Refusal to pay for deteriorated stumps; inadequate settlement offer; premature repairs after water inundation
Text of the determination
Determination
Case number 659743
Financial firm AAI Limited
Determination | Case number: 659743 Page 2 of 20
Case number: 659743 21 July 2020
1 Determination overview
1.1 Complaint
The complainant held a home building insurance policy with the financial firm
(insurer). In September 2016, a council pipe broke and the property was inundated for
several days with stormwater and sewage waste, resulting in movement related
damage to the home. The insurer accepted the claim.
The insurer commenced repairs before allowing sufficient time for soil drying,
resulting in the requirement for significant rectification work. The insurer says it will
cover related damage, yet it is not liable for stumps which it says were deteriorated
before the loss. It offers settlement for outstanding damage on this basis.
The complainant says the condition of stumps is a result of the water inundation and
subsequent actions of the insurer. She says finished repairs are of a poor standard
and damage is ongoing. She also says the claim experience has taken an emotional
and financial toll.
1.2 Issues and key findings
Is the insurer liable for the deteriorated stumps?
The insurer says the proximate cause of damaged stumps is long term deterioration
which is excluded under the policy. The panel is not satisfied this is the case. As the
insurer has not established an exclusion applies, it is liable for the stumps.
Is the insurer’s settlement otherwise offer fair and reasonable?
The insure r‟s settlement offer is not fair as it is based on an incomplete quote. The
insurer is liable for the lesser cost of rebuilding the home or the policy sum insured
plus applicable additional benefits.
Is the complainant entitled to any compensation?
The cla im has not been managed in line with the complainant‟s reasonable
expectations, resulting in an unusual degree of stress and inconvenience. The
complainant is entitled to $5,000 compensation for non-financial loss and subject to
proof is also entitled to the indirect financial costs of increased heating and cooling.
Determination | Case number: 659743 Page 3 of 20
1.3 Determination
This determination is substantially in favour of the complainant.
Should be complainant accept this determination then within seven days of
notification of acceptance, the insurer is to pay to the complainant the sum insured of
$213,400 and $5,000 non-financial loss compensation.
The insurer is also to pay interest on $213,400 pursuant to section 57 of the
Insurance Contracts Act (the Act) from 5 March 2020 (the date of the insur er‟s offer)
until settlement.
Taking into account the policy limits and policy terms and conditions and past
conduct, the insurer is to indemnify the complainant for the fair costs of demolition
and removal of debris and benefits payable under temporary accommodation and the
cost of removing and storing the contents of the home.
Subject to the AFCA Rules limit of $5,000 for indirect financial loss and requisite
proof, the insurer to compensate the complainant for any increased costs in utilities
bills from July 2018 (the date it was advised repairs were failing).
Interest pursuant to section 57 of the Act is to be paid on the agreed sum from the
date of payment of the utility bills by the complainant until settlement.
Determination | Case number: 659743 Page 4 of 20
2 Reasons for determination
2.1 Is the insurer liable for the deteriorated stumps?
Insurer must establish exclusions apply
The complainant must establish, on the balance of probabilities, she has suffered loss
or damage which is covered by the terms and conditions of the policy. This is known
as a prima facie or valid claim.
Once the complainant establishes this, the onus shifts to the insurer to demonstrate a
policy exclusion applies, or cover is otherwise limited.
It is not in dispute the complainant‟s policy covers damage resulting from an esca pe
of liquid, and this event caused damage at the home. The insurer says some subfloor
stumps were deteriorated and damaged before the loss because of gradual
deterioration. It says damage because of gradual deterioration is excluded from cover
and it is therefore entitled to decline cover for these stumps.
The panel accepts there was damage to the home because of an insured event, and
views this as prima facie evidence of an insured event to account for the claimed loss,
including the deteriorated stumps.
On this basis, the panel considers the onus shifts to the insurer to show, on the
balance of probabilities, it is entitled to rely on policy exclusion(s) to limit its liability
under the claim.
Insurer engaged forensic engineer to review evidence
Throughout the life of the claim, the insurer obtained engineer and assessment
reports on the condition of the property. Early reports noted relevelling the floor was
required due to movement, yet these reports identified no damage to the subfloor
stumps.
The complainant disputes the accuracy of reports. She said stumps had almost
completely decayed because of the loss, therefore the insurer is liable for this
damage. In support, the complainant supplied photographs and video footage
showing subfloor stumps in a decayed state.
Late last year, the insurer agreed to engage a forensic engineer (FM) to review early
reports and comment on current condition of the home. FM found:
stumps, primarily located beside the unpaved rear side and side of the home, are
in an advanced state of decay and resulted in a failed footing system
the advanced state of decay has been exacerbated by poor site drainage, including
a lack of pavement, and further exacerbated by the claimed overflow event.
Determination | Case number: 659743 Page 5 of 20
stumps located closest to the unpaved side of the home were in relatively worse
condition than other stumps
footing movement, resulting from on-going changes in soil moisture content,
contributed to damage
the lifespan of the stumps is between 15 and 30 years, and full-service life has
expired
decay would have been obvious when the floorboards were removed and replaced
there is no evidence that any party had previously investigated the condition of
stumps.
The panel notes the age of the building is not definitively established. FM esti mates
the building was constructed over 30 years ago.
FM says decay was exacerbated by the overflow event, yet it does not describe the
extent. The panel considers such discussion important, particularly in circumstances
where soil moisture was so greatly increased as to require mould removal, and
therefore considers FM‟s report as lacking in relevant detail in this regard.
Additionally, the complainant reported a downpipe was left off after the insurer
conducted initial repairs, causing water to disperse around the house‟s rear during
rainfall events. FM make no comment as to any potential impact this may have had.
The report confirmed the complainant‟s view that stumps are damaged and require
replacement.
Findings of insurer’s other engineers
Soon after the claim was lodged the insurer arranged for an engineer (IE) to attend
the property and report on the cause of damage. The property was inspected on 16
March 2017 and IE concluded the overflow and subsequent inundation had caused
the reactive clay soil to swell, causing movement damage to the home.
IE recommended re- levelling the house by „jacking and packing‟ between existing
stumps and bearers. IE specifies „existing stumps‟ when discussing repair methods,
and in the same report says there i s no sign of failed footings. In the panel‟s view, this
statement suggests IE probably considered the condition of stumps.
IE recommended monitoring soil moisture for two years prior to conducting repairs,
however the insurer arranged repairs before this period had expired. As a result,
repairs failed, and rectification work was required.
The panel acknowledges mould damage required the early intervention, but the panel
also notes FM‟s strong recommendation that the complainant should have been made
aware of the condition of the stumps and should have been warned that it was
premature to commence repairs.
Determination | Case number: 659743 Page 6 of 20
A second inspection occurred on 4 September 2018 after repairs had failed. IE was
directed to matters of concern by the complainant, including issues relating to stumps.
IE make no mention of the condition of the stumps in this report. IE later prepared a
scope of works in August 2019 which, again, makes no mention of deteriorated
stumps.
Throughout the claim, subfloor work has been ongoing and involved multiple parties.
Work involved stripping the existing tongue and groove flooring, replacing it with new
materials, and installing new stumps. Rectification work was later required relating to
the new stumps. Tellingly, a scope of works prepared by builder PB in April 2017
describes what actions to take if significant damage is found underneath the floor,
implying the potential for stump damage was recognised. In short, the floor and
subfloor has been a significant part of the claim, increasing the likelihood t hat the pre-
existing deterioration of stumps (if it existed) would be identified.
In circumstances where subfloor work was central to repairs, the panel consider FM‟s
view that the advanced state of decay should be obvious is particularly significant.
None of the various parties involved in repair and assessment, including an engineer
and assessor engaged soon after the loss occurred, identified any pre-existing decay
or gave proper advice to the complainant before commencing remedial repairs.
The panel also notes multiple drainage issues at the property were raised by the
assessor in early 2018. While IM say these issues did not contribute to damage, the
panel is further persuaded the insurer and its agents were aware of factors which
could cause or exacerbate stump decay. Despite this, no such decay was observed
or taken into account.
Deteriorated stumps not observed immediately after the loss
The insurer relies on FM‟s report and says the proximate cause of damage to stumps
on the unpaved side of the home is gradual deterioration. It says this damage is
excluded under the policy therefore it is not liable for the impacted stumps. While FM
provides a strong opinion as to the cause of damage, the onus is on the insurer to
establish an entitlement to rely on exclusions on the balance of probabilities.
The panel is not satisfied FM‟s views can be relied upon to the exclusion of all others.
FM attended the premises over three years after the insured event. Comparatively,
other agents of the insurer were onsite soon after the overflow and regularly over the
following years.
IE attended the property less than six months after the loss and, while methods of
investigation are not described, says no sign of failed footings was observed.
Similarly, assessors and tradespersons who replaced flooring and stumps did not
observe any decay or rot, evidence of which FM says would be obvious to any
repairer. The property was described as in a fair condition with no maintenance
required.
Determination | Case number: 659743 Page 7 of 20
Insurer is liable for deteriorated stumps
FM accepted the insured event contributed to the decayed condition of the stumps.
This is significant as it affirms the panel‟s view the stumps should be covered,
particularly as FM‟s report was so long after the event and the other more
contemporaneous reports cite no apparent issues.
The available evidence does not support the view the prior inspections were
insufficiently thorough (compared to FM) or did not pay attention to the stumps. This
leaves the evidence from FM as an outlier, which might be explained by the passage
of time since the event, and the likelihood of ongoing deterioration and damage
because of it.
On review of available evidence, the panel is not satisfied the insurer has shown the
proximate cause of damage is long term decay. Therefore, the panel is of the view the
insurer is liable for the deteriorated stumps.
This is so not only because of the above analysis but because FM was unable to
provide an opinion about the extent of damage caused by the inundation event
because of the time which had elapsed between the event, the repairs and FM‟s
inspection of the property. In the circumstances, the panel is not satisfied the insurer
has reasonably met the onus to establish the policy exclusion relied on.
2.2 Is the insurer’s settlement offer o therwise fair and reasonable?
Complainant says property is poor condition and cannot be repaired
The complainant says the tongue and groove flooring was damaged when the insurer
raised the home. In support she supplied photographs and video footage showing
sunlight visible through gaps.
The material supplied by the complainant clearly depicts sunlight visible through gaps
in floorboards. Additionally, the complainant says other work is either outstanding or
inadequate, or the insurer has not assessed certain damage, including:
roof and gutters have twisted as a result of movement
bathroom toilet has lifted from the floor
bath drain is partially blocked and draining slowly
property displays cracks in wall and ceiling
there is a large gap under front door
kitchen cupboards are unsecure.
The insurer has offered to pay the complainant $89,474.83 to settle the loss. It bases
this amount on the cost to restump the building in situ, the cost of drainage repairs
and internal cracking. It includes cost of installing new tongue and groove flooring in
the quote for restumping.
Determination | Case number: 659743 Page 8 of 20
The complainant rejects this offer on the basis it will not allow her to complete repairs
to her home.
FM unable to provide scope of works due to foreseen and unforeseen blowouts
The insurer requested FM to provide a scope of works for restumping the home, and
repairs and rectification work. FM responded advising repairs should not proceed until
the inadequate and failed footing system had been replaced which would require
moving the building off site.
FM later clarified that whatever repair method was adopted, foreseen and unforeseen
complications would cause budget blowouts and time delays. FM suggested the
insurer consider construction of a new home, or a cash settlement.
Insurer bases settlement offer on incomplete information
After FM indicated it would be unable to provide a scope of works, the insurer sought
quotes from builders (JG). JG provided separate scopes for rebuilding the home,
restumping with the building moved off site, and restumping without moving the
building. The insurer‟s offer of settlement is based on the quote to restump without
moving the building.
The quote for restumping, prepared by builder JG, allows for installation of new
footings, tongue and groove flooring and subsequent painting. It lists standard
exclusions to its scope and various other fees and costs which may be incurred. The
panel notes with concern the broad exclusion for „any item not detailed in the scope of
work‟.
JG proposes to install a pile system bas ed on a yet to be determined engineer‟s
scope of proposed works. An allowance for engineer‟s costs is not included. It is clear
the quote will increase, most likely substantially, should it ever be actioned.
Of particular concern, JG notes all care will be taken yet it will not guarantee further
damage will not occur, given the nature of works to be carried out. It says, should
work proceed, further details of all risk and costings can be provided.
The panel is concerned the insurer bases its offer on a quote which is clearly
incomplete and explicitly states work cannot be guaranteed. This concern is
compounded when the panel considers FM‟s advice which states any scope will
increase due to foreseen and unforeseen cost blowouts and delays.
Additionally, the insurer does not include costs such as alternative accommodation
arrangements or moving and storing contents while any proposed repairs occur.
Determination | Case number: 659743 Page 9 of 20
The panel does not consider the settlement offer made by the insurer is fair or
reasonable. This is not only because of the analysis set out above but also because
the insurer‟s actions in repairing the home prematurely without adequate warning,
have resulted in repairs and rectification required to the home which the insurer‟s own
expert is reluctant to cost but says a fair resolution is the rebuild of the home or
provide a cash settlement.
Insurer to pay what it would cost to repair the damage or pay the sum insured
The policy describes how the insurer may settle the claim. If it agrees to pay a claim it
will decide whether it will repair the damage or pay what it would cost to repair the
damage or pay the building sum insured shown on the certificate of insurance.
The policy stipulates where the insurer rebuilds, repairs or pays the policy holder the
equivalent costs, it will do so on a new for old basis. The policy definition of new for
old states the insurer will repair to the same type, standard and specification as when
new.
The policy also includes a lifetime guarantee on building repairs.
Any offer to pay the complainant the cost of repairs should reflect these policy
provisions and should be fair. A fair cash offer must take into account variations and
contingencies which may occur during repairs. Further, a fair cash offer should reflect
the transfer of risk to the insured who loses the lifetime guarantee on building repairs.
The panel is not satisfied the insurer has supplied a fair or reasonable quote for
repairs on which a negotiated settlement can be based.
The panel considers the insurer has had ample time to obtain such a quote. It first
engaged FM to report on the condition of the home, and what was required to repair
it, in September 2019. Its settlement offer was not made until March 2020, partially
due to the reluctance of FM to provide a scope.
In December 2016, the property was described as in fair condition with no
maintenance required. The insurer reviewed the condition of the home on 21 June
2018 and elected to continue insuring the property as it had not found any indication
the home was in poor condition.
The property now requires substantial restumping and rectification work.
Determination | Case number: 659743 Page 10 of 20
The insurer accepts damage has occurred as a result of an insured event. It accepts
liability for rectification as a result of repairs which commenced prior to soil sufficiently
drying. The panel considers the insurer is liable for deteriorated stumps. This liability
extends to costs resulting from the repair or replacement of these stumps. The panel
notes if the most appropriate repair method is restumping the entire building, the
insurer is liable for the entire cost. The panel considers this a fair outcome in
circumstances where the insurer‟s own expert engineer is reluctant to provide a scope
of works a nd says a more appropriate resolution is the construction of a new house or
a cash settlement.
Considering the insurer cannot provide a quote which guarantees work will not fail or
cause further damage, the panel is not satisfied it is fair or reasonable for settlement
to be based on the quote relied on.
The panel notes the insurer has acknowledged it could have better addressed the
requirement to have the stumps replaced before proceeding with repairs. The panel
also notes the insurer‟s submission about b etterment. However, in circumstances
where the insurer is unable to establish to the panel‟s satisfaction the extent of
exacerbation caused by the inundation event, and FM‟s reluctance to cost an
outcome where the insurer is only liable to repair some of the stumps, the panel is
satisfied the outcome proposed in this determination is the fairest outcome.
The panel considers it is fair the insurer rebuilds the home or settles the complainant
for the sum insured. The only available evidence establishes it is likely the cost of
rebuilding the home ($315,308.79) exceeds the sum insured ($213,400) at the date of
loss.
Therefore, the panel is satisfied a fair outcome is that the insurer pays to the
complainant the sum insured of $213,400.
The insurer is also to pay interest on $213,400 pursuant to section 57 of the
Insurance Contracts Act (the Act). The section provides interest is payable from the
day on which it was unreasonable for the insurer to have withheld payment. In view of
the material from FM in January 2020 and the costing from JG in February 2020, and
allowing necessary time to consider this material, the panel considers it is fair interest
is paid from 5 March 2020 being the date of the insurer‟s offer until the date of
settlement.
The policy provides additional features in addition to the cover provided under
building insurance. This includes the reasonable and necessary cost of demolishing
and removing the damaged parts of the building from the insured address and
temporary accommodation (both of which are limited to 10% of the building sum
insured and are subject to policy terms and conditions).
Taking into account the policy limits and policy terms and conditions, the insurer is
also to indemnify the complainant for the fair costs of demolition and removal of
debris and benefits payable under temporary accommodation.
Determination | Case number: 659743 Page 11 of 20
The complainant also seeks the cost of removing and storing the contents of the
home. This benefit is not covered by the policy. The panel is satisfied it is fair the
insurer includes this item in the settlement in circumstances where the complainant
was not sufficiently advised of the ramifications of early repairs which resulted in
delays and ongoing rectification and an outcome which would otherwise not have
occurred.
On the available information, the panel is unable to quantify these additional benefits.
The parties are encouraged to work together to formulate a fair settlement. However,
if this aspect of the complaint cannot be agreed, the parties can return to AFCA for a
further determination on the quantum of these additional benefits.
2.3 Is the complainant entitled to any compensation?
AFCA may award compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-
financial loss (capped at $5,000) where there has been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant‟s expectat ion of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear
a normal degree of inconvenience during a claim.
We can also award compensation for financial loss (out of pocket expenses or other
liabilities, which are caused because of the insurer‟s conduct). This is capped at
$5,000 per claim.
Complainant entitled to costs and compensation for non-financial loss
The complainant is dissatisfied with the insurer‟s management of the claim. She says
delays and inadequate repairs caused significant stress and she was required to be
heavily involved in the process.
The insurer arranged repairs without allowing sufficient time for soil to dry, against its
engineer‟s advice. The panel acknowledges the repairs we re commenced because of
mould issues. However, the panel is satisfied the complainant was not sufficiently
advised of the ramifications of these early repairs. This decision resulted in lengthy
delays and a requirement for ongoing rectification, which would otherwise not have
occurred, and which caused significant disruption for the complainant.
Determination | Case number: 659743 Page 12 of 20
The panel does not consider that the claim has been managed in line with the
complainant‟s reasonable expectations. The complainant was involved in the claim to
an unusual degree and has suffered significant interruption, frustration and distress as
a result. Taking all matters into account, the panel is satisfied it is fair the insurer pays
$5,000 in compensation for non-financial loss.
Additionally, the complainant says utilities costs increased as gaps in flooring and
throughout the home resulted in the uneconomical use of heating and cooling. She
supplied a utilities bill showing usage equivalent to a home of over four occupants yet
says she lives alone. She also supplied photographs of the gaps in the flooring.
Subject to the AFCA Rules limit of $5,000 for indirect financial loss, the panel
considers it reasonable for the insurer to compensate the complainant for any
increased costs from July 2018, that being the date it was advised repairs were
failing. This is provisional on the complainant supplying utility bills showing current
usage against pre-loss usage, preferably spanning 12-months of each period. The
insurer should use these bills to establish an average differential rate and apply this
from July 2018 until the date the claim is resolved.
Interest pursuant to section 57 of the Act should be paid on the agreed sum from the
date of payment of the utility bills by the complainant until the date of settlement.
Determination | Case number: 659743 Page 13 of 20
3 Supporting information
3.1 Our Approach
This complaint has not been the subject of a recommendation. Due to the nature of
the complaint, it has been referred directly to a panel for determination, in line with the
Operational Guidelines to the AFCA Rules. The panel consists of an ombudsman and
two representatives with consumer and insurance experience.
The panel has decided this complaint based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all the material provided by the parties. While
the parties have raised numerous issues in their submissions, for the purposes of this
determination the panel has restricted its commentary to those issues that it considers
directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
For some part of the complaint, the complainant was represented. Where relevant,
references to the complainant include references to the complainant‟s representative.
3.2 Relevant policy terms
The relevant policy terms are referred to in correspondence between the parties and
in the additional notice of response. The notice and the policy document have been
exchanged with the complainant.
What you are covered for – insured events
Escape of liquid
We cover
Loss or damage to the building caused by liquid leaking, overflowing or bursting
from any of the following:
refrigerators, freezers, dishwashers and washing machines;
Determination | Case number: 659743 Page 14 of 20
any drain, fixed pipes, roof gutters or guttering and rainwater downpipes,
drainage and sewage systems;
fixed tanks;
swimming pools or spas;
waterbeds;
baths, sinks, toilets and basins;
fixed heating or cooling system;
water main, fire hydrant or water supply pipe;
an aquarium.
We do not cover
…
wear and tear, or loss or damage by the escape of liquid occurring as a result
of a gradual process of leaking, splashing, dripping or overflowing over a
period of time when you could reasonably be expected to be aware of this
condition;
…
loss or damage caused by wear, tear, rust, fading, rising damp, mould,
mildew, corrosion, rot.
What we do not cover – general exclusions
You are not covered under any section of your policy for damage, loss, cost or
legal liability that is caused by, arises from or involves:
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light,
atmospheric or climatic conditions or gradual deterioration such as, but not
limited to:
tiles and their adhesive or grouting breaking down;
weathering of roof tiles or roof ridge capping;
gradual weathering and breakdown of bricks, mortar or concrete.
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage
or any other earth movement, but we will cover landslide or subsidence that is
specifically covered under the following insured events:
„Storm‟;
„Flood‟ (but only if you have cover for insured event „Flood‟);
„Earthquake and Tsunami‟;
Determination | Case number: 659743 Page 15 of 20
„Explosion‟.
We will not:
pay more than the relevant sum insured (unless you have the Complete
Replacement Cover® option) or policy limit;
pay extra to repair or rebuild the building to a better standard, specification or
quality than it was before the loss or damage occurred except as stated in the
meaning of „new for old‟;
fix a fault that existed before the loss or damage occurred.
…
Repairing or rebuilding damaged parts
We will only repair or rebuild the parts that are damaged in the incident covered
by your policy.”
3.3 Relevant extracts from material provided by parties
Date Action
Insurer report (IE)
3 April 2017
Inspected and photographed 16 March 2017 to
determine the cause of damage due to the subfloor
inundation as a result of sewer overflow.
Floor comprises timber floorboards, joists and bearers
supported above ground on timber stumps.
Since the inundation and storm event house
experienced movement and damage.
Some internal cracking shows signs of age. Majority of
cracking not rec ent.
Floor uneven and settles to the window next to the
kitchen and the bathroom window is out of alignment.
Bore logs show foundation soil has an upper layer of
silty soil underlaid by reactive clay soil. Possible
moisture lev els in the deeper soils have increased
because of the moisture concentrations that led to the
collapse of the upper soil.
Level survey conducted and levels vary from a
maximum of +4omm to - 144mm.
Spot level shows house generally settled towards the
front with a significant settlement next to the kitchen.
Hous e moving cracking throughout its life bec ause of
the moisture changes in the soil.
Recent subfloor inundation has contributed to hous e
movement. Made some of the existing cracking and
movement wors e. H ous e will continue to move a soil
dries out. Repairs should be wit hheld until soil is dry
out and hous e stabilises.
Recommend we reinspect in September 2017 and
Determination | Case number: 659743 Page 16 of 20
Date Action
provide a scope of works once house settled.
Without prejudice, the repairs to the inundation -
induced damage would including:
> • Re - levelling the house by jacking and packing
between the existing stumps and bearers;
> • Re - adjust all doors and windows to ensure full
working operation;
> •Cosmetic repair wall, ceiling and cornice cracks
throughout.
> • Replace cracked tile adjac ent bathroom window
and re - grout bathroom, where required;
> • Paint repaired surfaces to match existing.
Insurer report (IE)
12 September 2018
Reins pected 4 September 2018 to determine the
cause of cracking damage seen after repairs.
Recorded cracking in the cornices and wall in the
bathroom and living room.
Gaps scene between floorboards in the living room.
Downpipe next to the toilet was left off by the builder
causing water to disperse around the house‟s rear
during rain.
Pattern of movement not consistent with disconnected
stormwat er pipe or tank overflow. Repairs were
undertaken (too) early because of reported mould
damage.
Recent cracking around the internal walls has been
caused by settlement of the foundation soil bene ath
the house‟s centre as the inundated affected soil has
continued to dry out. Based on the available evidence,
there may still be some furt her movement in the house
as the inundated affected soil continues to dry out.
Recommend monitoring the house over the coming
summer period, by reins pecting in May 2019. This
should allow us to determine the appropriat e time for
final repairs, which would include cosmetic repainting
and redecorating only.
Insurer report (IE)
3 October 2018
Cracking in the bathroom has not created a potential
for a fire risk in the electrical work in the walls, or the
potential for additional damage due to the humid
bathroom environment.
Based on the recent cracking, it appears the repairs to
the house were undertaken prior to the influence of the
inundation fully dissipating. ….these repairs were
required to be undertaken to remediate the mould
issues, and so the recurrence of some damage was
unavoidable in the circumstanc es.
All movement and damage relatin g to the original
event in September 2016 will fully dissipate over time.
In light of the recent movement, there may still be
Determination | Case number: 659743 Page 17 of 20
Date Action
some minor movement in the near future and
recommend reinspecting after the coming summer
period, in around March 2019, to determi ne the extent
of remaining damage from the event that requires
repairs. These final repairs will consist of cosmetic
crack repairs and repainting only.
Insurer report (IE)
3 July 2019
Reins pected 18 June 2019 to determine damage since
repairs.
Continued movement with new cracking. Toilet lifted
from the floor. Front and rear doors out of alignment.
Adequate time provided for any soil affected by the
inundation in 2016 to dry out and return to the
condition it held prior to the inundation. Therefore, fina l
repairs to the house as a result of the inundation could
be considered.
Influence of the 2016 inundation has dissipated.
Minor cracking and movement can be repaired. Install
a flexible joint in the pipe under the toilet. Scope can
be provided.
Movement in the toilet pipework suggests the
possibility of a further pipe leak. Recommend testing
the house‟s plumbing to det ermine if there are any
additional leaks.
Hous e will continue to move and crack in the future
due to seasonal and environmental factors un related
to the inundation event in 2016. Therefore, any repairs
to the house cannot be guaranteed.
IE Scope of works
19 August 2019
Possible that other work may be required to ac hieve
total reinstatement.
Other building repairs not specified in this Scope of
Works may become necessary if work at the site
exposes additional damage or circumstances not
previously considered.
Engineer’s report (FM)
27 November 2019
Senior forensic engineer inspected and photographed
property with the complainant on 23 O ctober 2019.
Reviewed several reports provided to him.
Estimates house constructed 30 years ago. Floor is a
timber framed construction support ed by stock
footings. Footings are mainly timber stumps buried in
the ground and (recently installed) bearing on concrete
blocks.
Undertook level survey. Total variance in levels across
house 78mm. General pattern of settlement towards
the north west. Assumes house faces West.
Soil tests show soils are extremely reactive.
Describes internal damage as very slight.
In ternal damage caused by failed footing system as a
Determination | Case number: 659743 Page 18 of 20
Date Action
result of the severe (long - term) decay of the timber
stumps located mainly along the (unpaved) elevations
of the house to the nort h and east ( by far the
predominant cont ributing factor to the observed
dam age) and differential footing movement resulting
from on - going, differential changes in the moisture
content of the extremely reactive foundation soils due
to seasonal changes in soil moisture and inadequate
site drainage particularly along the east (rear) .
Typical lifespan of hardwood timber stumps supporting
the house lies somewhere between 15 to 30 years.
Timber stumps supporting the hous e have gradually
decayed over time as a res ult of being in contact with
the ground for their full - service life thus fa r.
Observed severe to total decay of the timber stumps,
mainly along the (unpaved) perimet er of the house to
the north and east, has been exacerbat ed by the
prevailing poor drainage conditions as a result of the
lack of any protective impervious pavement in t his
area.
Decay has been further exacerbated by the sewer
overflow event of 2016.
This is in contrast to the naturally weathered and aged
(but not decayed) timber stumps along the (paved)
western perimeter.
On - going dec ay of the hardwood stumps combined
with seasonal footing movements resulting from
differential variations in the moisture content of the
extremely reactive foundation has continued to cause
misalignment of the timber floor, in particular the
continuing floor movement around the toilet pan/ waste
pipe and the very slight to slight cracking in the house.
Successive works thus far completed should not have
been proceeded with considering the presence of the
existing decayed timber stumps. Any rating of the
completed work is now irrelevant as th e provided
scopes have bot h dealt with the repair of resultant
damage symptoms without due consideration being
given to the advanced state of decay of the timber
stumps, mainly along the (unpaved) perimeter of the
house to the nort h and east elevations.
H ous e is still considered safe to occupy from a
structural adequacy point of view. But concerned about
the advanced deterioration of the timber stumps which
are locat ed mainly along the rear perimeter.
Serviceability of the house will continue to regress by
way of on - going movement of the house,
predominantly as a result of the continuing
deterioration of the hardwood timber stumps.
Could not find any phot ographic evidence, or
Determination | Case number: 659743 Page 19 of 20
Date Action
otherwise, that the timber stumps had been
investigated and/or considered by any p arty prior to
this site attendance.
Would have expected that the advanced decayed
condition of the timber stumps would have been
obvious to a repair builder at least at the stage when
the floorboards were removed and replaced with new.
Initial repairs and subsequent repair works have not
adequately performed not as a result of any sub -
standard works but because of premature execution of
remedial works prior to addressing the seriously
decayed timber stump footing system mainly along the
(unpaved) perimeter of the house to the north and
east.
Any future repairs to address on - going soil movement
and related cracking to the house should not proceed
until the inadequate and failed timber footing stumps
have been replaced.
Emails between FM and
Insurer
4 Decemb er 2019
When the floor was up during repairs, and prior to
repairs, FM would have highlighted (to the owner) the
deteriorated condition of the timber stumps and
recommended that the crack repairs should not be
performed prior to addressing the repair/repla c ement
of the timber stumps.
FM would have raised concerns regarding the
suitability and the adequacy of the existing footing
system with respect to the actual site classification
which is extremely reactive. A very explicit and
emphatic warning would have also been made that the
(flexible) timber stump footing system, founded upon a
reactive clay soil will continue to experience the effects
of seasonal soil movement and long - term clay soil
settlement and that there may be future cracking in this
dwelling n ot as a consequence of leaking pipe events,
flooding or the like, or for that matter the occurrence of
any other policy defined events, but as a result of
natural soil - footing interaction movement in response
to changes in climate that bring about concomit ant
changes in soil moisture content.
Re the need to reloc ate the house, or ot herwise, for
the purpose of “restumping”, FM may consider and
propose the following option or an alternative option
(whic h will not require the reloc ation of the house, if
possib le): a) A screw piles system installed from inside
the house – will require lifting the floorboards and the
use of a very small (1 tonne) machine and a lot of
physical labour to install the screw piles .
As for the extent of the event impact on the stumps,
FM cannot answer that question because of the time
Determination | Case number: 659743 Page 20 of 20
Date Action
which has elapsed bet ween the event and the repairs
and its inspection.
Observed severe to total decay of the timber stumps,
mainly along the (unpaved) perimet er of the house to
the north and east, has been exacerbat ed by the
prevailing poor drainage conditions as a result of the
lack of any protective impervious pavement in t his
area.
Decay has been further exacerbated by the sewer
overflow event of 2016. This is in contrast to the
naturally weathered and aged (but not decayed) timber
stumps along the (paved) western perimet er.
Emails between FM and
Insurer
20 January 2020
Q: Would it be correct to say that you do not consider
the option of temporary removal of the home and
restumping a viable method for the stump replacement
and therefore should not be considered as an option at
all for this customer?
A: After careful considerations and the concerns raised
(lack of lateral bracing, ACM), FM is of the opinion that
what ever repair method is adopted, foreseen and
unforeseen complications during the repair stage will
ultimately cause budget blowouts and extended time
delays and therefore no scope of works can sufficiently
address all the above concerns and preferably the
construction of a new house should be considered or a
cash settlement (under the insured‟s policy) is the
more appropriat e resolution in this case.
3.4 Other relevant material considered and relied on
Parties‟ submissions/emails and all attachments to all submissions/emails.
Parties‟ expert reports.
Photographs and videos.
Correspondence between the parties.