Insurer's agents failed to remove or isolate designer contents during remediation after burst pipe, causing further damage
Text of the determination
Determination
Case number 661655
Financial firm AAI Limited
Determination | Case number: 661655 Page 2 of 16
Case number: 661655 12 May 2020
1 Determination overview
1.1 Complaint
The complainants are unit owners in an exclusive strata unit block and held contents
insurance with the financial firm (insurer). They lodged a claim on 7 February 2019
after a water pipe burst, causing damage to the building and their contents. The
insurer accepted the contents claim and settled it as a total loss for $202,700.
While acknowledging they were under insured the complainant says that many more
contents could have been restored or recovered had the insurer’s agents properly
managed the recovery process . They seek compensation of $246,068 for the
damaged contents and compensation for the claim experience.
The insurer accepts it could have done things differently but disputes the extent of the
damage claimed as due to its claims handling as against the insured event.
1.2 Issues and key findings
Is the insurer liable for the further damage claimed?
The panel is satisfied the insurer (or its agents) failed to properly manage the
recovery process and this caused further damage to the complainants’ contents.
Given this the insurer is not entitled to limit its liability to the sum insured.
What is the extent of the insure r’ s liability?
The panel accepts the complainants established they incurred a further loss of
$246,068. It is not possible to determine whether all this loss could be attributed to the
failure to manage the claim properly. In the circumstances the panel determines it is
fair that the insurer pay $164,000, being two thirds of the loss claimed.
Are the complainants entitled to compensation for non-financial loss?
The complainants are entitled to $5,000 (in total) non-financial loss compensation
given the loss and stress the Panel agrees they experienced.
1.3 Determination
This determination is substantially in favour of the complainants.
If the complainants accept this determination, the insurer must:
within 21 days of acceptance, pay the complainants $164,00 plus interest pursuant
to section 57 of the Insurance Contracts Act 1984 (Cth) from 24 July 2019 to date
of payment of the claim
within 14 days of acceptance, pay the complainants $5,000.
Determination | Case number: 661655 Page 3 of 16
2 Reasons for determination
There has been a full exchange of the relevant information between the respective
parties and each party has had the opportunity of addressing any issues raised.
Due to the complexities involved in this dispute it has been determined by a panel
comprising the lead ombudsman, a person with extensive industry background and a
person with extensive consumer background.
The parties have raised numerous issues in their submissions to AFCA. For the
purpose of this determination, commentary is restricted to those issues considered
relevant to the outcome.
The determination follows consideration of all the available information. It is based on
what is fair in the circumstances, having regard to the relevant legal principles, terms
of the policy, good industry practice including codes of practice and prior
determinations where applicable.
2.1 Is the insurer liable for the further damage claimed?
Complainants claim for damage to designer furniture and other contents
caused by insurers neglect
The complainants ’ policy was a contents only policy with a sum insured of $202,700.
There is no dispute that after a water pipe burst at their strata unit block on or about 7
February 2019 they suffered significant damage to their unit and to their contents.
There is no dispute the insurer accepted the contents damage claim and paid
$202,700 as it assessed the claim as a total loss.
The complainants accept the contents were significantly underinsured. Available
information indicates and again it is not disputed, that the complainant’s total contents
were valued at closer to $500,000.
The complainants say the insurer and its restorer failed to remove their undamaged
designer furniture and other items during the remediation process when the
dehumidifier was operating. The complainants say this caused damage to contents,
beyond those comprising the total loss settlement. The complainants have provided a
list of damaged items with the total additional loss claimed of $246,068.
Insurer disputes liability
The insurer initially said that as it deemed the claim as a total loss, all damage to the
complainants’ conte nts is accounted for within the settlement.
Further, the insurer said the complainants had not established the restorer’s actions
caused further damage. The insurer says the complainants’ decision to underinsure
Determination | Case number: 661655 Page 4 of 16
their contents is the reason why its settlement amount does not meet the value of all
the damaged property.
The insurer has subsequently accepted that the contents should have been removed
although it says this does not mean they were not damaged in the initial event. The
insurer has offered $80,000 to resolve this complaint. The complainants did not
accept that offer.
Insurer or agents omitted to arrange appropriate removal or isolation
There is no dispute between the parties the complainants owned the designer
furniture claimed or that these were kept in the apartment at the time.
The available information confirms the complainants put the insurer on notice of the
items’ value by, at latest, a 14 February 2019 email. The insurer’s restorer’s (EE’s)
preliminary report (on or after 19 February 2019) noted:
The insured has very fragile and valuable contents that require packing and
storing to facilitate repairs. It would be preferable to store all glass and sculptures
on-site with the use of containment to protect the items from cross-contamination
during demolition works.
The complainants say they asked the insurer and its agents if they could move their
contents. They say (beyond smaller personal items) they were told not to do so, which
is supported by the insurer’s claim records and EE’s report. It indicates the restorer
awaited the insurer’s approval to perform an appropriate content pack-out:
Pack-out: stage 1 – pack and protect fragile contents including ornaments and
sculptures and relocate upstairs. Install negative air containment (4-week
allowance) … Pack-out: stage 2 – pack and relocate remaining contents for off-
site storage …
The insurer provided no information suggesting the authorisation was either
requested or approved. Reports and claim records after the 19 February 2019 note,
EE did not provide the insurer any records from after this date, except an undated
letter appearing to give retrospective views of the remediation process.
The panel accepts either EE or the insurer omitted to take the steps to either remove
or isolate t he complainants’ contents.
Available material supports failure to remove or isolate caused loss
The insurer arranged for CC, a remediation contractor to assess the damaged
furniture in May 2019. CC reported:
during the required remediation, the content items remained onsite. Content items
of this quality should have been relocated from the premises.
Determination | Case number: 661655 Page 5 of 16
However, the insurer says the complainants have not established:
when, how or what damage occurred to each item
whether the items the complainants say the restorers should have moved were
included in the total loss settlement.
The insurer gave its own views about why it says the initial leak, not the restorer’s
actions, caused the damage. It says EE’s letter and comments by CC support its
view. The insurer considers the property’s proximity to saltwater, large windows and
normal deterioration may have caused or contributed to further damage.
The Panel does not give weight to the insurer’s own speculation as to the process of
damage. The Panel considers EE and CC, as remediation contractors, have more
suitable qualifications to offer opinions on the cause of the damage.
EE comments generally on the effect of moisture and dehumidification and states it is
‘impossible’ for the drying process to hav e caused the damage. EE cites an average
temperature and humidity content for the complainants’ property. The letter does not
indicate what this data is based on or provide any records capable of confirming it is
accurate. Given this the Panel is not persu aded EE’s account of the remediation
process is based on measurements taken at the time.
The panel notes the letter from EE is undated and contains factual inaccuracies,
including a suggestion the complainants did not promptly lodge a claim after the leak.
It is inconsistent with earlier comments on the need to pack out and store the items
offsite.
The panel also notes EE has an interest in the outcome of whether that remediation
process caused the contents damage. T he Panel gives EE’s views little weight.
In contrast, C C’s reports are contemporaneous and outline their limitations (such as
lack of involvement in remediation) and observations of the furniture itself.
CC observed ‘extensive damage to a number of items’ during a 28 May 2019
attendance. This included drying damage to mirrors, a cabinet and table, rust damage
to the lamps, lounge suites and (upstairs) chairs and damage the lounge suites’
fabric. While commenting tarnished silverware ‘typically responds well to remediation’,
CC did not state any other items were restorable. Instead, CC recommended each
item be individually reviewed as ‘ remediation is available however will be a lengthy
and delicate process ’.
Claim records dated 22 February 2019 also show one of the insurer’s internal
assessors noted:
‘ whether restorers caused the damage or the damage was caused by the event
would be impossible to determine ’ .
Determination | Case number: 661655 Page 6 of 16
Strata building works do not relieve the insurer of liability
The panel is not persuaded the inadequate building remediation works carried out by
a different insurer relieve the insurer’s liability in these circumstances.
A remediation report by BB, which the complainants provided, says the initial building
remediation process was inadequate. The ins urer did not clarify whether this refers to
EE or a strata (building) insurer’s remediation contractor. The insurer says water in
the building material and any remediation failure is not EE’s responsibility, given the
insurer covered the complainants’ cont ents only.
The Panel is satisfied the complainants’ further loss would have been avoided had the
(contents) insurer not failed to adequately remove or isolate the designer furniture.
Insurer is liable for the further loss
CC’s report, in addition to noti ng the contents should have been removed, details
types of damage which occurred to several of the claimed items. The available
information supports the complainants’ views further damage occurred to their
contents because the insurer did not remove or isolate them.
As the loss arises from the claims management and actions of the insurers agents,
the panel is satisfied the insurer is liable for the additional loss.
2.2 What is the extent of the insurers liability?
Insurer’s records do not refute omission caused further loss
The insurer says the complainants identified, in emails from 14 February 2019
onwards, many of the claimed items as already water damaged. It suggests the items
may have been damaged before remediation started, because the water leak and its
impact were so severe, even if timely or appropriate remediation had occurred.
The insurer’s conclusions are heavily based on what it says occurred between EE’s
and its internal assessor’s (KK’s) attendances. KK’s photographs of contents are
dated 1 April 2019 and occurred after the complainants notified the insurer about
additional damage.
The insurer provided a contents inventory detailing the items EE considered damaged
beyond repair before remediation started. The inventory does not include any items
the complainants claim the remediation process further damaged.
Insurer’s views on sum insured limitation are not supported by its records
The complainants provided lists, photographs and replacement/repair quotes and
estimates for the damaged items. The parties do not dispute damage occurred to
contents in the complainants’ apartment . The insurer did not provide any reasons
challenging the complain ants’ replacement values (except some estimates addressed
separately below). The total amount claimed is $246,068.
Determination | Case number: 661655 Page 7 of 16
Having reviewed the complainants’ list, the panel notes it contains some damaged
items or costs that appear in KK’s total loss settlement list (TL list) covered by the
total loss settlement. Those items include:
a chaise, mirror plinths and a silver nine drawer chest in kitchen
packing materials or labour (TL list includes $2,500 for these works)
a sofa and table (TL list includes $13,106 for complainants’ items F, G and H )
emergency plumbing (TL list allowed $4,000 for make safe works)
the microwave, fridges, dishwasher, kettle or toaster (TL list allowed $9,000 for
electricals)
EE’s non -salvageable list and small rugs (TL list included $5,000 for ‘inventoried
items’ , which includes th e $300 claimed for ‘small rugs’)
accommodation (TL list allowed $2,000 for this).
The total loss list is undated. It appears it was not compiled until after the complainant
notified the insurer of the additional damage.
Most items are not on the insurer ’ s total loss list
The Panel is not persuaded the insurer’s information challenges the value of the
following items claimed, or that they incurred the damage reported. The Panel is also
satisfied they d o not appear in the insurer’s TL list.
The panel makes the following observations:
the insurer has not established the strata ’s coverage includes the shutters
the TL list included wallpaper made by Versace, not Robero Cavalli
the insurer has not established that the complainants ’ rather than the restorer’s
actions allowed the carpet to mould
it is unclear whether the assessor’s description of ‘many silver items’ includes the
silverware trays
the complainants likely owned certain contents (the items in cupboards, table linen,
kitchenware and bar stools and day bed). The claims for these items are
reasonable in the circumstances
the complainants likely lost $800 worth of food as claimed. The insurer is liable for
$400 under the policy benefit and $400 because of the failure to isolate or remove
contents
the delivery and freight costs appear on the complainants ’ furniture quotes
the insurer has not provided information supporting its views the strata would have
been liable for the crane hire. The comp lainants’ quotes confirm a crane is required
and the complainants’ detailed estimate for four hours o f crane hire appears
reasonable.
The detailed list of items is set out under section 3.2 of this determination.
Determination | Case number: 661655 Page 8 of 16
Having reviewed each of the claimed items a gainst the parties’ descriptions and
responses, reports, assessments, photographs and quotes the loss amounts to
$157,713
Variation between TL valuations and complainants ’ valuations
It is unclear whether KK assessed the total loss items before or after the additional
damage occurred. As indicated the photographs are taken in April 2019 after the
items were further damaged due to the delays caused by the claim management. It
would be unfair to deduct all the items referred to by KK from the complainants further
claim in these circumstances.
The estimates KK provided on the TL list, to replace or restore items the insurer
agreed to indemnify, do not reflect the amount of loss the complainants sustained.
The repair or replacement quotes for the items (as set out under section 3.3 of this
determination) exceed the amount KK allowed by $88,355. As set out above the
complainants have established that losses occurred after the leak.
The Panel is satisfied the differences in the amounts the insurer paid, and the loss the
complainants established of $88,355, should be added to the loss amount to make a
total claimed loss arising from the claim management of $246,068.
Insurer should settle claim for two thirds of the assessed loss
It is not possible in the circumstances of this claim to determine whether all the
additional loss claimed is directly related to the failure to manage the claim correctly.
It is likely some of the additional loss claim would be correctly related to the original
loss. The Panel is required to do what is fair in all the circumstances and in assessing
the loss to fairly assess what could reasonably be attributed to the original loss. It is
likely some of the it ems on KK’s TL list were damaged by the original incident. To the
extent the items were a total loss from the original incident then those items have
been settled regardless of the valuation placed on them by the complainants.
The Panel accepts many items likely suffered damage from the poor claims handling.
The Panel considers it fair given the complexity of the issues that the insurer settles
the claim for $164,000, being two thirds of the claimed loss. Interest pursuant to
section 57 of the Insurance Contracts Act 1984 (Cth) is payable on the cash
settlement from 24 July 2019 to date of payment of the claim.
2.3 Are the complainants entitled to compensation for non-financial loss?
Complainants claim for non-financial loss
AFCA’s Rules allow it t o consider non-financial loss claims, including for stress or
inconvenience caused by an error of the insurer. The maximum amount we can
award for non-financial loss is $5,000 for each claim of loss.
Determination | Case number: 661655 Page 9 of 16
We will only award this type of compensation if there has been an unusual degree or
extent of inconvenience.
The complainants say they experienced unnecessary stress from the claim actions,
including the insurer attributing loss to the complainants’ actions. They explain:
We were advised by many parties attending to not move anything or we would
compromise our claim. We were put in a very difficult position of watching
everything go to waste in front of our eyes and in the end had to arrange our own
tipping of items that could have been removed from day one an d salvaged … We
were left however spending countless hours on the phone, in emails and
meetings with many individuals in terms of this matter- 3 loss adjusters, 1
complex claims manager … [multiple contractors] …
Insurer is required to compensate the complainants
The Panel considers the available information supports the complainants’ above
position. Their claims have remained consistent since they first raised concerns about
furniture in March 2019. The insurer had the information necessary to address thi s for
at least several months. The Panel is satisfied:
the delay in doing so exacerbated the stress caused by the failure to remove or
isolate the contents
the nature of the items damaged is particularly distressing to the complainants,
given their occupations (architect and interior designer)
the available reports confirm some damaged items are irreplaceable and were
antique or from particularly important designer collections.
Given all the above, the Panel is persuaded the complainants experienced an
unusual degree or extent of physical inconvenience. The insurer is required to pay the
complainants $5,000 (in total) non-financial loss compensation.
Determination | Case number: 661655 Page 10 of 16
3 Supporting information
3.1 Records
Report/Insurer’ s claim
record date
Comments
11 Feb ruary 2019 Excess payment received … $600
Complainant
Email to insurer
14 February 2019
Will someone attend to review our contents - or will [representative]
arrange from [RR]?
We have damage to a large rug, Versace furniture that is stained at
legs, swelling on a buffet cabinet. Silver leaf, coffee table, dyson
vacuum, dishwasher, oven, rust /damage on bar stools, sofas, chest of
drawers swelling, foot stools, and the like.
I ha ven’t take a proper inventory but please let me know what you
need me to do as I am unfamiliar with this process.
[RR] also asked me to not move many items we have stored in
concealed area under stairs unt i l they undertake mould treatment so
not sure what damage of these cont ents
Insurer
Claim record
19 February 2019
Spoke to [complainants] who has called to seek reimbursement for
the packing of undamaged cont ent items … want ed me to follow up
with [restorer] to obtain further updates regarding the mould
remediation schedule
Insurer’s expert (EE )
Restoration cont ractor
Preliminary report
Undated (approximately
19 February 2019)
The insured has very fragile and valuable contents that require
packing and storing to facilitate repairs. It would be preferable to store
all glass and sculptures on - site with the use of containment to protect
the items from cross - contamination during demolition works.
Cont ents pack - out and furt her works post demolition cost estimate
[authorisation requested]
Pack - out: stage 1 – pack and protect fragile contents including
ornaments and sculptures and relocat e upstairs. Install negative air
containment (4 week allowance)
Pack - out: stage 2 – pack and relocate remaining cont ents for off - site
storage
Storage (3 month allowance)
22 Fe b ruary 2019 Assessor advised … [insurer] will assist in the relocation of furniture
while repairs are being completed … Insured advised they would like
to relocate some of the personal and breakable contents items
themselves. Assessor advised if insured ca n have this completed by
next week assessor and [restorers] can attend and address any
damage to furniture and arrange to have contents relocated
4 March 2019 [complainants] enquired about the contents, so I've said that we will be
looking after the cont ents … it appears EE are yet to upload their
content list
12 March 2019 [complainants] adv Versace branded dining and lounge furniture has
been damaged, awaiting repair quote from Versace
Determination | Case number: 661655 Page 11 of 16
Report/Insurer’ s claim
record date
Comments
5 April 2019 Assessor confirmed she assessed on site later in the process after a
building assessor [and EE] attended earlier. Assessor noted that it
may be difficult to confirm if items were affected further by the drying
affects of the restoration equipment or if they only exacerbated pre -
existing natural corro sion from the sea air.
1 May 2019 [restorer’s] report received Report advises … No furt her timeline
provided of actions to date since 19/2. - Discussed claim with TL who
recommended organising a meeting bet ween the key stakeholders
7 May 2019 Complaint i s ready for IDR review - The rectification and remedial
works at the property has not caused nor contributed to the loss of the
contents which [the complainants are] under - insured for.
9 May 2019 asked [restorer] for daily ambient temperature readings, ki nd regards
Complainant’s expert
(PD )
Architecture and interior
design agency
Report and quote
28 May 2019
We are pleased to present quot ation for the works and rectification of
existing furniture including
> Repair and rectification of all timber framing and feet
> Replacement of all internal foam and padding due to suspected
mould within the foam
> Upholstery works including replacement of all fabrics due to water
damage
> Replacement fabric by Versace Home to all items
> Replacement and re - manufacture of some it ems
Items requiring repair and re - upholstery are
> 8 x Dining chairs with existing Vers ace Home fabric
> 1 x Sofa with existing Versace Home fabric
> 2 x Chair without arms with existing Versace Home fabric
> 2 x Versace Elena timber frame armchair with existing V ersace
Home fabric
> 2 x Versace Carioca metalstructure armchair with existing Versace
Home fabric
> 2 x Versace style display plinth
> 1 x Versace style tallclosed cabinet
> 1 x Bespoke display cabinet
> 1 x Versace style display shelf
> 2 x Versace style Swarovski C rystal Table Lamps
> 1 x Roberto Cavallistyle bespoke sideboard
> 1 x Versace - style large side table
Some items within the above list are considered Versace Home
collector items and will therefore have a considerable loss of value if
repaired and rectified. Th ese include:
> 2 x Versace Elena timber frame armchair with existing Versace
Home fabric
Quotation is included for full replacement of this Item
Items requiring replacement due to loss of value if repaired and
rectified and are no longer available within the Versace Home
collection include:
Determination | Case number: 661655 Page 12 of 16
Report/Insurer’ s claim
record date
Comments
> 2 x Versace Carioca metal structure armchair with existing Vers ace
Home fabric
Insurer’s expert (CC )
Remediation contractor
Attendance report
28 May 2019
CC has noted that during the required remediation, the content items
remained onsite. Content items of this quality should have been
relocated from the premises.
The mirror's have etched glass, In the etching of a mirror located at the
rear of the property (located away from direct sunlight etc) visible
microbial acti vity presence was not ed under illuminated microscope.
Where as at the front of the front of property the mirrors had visible
efflorescence powder residue. CC completed ATP sampling onsite to
identify potential contamination where sampling returned as neithe r
bacteria or mould. It should be noted that modern mirrors use silver or
an amalgam of silver/aluminium in various forms, often quenched with
a copper backing and than protected by a coating of shellac or other
clear coating. This coating is aimed at cutt ing the exposure of the
metals to oxidation, which in turn is potentiated by moisture. Excess
drying can crystallise the protective film and this crazing can be the
forerunner of mirror det erioration.
The gold cabinet surface has dried out during the remed iation process
and has resulted in visible crazing.
The fabric lounge suites within the premises have a varying of
damages not ed. The sofa was found with rust markings under
illuminated microscope. CC noted no visible mould present. The upper
level chairs were ins pected and noted whilst remediation is available
to the fabric section of the items the legs were present with evident
rusting.
The silver round table base also noted with visible crazing the surface.
The crystal lamps, whilst delicate to inspect. It was evident that
oxidation to the chrome was present. No visible microbial activity
visible.
Silver ware within the premises was noted to be tarnished. Silver ware
typically responds well to remediation and would be available to be
restored.
Whilst the visible damage is extensive to several items within the
premises, [CC] has noted that remediation is available however will be
a lengthy and delicate process.
3 June 2019 CC noted contents should have been moved from property during
remediation/drying works. Assessors opinion as there are many other
factors which could have contributed to furniture damage … There
was a delay between the event and contents restoration works
commencing
3 July 2019 Assessor Review of CC Report - Assessor noted whether restorers
caused the damage, or the damage was caused by the event would
be impossible to determine.
Complainant’s expert Our initial attendance was on the 15th July 2019, where moisture
Determination | Case number: 661655 Page 13 of 16
Report/Insurer’ s claim
record date
Comments
Licensed builder and
restoration contractor
Assessment report for
strata insurer
8 August 2019
testing to the sub floor was carried out. The timber flooring in the home
was uplifted and removed allowing direct testing to the concrete sub
floor.
Prior to the removal, the timber flooring acted as a moisture barrier
trapping the moisture between the timber and the concret e slab. As a
result, moisture readings from the test carried out on the 15th July
2019 indicated a high moisture content througho ut the subfloor.
Due to moisture trapped between the flooring and sub floor, mould
began to manifest because of the event. Mould contamination is the
resultant damage from the initial event and occurred due to
inadequate processes undertak en by the previou s [strata insurer’s
building] restorer.
The mould contamination was not limited to the sub floor but had
spread to the insured contents, plasterboard walls, bottom of
architraves, timber frames, plantation shutters, kitchen joinery,
electrical cabling, bot tom of architraves, kitchen cupboards and
appliances. With time that has lapsed since the date of loss, this was
the major contribution for mould to infest and contaminate the entire
bottom level of the home.
Mould remediation testing was carried out, howe ver since the staining
to surfac es of the building cannot be remediated successfully, we
highly rec ommend that all affected building material to the property is
to be removed and disposed of to ensure that mould has been
eradicated.
The appliances in the k itchen have also sustained mould
contamination and evidence of rusting and pitting to the units is a
result of direct exposure to a high moisture content that was not
addressed at the time of the event.
… We have been ad vised by our external hygienist [SS] Consulting
that to ensure the affected areas are remediated successfully, to
remove and dispose of affected materials and contents.
Insurer’s expert (EE )
Restoration cont ractor
Report
Undated
Perceived Damage to the Furniture: When the water pipe burst t his
would have resulted in the discharge of large amounts of water on the
floor coverings, and a spike in the indoor humidity. It is unknown, what,
when and how mitigation meas ures were taken to remove the escaped
water.
Depending on the magnitude of the w ater discharged, it is highly likely
that the free water was immediately absorbed by porous elements in
direct contact with the water on the flooring. This would result in
swelling /delamination of the materials with some latent damage.
Increased humidity in a room would cause absorption of the water
vapor by porous materials fabrics which would then trans fer the
moisture onto any metallic fixings in contact causing rust.
Furnit ure, furnishings, and contents within properties close to areas of
naturally hig h humidity and saline levels such as seafronts are
susceptible to damage even if there is no water loss.
Conclusion: Based on the information and reasoning provided above,
the alleged damage to the furniture has not been caused by the
Determination | Case number: 661655 Page 14 of 16
Report/Insurer’ s claim
record date
Comments
dehumidifier installe d by [EE], but it is a direct result of the escape of
water.
Dehumidification / Dehumidifiers: is a process of removing moisture or
water vapor from a gas - vapor mixture. In the water loss industry,
dehumidifiers are us ed to remove the excess moisture in th e
atmosphere resulting from a water leakage/impact situation. A
dehumidifier works by condensing moisture from humid air, collects it
in a tray and then wit h the aid of a mot orized pump discharges the
collected wat er into a drain outlet.
The dehumidifier i nstalled on this site was situated near the stairs with
the processed air being directed to the affected area.
The average humidity readings taken showed:
> Relative humidity in the order of 49%
> Temperat ure - 25 Degrees
> Dew point - 14 Degrees
> Moisture content - 9.8 g/Kg
The indoor humidity recorded is consistent with normal humidity levels
for a comfortable environment which is generally considered to be
between 45 and 50%. It is impossible to consider that a refrigerant
dehumidifier would caus e water d amage by adding moisture to the
atmosphere. Conversely, very low humidity caused by equipment such
as desiccant dehumidifiers can result in shrink age damage. No heat
was used in the drying of this property
3.2 Not yet indemnified
Value and item
$22,710 for t he crystal Versace lamps
$11,704 for the round mirror
$16,214 for the rectangular mirror
$6,680 for the shutters
$2,075 for an ottoman
$38,610 for t wo Vers ace (Carioca) armchairs
$7,700 for a custom display cabinet
$22,000 for a closed cabinet
$380 for Roberto Cavalli wallpaper
$9,000 for the first - floor carpet
$420 for a side table
Determination | Case number: 661655 Page 15 of 16
Value and item
$380 and $1,200 for silver serving trays
$2,800 for items in cupboards
$800 for kitchenware
$4,800 for bar stools
$2,800 for custom made table linen
$800 for spoiled food
$1,800 for delivery and freight
$4,840 for crane hire
$157,713 – total
3.3 Partially indemnified
C omplainants’ de scription Repair/replacement
value established
TL list payment Further
loss
establi shed
Chairs (item B), 2 x Versace
chairs.
$39,446 Versace
quote
‘Versace Tub Chairs @
$18000 each - $36,000’
$3,446
Tall Versace d isplay/lamp
stand (C).
$30,300 Versace
quote
‘Versace lamp stand
configured $4,500’
$25,800
Side table (D), Ve rsace side
table closest match.
$15,036 Versace
quote
‘Versace coffee table
round $10,000'
$5,036
Cabinets (E), the 3 silver leaf
cabinets.
$29,832 Cromwell
quote
‘Semi circular $7,000 ...
Curved cabinet $8,000’
$14,832
Roberto Cavalli sideboard $27,565 Roberto
Cavalli quote
‘Gold coloured cabinet
$10,000’
$17,565
Chair repairs & reupholstery
labour, 8 dining chairs, 1x
large sofa, 2 armless lounge
chairs.
$29,326 PD quot e ‘Versace dining chairs x
8 @ $3,000 each -
$24,000’
$5,326
Fabric for repairs to sofas,
love seats and dining chairs
$1,950 per panel x28
required
$54,850 Versace
quote.
‘Lounge suit 2 chairs 1
sofa $40,000’
$14,850
Small items (KK) took away ‘Whilst value was ‘Designer $1,460
Determination | Case number: 661655 Page 16 of 16
C omplainants’ de scription Repair/replacement
value established
TL list payment Further
loss
establi shed
substantially higher,
we agreed on
$3,630.00’
silver/glassware ($500);
Dyson ($450); Footstool
($400); Steel baskets
($620); Small chest
($200)’ [Total $2,170]
Silverware restoration $990 PK quote ‘Silverware restoration
$950’
$40
Total $88,355