, less the policy excess of $400. The complainant says there is further hail damage which the insurer has not considered in its offer. The complainant wants a cash settlement of $25,456.70, as per her quotation. The case analyst provided the parties with a preliminary assessment on the issues in dispute. The preliminary assessment was that the insurer may settle the complainant in line with its offer. As the complainant did not except the preliminary assessment, the complaint has been referred to me for determination . 1.2 Issues and key findings Is the offer made by the insurer fair and in accordance with policy terms? The available information establishes, on the balance of probabilities, not all the claimed damage was caused by the hail event. The insurer’s offer was mostly fair and in accordance with policy terms, but a further small allowance should be made to take into account contingencies, such as a builder’s margin. 1.3 Determination This determination is substantially in favour of the insurer. Should the complainant accept this determination, then within seven days of notification of acceptance, the insurer is to pay to the complainant $10,939.07. If the policy excess of $400 has not been deducted, then it should be deducted from the cash settlement. In addition, interest pursuant to section 57 of the Insurance Contracts Act should be paid on the net settlement from 2 7 January 2020 (the date of the insurer’s last offer) until settlement. Otherwise, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 662208 Page 3 of 10 2 Reasons for determination I have decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). I have considered all the material s ubmitted by the parties, both before and after the preliminary assessment. I am satisfied that the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. The complainant is represented. Where I refer to the complainant in the determination, this includes, where relevant, references to the compl ainant’s representative. No new material provided after the preliminary assessment After the preliminary assessment was rejected, the complainant made further submissions in which she essentially reiterated her position. No new material was provided. The complainant wants a cash settlement, as per her own quotation, and for her repairer to complete the repairs. 2.1 Is the offer made by the insurer fair and in accordance with its policy terms? Complainant must establish all claimed damage caused by hail The complainant must establish, on the balance of probabilities, she has suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. The policy provides for cover for damage caused by storm, rain or flood. It is not in dispute this includes hail damage. This means, not only must the complainant establish the hail in the storm event caused damage, but she also must establish that all the claimed damage was caused by the hail event. The insurer accepted the hail event caused damage. The dispute is in relation to the extent of damage caused by the hail event. The insurer’s offer reflects its assessment of the cost of repairs to repair those parts of the roof which it says were damaged by hail. In addition, it has allowed an uplift of 25% for contingencies. Determination | Case number: 662208 Page 4 of 10 A cash settlement is fair in the circumstances The relevant parts of the insurance policy are set out in supporting section 3.2 of this determination. The insurer has the right to nominate the repairer. The insurer arranged for the hail damage to be examined by its builder, who inspected the damage on 16 October 2018. Repairs were commenced and completed in December 2018. The builder discovered additional damage and, as a result, the insurer arranged for another b uilder (M) to assess the additional damage. The parties cannot agree on the extent of repair work. In the circumstances, the insurer offered to cash-settle the claim. The insurer’s policy provides that, if it accepts the claim, it can opt to pay the reasonable cost of repairing the building. In the circumstances, I am satisfied it is fair the claim is settled by a cash settlement rather than the insurer undertaking repairs. Parties rely on expert reports and photographs The insured building has been inspected by two builders on behalf of the insurer and a roofer (X) was engaged by the complainant. A summary of the reports is set out in supporting section 3.3 of this determination. The roof was inspected by X on 5 April 2019. The report provided is accompanied by annotated photographs. X roofer concluded: Upon inspection the damage sustained as a result of hail impact is widespread and consistent across the entire surface of the main roof sheeting and its components. Our recommendation is that all roof sheeting and associated damaged components be replaced. The first builder inspected and photographed the roof for the insurer on 16 October 2018. The report notes the builder’s observations: Hail damage to Front Alsynite roof sheeting, pergola Alsynite sheeting, Roof ventilator, Rear pergola shade sail material. Having reviewed the available material, I accept the first builder repaired this damage except for the roof ventilator. Because the parties could not agree on the extent of the damage, the insurer arranged for the second builder (M) to inspect and photograph the property on 19 December 2019. Determination | Case number: 662208 Page 5 of 10 M also considered a technical bulletin provided by the manufacturer of the Colourbond steel roofing. In short, the technical bulletin says that this type of roofing is structurally robust and, even if it is slightly damaged in the hailstorms, it will not affect the life of the roof. Having inspected the roof and considered the technical bulletin, M concluded that most of the roof was not impacted by the hail event and, in the main, the roof’s life expectancy has not been reduced by the hail event and should remain in place. Insurer offered to settle the claim by paying $10,518.33 The insurer reviewed the report and confirmed that there was no hail damage to roof elevations 1, 6, 7 and 8. As a result, it says it is not required to replace the roof sheets on roof elevations 1, 6, 7 and 8 because its policy wording says it is not required to pay for undamaged parts to buildings, or even to restore those undamaged parts to achieve a uniform appearance. Having reviewed the report, the insurer was prepared to accept the following items:  Roof Elevation 2: there are some very minor indentations to the ridge capping fitted to this elevation.  Roof Elevation 3: there is a timber finial fitted to the apex of the gable end that has wood decay with a whirlybird fitted to this elevation having visible indentations. This elevation has a south-westerly aspect and there are two creases to the ribs of the roofing sheets that are a result of foot traffic.  Roof Elevation 4: there are some very minor visible indentations with the laps to the joins between the roofing sheets having been deformed, because of hail impact during this recent storm event.  Roof Elevation 5: there are some very minor visible indentations to the roofing sheets, with the laps to the joins between the roofing sheets having not been deformed because of hail impact during this recent storm event. The insurer had already obtained quotations from builder I to repair the earlier damage. Once the insurer received the report from M, the insurer asked builder I to revise the scope for the repair work, based on the recommendations made by M. Once the insurer received this information from builder I, the insurer made a cash settlement proposal, in the sum of $8,414.67, on 30 August 2019. The offer included minor repairs to elevations 2, 3 and 5, substantial repairs ($5,173.66) to elevation 4 and repairs to the whirlybirds ($1,732.04). On 27 January 2020, the insurer noted no quotation had been provided by the complainant. It said, given the semi remote location of the property, it would add an additional 25% contingency to its settlement offer and increased its offer to $10,518.33 with the policy excess of $400 to be deducted. Determination | Case number: 662208 Page 6 of 10 Complainant requires $25,456.70 to settle the claim The complainant rejected the offer because she said the offer did not include all damage. The complainant obtained a quotation in the amount of $25,456.70. The quotation includes repairs and replacement to the main roof, whirlybirds, the patio, the garage and garden shed. The quotation does not include the cost of repairs already undertaken by the insurer’s builde r. The complainant describes the quote as including all damage which has been identified at the property. The insurer says M’s report should be preferred to the report from X. It says X has no t provided any reasons for its professional opinion. The insurer says M’s report is very extensive, with reasons for its professional opinion, and is supported by diagrams, photographs and a technical bulletin. The complainant argues the roof should be re placed because the roof’s value is impaired and/or reduced because of the hail impact. The complainant also submits her contentions are backed by photographic evidence and criticises some aspects of M’s report , which she says shows inconsistencies. The complainant also argues the technical bulletin is irrelevant, because the claim is against the insurer for storm damage, not a warranty claim against the manufacturer of the steel sheets. Complainant has not established all claimed damage caused by hail I have carefully considered the parties’ submissions, the reports and photographs provided. I am not satisfied the complainant has established , on the balance of probabilities, all the claimed damage was caused by the hail event. This is because I find the report from M more persuasive than the report from X. The report is extremely comprehensive and is supported by the photographic evidence and the site map. Although the complainant criticises the report and says there are inconsistencies, I found it comprehensible and could refer to the text, the photographs and the site map to understand M’s opinion. Even though the complainant says all the roof was damaged in the storm so that it requires replacement, I do not accept that a close analysis of the photographs support this contention. For example, photographs of elevation 5 show no impact indentations to the PVC vent and no cracks to the solar hot water system. Likewise, photographs of elevation 6 show no visible indentations to the cowling. I accept there may be minor hail damage in some areas, but I also accept the expert opinion, which is that the roof remains structurally robust and that, but for roof elevation 4, the roof’s life expectancy has not been reduced by the hail event. Determination | Case number: 662208 Page 7 of 10 Therefore, I do not ac cept the complainant’s contentions the whole of the roof must be replaced, in the sum of $25,456.70. Insurer to increase its offer to $10,939.07 plus interest I have carefully considered the material provided by the insurer in relation to its costings. I note it has allowed an uplift of 25%. This is stated to be because of the semi-remote location of the property. However, I also note its builder has provided no builder’s on -costs and has some qualms about attempting to replace selected sheeting. In addition, in a cash settlement, the complainant loses the insurer’s warranty on works carried out by its own builders. An uplift of 25% is generally considered to be fair. However, taking all matters into account, I consider it is fair that a further allowance should be made, and that an uplift of 30% should be made in this instance. Therefore, I consider that a fair cash settlement is $10,939.07. If the policy excess of $400 has not been deducted, then it should be deducted from the cash settlement. In addition, interest pursuant to section 57 of the Insurance Contracts Act should be paid on the net settlement from 27 January 2020 (the date of the insurer’s last offer) until settlement. Determination | Case number: 662208 Page 8 of 10 3 Supporting information 3.1 Our Approach It is an accepted principle of general insurance law that the insured bears the onus to establish, on the balance of probabilities, that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove, on the balance of probabilities, that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response (the IDR letter). Both the policy document and the Notice/letter have been exchanged with the complainant. Settling building claims If we accept your claim, at our option we’ll pay for reasonable costs of repairing, rebuilding or replacing your building to its condition when it was either new or last renovated, altered or restored. We’ll repair up to the nearest archway, doorway or similar entry and exit point. We won’t pay for undamaged materials in any adjoining rooms. We won’t pay for undamaged parts, even to restore those undamaged parts to achieve a uniform appearance. Repairer information We have the right to nominate the repairer or supplier to be used. Damage: When an item insured by this Policy is physically harmed, but not from wear and tear. 3.3 Summary of expert reports Date Action Insurers’ si te report (I) 16 October 2018  Inspected and photographed 16 October 2018. Builders Observations: Hail damage to Front Alsynite roof sheeting, pergola Alsynite sheeting, Roof ventilator, Rear pergola shade sail material.  Roof made of Zincalume painted corrugated sheeting. Complainant ’s roof report (X) 5 April 2019  5 April 2019 roofer attended to inspect roof to ascertain damage caused in the hailstorm on 11 October 2018.  Main house roof covered approximately 220 m² corrugated zinc sheeting.  Garage covered about 40 m² corrugat ed zinc s heeting. Determination | Case number: 662208 Page 9 of 10 Date Action  Small garden shed locat ed behind garage.  Extent of damage on main roof, garage and garden shed was found to be consistent and widespread identified from direct impact of hail identified with the use of chalk to highlight affected areas.  Indent atio ns were found on all roof sheeting and associated components.  Damage warrants entire roof replac ement.  Whirlybirds sustained significant hail damage.  Garage sustained hail damage to roof sheeting and associated components with indentations ranging in size.  Garden shed sustained damage from direct impact ranging in size.  Recommend all hail damaged sheeting, associated caps and flashings along with the shed be replaced.  Report accompanied by annotat ed photographs. Insurer’s report M Builder 21 December 2019  Inspected and photographed the property and the roof on 19 December 2019.  Four - bedroom home with a single car garage/Met al shed in the rear of the property.  Photographs provided of the southern western northern and eastern sides of the house and a site sk etch provided.  Annotated photographs refer to minor indentations to whirly birds.  Annotated photographs of roof elevations noting splatter marks where powdery ruminants of the colour bonding and the day - to - day grime have been removed by the hail. No visibl e indent ations to the ridge capping. No deformed laps to the joins bet ween the roofing sheets. No visible or minor indentations to the barge capping.  Photograph of elevation 4 shows laps bet ween the roofing sheets have been deformed by hail impacting the e dges of the sheets.  Photographs of elevation 5 show no impact indentations to the PVC vent cap and no indentations/ cracks to the glass of the solar hot water system.  Photographs of elevation 6 show no visible indentations to the cowling.  Site sketch notes areas 1 – 8. Also notes replaced Alsynite at the front and back of the house and replaced shade cloth at the back of the house.  Roof elevations fitted with colour bond roofing sheets. Relies on and analyses steel technical bulletin which says hailstones do not usually affect the life of a roof made from Colourbond steel Determination | Case number: 662208 Page 10 of 10 Date Action  Roofing sheets fitted to most elevations of the building have not had life expectancy reduc ed by the hail event and concludes:  Roof Elevations - 1, 2, 3, 5, 6, 7 & 8 at this property have not been impacted by this recent hail event and have not had their life expectancy reduced by this recent hail event and should rem ain in place.  Roof Elevation - 4 has had its life expectancy reduced by this recent hail event wit h the laps of the roofing sheets having been deformed by hail impact and the roofing sheets should be removed and replaced.  Roof Elevation - 6 has not been inst alled to the manufacture’s requirements and: - Does not comply with Lysaght Installation Roofing Walling Installation Manual 2.5 Low Roof Pitches & Figure 2.12.1 Specifications of Roofing & Walling Profiles. (Please see Appendix B – Technical Requirement: A ppendice - 2. attached to this Report).  All eight roofing elevations fitted to the house and the shed have roofing sheets that have Colourbond coating that has gradually deteriorat ed over time since its installation with most of the Colourbond coating havin g gradually deteriorated away long before this recent event. Technical Bulletin 32 (Attached to M builder’s report)  Generally, Colourbond steel roofing is structurally robust in the event of interaction with hailstorms and do not affect the life of a roof .  Only potential area of concern will arise from low pitched roofs and roof where sheet overlaps have been significantly deformed.  Loss of paint topcoat will be aesthetic only. It will have no effect on the corrosion performance of the roof. 3.4 Other relevant material considered and relied on  Parties’ submissions/emails and all attachments to all submissions/emails both before and after the preliminary assessment.  Parties’ expert reports.  Photographs.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.