Home / IAG / Determination 658310
Determination 658310
Storm damage claim: scope of internal repairs, cash settlement and roof exclusion
Summary
The complainant's storm claim was partly denied for roof damage and some internal areas, and she rejected the insurer's cash settlement offer. AFCA increased the internal repair allowance with a 15% uplift, ordered accommodation and storage allowances and interest, and awarded $1,000 for non-financial loss.
The roof was excluded as wear and tear and lack of maintenance, but the insurer's assessor quotes underestimated storm damage to internal areas, so a fair cash settlement with a risk uplift applies.
Issues
- Claim amount dispute primary · upheld
“The insurer is required to make an amended offer; the cash settlement for internal repairs totals $55,981.77.”
- Claim denial secondary · not upheld
“I accept the conclusion of the insurer and its decision to deny a claim for damage to the roof.”
- Delay secondary · upheld
“The available material suggests the claim has been delayed significantly and the insurer's assessors have not allowed sufficient scope.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interestpay non financial loss
Text of the determination
Determination
Case number 658310
Financial firm Insurance Australia Limited
Determination | Case number: 658310 Page 1 of 9
Case number: 658310 1 April 2020
1 Determination overview
1.1 Complaint
On 31 January 2019 the complainant lodged a claim on her home and contents
insurance policy with the financial firm (the insurer) for storm damage. The
complainant said water was leaking from several areas of her home.
The insurer accepted the claim for most of the internal damage but denied the portion
of the claim related to the roof. The insurer says this damage was caused by wear
and tear and a lack of maintenance, which are circumstances specifically excluded
from cover under the policy.
The insurer has offered a cash settlement for the internal repairs and this has not
been accepted by the complainant. The complainant wants the insurer‟s decision
reviewed and the damage to her home repaired.
1.2 Issues and key findings
Is the insurer entitled to rely on its exclusion to deny liability for a portion of the
claimed damage?
Yes. The evidence submitted by the parties supports the decision by the insurer to
deny liability for the roof and for some of the internal damage claimed. However, the
insurer is required to increase its offer for repairs for the internal damage, in
accordance with this determination.
Is the complainant entitled to compensation for non-financial loss?
The available material suggests the claim has been delayed significantly and the
insurer ‟s assessors have not allowed sufficient scope for the loss and damage to the
home. This has created a level of stress and inconvenience for the complainant over
and above the ordinary claim ‟ s experience expected.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is required to pay the complainant:
$55,981.77 as a cash settlement for the repairs to the home as outlined in section
2.1
an allowance for the reasonable cost of accommodation for the complainant and
her family while the repairs are being completed (no time frame has been provided
for the duration of the works required.)
Determination | Case number: 658310 Page 2 of 9
an allowance for the storage of the complainant‟s contents required to be mo ved
from her home while the repairs are being completed (no time frame has been
provided for the duration of the works required.)
interest on the cash settlement for the repairs, in accordance with the Insurance
Contracts Act 1984 (the Act), from 31 January 2019, to the date of settlement
$1,000 compensation for non-financial loss.
Determination | Case number: 658310 Page 3 of 9
2 Reasons for determination
2.1 Is the insurer entitled to rely on its exclusion to deny liability for a
portion of the claimed damage?
The insurer is not liable for the damage to the roof
Following lodgement of the claim, the insurer arranged for multiple assessments of
the complainant‟s roof. The first assessor (A) attended the property and reported
„ water has entered through missing pointing and into the roof space .. there are
maintenance issues that relate to this claim … the damage sighted is consistent with
that of storm and in the circumstances described by the insured.‟
I am satisfied that A was referring to internal damage as being caused by the storm,
not damage to the roof.
A further inspection was arranged by the insurer with (H) who reported “Inspection of
roof found a tile roof in poor condition … There are many places that water would
enter … Overall roof is leaking badly in multiple places … The tiled roof needs a lot of
maintenance.‟
There has been no evidence submitted by the complainant to contradict these
opinions. The builder used by the complainant to quote for internal repairs does not
comment on the condition of the roof.
The insurer has declined liability for the roof as it says the roof was not damaged by
the storm. The insurer also says liability for the damage to the roof is excluded under
the policy as it is caused by wear and tear and a lack of maintenance.
I accept the conclusion of the insurer and its decision to deny a claim for damage to
the roof, as there is no evidence the roof was damaged by the storm.
The complainant has not established all her loss is related to the storm event
The complainant told the insurer that water was leaking from the ceiling into her
kitchen, down the kitchen walls, out of the kitchen cupboard, ceiling at the front of the
house, ceiling in her bedroom, ceiling in her garage, through both bathroom walls &
ceilings and in two of the internal walls in both lounge areas which backs on to both of
the children‟s‟ bedrooms
There are multiple reports on the internal damage in the complainant‟s home . The
insurer has accepted liability for some rooms and for others, made an offer to meet
some of the cost of repair. Other areas of the home have been denied completely.
The complainant disputes the insurer ‟s decision to accept only damage in some of the
rooms. The complainant also does not accept the quotation for repair costs applicable
for rooms the insurer has accepted. The insurer relies on A‟s opinion as the basis for
its offer of resolution, but A will not be performing any of the work as it has not agreed
Determination | Case number: 658310 Page 4 of 9
to provide a warranty due to issues with the roof. As a result, the insurer seeks to
cash settle the internal repairs component of the claim.
Given that the roof itself is damaged and is not part of the covered claim, I accept that
A would not be able to warrant its repairs.
In the circumstances I am satisfied that the insurer is entitled to cash settle for the
internal repairs component of the claim.
Having made this decision it is important to note that the insurer must cash settle
fairly. By cash settling the repairs for damage the risks associated with repairs are
transferred from the insurer to the complainant. The risks include the possibility that
the repairs are more complicated than first thought and there may be additional,
unforeseen damage not factored in to earlier quotes.
Further, the normal life time guarantee offered by an insurer for repairs, would not
apply to the complainant.
As a result, in addition to what I consider are the more appropriate quotes, the insurer
is to provide an uplift of the cash settlement of 15% to account for the transfer of risk.
The complainant relies upon an assessment and quote from her builder (T). The
quotes of A and T are vastly different.
The subsequent sections outline the areas of damage and my view of what is fair in
the circumstances and account for the fact that the risks associated with completion
of the repairs has been transferred from the insurer to the complainant.
Main Bedroom
The insurer has accepted liability for the main bedroom. The difference in the main
bedroom is between repair and replacement costs.
Th e insurer‟s quote is for repair but in its latest response it said it agreed to replace
the ceiling, notwithstanding the view of its engineer
I am satisfied that it is fair that the insurer accepts the quote of $9,750.00 provided by
T for the work required in the main bedroom, including the replacement of the ceiling
and cornices.
Kitchen
Liability has been accepted for the kitchen. A has quoted for the partial replacement
of the ceiling and cornice, the painting and installation and cleaning of the affected
areas. The quote for the kitchen is $4,430.30.
T has quoted more extensively for the removal of wall linings, kitchen carcasses,
doors and kickboards and the full replacement of the kitchen. The total quote is for
$22,660.00.
Determination | Case number: 658310 Page 5 of 9
A further opinion was provided by a builder (F) on behalf of the complainant. This
information was provided as part of a discussion of make safe arrangements for the
home. F noted water had entered the ceilings and travelled behind the wall linings. F
also notes there was evidence of excessive moisture levels and water damage to the
kitchen kickboard.
A says the kitchen required only a partial ceiling replacement and the comparative
quote was $5,526.48. The insurer has offered to replace the ceiling.
The complainant said she noticed water coming from out of the kitchen cupboard
during the storm.
It is not clear from the evidence why the entire kitchen needs to be replaced. I am
satisfied however A‟s quote is insufficient to cover all the damage to the kitchen. As a
compromise I consider it fair to increase the proposed quote from A to $11,330 for the
repair of the kitchen.
TV room
The insurer has accepted this area was damaged by the storm and A has quoted
$763.38 to patch and paint plasterboard in the room. T has quoted for the sum of
$5,600 for this room including the complete replacement of the ceiling and cornice as
well as wall linings and trims.
The complainant was clear there was water running out through the ceiling and walls
into this room during the storm.
I consider A has underquoted the damage is this area. The insurer has offered to
replace the ceiling notwithstanding its evidence the ceiling only needs to be repaired. I
prefer the opinion of T as to the repair cost. I therefore accept the quote of $5,660.00
provided by T for the work required in the TV room.
Bedroom 2
Damage to bedroom 2 has been accepted by the insurer and A has quoted the sum
of $402.06 to repair and replace the door and paint the internal door. T has quoted to
replace the ceilings and cornice in the bedroom in addition to replacing the door. A
disagrees saying this room only requires a partial ceiling patch and paint. Its quote
does not allow for this work to the ceiling at all.
I consider A has underquoted the damage is this area. Consistent with the offer of the
insurer to replace the ceiling in other rooms where water ingress came through the
ceiling, I prefer the opinion of T as to the repair cost. I therefore accept the quote of
$6,340.00 provided by T for the work required in bedroom 2.
Main Bathroom, Ensuite and Toilet
The complainant says water came through the bathroom ceilings and walls during the
storm. She says this caused damage to the main bathroom and the ensuite. The
Determination | Case number: 658310 Page 6 of 9
insurer initially declined liability for the main bathroom and ensuite. The insurer says
mould was pre-existent because there are no exhaust fans and small windows.
The insurer obtained a recent engineering assessment from (N). N says:
The ceiling areas in the bathroom and ensuite have become affected by mould
due to a lack of ventilation and the typically high humidity levels experienced in
these types of wet areas. An increase in the mould levels to the ceilings may likely
have occurred during the rain/event period of wet weather due to the severe
humidity during that time.
The insurer maintains its view that these areas were not damaged by the storm but
has made an offer to resolve the complaint. The quote from A to fix these areas is
$4,059.80.
The complainant has submitted a quotation from T for both the main bathroom and
the ensuite. Each room is quoted as needing a full renovation costing $14,720 each.
The total renovation cost for the bathrooms is therefore $29,440.00. There is an
additional cost for the toilet in the sum of $2,322.00.
I accept the evidence from the insurer about the bathroom and ensuite. I accept
therefore the complainant is not entitled to a full renovation of these rooms because of
the storm damage. There is a valid exclusion under the policy for some of the damage
caused by „mildew, atmospheric or climatic conditions‟ and „gradual deterioration and
wear or tear.”
N says some of the damage in the bathrooms was exacerbated by the storm
conditions and therefore I accept the proposal of the insurer to allow repairs as
quoted by A, is appropriate in the circumstances. This sum is $4,059.80.
There is evidence the toilet was damaged by the storm and this was accepted by the
insurer. A has quoted for a clean and paint as well as minor patching. T has quoted
for the replacement of the ceiling, cornice and wall lini ngs.
I consider A has underquoted the damage in the toilet. I prefer T‟s opinion about the
repair cost. I therefore accept the quote of $2,322.00 provided by T for the work
required in the toilet.
Garage
The liability for the garage is in dispute. The complainant says she saw water coming
from the ceiling in the garage during the storm event. Her builder (T) has quoted for
the complete refurbishment of the garage ceiling and a replacement of an internal
door and the garage door.
The insurer arranged an engineering assessment by N. N reported no structural
damage to the ceiling sheeting was observed. N says the staining to the ceiling
Determination | Case number: 658310 Page 7 of 9
sheeting above the roller doors appears to be marks created from the opening/closing
of the roller doors during wet weather.
I am not satisfied there is sufficient evidence to support the existence of storm
damage to the garage ceiling or doors.
Entry/Living
The insurer has accepted internal damage to the entry and living room area and A
has quoted for the replacement of the ceiling. A quoted $6,704.52 for the repairs to
this area of the house.
Apart from the mention of the cornice in T‟s quote, there is little difference in the
assessments of the repairs in this room. T quotes $9,240 for the repairs.
I am prepared to accept the quote of T for this area. As noted above, I consider A has
underquoted many areas of the house and furthermore A has not submitted an
actionable quote. As such I consider the appropriate allowance for this area to the
$9,240.00.
The insurer is required to increase its proposed case settlement and allowance
under the claim
The insurer is required to make an amended offer as follows:
Room A llowance
Main Bedroom $9,750.00
Kitchen $11,330.00
TV Room $5,660.00
Bedroom 2 $6,340.00
Main Bathroom and
Ensuite and Toilet
$6,359.80
Entry/Living $9,240.00
Subtotal $48,679.80
Contingencies of 15% $7,301.97
Determination | Case number: 658310 Page 8 of 9
Room A llowance
Total $55,981.77
The insurer should pay the reasonable costs for temporary accommodation
It is expected the complainant will need to have some time out of the home while the
substantial repairs are being completed. No time frame has been provided for the
completion of repairs. The insurer should make an appropriate allowance for the
accommodation of the complainant and her family while the repairs are being
completed and for any contents which need to be stored during this time. The insurer
should seek an assessment of the reasonable time frame required to complete the
repairs approved from T, given it is likely T will be engaged to complete the repairs.
This should be done within seven days of the determination being accepted.
2.2 Is the complainant entitled to compensation for non-financial loss?
We have a conservative approach to compensation
Non-financial loss includes claims for stress or inconvenience caused by an error of
the insurer. The maximum amount we can award for non-financial loss is $5,000.
We will only award this type of compensation if there has been an unusual degree or
extent of inconvenience. We will not award compensation for loss that a complainant
may incur because of pursuing a complaint.
When assessing whether the circumstances are of an unusual nature we will review:
the degree or extent of physical inconvenience suffered
the general time taken to resolve the complaint
the extent to which the insurer‟s actions interfered with the complainant‟s
expectation of enjoyment or peace of mind.
We will assess any claims for non-financial loss in accordance with the AFCA Rules.
The complainant has established an entitlement to non-financial loss
The complainant has endured multiple assessments and delays during her claim. The
determination is for a more substantial settlement than allowed by the insurer. The
complainant has had to continue living in the damaged home since the storm with
make safe arrangements in place.
Some of the delay has been caused through the dispute process. I cannot be critical
of an insurer causing delay in assessing its liability, especially where some of the
claimed damage is subject to exclusion.
Determination | Case number: 658310 Page 9 of 9
However, I have assessed the claims experience of the complainant as being over
and above that which would be reasonably expected. The decision of the insurer to
deny full repairs to areas clearly damaged and its failure to make allowances for those
repairs has caused the complainant considerable stress and inconvenience.
Accordingly, I consider an award of $1,000 an appropriate sum in the circumstances.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.