Home / Suncorp Group / Determination 659961

Determination 659961

Partial decline of storm damage claim and dispute over cash settlement amount

FirmSuncorp Group
Decided2020-08-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$40,000
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed storm damage to their home and the insurer accepted only part of it, with a cash settlement offer of about $14,320. AFCA found the insurer liable for part of the damage and ordered a cash settlement of $40,000, but rejected compensation for delay.

The onus is on the complainants to show damage was caused by the insured storm, and prior unrepaired damage and maintenance issues limited liability to the areas the panel accepted.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 659961 Financial firm AAI Limited Determination | Case number: 659961 Page 2 of 19 Case number: 659961 20 August 2020 1 Determination overview 1.1 Complaint The complainants held a home insurance policy with the financial firm (the insurer) and lodged a claim after a storm damaged the home on 11 June 2019. The insurer accepted the claim and appointed assessors/contractors to inspect the property and determine the cause and extent of damage. It also appointed a remediation company to assess the extent of any mould remediation required. This dispute relates to the extent the damage claimed is related to the storm of the 11 June 2019. The insurer says not all the damage is related to the 11 June 2019 storm, but is due to a failure to repair the previous damage (cash settled in June 2018), lack of maintenance, and defective workmanship. The complainant s disagree with the insurer‟s decision. They also say the insurer has delayed its handling of the claim and this has resulted in physical inconvenience to them and their extended family who reside at the premises. 1.2 Issues and key findings What is the insurer’s liability for building damage? The panel is satisfied that not all the damage claimed is due to the 11 June 2019 storm. As set out under Section 2.1 of this determination, the insurer ‟s liability is limited to damage in bedrooms 1 and 2, water damage to the gym and mould remediation/damage in these areas. The insurer is to cash settle the claim for $40,000 Did the insurer ’s conduct cause an unreasonable delay in its handling of the claim? While there have been delays in the handling of this claim those delays have been contributed to by both parties and in the circumstances the panel accepts it is fair that no compensation for non-financial loss is applicable. 1.3 Determination This determination is partially in favour of the complainants. The insurer is to pay the complainants $40,000 within 14 days of the complainant‟s acceptance of this determination in settlement of its liability for damage arising from the claimed event. Determination | Case number: 659961 Page 3 of 19 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues in dispute. Due to the complexity of this dispute it has been referred to a Panel for determination. The panel comprises the Lead Ombudsman, a panel member with significant industry experience and a panel member with significant experience as a consumer representative. This determination follows consideration of all relevant information. The panel has decided this case based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous AFCA decisions where applicable. 2.1 What is the insurer’s liability for building damage? Policy cover is subject to terms and limits The complainan ts‟ home insurance policy cover commenced on 19 April 2019 and covers loss or damage that occurs during the relevant period of insurance as a result of a number of listed events including storm, subject to certain terms and exclusions. The onus is on the complainants to establish, on the balance of probabilities, (that is more likely than not) that the damage falls within an insured event. The complainants say the loss or damage arose from a storm on the 11 June 2019. The insurer does not dispute that a storm occurred and agreed to cover some damage. However, it says it declined some of the claimed damage because:  the complainants have not shown all damage claimed was caused by the storm,  there is evidence some of the damage is pre-existing, due to maintenance/workmanship issues which is excluded from cover  there is evidence of unrepaired damage for which the complainants were cash settled under a previous claim. Circumstances of the complaint The insured building is spread over three-levels plus a roof terrace. For the purpose of this determination, the levels will be identified as lower ground, ground and upper levels. The insurer says it had not completed its assessment or developed a definite scope prior to this complaint being lodged with AFCA because the complainants would no longer allow its experts access to the premises to conduct further inspection(s) or carry out any mould remediation. As such, it says it is not liable for all damage Determination | Case number: 659961 Page 4 of 19 (including contents) provided for in the male complainant‟s quotation for building repairs, or any mould damage outside of the areas of damage which it accepted. The complainants say the insurer had ample opportunity to assess the premises between June and August 2019 and conducted numerous assessments which ought to have been enough. The insurer completed desktop assessments on what it considers to be the extent of its liability based on the complainants‟ building quotations and available information and proposed a cash settlement of $4,320 for building repairs and $10,000 for mould remediation based on a desktop quote it (insurer ‟s) restoration company „R‟ ( $10,000 being just under 50% of R‟s quote of $21,192) given the quote included the upper level of the home. The complainants disagree with the assessment and maintain all loss claimed was a result of the storm event. In addition to building damage and mould remediation, the complainants say the insurer should cover:  temporary accommodation costs as they do not believe they can remain on the premises while mould remediation occurs,  the costs of removing and storing items  mould affected contents in the claimed rooms Complainants’ previous storm/water damage claims The complainants had previous claims for storm and escape of liquid in 2014 and 2018 respectively. The insurer says some of the damage being claimed either relate to defects/workmanship issues previously identified which remain unaddressed, and/or is damage the complainants were previously cash settled to repair. The complainants say the insurer should not take prior claims into account in assessing its liability for the present claim because the damage is separate, previous damage has been repaired, and the insurer‟s investigation team „cleared‟ the claim to progress. Previous damage relevant to the current claim The panel has carefully reviewed available information and notes:  bedroom 1, billiard/pool room/hallway were previously damaged, and the complainants were cash settled to complete repairs to the rooms, and  some of the damage currently being claimed are in the same areas/rooms. The complainants‟ onus extends to showing damage/loss claimed was caused by the claimed event. The panel accepts that it is reasonable that the complainants provide sufficient evidence that repairs under the prior claims have been completed. This is particularly crucial given available information suggests damage to ceilings in Determination | Case number: 659961 Page 5 of 19 bedroom 1, the prayer and billiard room/hallway, as well as flooring damage to the prayer and billiard rooms pre-date the claimed storm event. Parties obtained and provided expert input There is no dispute a storm occurred on or around the reported date of loss and likely resulted in some damage to the insured premise. The parties‟ views on the cause of damage differ; their positions are summarised in table provided in section 3.1 of this determination. The insurer‟s assessment covered bedrooms 1 (BR1) being the front room to the left when entering the premises from G Road and bedroom 2 (BR2), the wall and gym on the lower ground level, and prayer and billiard (hallway)rooms on the upper level. The panel notes that the insurer provided a mould report from mould hygienist „V‟ and the complainants from mould consultant „M‟. After carefully reviewing these reports, the panel finds V‟s report more persuasive (noting that V‟s report does not include the gym which was added to the claim after its attendance). This is because V provides a clear analysis of information including its own observations and results of sample/testing carried out in reaching its conclusions. While M suggests air sampling was required, it based its conclusions on visual inspection of mould only. V also says high level „condition 3‟ growth/mould was found in the ceiling and wall and air sampling shows “excess of airborne fungal/mould spores”. However, at the time, V says there was little evidence contents were contaminated by the mould. The parties also obtained and provided numerous reports from experts/trades/assessors on the claimed damage some of which are summarised in section 3.2 of this determination. For ease of reference, the panel will address the claimed loss (building and contents) in the following paragraphs under headings bedroom 1, bedroom 2, gym room, prayer room, billiard room/hallway, and garden/electrical. Bedroom 1 The insurer declined cover for wall damage to BR1 saying the water ingress was a result of construction issues with the roofing, and for the ceiling plaster damage because it says it predates the claimed incident. The insurer says it is not liable for the moisture issue and any wall damage claimed in this room because while storm water has entered the home, it was due to issues with construction, specifically the roof pitch of the metal roofing over the area and issues with the size of the box gutter. It says this was identified in a pre vious claim, the complainants knew about it and have not provided any evidence steps were taken to address the issues. Determination | Case number: 659961 Page 6 of 19 The insurer also refers to previous settlement for water damage to certain areas of the home (including bedrooms 1 and 2) from a burst water pipe at the front of the home in July 2018; it says the complainants have not shown the repairs were completed and as such, that any issue with the wall lining and skirting is the same as previously settled. The complainants say all damage they identified must be covered because it was caused by the storm. T he insurer‟s roofer D attended the premises on 18 June 2019 for make-safe and found the roofing over BR1 is non-complaint as it has a 0-degree pitch (underpitched) which allows “ water to backflow under the ends of the sheeting and into roof cavity ”. The insurer‟s assessor (A) reinspected the property on 22 August 2019. A echoes D‟s view that the roof pitch in this area was non- complaint and defective. „A‟ also refers to a 2012 roof report that shows the roofing was not complaint at the time it was constructed. The complainants disagree and provided photographs showing measurement of the roof pitch and the occupancy permit at the time construction. The panel notes that the complainant has not provided a roofing report. The information provided by the insurer does not include a 2012/2014 roof report. When asked to clarify which report referred to the pitch being non-complaint, the insurer points to the building plans/drawings as including two-degrees pitch for the roofing sheet in the area, compared with D‟s measurement as basis for its conclusion. While the insurer provided a leak detection report obtained from plumber (B) by the insurer, this only addresses water entry to the room at the back on the lower-ground level (presumably the gym), not the bedroom. In the panel‟s view that the complainants have not provided sufficient information to establish the damage to BR1 ceiling was a result of the storm considering:  BR1 suffered water damage under a previous claim  the complainants were previously settled for repairs and remediation to the room and have not provided acceptable evidence (such as independent builders/contractor invoices, mould clearance certificate etc) showing the repairs and mould remediation were completed  „V‟ conducted testing/sampling and found evidence of water damage to ceiling lining in BR1, however says it is relates to old water damage/mould because the area was dry and there was “evidence of some age”.  while the complainants‟ mould remediation quotation/report says all damage to BR1 was from the storm, the panel is not satisfied it s writer „M‟ has sufficiently shown how this conclusion was reached. Determination | Case number: 659961 Page 7 of 19 As for the damage to the south eastern wall lining and skirting i n BR1, the panel accepts water ingress during the claimed storm event caused the moisture on the wall and skirting boards. The panel has formed this view because:  It is clear from V‟s report that moisture was present on the south-east walls of BR1.  The insurer has not provided details of the compliance requirement it refers to  the reports provided do not include sufficient information and analysis of how its writers reached the conclusion that the roofing is non-compliant, or that the storm water ingress would not otherwise have occurred  while V raises concerns with rising damp considered to be emanating from external soil because part of the south-east wall of the room acts as a soil retaining wall, there is insufficient information to establish this (rather than the storm) resulted in moisture observed on the wall or establish an exclusion in this regard.  It is likely the moisture present has contributed to the development of mould in the walls As for the contents of BR1 being damaged by mould the panel notes in its report, V says there was little evidence of mould contamination to contents in this room. The panel accepts that the insurer is not required to cover the claimed contents in this room given:  the lack of evidence the contents in this room was damaged due to the event.  the complainants raised contents damage months after lodgement of the claim  while the complainants mould report/remediation quote includes remediation/replacement of entire room and contents, as mentioned earlier in this determination, M has not provided any detailed analysis of how it reached this conclusion. In fact, M specifically states in its report that it has not carried out any sampling, although noting it was required  available information shows the insurer attempted to have its remediation contractors place drying equipment at the property (which would likely have mitigated damage through the passage of time), however the complainants rejected this. Given V‟s earlier report, the panel is of the view that if contamination has occurred due to the passage of time, the insurer is not liable for the contents damage claimed. The complainants did not agree to the insurer taking actions to mitigate further loss and did not take any action themselves to mitigate loss as required under the policy. Bedroom 2 The insurer has agreed to cover the claimed building damage in BR2. It says it made this decision “in good faith” because there is evidence of “new and recent water ” . Similar to BR1, V reported mould was present in BR2 wall(s). There does not appear to be any question that the insurer will cover any mould remediation required in BR2. Determination | Case number: 659961 Page 8 of 19 As with contents claimed in BR1, the insurer says it is not liable to cover any costs for replacement/remediation of contents which the complainants say have been impacted by mould. The panel‟s views in relation to claimed contents in BR1 (above) also applies to BR2. Gym The insurer has agreed to cover the claimed water and mould damage to the wall (which it says backs onto the ensuite ) “in good faith” because “ a leak from the ensuite has been located and is likely contributing to the damage seen” While the insurer agrees to cover damage to this room, it has declined cover for contents on the basis the complainants have not shown the contents loss claimed was due to the claimed storm event. Additionally, it points to the complainants‟ refusal to allow its remediators to address moisture issues and complete mould remediation despite its attempts. If any mould damage has occurred, it considers it is a result of the complainants‟ actions/delay . The panel accepts there was evidence some mould in this area was present at the time the insurer conducted its leak detection testing and assessment. The complainants should have allowed the insurer to complete mould remediation or taken actions to address any potential for mould growth themselves. While the panel accepts some contribution should be made to the mould remediation in this room it is fair that it be limited in these circumstances. Upper level billiard and prayer rooms The billiard room (or hallway) and prayer room appear to be below or partly below shingle roofing tiles and the roof terrace. The insurer says there is no evidence damage to these rooms was caused by the storm. The insurer says roof workmanship issues and/or unrepaired damage from a previous claim are most likely the cause of damage. The available information shows the complainants prior claim included ceiling lining around the same location, in similar areas. The complainants disagree and say the damage to these rooms/areas do not relate to the previous claim and that the insurer cannot refer to the previous claim. As previously explained, the panel does not agree with this view. There is no dispute there was previous damage to upper levels. The available information indicates:  there was damage to areas of ceiling on the upper level of the building resulting in a storm claim in 2014.  as part of the insurer‟s assessment of the 2014 claim, it appointed engineer (F) to report on cause of damage. Among other things, F found water ingress from the Determination | Case number: 659961 Page 9 of 19 roof space was “m ost likely as a result of plumbing deficiencies ” such as inadequate box guttering.  F recommended roof plumbi ng assessment and that construction defects and leakage be fixed.  The complainants were subsequently cash settled to repair resultant damage. The complainants say any defects or prior claim related issues have been fixed and: > say there has been no water ingress from that time until the claimed incident (about 4 years) as evidence of the repairs > provided receipts of building works carried out > refer to comments by the insurer‟s assessor (T) who attended the premises on 27 June 2019 that suggest previous repairs done and damage observed were new. The insurer says the receipt/invoices provided by the complainants are from a building company which the male complainant is a Director/owner ; this is not sufficient evidence of prior repairs. It says it asked the complainant to provide further substantiation of repairs from the trades who the male complainant would have inevitably employed to complete roofing/repair works, however this has not been provided to date. It maintains this position. The panel notes that this service asked the complainants to provide evidence of previous repairs. While the complainants provided repairs invoices, they are from the male complainant‟s building company (J). The panel does not consider the receipt/invoice by themselves, sufficient in the absence of other corroborating information (such as evidence of purchase of parts, paying contractors/trades etc) of repairs. Even if the panel accepted the invoices were sufficient (and it does not), it is also not satisfied there is sufficient evidence that the damage claimed to the prayer and billiard rooms were caused by the claimed storm. The panel has taken the following into account in reaching this conclusion:  the complainants confirm they has patched many areas of cracked lead flashings, and tape wrapp ed “[s]so lar Tube outlet and inlets tubes which penetrates the roof ” carried out preventative work to avoid leak from the roof terrace, as ongoing maintenance of the house. They say damage in billiard and prayer rooms: > “ have happened from the Inlet /outlet pipes of the Solar Tubes installed on the roof. Insulations of those tubes have been torn by the birds and possums ” and this was subsequently fixed > “ some storm water has penetrated through the cracked flashings which were also fixed subsequently ”. Neither of the above suggests damage to the rooms was a direct result of or caused by the storm. Determination | Case number: 659961 Page 10 of 19  while the insurer‟s assessor (T) who inspected the premises on 27 June 2019 says in its report that the billiard room “has been repaired previously”; “viewed damage is new damage”, and the prayer room is noted as having “new damage”, this does not of itself show that the damage was caused by the storm event. It should be noted that T clearly says he is unable to determine the point of entry of water from the roof as he did not have a roof report at the time.  The insurer provided reports of D who attended the property to complete make- safe shortly after lodgement of the claim. D‟s report includes that se ctions of roof shingles had been blown from fixings during the storm. It is not clear from the report that the ceiling damage is in the areas where the shingles blew off. However, in relation to water entry D says: > cracking to lead used to flash around wall cladding, and suspects water entry through damaged lead “that was freshly sealed” > “ Joins in the lead flashing allow water to enter the lining boarding under the shingle roofing- maintenance ” > “Numerous sections of lead flashing have faltered / lifted. Lead has also dropped allowing water to enter up and under the roofing”. > “Numerous section of roofing has been patched in attempts to stop water entry in the past” While this arguably shows that some work had been done on the roof, it was clearly not completed appropriately if water was still entering the roof. The insurer provided a builder‟s report from „P‟ dated 13 August 2019 which deals with the location and extent of damage to the billiard and prayer room ceiling. D concludes that water entry points are from the split and deteriorated flashings. It should be noted that D estimated the damage to the ceiling had been present for 1-6 months Further the mould report from V confirms mould in the prayer and billiard rooms are historic and resolved. This does not support a conclusion that the damage was from a recent occurrence of water ingress. In view of the above, the insurer is not required to cover any damage (including to flooring and contents) in the prayer and billiard rooms. Garden/electrical The insurer conducted make-safe electrical work after the claim was lodged as the complainants reported short-circuiting of electricity at the premises. The complainants say following the make-safe, there is damage to garden electrical and seeks indemnity for its repairs. On the available information, the panel is not satisfied the complainants have shown any garden electrical issue is a result of the storm (or any other covered event), or from the make-safe carried out. Determination | Case number: 659961 Page 11 of 19 How the claim should be settled The policy provides the insurer with a discretion whether to repair, rebuild or cash settle the cost of the loss covered under the terms of the policy. The complainants have expressed a view that the damage should be cash settled. The insurer has not opposed this. In the Panels view given the limited extent to which the damage relates to an insured event during the period of insurance a cash settlement is an appropriate way to settle the claim. The panel has considered the various quotes provided against the damage accepted as being related to the claimed event to try to reach a figure it feels is fair in the circumstances to cover the accepted loss. A quote of $21,021 has been provided for damage to BR1&2 plus prayer room and pool room. It is fair to allow 50% of this quote ($10,000) for the damage to BR1 and BR2. R has quoted $21,192.38 for mould remediation. The quote appears to be for the lower and upper levels of the home but does not include the Gym. As the mould to the lower level (other than the ceiling in BR1) and to the Gym is accepted damage then the panel considers this a fair figure to cover the accepted mould remediation. The insurer has also accepted liability for the damage to the wall in the Gym although no relevant quote is available. Given the damage is similar to the damage to BR1 and BR2 the panel accepts a fair allowance would be $7500. This comes to a total of $38,692.38 Based on these figures the panel considers a fair settlement would be to round up this to $40,000. Accordingly, the panel determines that within 14 days of the complainant‟s acceptance of this determination the insurer is to pay the complainants $40,000 in settlement of its liability under the claim. 2.2 Did the insurers conduct cause an unreasonable delay in its handling of the claim? Under its Rules, AFCA we may award compensation (capped at $5,000) for non- financial loss where complainants have suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the complainants ‟ expectation of enjoyment or peace of mind. The panel has carefully reviewed the available information, including the timeline provided by the complainants, email correspondence between the parties and the insurer‟s file notes. The panel notes the insurer initially referred the claim to its investigations team for review and that the claim remained with its investigation team for some time as the complainants were dissatisfied with the investigation and appeared not to have provided all information requested in a timely manner. Determination | Case number: 659961 Page 12 of 19 The panel accepts that the insurer is entitled to investigate claims to determine the extent of its liability and does not consider the insurer unreasonably delayed or handled the claim in this respect because:  its assessment of the damage continued while the matter was being investigated  the male complainant‟s initial decline of an interview and noncooperation with information requests during July 2019 contributed to delay in investigations with the mail complainant only agreeing to provide information on 25 July 2019. The investigation team released the matter on 31 July 2019. The panel has reviewed the complainants‟ position about the number of attendance by the insurer from lodgement of the claim was excessive and caused him and his family stress and inconvenience. The panel accepts the conduct of the claim has been less than ideal. However, the insurer did take steps to address possible mould and prevent further damage. The attempts were refused by the complainant. The complainants restricted the Insurers access to the home after August 2019 and this has caused further delays. The panel considers that as both parties have contributed to the delays, it is not appropriate to award compensation for non-financial loss. Determination | Case number: 659961 Page 13 of 19 3 Supporting information 3.1 Parties’ position about claimed damage Area/room Claimed damage Complainants’ position Insurer’s posi tion Upper level - Billiard /Hallway  ceiling lining  gaps in flooring  mould - building and contents (pool table and furniture) requiring remediation and/or replacement  damage due to storm water ingress from roof during storm Complainants have not shown damage from claimed event and:  area of ceiling and flooring previously claimed  insufficient ev idence of repairs after prior claim and cash settlement  insufficient evidence of repairs/ maintenance reportedly carried out after previous claim settlement.  evidence damage pre - dates event. Upper level - Prayer  ceiling lining  mould - building and contents (temple) requiring remediation and replacement respectively  damage caused by storm water ingress from roof during storm Complainants have not shown damage from claimed event and:  evidence damage pre - dates storm event  damage in the same area of ceiling as previous settled claim  insufficient evidence of repairs, and maintenance after settlement of prior claim Ground level - Bedroom1  ceiling lining and lighting/ fan  wall  skirting  mould – building and contents (mattress base) requiring remediation and/or replacement.  damage from water ingress during storm. Complainants have not shown damage from storm event. and:  water ingress and ceiling damage due to construction/workmanship issues with roof over the ground level rooms  previous settled claim for wall, skirting and mould remediation. Insufficient evidence works carried out.  evidence damage occurred prior to storm Ground level - Bedroom2  wall  skirting  mould – building and contents (mattress base) requiring remediation and/or replacement.  damage from water ingress during storm.  previous cash settlement for mould remediation to same room, no clearance certific ate showing remediation complet ed.  evidence of recent water ingress to wall, therefore accepts cover for wall/skirting damage and mould remediation t o room “in good faith”.  does not accept cont ents claim because: > no evidence damage caused by Determination | Case number: 659961 Page 14 of 19 Area/room Claimed damage Complainants’ position Insurer’s posi tion event > its earlier offer to remediate and mitigate damage affected areas were rejected > complainants‟ refusal to allow remediation or mitigate loss likely resulted in any damage > no evidence of the extent of loss as further ins pection has not been allowed. Ground level - Gym  wall  mould – building and contents (furniture, gym equipment ) requiring remediation and/or replacement.  damage caused by water ingress from roof  accepts wall damage and mould remediation “in good fait h” because possible leak in adjacent bathroom resulted in damage  does not acc ept any contents damage claimed as the complainants have not shown to have been ca used by storm event . Garden and electrical issue s  garden light and fountain not working  storm water ingress and issues that ensued earlier in claim  Complainants have not shown damage from storm  relates to underground cables – cover for this is excluded un der policy, and  short circuiting of the internal damages has not been shown to be as the result of the accepted water ingress. 3.2 Expert reports Record Key points financial firm ’s expert (F ) engineer‟s r eport 14 October 2014  “ observed water staining to the plasterboard ceiling and the damage to the parquetry flooring within the upper floor of the subject house is consistent with the damage caus ed by wat er leaking from the roof space most likely as a result of plumbing deficienc ies”  “ recommends suitably qualified plumber to be engaged to investigate and assess the roof plumbing of the subject house for any co nstruction defects and leak age. … Conclusion  5.1 “ observed damage throughout the house has been caused by inadequate design and/or construction of the subject building and it is not due to any particular event. … Insurer’s expert  Attended premises to assess roof and conduct make - safe Determination | Case number: 659961 Page 15 of 19 Record Key points (D ) Make - safe report 18 June 2019  Provided report (including photographs) which includes > C ondition of roof is “average – Requires some work” Upper level roofing > around roof terrace “ Lead has been used to flash around wall and has dropped from behind the cladding. Also, there is c racking in the lead. We suspect water entry through the dama ged lead that is freshly sealed” > “ Shingles have dislodged, causing water entry ” > “During recent storms, a section roof shingles has been blown away from there fixings - insurable” > “ Joins in the lead flashing allow wat er to enter the lining boarding under the shingle roofing - maintenance ” > Tiles – “Whilst onsite for assessment of the roof, we suspect that the singles have bec ome brittle and started to drop. The lead has expanded and contracted con stantly and fallen away from the wall” > Insurable: - replace up to 10 shingles - review waterproofing membrane to ensure int egrity > Maintenance: - “ remove and install lead to building on 3 rd storey”. - “ Box guttering is holding water – pitch and fall must be rectified to ensure roof does not allow water to backflow into roof cavity ” - “ Roof penetration require correct versatile flashing - silicone will give way in future allowing water to enter roof cavity ” . - “ Numerous sections of lead flashing has faltered / lifted. Lead has also dropped allowing water to enter up and under the roofing ” . - “Numerous section of roofing has been patched in attempts to stop water entry in the past” Ground level roofing > “[K…] roof located on left of property lower roof. Underpitched and non - compliant. ” > “ Lower section of metal [K…] roofing is non - compliant at 0 - degree pitch - this is to allow water to backflow under the ends of the sheeting and into roof cavity ” Insurer’s expert (H ) Assessor‟s report 09 - 08 - 2019  discussed power dis ruption to certain areas of the home following storm  noted: > roof report obtained and multiple maint enance issues with both shingle and metal roofing. Metal roofing does not meet pitch requirements > mould remediation required > awaiting ro of report to determine cause of damage Complainant’s expert (M ) Mould remediation report/quote 09 - 08 - 2019  “Has any particular weather event caused the damaged to the property?” – “Yes”  “Type of damage” – “Mould contamination, Water Damage”  “Cause of Mould Damage” – “Water Leaks, Water Damage”  “Is mould sampling required” – “Yes”  “Has mould sampling been conducted” – “ No”  “Type of Mould sampling required” – “Air sampling”  “Affected rooms ” – “ All rooms ”  “Are there any water leaks within the property” – “Yes ”  Which room or rooms did the water leak occur” – “ Roof Insurer’s expert Cause / Circum stance s Determination | Case number: 659961 Page 16 of 19 Record Key points (P ) Building report 13 - 08 - 2019 Asse ssment statement:  Location and extent of the damage: pool room hallway and pray room ceiling  Estimate time that the damage has be present for: 1 - 6 months  Dwelling type: TRIPLE STOREY  General condition of roof: GOOD  Ridge pointing ( If damaged include l/m ): GOOD  Tiles above are of damage: SOUND  Roof penetrations in accordance with, SA HB 39 se ction 8.6 : YES  Adequate flashing covers in accordanc e with SA HB 39 8. 1.4: NO  Fixing seal application in accordance with SAA HP39 2.9: NO  Adequate fixing spacing wall flashings in accordance with SA HB 39 8.4: NO Cause of Damage:  Deteriorated flashin gs. Conclusion:  owner confirmed a plumber had already attended prior to attendance and the points of water entry has been temporarily sealed.  owner showed the perimeter flashings to the balcony parapet of where water entry into the dwelling had occurred co nfirming that the deteriorated flashings were the cause of water entry.  owner has already engaged his own private plumber to undertake the new flashing installation.  The water entry points are from the split and deteriorated flashings. Recommendations: Install adequate over capping with sufficient fixings to balcony p arapet. Insurer’s expert (V ) Hygienist report 19 - 09 - 2019 Ceiling  “ Ceiling linings to the Lower level Bedroom 1 and the First floor Prayer and Pool/Billiard rooms appears to be relat ed to hi storic and now seemingly resolved ” .  “ damages to plasterboard ceiling linings also cont ains localised fungal/mould growth. Thes e issues appear to be related to old water ingress issues (including that within the Lower level Bedroom 1), as at the time of the inspection, these areas were dry and displaying evidence of some age ” .  “ Although the water damage to the ceiling linings will need to be repaired, and the associated mould will need to be appropriately remediated, testing suggests these issues pose more o f a cosmetic problem than an exposure one ” . Wall  “ current moisture and fungal issues to the walls of the Lower level Bedrooms 1 & 2 do not appear to be part of a single event, but moisture seepage through the retaining walls, or condensation issues relatin g to thermal transfer due to poor insulation ”  “ current fungal issues will need to be remediat ed, with detailed cleaning also required to the habitable areas of the Lower/Basement level ” .  Lower level Bedrooms “Damp conditions have created an abnormal indoor fungal ecology, with high levels of airborne and surface mould present.  In light of the current evidence, occupancy of the Lower level habitable areas needs to be considered, as exposure issues may exist”. Insurer’s expert ( A ) Assessment  reinspection of additional damage (mould) in gym reported by complainant  assessment with complainant and builder (A) pres ent  A cut into wall on bat hroom in gym area and it was “exceptionally w et and mouldy” Determination | Case number: 659961 Page 17 of 19 Record Key points report 19 - 09 - 20 19  unable to establish if damage from same event as claimed by the complainant. Leak det ection and additional roof report for area directly above recommended  visual inspection of outside wall shows “ water running down the external wall over the flashing to the roof above, unsure if related or not roof r eport required ” Insurer’s expert (B ) Leak det ection report 03 - 10 - 2019 RESULTS FROM TESTING: > Attended site to conduct a roof report. > There is damage to the wall in the room at the rear of the property adjac ent to the ensuite, mould is present. > Spray tested the roof and external rendered wall directly above the affected area and water was seen entering the property as shown with thermal imaging photos. > The … roof sheets are in good condition. > There is cracked render which has been caulk ed previously, however there are still cracks present. > There are gaps in caulking around the air conditioning unit brackets and flashing. MAINTENANCE ISSUES (MAINTENANCE UPHELD OR ISSUES DETECTED?):  Box gutters and rain head to be cleared.  Caulking issues. REPAIRS TO BE CARRIED OUT: • Address/repair cracked rendering. • Replace caulking where necessary. • Clear gutters and rains heads. LEAK TESTING  Moisture seen to the bat hroom ceiling when spray testing the roof above Insurer’s expert (A) Desktop a ssessment report 2 1 - 1 0 - 2019  report on claim coverage decision and damage to property OUTCOME OF THE ASSESSMENT:  after “several onsite assessments regarding the damages to this property , I have been able to determine”: > from mould report that “ upstairs mould is minor and no cross conta mination issues, pote ntially very old mould upstairs ” > “ floor coverings from this event look to be the same floor coverings and damages as 2014 event and have not been replaced, roof maintenance has not been done as per past requirements and has allowed wat er to enter second storey again. Due to these factors second storey not covered ” . > Lower level damage “ look to be caused by the roof above which has been installed at 0degrees and is not compliant and a building defect, as the customer is the registered builder who built his own home he would have been fully aware of this at time of construction ” . > “ Damages total for down stairs is $4320.29 customer mould remediation quotation that is not based off any hygienist reports or tests we would pay ½ this expense being $10000 for lower level mould remediation. ” > “ New mould found in the gym area are not consistent with the event of water ingress as dated by the customer as this is a separate area and due to no water entry leaks found during leak detection would be r uled out as contributed from this claim ” . > “ There are many areas of concern regarding this property in how it was constructed and the past documents supplies with evidence of works being completed and invoiced by customers builder, no invoice has a any tax invoice Determination | Case number: 659961 Page 18 of 19 Record Key points numbers or the full builders information ” . > “ TOTAL CASH SETTLEMENT $14,320.29 ” Insurer’s expert (A) Desktop a ssessment report (building repairs) 29 - 11 - 2019  assessing c laim coverage and decision regarding repairs Lower gr ound floor bedroom 1 (front of property)  damage due to water from roof above room  roof installed incorrectly (fall requirement in building information from 2012 not met)  damage due to defect in building/roofing  exclude under policy exclusion for damage caused by defect the owner would reasonably have known about and did nothing about before the damage occurred. lower g round floor bedroom 2  visi ble mould growing on the wall  mould looks to be a result of the retaining wall allowing water from the ground to pass through the wall and affect the plaster due to insufficient water proofing to the retaining wall  Additional exploratory works is required to determine the cause of this damage  “ On my last visit we requested to remove a small section of plaster from this room and were told we would not be given access to this room again so we cannot definitively confirm or deny the cause of damage to bedroom 2 without this further invasive investigation ” . Pool and prayer room  photos 2014 claim show same cause of damage from that previously sett led on that claim (roof tiles) from which water entered the ceiling  map photos and report photos show roof was never repaired after 2014 claim  from 2014 and current claim photos of flooring damage it appears: > “to be the same as the current damage identifie d to the flooring in the current claim”. > “joins in the flooring and gaps caused by water ingress the flooring on second storey has never been replaced” from 2014 claim > complainant pointed to prayer room flooring damage raised after inspection completed. At the time there was a rug over the flooring. However, this area was also part of 2014 claim Gym room  mould visible on bottom 500mm of wall that backs onto en - suite  water leak detection carried out, however still unclear what the cause of mould growth is. L eaking toilet, however complainant advised not regularly used  damage to wall and mould remediation would need to be covered under current claim Conclusion  Areas of damage covered – Bedroom 2 and gym  Insurer would approve SOW from panel builder for these areas plus mould remediation for ground floor suggested by hygienist „V‟ and quoted by remediator „R‟  R quote lower level remediation : $21,192. 38  J quote (accepted rooms): $4320.29 Insurer’s expert (A) Desktop  notes: > i nsurer appointed remedia tion company to attend property on or around 20 June 2019 and 6 August 2019 to try to stop the spread and remove mould at Determination | Case number: 659961 Page 19 of 19 Record Key points a ssessment report (mould) 04 - 12 - 2019 premises. The proposals were reportedly rejected by the complainant on the basis he wanted a hygienist to atte nd before any remediation work. > insurer engaged qualified hygienists ( V ) who collected and reported on air and swab samples collected from t he premises > complainant disagreed with V‟s report and initially provided own quote/report from „M‟ for $20,626. M‟s report says the mould was from “black water contamination”, does not suggest the property was unliveable or that relocation was required to address mould. > M is not a hygienist, rather a mould technician. > M‟s report was done at the time complainant had re fused the insurer‟s remediator‟s attendance  upstairs damage (building and contents) not associated with current claim  insurer obtained mould remediation scope of works (SOW) f rom remediator „R‟ based on its hygienist report  no need for complainant to reloc ate due to claimable damage  suggested SOW from remediat or „R‟ and builder „J‟ “ would sufficiently cover the claimable event damages ”

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.