Determination 659549

Cash settlement of water damage building claim

FirmSuncorp Group
Decided2021-01-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$77,229
Non-financial loss—
Amount claimed$348,701
SourceAFCA PDF

Summary

The complainants disputed the insurer's cash settlement of their water damage building claim and sought further payment for building, mould, storage and accommodation costs. AFCA ordered the insurer to pay a further $77,229 for contingencies and mould remediation but rejected the other claimed amounts and compensation.

The insurer may cash settle under the policy discretion if exercised fairly, and a cash settlement should include an allowance for contingencies.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 659549 Financial firm AAI Limited Determination | Case number: 659549 Page 2 of 14 Case number: 659549 30 November 2020 1 Determination overview 1.1 Complaint The complainants lodged a claim under their home insurance policy with the financial firm (insurer) for water damage that occurred after their refrigerator hose burst in December 2015. The complainants are dissatisfied with the insurer‟s handling and settlemen t of the claim. They say the scope of work (SOW) on which the insurer based its cash settlement ($295,149) did not cover the actual cost of repairing the claimed damage. They are seeking additional payment of $348,701 for building works, mould remediation, storage, temporary accommodation and utilities at the temporary accommodation. The insurer offered/paid an additional $40,128 for building and mould remediation work and covered two additional weeks of temporary accommodation. To resolve this complaint, the insurer has offered a further $64,951 for contingencies. The complainants reject the offer and seek a review of the insurer‟s decision. 1.2 Issues and key findings Is the insurer required to increase its settlement for building repairs? The Panel accepts the insurer is entitled to rely on the quotations from its builder R and roofer HWF to settle the claim. However, the Panel determines the insurer should pay an additional $77,229 being $64,951 as a contingency as offered and $12,278 for the balance of the mould remediation costs. Is the insurer required to cover additional temporary accommodation? For the reasons set out under section 2.2 the insurer is not required to cover any further temporary accommodation costs. Is the insurer required to cover storage and utilities costs claimed? Based on the available information the Panel is satisfied the insurer has met its liability for any storage or utilities costs concerning this claim. In the absence of any information to the contrary, the insurer is not required to pay any additional utilities connection costs. Is the insurer required to compensate the complainants? The insurer is not required to compensate the complainants. While the duration from claim lodgement to settlement was approximately 11 months, there is no evidence of extended period of inaction by the insurer. The Panel is satisfied that the insurer handled the claim reasonably in the circumstances. Determination | Case number: 659549 Page 3 of 14 1.3 Determination This determination is partly in favour of the complainants. The insurer is to pay the complainants a further $77,229.00 to cover contingencies and the balance of the mould remediation in finalisation of the claim. The insurer has otherwise met its liability in accordance with the terms and condition of the policy. Determination | Case number: 659549 Page 4 of 14 . 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues in dispute. Due to the circumstances involved, this dispute has been referred to a Panel for determination. The Panel comprises the Lead Ombudsman, a member with significant industry experience and a member with extensive experience as a consumer representative. The determination follows consideration of all the available information. It is based on what is fair in all the circumstances having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Is the insurer required to increase its settlement for building repairs? Policy covers loss or damage caused by escape of liquid There is no dispute the complainants had a valid claim for damage caused by the escape of liquid. The complainant ‟ s home and contents policy provides cover for a series of insured events including the escape of liquid subject to several limitations and exclusions. The complainants lodged the claim with the insurer on 21 December 2015 for damage caused by a leaking water machine on a refrigerator. During investigation of the claim the insurer identified two other events, namely damage from a bathtub leak or overflow and damage from a leaking air conditioner. Both claims have been settled and are not part of this complaint. Claim cash settled based on SOW A brief timeline of events leading to the cash settlement is provided in section 3.2 of this determination. The timeline is mainly drawn from file notes/record provided by the insurer, the parties submissions and copies of email correspondence provided. The insurer appointed an assessor on 22 December 2015 and a builder M to assess the damage in January 2016. M identified maintenance issues with the property that would make it hard to warrant the repairs . Mould related issues arose, and remediation was attempted in July 2016. Ultimately the insurers builder R provided a SOW for the damage determined to have been caused by the refrigerator pipe leak. R indicated it could not warrant building works due to ongoing/incomplete repairs in one of the bathrooms. In the insurer‟s claim outcome letter, it also suggests a break-down in relationship between parties. Determination | Case number: 659549 Page 5 of 14 Policy allows insurer to decide how to settle claim The insurer cash settled the contents claim for the sum insured and the building claim for $295,149.72 based on quotes from R and HWL, a flooring specialist. The complainants consider the insurer should have repaired rather than cash-settled them for building repairs. They expressed preference for the insurer to complete the building repairs, however the insurer went ahead with cash settlement citing R‟s inability to warrant repairs. They do not accept available information shows the work could not be completed and warranted by R. Under the terms of the policy, if the insurer agrees to pay a claim, it will decide whether to repair/rebuild or pay the complainants what it would cost it (insurer) to repair/rebuild the home. The Panel accepts the insurer is entitled to exercise this discretion under the policy terms however, it is required to exercise such discretion fairly, reasonably and consistent with utmost good faith. Having carefully considered the available information, the Panel is satisfied the application of the insurer‟s discretion to cash settle was reasonable , given:  R clearly expressed unwillingness to warrant the repairs due to ongoing repairs and condition of the property unrelated to the claimed event  there is an extensive history of complaints made by the complainants through the claim process. The complaints include contents/contents remediation, claim handling and conduct of the insurer‟s contr actors. This is evidence of breakdown in relations/communication.  The quote from the HWF for supply and replacement of all timber flooring Complainants say settlement amount is insufficient After the claim was settled, the complainants contacted the insurer and advised their builder (D) would be unable to complete works relating to structural flooring in the manner provided for in the insurer‟s SOW and requested a meeting. Following a site meeting on 9 February 2017, the insurer wrote to the complainants in March 2017 maintaining the SOW and cash settlement amount was sufficient to cover the reasonable cost of repairs and discharges its obligation. The complainants sent a request for additional costs incurred to the insurer in June 2017. A list of items that make up additional costs claimed is provided in section 3.2 below. After reviewing this information, the insurer paid the complainants $40,129.15 being $29,605.30 for additional building and $10,523.85 for 50% of the mould remediation cost. Determination | Case number: 659549 Page 6 of 14 The complainants say the total cash settlement is not sufficient to cover the cost incurred to repair the insured damage and provided the following information as evidence of additional loss they say they have incurred:  construction proposal/ revised SOW by their builder „D‟ totalling $861,910.78  statement by D outlining why structural flooring cannot be accessed in manner provided for in R‟s S OW  mould testing reports dated 6 March 2017, 18 & 25 January 2018  mould testing invoices  plasterer‟s invoice  timber/hardware invoices from two suppliers  cabinetry invoices covering kitchen cabinetry, 6 vanities, 4 robes and stone  electrical invoices which include variation due to wall removal as well as remove The complainants say D‟s statement shows that structural flooring could not be accessed, and flooring repl aced as provided for in R‟s S OW. According to D‟s statement several methods were attempted to complete work as provided for and failed. The complainants say D‟s statement supports conclusion that R‟s S OW was unachievable and the cash settlement amount, insufficient. The complainants say the only method that worked resulted in damage to battens, wall frames, ceiling (battens and sheets), cornices, electrical wiring and cabinetry in the pantry, laundry and wardrobes. They also say further mould remediation was required after removal of these building materials as their hygienist found mould contamination due to water leak at the premises. Information does not establish entitlement to further amount claimed The Panel has reviewed information provided by the parties. The Panel is satisfied that the assessed scope of works provided by R is reasonable. It is detailed and itemised. The quote from HWF is clear and covers replacement of all timber floors. The Panel has reviewed the complainants‟ submissions, including D‟s S OW, email statement and individual supplier invoices to D. The SOW does not contain a detailed break-down of costs on a room by room basis showing what material/labour falls within each section. Further, the email statement from D does not provide any detail in relation to specific increases in cost of material, labour etc. The statement is not supported by any detailed report, documents, photographs or the like and it does not provide an analysis of evidence supporting the conclusion that the repair method provided for by R was not standard in the industry or would result in the repairs being non-compliant. Determination | Case number: 659549 Page 7 of 14 While the supplier invoices provided show D was billed for certain material and contractors‟ work (cabinetry, electrician etc) , these documents do not show the costs were incurred solely due to claim related damage. The Panel also notes information from D is not provided in a manner that would allow for a proper like for like comp arison between what was provided for in R‟s SOW and what was in D‟s SOW. AFCA drew the complainants‟ attention to the need for detailed scope of works/actionable quotes to support their position throughout the complaint process. However, the complainants have not provided information other than what is mentioned in this determination. The complainants say what they provided sufficiently shows they are entitled to the full additional amount claimed. The complainants say the quotation which the insurer based its cash settlement on is not achievable in the market. They have not provided any evidence (such as comparison quotes they obtained at the time) to support this position. The Panel is satisfied the insurer was entitled to rely on the quotations obtained to settle the claim. The repairs included in the scope of works are consistent with the claim-related damage identified in the reports provided (including photographs) by the insurer‟s contractors following their assessment of the claimed damage. Fair in the circumstances that insurer increase the cash settlement While the insurer has cash settled the claim, by cash settling the claim it has transferred to risk of the repair process to the comp lainants. Where an insurer chooses to cash settle a claim then it should make an allowance for the contingencies that may occur in the repair process. The insurer has offered to the pay a further $64,951 being a 20% contingency payment to cover the transfer of risk. The Panel considers this is a reasonable amount for the building works. The Panel notes the complainants claimed $24,556.27 for further mould remediation. The complainants say this was required after mould testing following demolition showed airborne mould particles and surface mould contamination. The complainants say this was a direct result of the water damage . The Panel has reviewed the extensive history relating to mould remediation at the premises following the claimed event. It is not clear on the available information that mould issues at the premises had been completely resolved as there is no report to that effect. The insurer allowed for 50% of the costs of further mould remediation. There is no information to support the conclusion that this is a reasonable contribution to those costs. The Panel accepts that it is likely that any mould issue would have been contributed to by the claimed event. Determination | Case number: 659549 Page 8 of 14 To achieve finalisation of this aspect of the claim, the Panel considers it fair in the circumstances that the insurer pays an additional $12,278.00 to cover the full amount claimed for additional mould remediation at the property. The insurer must therefore pay the complainants a further $77,229.00 to settle the claim for the building damage. 2.2 Is the insurer required to cover additional temporary accommodation? The complainants‟ policy provides benefits including temporary accommodation up to 12 months to a limit of 10% of the sum insured. Relevant policy wording is provided in section 3 of this determination. The insurer is not required to pay temporary accommodation benefits for the entire repair period, but only for such time as the complainants ‟ property is unliveable. Available information shows the insurer covered the emergency and temporary accommodation to 12 May 2017, and a further two-weeks cost was reimbursed to the complainants in or around August 2017. While the complainants suggest they are entitled to further temporary accommodation payment due to delays in construction, they have not provided evidence that the duration of claim related repairs exceeds what the insurer has provided, that the home was unliveable throughout the period of repairs, or that any additional time taken was a result of the insurer ( rather than their builder‟s ) actions. Further they have not provided evidence of the additional loss claimed. On the available information, the insurer is not required to cover any further temporary accommodation costs. 2.3 Is the insurer required to cover utilities and storage costs claimed? The policy benefit for utility at temporary accommodation extends to connection costs reasonably and necessarily incurred , not usage costs. The insurer says it has made payment for connection costs; the complainants have not provided any evidence to the contrary. As such there is no basis to determine any additional cost is payable to the complainants in this regard. In relation to storage costs, the available information shows the complainants were settled the full sum insured for contents that were deemed total loss; therefore, they are not entitled to further payment for storage of “undamaged” contents provided for under the policy. Determination | Case number: 659549 Page 9 of 14 2.4 Is the insurer required to compensate the complainants? We can award compensation in certain circumstances Under AFCA‟s Rules, we may award an amount of compensation (capped at $5,000) for non-financial loss where a complainant has suffered:  an unusual degree or extent of physical inconvenience  time taken to resolve the situation  interference with their expectation of enjoyment or peace of mind. However, we expect a complainant to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. The complainants say the insurer did not take steps to prevent mould growth and its actions in conducting several assessment and inspections resulted in growth of mould and damage which could have been avoided. They say the mould negatively impacted the female complainant and their child‟s health . No award of compensation is warranted in the circumstances The Panel has carefully reviewed the available information, including the insurer‟s claim records and considers the insurer did not unreasonably delay or mishandle the claim overall. There is no record of extended periods of inaction by the insurer. While there was a lot of communications, assessment, appointment of different experts to determine the extend of loss/damage to building and contents, the Panel does not consider this unreasonable given the complexity of the claim (including the discovery of two other leaks), issues that arose about the installation and repairs to the timber flooring and remediation at the premises. In the circumstances, the Panel does not consider that an award of compensation for non-financial loss is warranted. Determination | Case number: 659549 Page 10 of 14 3 Supporting information 3.1 Brief timeline of events Date Action 21 - 12 - 2015 Claim lodged 22 - 12 - 2015 Insurer assessor appointed 07 - 01 - 2016 Insurer informed builder „M‟ appoint ed 02 - 02 - 2016 M informed insurer complainants had indicated attendance/repairs to occur after 04 - 03 - 2016 14 - 03 - 2016  M raised concerns about repairing floor due to installation without joists  M suggested potential for cash settlement du e to disagreement on having expansions joists and unable to warrant  recommended obtaining flooring consultant report 29 - 04 - 2016  flooring expert (A) appointed 18 - 05 - 2016  complainant advised insurer of mould at premis es 27 - 05 - 2016  insurer‟s restorer ( W ) advis ed insurer mould covering everything at premises and that the temporary accommodation (TA) would be required  insurer tried to cont act complainant to arrange emergency TA 07 - 06 - 2016  complainant contacted insurer and says: > mould making her sick > she does not want repairs cash settled, she wants repairs done her way (no expansion joists) by insurer > wants pets placed in TA/boarding and has submitted quotes  FF advis ed > to obtain quote from repairer (A) to see if same repair process > TA extension until premises stable/liveable environment after mould remediation 10 - 06 - 2016  Mould review re - attendance requested as initial test seem to have come back clear (likely incorrect) 14 - 06 - 2016  Insurer notes it will appoint engineers (JH) as concerns with excessiv e mould situation and whether linked to historic event ( s) 17 - 06 - 2016 Insurer‟s r e - inspection report  attended premises with flooring consultant (A)  await „A‟ report before “establishing final direction/findings, however,  from discussion s flooring would not need to be replaced , a further 6 month drying period, then a sand/polish of the affected rooms (Kitchen/living, Long hallway, Toilet, Master bedroom, WIR, Butler's pantry, Formal lounge & pantry cupboard) was all that is required. No need for expansion joints to be installed”  mould issues: await report from expert  JH to attend on 21 June to “review the downstairs retaining wall and the possibility Determination | Case number: 659549 Page 11 of 14 Date Action of mould/moisture issues to be occurring due to some other means” 22 - 06 - 2016 complainant cancelled JH inspection for 21 - 06 - 2016 27 - 06 - 2016  Male complainant advises insurer to only contact him (not female complainant )  Male complainant questioned requirement for JH to attend and insurer explained “ so we need to determine what is going on ” wit h mould, “ we ne ed to know where the mould is coming from asap ”. Insurer p ointed out previous assessment in 2012 following a malicious damage claim and that the report noted “rear block wall of the lower level is dug into the sloping block of land … at this time that it is possible that there is a fault with the waterproofing membrane to the block wall that is causing moisture to the lower level to stay high ” .  insurer raised issue with complainant‟s delay resulting in furt her TA being needed and that it may cease cover for TA  insurer provided complainant with JH details to arrange urgent assessment as need to determine mould issue – origin b efore remediation work is done. 30 - 06 - 2016 JH and insurer‟s assessor attended premises 01 - 07 - 2016 JH report - mould related to wat er leak from fridge 04 - 07 - 2016  insurer‟s notes indicate after reviewing JH report, mould due to escape of liquid ( EOL ) event. Re mediation authorised  insurer to extend TA till mould remediation done  Flooring expert report from „A‟ 07 - 0 7 - 2016  Complainant rais ed concern wit h insurer about insurer‟s remediator doing mould remediation. Insurer advised the remediat or will complete work in line with SOW  insurer say s a waiting report but will need to allow about 6 month drying period to do flooring/timber repairs 08 - 07 - 2016  Insurer received escalation of female complainant‟s concern with remediation company  Insurer contacted remediator W who confirmed it can complete the job, therefore insurer appointed new remediation company to complete remediation 13 - 07 - 2016  W commenced remediation 14 - 07 - 2016  W report ed secondary cause of mould/leak – lower level bedrooms 2&3 27 - 09 - 2016  Onsite meeting bet ween insurer‟s assessors and complainants. Matters discussed includ es : > building SOW “ $209, 089.63 changed to $223,089.63 following onsite clarification that scope is likely to be higher ”, as well as contents settlement and TA > trying to work out suitable settlement ( insu rer suggest ed its builder does not want to do the work) 07 - 10 - 2016  Com plainant suggests cash settlement of contents sum insured due to W‟s failure in remediation Determination | Case number: 659549 Page 12 of 14 Date Action October 2016  Third EOL claim lodged for leak from toilet  “called [ E …] samples indicate higher than normal mould issues >underside sub - floor is extremely mouldy, DNA will clarify if fridge leak, bathroom leak or other [indicates full sub - floor replacement required] >… [ E ] mould testing results to verify extent of covered clai m building repairs – provide written formal outcome to customer of options of fulfilment pending mould testing results” October - November 2016  W completed mould remediation and cont ents removal  builder (R ) and floorer (H ) completed quotes/SOW (R als o sai d work could not be warranted)  insurer cash settled content sum insured = $109K  Com plainants raised complaint. Insurer‟s notes of 4 Octob er 2016 suggest reasons include dissatisfaction with supervision by insurer‟s vendors  Insurer‟s notes show it advised complainants it d oes not accept that vendors can “provide safety liability for customer being onsite during co nstruction” Insurer also notes complainant‟s interference with works being done to date  on 21 October 2016 insurer informed complainants building claim will be cash settled.  on 6 November insurer wrote to complainant outlining cash settlement decision  c omplainant s dispute about settlement went through insurer‟ s IDR  on 10 November 2016, IDR maintained cash settlement decision  on 25 November 2016, in surer cash settled $295, 149 for home repairs based on R ‟s building quote 03 - 02 - 2017  Complainants‟ builder (D) wrote to them saying among other things: > “ entire first - floor structural flooring has been in contact with moisture as the water has travelled bet ween the spotted gum floating floor and the structural flooring beneath, therefore mould is present ” > “cannot remove the structural flooring underneath the internal wall frames without first removing all of the framework. Because like all homes, the structu ral flooring is installed before the wall frames and trusses are installed on top” > “We have pulled up all the flooring except underneath the wall frames > “We have tried multiple methods of removing the flooring underneat h the frames, including trying to cut the fixings with a sabre saw, chiselling out the flooring in small pieces, jacking the frames and flooring up slightly with a car jack to give enough cl earance to remove the flooring. All of which are unfort unately doing more harm than good to the structural int egrity of your home and unsuccessfully removing the contaminated material”. > “To remove the wall frames all gyprock must be removed from the frame s, all cornice will need to be removed, the ceiling battens are also connected to the wall frames which means the ceiling must come down and the ceiling battens removed” > “There is no guarant ee that the framework can be removed without damaging the frames. If this is the case you will require new steel internal wall frames installed throughout the first floor of your home” 09 - 02 - 2017  R, insurer‟s building consult ant, D an d complainant(s) met at premises 10 - 02 - 2017  R emailed complainants requesting copy of home building plan Determination | Case number: 659549 Page 13 of 14 Date Action 06 - 03 - 2017  Insurer wrote to complainants advising : > it had r eviewed request for additional payment bas ed on complainant‟s builder‟s (D) scope of works and > had req uested that R its B uilding Co - ordinator (BC) and Assessor, re - inspect the damage to consider the R and D‟s scope of works against one another > follo wing re - inspection, it is satisfied that the R Scope of Works sufficiently allows for the cost of the repairs to damage caused by the leak from your fridge, the bathroom leak and the air - condit ioning leak. > its cash settlement decision of as set out in N ovember 2016 is maintained 09 - 03 - 2017  Complainants ‟ response to insurer‟s 6 March 2017 decision inc luded that: > the repair quote from R “ advises the method of removing the structural floor ing is to raise each wall frame” > when R inspected the “ work carried out to date by our repair contractor it was shown that this method could not be carried out due to the way the wall frames were glued and fixed to the met al joists and block exterior walls ” > R and BC “ both agreed verbally with our construction contractor and ourselves that the way the structural flooring was removed is the only possibly way it could have been carried out successfully and efficiently. ” 27 - 06 - 2017  complainant letter to insurer outlining additional payment required due to D not being able to successfully remove structural flooring to complete claim related repairs. Complainants note s: > D t ried different methods but only way resulted in damage to the remaining gyprock sheeting, cornices and ceiling sheets which then had to be removed. > R‟s representative and insurer‟s assessor attended the premises and agreed “ the only remaining course of action that could successfully have been taken was to completely remove each of the wall frames in order to be able to remove the damaged and contaminated structural flooring”. 25 - 07 - 2017  Insurer‟s BC provides statement: > about onsite meeting at insured pr emises on 9 February 2017 > with outcome of his reviews additional submission by complainant dated 27 June 2017 > specifying items from the complainant‟s request he considered admissible, partly admissible and not admissible and why > recommen ding that insurer obtain costing from R for the admissible/partly admissible items for payment 12 - 08 - 2019  AFCA complaint lodged 3.2 Additional costs claimed by complainants  building = $292,831.35  mould remediation = $24,556.27  temporary accommodation = $18,012.14  electricity/power connection and usage at temporary accommodation = $5552  gas connection and usage at temporary accommodation = $450 Determination | Case number: 659549 Page 14 of 14  telephone and internet connection at temporary accommodation = $400  storage of personal items, furniture and clothing = $6900 3.3 Relevant policy terms  Pages 26 – 28 PDS Additional features If we accept your claim for loss or damage due to an insured event, we will also provide the following additional features. ... Below is an overview of the additional features and the limits that apply for each level of cover. For full details read the PDS. … Temporary accommodation when you have home cover We cover When an ins ured event damages your home to the extent you cannot live there, and we agree, we will pay for your reasonable temporary accommodation costs for the time it will take to repair or rebuild your home to a liveable condition. (emphasis added) … We will also pay the reasonable and necessary costs for: – redirection of mail from the insured address for up to … – utility connection costs at the temporary accommodation residence; – relocation of your contents to and from the temporary accommodation residence if you have contents cover under this policy; … Limits … The most we will pay under this feature is 10% of your home sum insured and the longest period you can claim for is 12 months ...  Page 69 -PDS: How we settle your claim We choose how we settle home claims If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will: – repair damage to your home; – rebuild your home; – pay you what it would cost us to repair or rebuild your home; – pay you the sum insured for your home. If we rebuild (or pay you what it would cost us to rebuild), we will do so on a „new for old‟ basis. If we repair (or pay you what it would cost us to repair), we will at our option do so on a „new for old‟ basis or to a similar condition to wha t your home was in before the loss or damage occurred. We may offer you a voucher, store credit or stored value card for the amount it would cost us to repair or rebuild an item …