Text of the determination
Determination
Case number 659961
Financial firm AAI Limited
Determination | Case number: 659961 Page 2 of 19
Case number: 659961 20 August 2020
1 Determination overview
1.1 Complaint
The complainants held a home insurance policy with the financial firm (the insurer)
and lodged a claim after a storm damaged the home on 11 June 2019.
The insurer accepted the claim and appointed assessors/contractors to inspect the
property and determine the cause and extent of damage. It also appointed a
remediation company to assess the extent of any mould remediation required.
This dispute relates to the extent the damage claimed is related to the storm of the 11
June 2019. The insurer says not all the damage is related to the 11 June 2019 storm,
but is due to a failure to repair the previous damage (cash settled in June 2018), lack
of maintenance, and defective workmanship.
The complainant s disagree with the insurer‟s decision. They also say the insurer has
delayed its handling of the claim and this has resulted in physical inconvenience to
them and their extended family who reside at the premises.
1.2 Issues and key findings
What is the insurer’s liability for building damage?
The panel is satisfied that not all the damage claimed is due to the 11 June 2019
storm. As set out under Section 2.1 of this determination, the insurer ‟s liability is
limited to damage in bedrooms 1 and 2, water damage to the gym and mould
remediation/damage in these areas. The insurer is to cash settle the claim for
$40,000
Did the insurer ’s conduct cause an unreasonable delay in its handling of the
claim?
While there have been delays in the handling of this claim those delays have been
contributed to by both parties and in the circumstances the panel accepts it is fair that
no compensation for non-financial loss is applicable.
1.3 Determination
This determination is partially in favour of the complainants.
The insurer is to pay the complainants $40,000 within 14 days of the complainant‟s
acceptance of this determination in settlement of its liability for damage arising from
the claimed event.
Determination | Case number: 659961 Page 3 of 19
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues in dispute.
Due to the complexity of this dispute it has been referred to a Panel for determination.
The panel comprises the Lead Ombudsman, a panel member with significant industry
experience and a panel member with significant experience as a consumer
representative.
This determination follows consideration of all relevant information. The panel has
decided this case based on what is fair in all the circumstances, having regard to the
relevant legal principles, terms of the policy, good industry practice including codes of
practice and previous AFCA decisions where applicable.
2.1 What is the insurer’s liability for building damage?
Policy cover is subject to terms and limits
The complainan ts‟ home insurance policy cover commenced on 19 April 2019 and
covers loss or damage that occurs during the relevant period of insurance as a result
of a number of listed events including storm, subject to certain terms and exclusions.
The onus is on the complainants to establish, on the balance of probabilities, (that is
more likely than not) that the damage falls within an insured event. The complainants
say the loss or damage arose from a storm on the 11 June 2019.
The insurer does not dispute that a storm occurred and agreed to cover some
damage. However, it says it declined some of the claimed damage because:
the complainants have not shown all damage claimed was caused by the storm,
there is evidence some of the damage is pre-existing, due to
maintenance/workmanship issues which is excluded from cover
there is evidence of unrepaired damage for which the complainants were cash
settled under a previous claim.
Circumstances of the complaint
The insured building is spread over three-levels plus a roof terrace. For the purpose
of this determination, the levels will be identified as lower ground, ground and upper
levels.
The insurer says it had not completed its assessment or developed a definite scope
prior to this complaint being lodged with AFCA because the complainants would no
longer allow its experts access to the premises to conduct further inspection(s) or
carry out any mould remediation. As such, it says it is not liable for all damage
Determination | Case number: 659961 Page 4 of 19
(including contents) provided for in the male complainant‟s quotation for building
repairs, or any mould damage outside of the areas of damage which it accepted.
The complainants say the insurer had ample opportunity to assess the premises
between June and August 2019 and conducted numerous assessments which ought
to have been enough.
The insurer completed desktop assessments on what it considers to be the extent of
its liability based on the complainants‟ building quotations and available information
and proposed a cash settlement of $4,320 for building repairs and $10,000 for mould
remediation based on a desktop quote it (insurer ‟s) restoration company „R‟ ( $10,000
being just under 50% of R‟s quote of $21,192) given the quote included the upper
level of the home.
The complainants disagree with the assessment and maintain all loss claimed was a
result of the storm event. In addition to building damage and mould remediation, the
complainants say the insurer should cover:
temporary accommodation costs as they do not believe they can remain on the
premises while mould remediation occurs,
the costs of removing and storing items
mould affected contents in the claimed rooms
Complainants’ previous storm/water damage claims
The complainants had previous claims for storm and escape of liquid in 2014 and
2018 respectively. The insurer says some of the damage being claimed either relate
to defects/workmanship issues previously identified which remain unaddressed,
and/or is damage the complainants were previously cash settled to repair.
The complainants say the insurer should not take prior claims into account in
assessing its liability for the present claim because the damage is separate, previous
damage has been repaired, and the insurer‟s investigation team „cleared‟ the claim to
progress.
Previous damage relevant to the current claim
The panel has carefully reviewed available information and notes:
bedroom 1, billiard/pool room/hallway were previously damaged, and the
complainants were cash settled to complete repairs to the rooms, and
some of the damage currently being claimed are in the same areas/rooms.
The complainants‟ onus extends to showing damage/loss claimed was caused by the
claimed event. The panel accepts that it is reasonable that the complainants provide
sufficient evidence that repairs under the prior claims have been completed. This is
particularly crucial given available information suggests damage to ceilings in
Determination | Case number: 659961 Page 5 of 19
bedroom 1, the prayer and billiard room/hallway, as well as flooring damage to the
prayer and billiard rooms pre-date the claimed storm event.
Parties obtained and provided expert input
There is no dispute a storm occurred on or around the reported date of loss and likely
resulted in some damage to the insured premise. The parties‟ views on the cause of
damage differ; their positions are summarised in table provided in section 3.1 of this
determination.
The insurer‟s assessment covered bedrooms 1 (BR1) being the front room to the left
when entering the premises from G Road and bedroom 2 (BR2), the wall and gym on
the lower ground level, and prayer and billiard (hallway)rooms on the upper level.
The panel notes that the insurer provided a mould report from mould hygienist „V‟ and
the complainants from mould consultant „M‟. After carefully reviewing these reports,
the panel finds V‟s report more persuasive (noting that V‟s report does not include the
gym which was added to the claim after its attendance). This is because V provides a
clear analysis of information including its own observations and results of
sample/testing carried out in reaching its conclusions. While M suggests air sampling
was required, it based its conclusions on visual inspection of mould only.
V also says high level „condition 3‟ growth/mould was found in the ceiling and wall and
air sampling shows “excess of airborne fungal/mould spores”. However, at the time, V
says there was little evidence contents were contaminated by the mould.
The parties also obtained and provided numerous reports from
experts/trades/assessors on the claimed damage some of which are summarised in
section 3.2 of this determination.
For ease of reference, the panel will address the claimed loss (building and contents)
in the following paragraphs under headings bedroom 1, bedroom 2, gym room, prayer
room, billiard room/hallway, and garden/electrical.
Bedroom 1
The insurer declined cover for wall damage to BR1 saying the water ingress was a
result of construction issues with the roofing, and for the ceiling plaster damage
because it says it predates the claimed incident.
The insurer says it is not liable for the moisture issue and any wall damage claimed in
this room because while storm water has entered the home, it was due to issues with
construction, specifically the roof pitch of the metal roofing over the area and issues
with the size of the box gutter. It says this was identified in a pre vious claim, the
complainants knew about it and have not provided any evidence steps were taken to
address the issues.
Determination | Case number: 659961 Page 6 of 19
The insurer also refers to previous settlement for water damage to certain areas of
the home (including bedrooms 1 and 2) from a burst water pipe at the front of the
home in July 2018; it says the complainants have not shown the repairs were
completed and as such, that any issue with the wall lining and skirting is the same as
previously settled.
The complainants say all damage they identified must be covered because it was
caused by the storm.
T he insurer‟s roofer D attended the premises on 18 June 2019 for make-safe and
found the roofing over BR1 is non-complaint as it has a 0-degree pitch (underpitched)
which allows “ water to backflow under the ends of the sheeting and into roof cavity ”.
The insurer‟s assessor (A) reinspected the property on 22 August 2019. A echoes D‟s
view that the roof pitch in this area was non- complaint and defective. „A‟ also refers to
a 2012 roof report that shows the roofing was not complaint at the time it was
constructed.
The complainants disagree and provided photographs showing measurement of the
roof pitch and the occupancy permit at the time construction. The panel notes that
the complainant has not provided a roofing report.
The information provided by the insurer does not include a 2012/2014 roof report.
When asked to clarify which report referred to the pitch being non-complaint, the
insurer points to the building plans/drawings as including two-degrees pitch for the
roofing sheet in the area, compared with D‟s measurement as basis for its conclusion.
While the insurer provided a leak detection report obtained from plumber (B) by the
insurer, this only addresses water entry to the room at the back on the lower-ground
level (presumably the gym), not the bedroom.
In the panel‟s view that the complainants have not provided sufficient information to
establish the damage to BR1 ceiling was a result of the storm considering:
BR1 suffered water damage under a previous claim
the complainants were previously settled for repairs and remediation to the room
and have not provided acceptable evidence (such as independent
builders/contractor invoices, mould clearance certificate etc) showing the repairs
and mould remediation were completed
„V‟ conducted testing/sampling and found evidence of water damage to ceiling
lining in BR1, however says it is relates to old water damage/mould because the
area was dry and there was “evidence of some age”.
while the complainants‟ mould remediation quotation/report says all damage to
BR1 was from the storm, the panel is not satisfied it s writer „M‟ has sufficiently
shown how this conclusion was reached.
Determination | Case number: 659961 Page 7 of 19
As for the damage to the south eastern wall lining and skirting i n BR1, the panel
accepts water ingress during the claimed storm event caused the moisture on the wall
and skirting boards. The panel has formed this view because:
It is clear from V‟s report that moisture was present on the south-east walls of BR1.
The insurer has not provided details of the compliance requirement it refers to
the reports provided do not include sufficient information and analysis of how its
writers reached the conclusion that the roofing is non-compliant, or that the storm
water ingress would not otherwise have occurred
while V raises concerns with rising damp considered to be emanating from external
soil because part of the south-east wall of the room acts as a soil retaining wall,
there is insufficient information to establish this (rather than the storm) resulted in
moisture observed on the wall or establish an exclusion in this regard.
It is likely the moisture present has contributed to the development of mould in the
walls
As for the contents of BR1 being damaged by mould the panel notes in its report, V
says there was little evidence of mould contamination to contents in this room. The
panel accepts that the insurer is not required to cover the claimed contents in this
room given:
the lack of evidence the contents in this room was damaged due to the event.
the complainants raised contents damage months after lodgement of the claim
while the complainants mould report/remediation quote includes
remediation/replacement of entire room and contents, as mentioned earlier in this
determination, M has not provided any detailed analysis of how it reached this
conclusion. In fact, M specifically states in its report that it has not carried out any
sampling, although noting it was required
available information shows the insurer attempted to have its remediation
contractors place drying equipment at the property (which would likely have
mitigated damage through the passage of time), however the complainants
rejected this.
Given V‟s earlier report, the panel is of the view that if contamination has occurred
due to the passage of time, the insurer is not liable for the contents damage claimed.
The complainants did not agree to the insurer taking actions to mitigate further loss
and did not take any action themselves to mitigate loss as required under the policy.
Bedroom 2
The insurer has agreed to cover the claimed building damage in BR2. It says it made
this decision “in good faith” because there is evidence of “new and recent water ” .
Similar to BR1, V reported mould was present in BR2 wall(s). There does not appear
to be any question that the insurer will cover any mould remediation required in BR2.
Determination | Case number: 659961 Page 8 of 19
As with contents claimed in BR1, the insurer says it is not liable to cover any costs for
replacement/remediation of contents which the complainants say have been impacted
by mould.
The panel‟s views in relation to claimed contents in BR1 (above) also applies to BR2.
Gym
The insurer has agreed to cover the claimed water and mould damage to the wall
(which it says backs onto the ensuite ) “in good faith” because “ a leak from the ensuite
has been located and is likely contributing to the damage seen”
While the insurer agrees to cover damage to this room, it has declined cover for
contents on the basis the complainants have not shown the contents loss claimed
was due to the claimed storm event. Additionally, it points to the complainants‟ refusal
to allow its remediators to address moisture issues and complete mould remediation
despite its attempts. If any mould damage has occurred, it considers it is a result of
the complainants‟ actions/delay .
The panel accepts there was evidence some mould in this area was present at the
time the insurer conducted its leak detection testing and assessment. The
complainants should have allowed the insurer to complete mould remediation or
taken actions to address any potential for mould growth themselves. While the panel
accepts some contribution should be made to the mould remediation in this room it is
fair that it be limited in these circumstances.
Upper level billiard and prayer rooms
The billiard room (or hallway) and prayer room appear to be below or partly below
shingle roofing tiles and the roof terrace.
The insurer says there is no evidence damage to these rooms was caused by the
storm. The insurer says roof workmanship issues and/or unrepaired damage from a
previous claim are most likely the cause of damage. The available information shows
the complainants prior claim included ceiling lining around the same location, in
similar areas.
The complainants disagree and say the damage to these rooms/areas do not relate to
the previous claim and that the insurer cannot refer to the previous claim. As
previously explained, the panel does not agree with this view.
There is no dispute there was previous damage to upper levels. The available
information indicates:
there was damage to areas of ceiling on the upper level of the building resulting in
a storm claim in 2014.
as part of the insurer‟s assessment of the 2014 claim, it appointed engineer (F) to
report on cause of damage. Among other things, F found water ingress from the
Determination | Case number: 659961 Page 9 of 19
roof space was “m ost likely as a result of plumbing deficiencies ” such as
inadequate box guttering.
F recommended roof plumbi ng assessment and that construction defects and
leakage be fixed.
The complainants were subsequently cash settled to repair resultant damage.
The complainants say any defects or prior claim related issues have been fixed and:
> say there has been no water ingress from that time until the claimed incident
(about 4 years) as evidence of the repairs
> provided receipts of building works carried out
> refer to comments by the insurer‟s assessor (T) who attended the premises on
27 June 2019 that suggest previous repairs done and damage observed were
new.
The insurer says the receipt/invoices provided by the complainants are from a
building company which the male complainant is a Director/owner ; this is not sufficient
evidence of prior repairs. It says it asked the complainant to provide further
substantiation of repairs from the trades who the male complainant would have
inevitably employed to complete roofing/repair works, however this has not been
provided to date. It maintains this position.
The panel notes that this service asked the complainants to provide evidence of
previous repairs. While the complainants provided repairs invoices, they are from the
male complainant‟s building company (J). The panel does not consider the
receipt/invoice by themselves, sufficient in the absence of other corroborating
information (such as evidence of purchase of parts, paying contractors/trades etc) of
repairs.
Even if the panel accepted the invoices were sufficient (and it does not), it is also not
satisfied there is sufficient evidence that the damage claimed to the prayer and billiard
rooms were caused by the claimed storm. The panel has taken the following into
account in reaching this conclusion:
the complainants confirm they has patched many areas of cracked lead flashings,
and tape wrapp ed “[s]so lar Tube outlet and inlets tubes which penetrates the roof ”
carried out preventative work to avoid leak from the roof terrace, as ongoing
maintenance of the house. They say damage in billiard and prayer rooms:
> “ have happened from the Inlet /outlet pipes of the Solar Tubes installed on the
roof. Insulations of those tubes have been torn by the birds and possums ” and
this was subsequently fixed
> “ some storm water has penetrated through the cracked flashings which were
also fixed subsequently ”.
Neither of the above suggests damage to the rooms was a direct result of or
caused by the storm.
Determination | Case number: 659961 Page 10 of 19
while the insurer‟s assessor (T) who inspected the premises on 27 June 2019 says
in its report that the billiard room “has been repaired previously”; “viewed damage
is new damage”, and the prayer room is noted as having “new damage”, this does
not of itself show that the damage was caused by the storm event. It should be
noted that T clearly says he is unable to determine the point of entry of water from
the roof as he did not have a roof report at the time.
The insurer provided reports of D who attended the property to complete make-
safe shortly after lodgement of the claim. D‟s report includes that se ctions of roof
shingles had been blown from fixings during the storm. It is not clear from the
report that the ceiling damage is in the areas where the shingles blew off.
However, in relation to water entry D says:
> cracking to lead used to flash around wall cladding, and suspects water entry
through damaged lead “that was freshly sealed”
> “ Joins in the lead flashing allow water to enter the lining boarding under the
shingle roofing- maintenance ”
> “Numerous sections of lead flashing have faltered / lifted. Lead has also dropped
allowing water to enter up and under the roofing”.
> “Numerous section of roofing has been patched in attempts to stop water entry
in the past”
While this arguably shows that some work had been done on the roof, it was clearly
not completed appropriately if water was still entering the roof.
The insurer provided a builder‟s report from „P‟ dated 13 August 2019 which deals
with the location and extent of damage to the billiard and prayer room ceiling. D
concludes that water entry points are from the split and deteriorated flashings. It
should be noted that D estimated the damage to the ceiling had been present for 1-6
months
Further the mould report from V confirms mould in the prayer and billiard rooms are
historic and resolved. This does not support a conclusion that the damage was from a
recent occurrence of water ingress.
In view of the above, the insurer is not required to cover any damage (including to
flooring and contents) in the prayer and billiard rooms.
Garden/electrical
The insurer conducted make-safe electrical work after the claim was lodged as the
complainants reported short-circuiting of electricity at the premises. The complainants
say following the make-safe, there is damage to garden electrical and seeks
indemnity for its repairs.
On the available information, the panel is not satisfied the complainants have shown
any garden electrical issue is a result of the storm (or any other covered event), or
from the make-safe carried out.
Determination | Case number: 659961 Page 11 of 19
How the claim should be settled
The policy provides the insurer with a discretion whether to repair, rebuild or cash
settle the cost of the loss covered under the terms of the policy.
The complainants have expressed a view that the damage should be cash settled.
The insurer has not opposed this. In the Panels view given the limited extent to which
the damage relates to an insured event during the period of insurance a cash
settlement is an appropriate way to settle the claim.
The panel has considered the various quotes provided against the damage accepted
as being related to the claimed event to try to reach a figure it feels is fair in the
circumstances to cover the accepted loss.
A quote of $21,021 has been provided for damage to BR1&2 plus prayer room and
pool room. It is fair to allow 50% of this quote ($10,000) for the damage to BR1 and
BR2. R has quoted $21,192.38 for mould remediation. The quote appears to be for
the lower and upper levels of the home but does not include the Gym. As the mould to
the lower level (other than the ceiling in BR1) and to the Gym is accepted damage
then the panel considers this a fair figure to cover the accepted mould remediation.
The insurer has also accepted liability for the damage to the wall in the Gym although
no relevant quote is available. Given the damage is similar to the damage to BR1 and
BR2 the panel accepts a fair allowance would be $7500. This comes to a total of
$38,692.38
Based on these figures the panel considers a fair settlement would be to round up this
to $40,000. Accordingly, the panel determines that within 14 days of the
complainant‟s acceptance of this determination the insurer is to pay the complainants
$40,000 in settlement of its liability under the claim.
2.2 Did the insurers conduct cause an unreasonable delay in its handling of
the claim?
Under its Rules, AFCA we may award compensation (capped at $5,000) for non-
financial loss where complainants have suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with the
complainants ‟ expectation of enjoyment or peace of mind.
The panel has carefully reviewed the available information, including the timeline
provided by the complainants, email correspondence between the parties and the
insurer‟s file notes.
The panel notes the insurer initially referred the claim to its investigations team for
review and that the claim remained with its investigation team for some time as the
complainants were dissatisfied with the investigation and appeared not to have
provided all information requested in a timely manner.
Determination | Case number: 659961 Page 12 of 19
The panel accepts that the insurer is entitled to investigate claims to determine the
extent of its liability and does not consider the insurer unreasonably delayed or
handled the claim in this respect because:
its assessment of the damage continued while the matter was being investigated
the male complainant‟s initial decline of an interview and noncooperation with
information requests during July 2019 contributed to delay in investigations with the
mail complainant only agreeing to provide information on 25 July 2019. The
investigation team released the matter on 31 July 2019.
The panel has reviewed the complainants‟ position about the number of attendance
by the insurer from lodgement of the claim was excessive and caused him and his
family stress and inconvenience. The panel accepts the conduct of the claim has
been less than ideal.
However, the insurer did take steps to address possible mould and prevent further
damage. The attempts were refused by the complainant. The complainants restricted
the Insurers access to the home after August 2019 and this has caused further
delays.
The panel considers that as both parties have contributed to the delays, it is not
appropriate to award compensation for non-financial loss.
Determination | Case number: 659961 Page 13 of 19
3 Supporting information
3.1 Parties’ position about claimed damage
Area/room Claimed damage Complainants’
position
Insurer’s posi tion
Upper
level -
Billiard
/Hallway
ceiling lining
gaps in flooring
mould - building and
contents (pool table
and furniture)
requiring remediation
and/or replacement
damage due
to storm water
ingress from
roof during
storm
Complainants have not shown
damage from claimed event and:
area of ceiling and flooring
previously claimed
insufficient ev idence of repairs after
prior claim and cash settlement
insufficient evidence of repairs/
maintenance reportedly carried out
after previous claim settlement.
evidence damage pre - dates event.
Upper
level -
Prayer
ceiling lining
mould - building and
contents (temple)
requiring remediation
and replacement
respectively
damage
caused by
storm water
ingress from
roof during
storm
Complainants have not shown
damage from claimed event and:
evidence damage pre - dates storm
event
damage in the same area of ceiling
as previous settled claim
insufficient evidence of repairs, and
maintenance after settlement of
prior claim
Ground
level -
Bedroom1
ceiling lining and
lighting/ fan
wall
skirting
mould – building and
contents (mattress
base) requiring
remediation and/or
replacement.
damage from
water ingress
during storm.
Complainants have not shown
damage from storm event. and:
water ingress and ceiling damage
due to construction/workmanship
issues with roof over the ground
level rooms
previous settled claim for wall,
skirting and mould remediation.
Insufficient evidence works carried
out.
evidence damage occurred prior to
storm
Ground
level -
Bedroom2
wall
skirting
mould – building and
contents (mattress
base) requiring
remediation and/or
replacement.
damage from
water ingress
during storm.
previous cash settlement for mould
remediation to same room, no
clearance certific ate showing
remediation complet ed.
evidence of recent water ingress to
wall, therefore accepts cover for
wall/skirting damage and mould
remediation t o room “in good faith”.
does not accept cont ents claim
because:
> no evidence damage caused by
Determination | Case number: 659961 Page 14 of 19
Area/room Claimed damage Complainants’
position
Insurer’s posi tion
event
> its earlier offer to remediate and
mitigate damage affected areas
were rejected
> complainants‟ refusal to allow
remediation or mitigate loss likely
resulted in any damage
> no evidence of the extent of loss
as further ins pection has not been
allowed.
Ground
level - Gym
wall
mould – building and
contents (furniture,
gym equipment )
requiring remediation
and/or replacement.
damage
caused by
water ingress
from roof
accepts wall damage and mould
remediation “in good fait h” because
possible leak in adjacent bathroom
resulted in damage
does not acc ept any contents
damage claimed as the
complainants have not shown to
have been ca used by storm event .
Garden
and
electrical
issue s
garden light and
fountain not working
storm water
ingress and
issues that
ensued earlier
in claim
Complainants have not shown
damage from storm
relates to underground cables –
cover for this is excluded un der
policy, and
short circuiting of the internal
damages has not been shown to be
as the result of the accepted water
ingress.
3.2 Expert reports
Record Key points
financial firm ’s
expert (F )
engineer‟s r eport
14 October 2014
“ observed water staining to the plasterboard ceiling and the damage to the
parquetry flooring within the upper floor of the subject house is consistent with the
damage caus ed by wat er leaking from the roof space most likely as a result of
plumbing deficienc ies”
“ recommends suitably qualified plumber to be engaged to investigate and assess
the roof plumbing of the subject house for any co nstruction defects and leak age.
…
Conclusion
5.1 “ observed damage throughout the house has been caused by inadequate
design and/or construction of the subject building and it is not due to any particular
event.
…
Insurer’s expert Attended premises to assess roof and conduct make - safe
Determination | Case number: 659961 Page 15 of 19
Record Key points
(D )
Make - safe report
18 June 2019
Provided report (including photographs) which includes
> C ondition of roof is “average – Requires some work”
Upper level roofing
> around roof terrace “ Lead has been used to flash around wall and has dropped
from behind the cladding. Also, there is c racking in the lead. We suspect water
entry through the dama ged lead that is freshly sealed”
> “ Shingles have dislodged, causing water entry ”
> “During recent storms, a section roof shingles has been blown away from there
fixings - insurable”
> “ Joins in the lead flashing allow wat er to enter the lining boarding under the
shingle roofing - maintenance ”
> Tiles – “Whilst onsite for assessment of the roof, we suspect that the singles
have bec ome brittle and started to drop. The lead has expanded and contracted
con stantly and fallen away from the wall”
> Insurable:
- replace up to 10 shingles
- review waterproofing membrane to ensure int egrity
> Maintenance:
- “ remove and install lead to building on 3 rd storey”.
- “ Box guttering is holding water – pitch and fall must be rectified to ensure roof
does not allow water to backflow into roof cavity ”
- “ Roof penetration require correct versatile flashing - silicone will give way in
future allowing water to enter roof cavity ” .
- “ Numerous sections of lead flashing has faltered / lifted. Lead has also
dropped allowing water to enter up and under the roofing ” .
- “Numerous section of roofing has been patched in attempts to stop water entry
in the past”
Ground level roofing
> “[K…] roof located on left of property lower roof. Underpitched and non -
compliant. ”
> “ Lower section of metal [K…] roofing is non - compliant at 0 - degree pitch - this is
to allow water to backflow under the ends of the sheeting and into roof cavity ”
Insurer’s expert
(H )
Assessor‟s report
09 - 08 - 2019
discussed power dis ruption to certain areas of the home following storm
noted:
> roof report obtained and multiple maint enance issues with both shingle and
metal roofing. Metal roofing does not meet pitch requirements
> mould remediation required
> awaiting ro of report to determine cause of damage
Complainant’s
expert (M )
Mould
remediation
report/quote
09 - 08 - 2019
“Has any particular weather event caused the damaged to the property?” – “Yes”
“Type of damage” – “Mould contamination, Water Damage”
“Cause of Mould Damage” – “Water Leaks, Water Damage”
“Is mould sampling required” – “Yes”
“Has mould sampling been conducted” – “ No”
“Type of Mould sampling required” – “Air sampling”
“Affected rooms ” – “ All rooms ”
“Are there any water leaks within the property” – “Yes ”
Which room or rooms did the water leak occur” – “ Roof
Insurer’s expert Cause / Circum stance s
Determination | Case number: 659961 Page 16 of 19
Record Key points
(P )
Building report
13 - 08 - 2019
Asse ssment statement:
Location and extent of the damage: pool room hallway and pray room ceiling
Estimate time that the damage has be present for: 1 - 6 months
Dwelling type: TRIPLE STOREY
General condition of roof: GOOD
Ridge pointing ( If damaged include l/m ): GOOD
Tiles above are of damage: SOUND
Roof penetrations in accordance with, SA HB 39 se ction 8.6 : YES
Adequate flashing covers in accordanc e with SA HB 39 8. 1.4: NO
Fixing seal application in accordance with SAA HP39 2.9: NO
Adequate fixing spacing wall flashings in accordance with SA HB 39 8.4: NO
Cause of Damage:
Deteriorated flashin gs.
Conclusion:
owner confirmed a plumber had already attended prior to attendance and the
points of water entry has been temporarily sealed.
owner showed the perimeter flashings to the balcony parapet of where water entry
into the dwelling had occurred co nfirming that the deteriorated flashings were the
cause of water entry.
owner has already engaged his own private plumber to undertake the new
flashing installation.
The water entry points are from the split and deteriorated flashings.
Recommendations:
Install adequate over capping with sufficient fixings to balcony p arapet.
Insurer’s expert
(V )
Hygienist report
19 - 09 - 2019
Ceiling
“ Ceiling linings to the Lower level Bedroom 1 and the First floor Prayer and
Pool/Billiard rooms appears to be relat ed to hi storic and now seemingly resolved ” .
“ damages to plasterboard ceiling linings also cont ains localised fungal/mould
growth. Thes e issues appear to be related to old water ingress issues (including
that within the Lower level Bedroom 1), as at the time of the inspection, these
areas were dry and displaying evidence of some age ” .
“ Although the water damage to the ceiling linings will need to be repaired, and the
associated mould will need to be appropriately remediated, testing suggests these
issues pose more o f a cosmetic problem than an exposure one ” .
Wall
“ current moisture and fungal issues to the walls of the Lower level Bedrooms 1 & 2
do not appear to be part of a single event, but moisture seepage through the
retaining walls, or condensation issues relatin g to thermal transfer due to poor
insulation ”
“ current fungal issues will need to be remediat ed, with detailed cleaning also
required to the habitable areas of the Lower/Basement level ” .
Lower level Bedrooms “Damp conditions have created an abnormal indoor fungal
ecology, with high levels of airborne and surface mould present.
In light of the current evidence, occupancy of the Lower level habitable areas
needs to be considered, as exposure issues may exist”.
Insurer’s expert
( A )
Assessment
reinspection of additional damage (mould) in gym reported by complainant
assessment with complainant and builder (A) pres ent
A cut into wall on bat hroom in gym area and it was “exceptionally w et and mouldy”
Determination | Case number: 659961 Page 17 of 19
Record Key points
report
19 - 09 - 20 19
unable to establish if damage from same event as claimed by the complainant.
Leak det ection and additional roof report for area directly above recommended
visual inspection of outside wall shows “ water running down the external wall over
the flashing to the roof above, unsure if related or not roof r eport required ”
Insurer’s expert
(B )
Leak det ection
report
03 - 10 - 2019
RESULTS FROM TESTING:
> Attended site to conduct a roof report.
> There is damage to the wall in the room at the rear of the property adjac ent to
the ensuite, mould is present.
> Spray tested the roof and external rendered wall directly above the affected area
and water was seen entering the property as shown with thermal imaging
photos.
> The … roof sheets are in good condition.
> There is cracked render which has been caulk ed previously, however there are
still cracks present.
> There are gaps in caulking around the air conditioning unit brackets and
flashing.
MAINTENANCE ISSUES (MAINTENANCE UPHELD OR ISSUES DETECTED?):
Box gutters and rain head to be cleared.
Caulking issues.
REPAIRS TO BE CARRIED OUT:
• Address/repair cracked rendering.
• Replace caulking where necessary.
• Clear gutters and rains heads.
LEAK TESTING
Moisture seen to the bat hroom ceiling when spray testing the roof above
Insurer’s expert
(A)
Desktop
a ssessment
report
2 1 - 1 0 - 2019
report on claim coverage decision and damage to property
OUTCOME OF THE ASSESSMENT:
after “several onsite assessments regarding the damages to this property , I have
been able to determine”:
> from mould report that “ upstairs mould is minor and no cross conta mination
issues, pote ntially very old mould upstairs ”
> “ floor coverings from this event look to be the same floor coverings and
damages as 2014 event and have not been replaced, roof maintenance has not
been done as per past requirements and has allowed wat er to enter second
storey again. Due to these factors second storey not covered ” .
> Lower level damage “ look to be caused by the roof above which has been
installed at 0degrees and is not compliant and a building defect, as the customer
is the registered builder who built his own home he would have been fully aware
of this at time of construction ” .
> “ Damages total for down stairs is $4320.29 customer mould remediation
quotation that is not based off any hygienist reports or tests we would pay ½ this
expense being $10000 for lower level mould remediation. ”
> “ New mould found in the gym area are not consistent with the event of water
ingress as dated by the customer as this is a separate area and due to no water
entry leaks found during leak detection would be r uled out as contributed from
this claim ” .
> “ There are many areas of concern regarding this property in how it was
constructed and the past documents supplies with evidence of works being
completed and invoiced by customers builder, no invoice has a any tax invoice
Determination | Case number: 659961 Page 18 of 19
Record Key points
numbers or the full builders information ” .
> “ TOTAL CASH SETTLEMENT $14,320.29 ”
Insurer’s expert
(A)
Desktop
a ssessment
report (building
repairs)
29 - 11 - 2019
assessing c laim coverage and decision regarding repairs
Lower gr ound floor bedroom 1 (front of property)
damage due to water from roof above room
roof installed incorrectly (fall requirement in building information from 2012 not
met)
damage due to defect in building/roofing
exclude under policy exclusion for damage caused by defect the owner would
reasonably have known about and did nothing about before the damage occurred.
lower g round floor bedroom 2
visi ble mould growing on the wall
mould looks to be a result of the retaining wall allowing water from the ground to
pass through the wall and affect the plaster due to insufficient water proofing to
the retaining wall
Additional exploratory works is required to determine the cause of this damage
“ On my last visit we requested to remove a small section of plaster from this room
and were told we would not be given access to this room again so we cannot
definitively confirm or deny the cause of damage to bedroom 2 without this further
invasive investigation ” .
Pool and prayer room
photos 2014 claim show same cause of damage from that previously sett led on
that claim (roof tiles) from which water entered the ceiling
map photos and report photos show roof was never repaired after 2014 claim
from 2014 and current claim photos of flooring damage it appears:
> “to be the same as the current damage identifie d to the flooring in the current
claim”.
> “joins in the flooring and gaps caused by water ingress the flooring on second
storey has never been replaced” from 2014 claim
> complainant pointed to prayer room flooring damage raised after inspection
completed. At the time there was a rug over the flooring. However, this area was
also part of 2014 claim
Gym room
mould visible on bottom 500mm of wall that backs onto en - suite
water leak detection carried out, however still unclear what the cause of mould
growth is. L eaking toilet, however complainant advised not regularly used
damage to wall and mould remediation would need to be covered under current
claim
Conclusion
Areas of damage covered – Bedroom 2 and gym
Insurer would approve SOW from panel builder for these areas plus mould
remediation for ground floor suggested by hygienist „V‟ and quoted by remediator
„R‟
R quote lower level remediation : $21,192. 38
J quote (accepted rooms): $4320.29
Insurer’s expert
(A)
Desktop
notes:
> i nsurer appointed remedia tion company to attend property on or around 20 June
2019 and 6 August 2019 to try to stop the spread and remove mould at
Determination | Case number: 659961 Page 19 of 19
Record Key points
a ssessment
report
(mould)
04 - 12 - 2019
premises. The proposals were reportedly rejected by the complainant on the
basis he wanted a hygienist to atte nd before any remediation work.
> insurer engaged qualified hygienists ( V ) who collected and reported on air and
swab samples collected from t he premises
> complainant disagreed with V‟s report and initially provided own quote/report
from „M‟ for $20,626. M‟s report says the mould was from “black water
contamination”, does not suggest the property was unliveable or that relocation
was required to address mould.
> M is not a hygienist, rather a mould technician.
> M‟s report was done at the time complainant had re fused the insurer‟s
remediator‟s attendance
upstairs damage (building and contents) not associated with current claim
insurer obtained mould remediation scope of works (SOW) f rom remediator „R‟
based on its hygienist report
no need for complainant to reloc ate due to claimable damage
suggested SOW from remediat or „R‟ and builder „J‟ “ would sufficiently cover the
claimable event damages ”
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.