Home / QBE / Determination 657452

Determination 657452

claim_denial

FirmQBE
Decided2020-08-31
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$12,208
Non-financial loss$2,000
Amount claimed$10,272
SourceAFCA PDF

Summary

A lot owner under a strata building policy claimed water damage to timber flooring and disputed the insurer's partial denial, the $5,000 excess and the settlement basis. AFCA held the undamaged bedroom floor and the $5,000 excess were excluded or payable, but ordered a cash settlement of $12,208.38 net (averaging the two quotes) plus $2,000 for claims-management delay.

A cash settlement in lieu of repairs must be fair and must not be used to minimise the payout, so averaging the competing quotations was fair; the policy's water-damage excess was clear.

Issues

Subjects and remedies

health or medicalhome or building damagepay claimpay non financial loss

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 657452 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 657452 Page 2 of 18 Case number: 657452 27 August 2020 1 Determination overview 1.1 Complaint The complainant is a beneficiary and unit owner under a residential strata insurance policy (the policy) where the insured is the Owners Strata Plan (the insured). The strata manager lodged a claim with the financial firm (the insurer) following storm damage in November 2018 t o the complainant’s floating timber flooring in his Unit. The insurer assessed and initially denied the claim and later changed its decision to partially accept the claimed damage with an applicable excess of $5,000. The insurer denies damage to the bedroom floor saying the policy does not extend cover to undamaged sections of the property. The complainant disputes the limitation of cover, saying the flooring cannot be matched therefore the insurer should cover all the floor cost. The complainant also disputes the application of the $5,000 excess saying the damage occurred from a single event in November 2018 and the $300 excess should apply. The complainant says he provided a much lower quotation to complete the works and so it is fair the insurer pays this quotation. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was mainly in favour of the insurer. The insurer accepted the recommendation, but the complainant continued with questions regarding the excess after the recommendation. In the circumstances, the complaint has been referred to me for determination. 1.2 Issues and key findings Is the insurer’s settlement offer fair? While the insurer is entitled to limit its offer to the damaged floors and so is not liable to pay for damage to the bedroom floor, the insurer has not taken sufficient account of all the repair quotations and has not acted fairly by settling the claim based on the cheapest quote even though it was obtained by the complainant. The available information establishes it is fair that a cash settlement be made of $12,208.38 (net of the policy excess of $5,000) by averaging the two quotations. Determination | Case number: 657452 Page 3 of 18 Is the complainant entitled to compensation for non-financial loss? The available information establishes there has been an unusual degree or extent of physical inconvenience and time taken to resolve the complaint caused by the insurer’s claims management which would have interfered with the complainant’s expectation of enjoyment or peace of mind particularly in view of the complainant’s poor health. 1.3 Determination This determination is substantially in favour of the complainant. Should the complainant accept this determination then within seven days of notification of acceptance, the insurer is to pay to the complainant:  $12,208.38 net of the policy excess of $5,000  $2,000 compensation As the insurer accepted temporary accommodation costs for the duration of repairs, it is to liaise with the strata manager/the insured and the complainant to arrange temporary accommodation or cash settle this special benefit fairly, once repairs commence. Otherwise, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 657452 Page 4 of 18 2 Reasons for determination No new material provided after recommendation I have decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). I have considered all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. After the recommendation, the complainant provided a further submission in which he essentially reiterated his position about the policy excess. Neither party provided any new material. Determination deals with matters between the insurer and the complainant Pursuant to AFCA’s jurisdiction, this determination only deals with issues between the insurer and the complainant as a beneficiary of the policy between the insurer and the insured. The complainant has raised several issues about the amount of the excess, who agreed to the amount of the excess, the quotations obtained and the conduct of the strata manager. These issues are not the subject of this determination as AFCA has no jurisdiction to deal with these issues. The insurer is entitled to negotiate policy terms with the insured. The insurer is not required to answer to the complainant who is not the insured but a beneficiary under the policy with the insured. These issues can be dealt with by the complainant in another forum and directly with the broker and/or the insured or strata manager. 2.1 Is the insurer’s settlement offer fair? Complainant established a valid claim for damage to flooring The complainant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Determination | Case number: 657452 Page 5 of 18 There is reference to water damage incurred in 2017. However, the strata manager lodged a claim in March 2019 saying water had entered the complainant’s unit because of a blocked box gutter which affected the timber flooring. The claim form refers to an incident date of 29 November 2018. Accompanying the claim form was a quotation for repairs obtained by the strata manager. The available material shows a plumber attended the premises in July 2017, December 2018 and March 2019 to flush downpipes and clean out blocked gutters and valleys. The complainant also provided a video showing how rainwater came onto his balcony in heavy rain. In the video, the building’s stormwater system did not appear to be coping with the volume of rain. The policy provides cover for damage to the building which occurs during the period of insurance. The policy was renewed on 1 October 2018. Damage is defined to mean: any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by this Policy. ‘Accidental’ is not defined in the p olicy. The courts have defined ‘ accidental ’ in an insurance context as something that is ‘ unintended and unexpected. ’ Having reviewed the available information, I am satisfied the water damage to the complainant’s wooden floor caused in November 2018 was unintended and unexpected. Therefore, I am satisfied the complainant has established a valid claim. The complainant and the strata manager obtained quotations The complainant provided two quotations obtained in February 2019 to repair the floor and remove and replace furniture. The quotations total $10,271.77. A further quote in July 2019 was provided for the same amount. The strata manager provided a quote to the insurer when the claim was made in March 2019. The quotation explains because the existing flooring is no longer available it will be removed and replaced with new flooring which will be slightly different in colour. The quotation to remove and store furniture was $2,596 and the quotation to remove and replace the underlay and flooring was $21,549. The total of the two sums is $24,145. The quotations and the material relied on by the parties are set out in supporting section 3.3 of this determination. Determination | Case number: 657452 Page 6 of 18 Insurer not liable to repair the bedroom floor The insurer said its liability was limited to the damaged flooring and skirting. Relying on policy terms, the insurer said undamaged areas were not covered. The insurer accepted the claim for storage and re -delivery of contents. The insurer eventually accepted it was liable to replace all the damaged flooring in the unit except for the flooring in the bedroom. It said this area was not damaged and can be closed off by the door. The policy provides if the insured property is damaged, the insurer can choose to repair the damage or pay the amount it would cost to repair the damage. The insurer is not liable to repair the undamaged property. Having reviewed the material provided including photographs I am satisfied the bedroom floor is not damaged. Therefore, the insurer is not liable for the bedroom floor. Fair the claim is settled by way of a cash settlement The insurer advised the strata manager it will authorise and manage the repairs, which included sanitation of the slab flooring slab, reinstatement of damaged skirting and removal, storage and reinstatement of furniture. However, in circumstances where the available material shows the relationship between the parties has deteriorated, I am satisfied it is fair this claim is settled by way of a cash settlement. Insurer’s liability to the complainant is $17,208.38 before application of an excess When considering a cash settlement, this discretion to cash settle must be exercised fairly and consistently with the principles of utmost good faith and should not be used to minimise an insurance payout. A cash settlement must ensure an insured is able to properly complete all necessary repairs and must consider variations and contingencies which may occur once repairs commence. In the circumstances of this matter, I do not consider it is fair to settle the claim based on the cheapest quote even though it was obtained by the complainant. In all the circumstances of this matter, I consider it is fair that a cash settlement be made of $17,208.38 averaging the two quotations.  Insurer’s quotation $24,145.00  Complainant’s quotation $10,271.77  Total $34,416.77  Average $17,208.38 Determination | Case number: 657452 Page 7 of 18 Both quotes are now out of date. The insurer’s quotation specifically said it was only available for 30 days and only covered work stated. It also provided a guarantee on workmanship. In the circumstances, I would usually allow a further 20% for interest, unknown variations and for the fact the complainant no longer has the benefit of the contractor’s gu arantee. But as I have averaged the quotations and as I have made no discount for the fact the insurer is not liable to replace the flooring in the bedroom, I propose to make no further allowance. In conclusion, based on the available information, and for the reasons stated, I am satisfied it is fair in the circumstances the insurer’s liability to the complainant is $17,208.38 inclusive of interest. The policy is a contract of insurance between the insurer and the insured, not the complainant. The complainant is a lot owner who is entitled to pursue a claim under the policy as a beneficiary. Therefore, the insurer indicated to the strata manager with the authority from the insured to authorise and manage the repairs. However, as set out above, I consider it is fair this claim is cash settled. Therefore , should the complainant accept this determination then within seven days of notification of acceptance, the insurer is to settle the claim between the insurer and the complainant by making a cash settlement for repairs to the complainant. Policy excess of $5,000 is to be applied to the claim The amount of the policy excess was the subject of considerable dispute. Both before and after the recommendation, the complainant said no authorisation was ever given by the corporate body to increase the excess from $300 to $5,000 in 2018. He wanted to know who had authorised the increased excess. In the circumstances, the complainant disputes the application of a $5,000 excess. The insurer says the policy was updated o n 1 March 2018 and because of changes to the insurance cover and prior insurance history the excess was to be increased upon renewal on 1 October 2018. The insurer says the terms of the renewal offer were accepted by the insured and the policy was issued. The insurer notes the policy is a contract of insurance between the insurer and the insured not the complainant. It says the complainant is entitled to claim under the policy as a beneficiary, but it is for the insured itself (and not the complainant) to accept the terms of cover. The insurer suggests the complainant may raise any issues regarding the policy terms in the Annual General Meeting with the Body Corporate. If the Body Corporate wishes to alter the terms of the insurance cover then it will be fo r it to decide by a vote. The insurer contends this issue is the subject of discussion between the complainant, the insured, the strata manager and/or the broker. Determination | Case number: 657452 Page 8 of 18 I have considered the available information and all the submissions made by the parties. The claimed incident occurred in November 2018. The policy was renewed on 1 October 2018. The terms of the relevant certificate of insurance/schedule are clear and the relevant extracts are set out in supporting section 3.2 of this determination. I am satisfied the excess payable on a claim such as this where there is water damage is $5,000. The policy terms (also set out in supporting section 3.2 of this determination) are clear. If the insurer agrees to pay a claim, it will deduct the excess as shown in the schedule from the amount of the claim. The complainant says as he did not agree to the policy excess of $5,000 and as other unit holders have only paid $300 excess for other claims, he should only pay the $300 excess. However, these issues are not determinative of the outcome in this complaint. If other unit holders paid $300 excess this was probably because their loss occurred before the policy was renewed. Further, any issues regarding the contract of the insurance and the broker or the insured or the strata manager agreeing to a policy excess of $5,000 cannot be the subject of this determination. The complainant is entitled to claim under the policy but cannot amend policy terms agreed to by the insured. This determination can only deal with issues between the insurer and the complainant as a beneficiary under the policy terms. Any disagreement and questions about the policy terms including the policy excess must be the subject of discussion in another forum. The insurer suggested the complainant may wish to have discussions with the strata manager to disburse the excess through the levies or sinking fund and therefore said it may be more beneficial for the strata manager to facilitate the repairs with approval from the body corporate. The insurer said it did not have the authority to make requests to the insured or the strata manager on how the excess should be collected or disbursed. The insurer points out as the member of the owner’s corporation the complainant can raise this with the strata manage r and the owner’s corporation. The parties are encouraged to work together as suggested by the insurer. Insurer liable to indemnify the complainant in the net sum of $12,208.38 However, based on the material before me and dealing with the dispute between the insurer and the complainant, on the available information, and for the reasons stated, should the complainant accept this determination, then the insurer is entitled to deduct from the settlement $5,000 excess. In conclusion, should the complainant accept this determination then within seven days of notification of acceptance, the insurer is liable to indemnify the complainant in the net sum of $12,208.38. Determination | Case number: 657452 Page 9 of 18 Insurer to pay reasonable costs of temporary accommodation once repairs commence The policy provides for a special benefit of temporary accommodation. The insurer will pay the reasonable cost of temporary accommodation necessarily incurred if the unit is made unfit to be occupied for its intended purpose due to damage to the insured property admitted as a claim. In addition to the cost of repairs, the insurer said (in liaison with the strata manager and broker) it will arrange to settle temporary accommodation costs to the complainant whilst the repairs are being undertaken. As the insurer accepted temporary accommodation costs for the duration of repairs, it is to liaise with the strata manager/the insured and the complainant to arrange temporary accommodation or cash settle this special benefit fairly, once repairs commence. 2.2 Is the complainant entitled to compensation for non-financial loss? Compensation paid in some circumstances The complainant complains about the insurer’s claims handling, he says it has taken too long for the claim to be resolved and this has been extremely stressful. AFCA will award compensation (capped at $5,000) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment o r peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and anxiety. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. Insurer to pay to the complainant $2,000 compensation The available information shows the claim was made on 12 March 2019. The insurer arranged an assessment a few weeks later. However, the claim was denied on 26 April 2019. Because of submissions made by the complainant, the insurer reconsidered its position and arranged for another assessor to re-attend. By late July, the insurer said the claim was limited to the damaged flooring and skirting and said it was entitled to apply excesses in the sum of $5,300 because there were two separate events. Determination | Case number: 657452 Page 10 of 18 I accept the insurer was entitled to discount the claim by not paying for the flooring in the bedroom which was not damaged. Further, as set out earlier in this determination, the insurer was entitled to apply a policy excess of $5,000. However, it was not until 4 February 2020 a reasonable offer was made and even then (as set out earlier in this determination) the insurer did not give fair consideration to the complainant’s circumstances and both the quotations received. I acknowledge some delay has been caused by the issue of the policy excess of $5,000. As set out earlier in this determination, I accept the c omplainant’s concerns about this issue have been comprehensively and correctly addressed by the insurer. Nonetheless, there has been an unusual degree or extent of physical inconvenience and time taken to resolve the complaint caused by the insurer’s clai ms management. I accept this would have interfered with the complainant’s expectation of enjoyment or peace of mind particularly in view of the complainant’s poor health. Taking matters into account, I am satisfied it is fair in the circumstances the insurer pays to the complainant $2,000 compensation. Determination | Case number: 657452 Page 11 of 18 3 Supporting information 3.1 Our Approach It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. The Policy Schedule : Excess 1 Damage by water or liquid, including exploratory costs incurred in locating the source of damage, caused by bursting, leaking, discharging or overflowing of tanks, apparatus or pipes. $5,000 Excess 2 Damage by water or liquid, other than caused by bursting, leaking, discharging or overflowing of tanks, apparatus or pipes. $5,000 Excess 5 Any event of any kind. $300 Excess Flood excess $300 Payment of Excesses The Excess is the amount You must contribute towards the cost of any claim You make. If We agree to pay Your claim, We will deduct the Excess from the amount of the claim We will pay to You. The amount of Excess payable by You is shown in the Policy or in the Schedule. General Definitions The words listed below have been given a specific meaning in this Policy Wording and these specific meanings apply when the words begin with a capital letter. Other words may have special meanings for particular Polices. These words will be defined in those Policies . Body Corporate means the owner(s) of Your Insured Property and Common Area incorporated under the Strata Legislation where Your Insured Property and Common Area is situated. Body Corporate Manager/Agent means a person or other entity appointed in writing by Your Body Corporate with delegated functions including the authority to act as an Office Bearer in terms of the Strata Legislation applying where Your Insured Property is situated . Determination | Case number: 657452 Page 12 of 18 Damage, Damaged means any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by this Policy. Event, Events means a happening or an incident not intended to happen which occurs during a particular interval of time and causes or results in Damage or series of Damage happening from that one Event, that is claimable under this Policy. Excess means the amount You must pay or contribute towards a claim. The amount of any Excess is shown in the Policy or in the Schedule. Flood means the covering of normally dry land by water that has escaped or been released from the normal confines of any of the following: a. a lake (whether or not it has been altered or modified); b. a river (whether or not it has been altered or modified); c. a creek (whether or not it has been altered or modified); d. another natural watercourse (whether or not it has been altered or modified); e. a reservoir; f. a canal; g. a dam. Lot/Unit means an area shown on a plan as a lot or unit in the Strata Legislation applying where Your Insured Property is situated. Lot Owner means a person, persons or other entity registered as a proprietor or owner of an estate in fee simple in a Lot/Unit in Your Building in terms of the Strata Legislation applying where Your Insured Property is situated. Rainwater means the rain which falls naturally from the sky. It includes Rainwater run-off over the surface of the land Storm means a violent wind sometimes combined with thunder, heavy falls of rain, hail or snow. You, Your, Yours means: a. in respect of Policies 1, 8, and 10: the Body Corporate, Corporation, Owners Corporation, Plan or Company named on the Schedule including: i. the interest therein of Members; ii. Lot Owners in respect of Special Benefits 1, 2, 11, 13, 18, 22 and 23 of Policy 1 – Insured Property; iii. Lot Owners in respect of Special Benefits 1, 2 and 4 of Policy 8 – Catastrophe Insurance Determination | Case number: 657452 Page 13 of 18 General conditions These General Conditions apply to all Policies. In addition to these General Conditions, each Policy will be subject to specific conditions. If any of the General Conditions or specific conditions applicable to each Policy are not met We may refuse a claim, reduce the amount We pay or in some circumstances We may cancel the Policy. Any person covered by the Policy or claiming under it must also comply with these conditions. … 6. Excess You must pay or contribute the amount of any Excess shown in this Policy or in the Schedule for each claim made. Payment of the Excess may be requested when the claim is lodged, or may be deducted from Our payment. With the exception of the Earthquake Excess as shown below, should more than one Excess be payable for any claim arising from the one Event, such Excesses will not be aggregated and the highest single level of Excess only will apply. The Excess You have to pay or contribute to earthquake or seismological disturbance as shown in the Schedule applies for an Event that occurs during any one period of seventy-two (72) consecutive hours. Policy 1 - Insured Property What We insure If selected and shown in the Schedule, We will insure You up to the Sum Insured shown for Policy 1 – Insured Property in the Schedule against Damage to Your Insured Property which occurs during the Period of Insurance. Special Benefits The following Special Benefits are included in addition to Your Sum Insured for Policy 1 – Insured Property. 1. Temporary Accommodation / Rent / contributions / storage a. Temporary Accommodation When You occupy Your Lot/Unit We will pay the reasonable cost of Temporary Accommodation You necessarily incur if Your Lot/Unit is made unfit to be occupied for its intended purpose due to: i. Damage to Your Insured Property that is admitted as a claim under Policy 1 – Insured Property; or ii. reasonable access to or occupancy of Your Lot/Unit being prevented by Damage from an Event claimable under Policy 1 – Insured Property happening to other property in the immediate vicinity. Determination | Case number: 657452 Page 14 of 18 We will pay:  under Clause a.i. from the time of the Event until the time You reoccupy Your Lot/Unit following completion of rebuilding, repairs or replacement; and  under C lause a.ii. from the time of the Event until the time when access to Your Lot/Unit is re - established . Claims - how We will settle Your claim 1. Replacement If Your Insured Property is Damaged, We may choose to either rebuild, replace, repair or pay the amount it would cost to rebuild, replace or repair. The amount We pay under Policy 1 – Insured Property will be the cost of Replacement at the time of Replacement subject to the following provisions: a . the necessary work of rebuilding, replacing or repairing (which may be carried out upon another site or in any manner suitable to Your requirements provided Our liability is not increased), must be commenced and carried out without unreasonable delay; b . where Your Insured Property contains any architectural or structural feature of an ornamental, heritage or historical character or where materials used in the original construction are not readily available We will use the nearest equivalent available to the original materials; c . if it is lawful, and with Our prior written consent, You will not be required to actually rebuild any building destroyed but may purchase an alternative existing building or part thereof to replace all or part of the one destroyed. Such Replacement will be deemed to constitute Replacement for the purpose of this insurance provided Our liability is not increased; d . if You cause unreasonable delays in commencing or carrying out Replacement, We will not pay any extra costs that result from that delay; e . when We wish to rebuild, replace or repair and You do not want this to occur and submit a claim for cash settlement in lieu, We will only pay Indemnity Value which means We will: i. reduce the amount payable after due consideration of age and condition of the property at the time of loss; ii. not pay in excess of Indemnity Value of Your Insured Property; and iii. seek release from further liability under this Policy. We will not pay under Policy 1 – Insured Property as part of the cost of Replacement for the cost to: i. rebuild or replace Your undamaged Insured Property; ii. rebuild, replace or repair illegal installation Determination | Case number: 657452 Page 15 of 18 Extracts from material relied on by the parties Date Action Plumber (SP) 25 July 2017  Attended site 20 July 2017 and after testing and flushing all downpipes found no blockages in the stormwat er system. Letter from hospital 5 October 2018  In 2014, complainant diagnosed wit h cancer which is incurable and will remain with him lifelong . He has had repeated chemot herapy with inc omplet e responses. It is incurable, and he currently has active cancer following a course of chemotherapy early in 2018 and will likely require continuing treatment.  Assessed as totally and permanently disabled in 2013. He remains totally and permanently disables and continues to be unable to work due to the active cancer. Tax invoice plumber 15 January 2019  Investigat ed the problem wit h water ent ry to unit 12 after storms on the 07/12/18.  Supply labour and mate rial to gain access to the roof.  Clean out blocked gutters and valleys.  Re - fix dislodged gutter to fascia.  Test on completion. Invoice is for $654. 50. Quotation (HF) 7 February 2019  Special instructions, site conditions, access. Based on 39m2 Water ingress from outside gutter & downpipe.  Take up and disposal, multi strip engineered floor, installation, underlay, terminations, 42 x 19 skirting board $6,825. Quotation (HF) 7 February 2019  Special instructions, site conditions, access. Based on 1 removal of furniture and reinstatement.  Pick and removal and storage of furniture to water damaged apartment.  Redelivery upon completion of works - $2,124.57 (2 men and truck).  Sanitization of slab for mould spores - $944.50 (TW).  Repainting of skirting boards - $377.70 (J and J)  Total $3,446.77. Quotation (DBS) 12 March 2019  Attended on site.  Existing floor no longer available.  Furnit ure must be removed and stored. Complainant said some items can be stored in his garage. Total cost $2,596.  To remove and replace underlay and flooring and supply 51 m² of engineered flooring and new skirting and remove debris $21, 549.  There will b e a colour style difference between old and new flooring.  Removing 47 m² of 2 strip Kempas flooring and replacing wit h 51 m² of 2 strip Merbau readyflor engineered flooring.  Only covers work stated. Any unforeseen work will be considered a variation and w ill be quoted separately. Determination | Case number: 657452 Page 16 of 18 Date Action  Remains available for 30 days. Installation guaranteed against defective workmanship for six years for major repairs. Tax invoice Plumber 22 March 2019  Attended site and found stormwater line right - hand side of property in good working order with a lot of dirt build - up which needed jetting maint enance. Invoic e $841.50.  Complainant explained downpipe blocks up in large downpours. Base of the downpipes is 30 m above the grate and was completely blocked and the downpipe was blocked. Removed build - up and ran hose down the line and it ran well.  Front left - hand property pit which runs to the street was blocked and found electrical conduits running through the p ipe. Quote to follow to offset stormwater around the NBN conduits that are running through the outlet. Asse ssor report (CA) 2 April 2019  Attended and photographed 29 March 2019.  Water entry has been occurring for over seven years. The owners’ corporation have been aware there is an ongoing issue int o the unit and they have made what appears to be inadequate investigations to the cause.  Recommend claim is denied referring to exclusions relating to gradual deterioration, failure to maintain your property a nd damage as a result of defects you knew of or should reasonably have known of.  Further, at the time of the initial water entry in 2011, floating floors were not covered under Residential Strata Ins urance Plan. Final asse ssment report (CA) 2 July 2019  Notes dat es of loss January 2017 and November 2018 from wat er damage (various sources).  First attended 29 March 2019. Phot ographs showed floor undamaged and nearly new in 2011 at time of purchase.  Reviewed detailed version of events and reattended and ph otographed 13 June 2019. Met with owner of unit 12. He says balcony overflowed due to a blocked downpipe.  Inspected damaged flooring of engineered hardwood floor laid as a floating floor over concrete subfloor.  Insolation barrier applied between subfloor and timber floor.  Unit purchased in 2011 with timber floor newly installed.  July 2017 flood event to the balcony. Plumbers investigated. Could not find stormwater blockage. No claim lodged.  Similar flood event in November 2018 following severe storm. Flo oring inundated with wat er from the balcony. Damaged living room and up to bathroom transition between the timber floor and tiles. Bedroom and dining area not damaged. Timber floor nearest bathroom most severely damaged but more typical of a leak from Determination | Case number: 657452 Page 17 of 18 Date Action the bathroom.  Plumber found a blockage as evidenced by invoice.  Due to the construction and design of the balcony a flood event would be impossible as described. Damage caused near the entry of the balcony to the timber floor may have been caused by leaving th e door open. Strata manager said wind driven rain against the glass door cause the flooding. Assessor disagrees.  Notes severe damage, cupping and expansion of the flooring outside the bathroom which does not accurately reflect a flood from the balcony, bu t the damage seen would have developed from at least two occurrences. Getting worse since the purc hase in 2011 and since 2017.  Building, gutter and downpipe adequately maintained.  Likely sliding door left open during heavy downpour causing damage to living room section of floor. Overflowing bathroom caused damage to timber floor outside bathroom.  Owners corporation aware of issues to the floor in 2017 and made inadequate attempts to investigat e the cause of the damage and relying on policy exclusions relat ing to inadequate investigations and lack of maintenance recommend claim be denied.  If indemnity to be considered apply 2 excess amounts for July 2017 and November 2018.  Recommend only accept flooring throughout the living room up to the bathroom. Not the kitchen or bedroom. This represents about 25 m and not 39 m quoted by contractors.  Quoted amount $6825.00 / 39m2 = $ 175 Per M2 Estimated 25m2 x $175 = $ 4375.00 ( Damage Section only adjusted) (Owners Quote) + Furniture Removal and re delivery, Sub floor cleaning, Repainting of skirtings Total above 3 items - $3446.77 (Quote provided by Owner) $4,375.00 + $3, 446. 77 = $ 7821.77 Less $5,000.00 2018 Policy Excess & $300.00 2017 Excess Total = $ 2,521. 77.  Photographs annotated including: Undamaged Kitchen/di ning flooring and bedroom flooring. Flooring near in living room near balcony has gradually delaminated but has minimal expansion. Severe Damage at bathroom hall junction transition strip removed due to swelling/ expansion typical of water damage. Lounge f looring view towards hall and bathroom no typical water damage cupping evident. External View of balcony shows water can just run off and will not be trapped by a balcony frame hob. Downpipe in this view was allegedly blocked and cleared recently. Property has a 1.5 Eave overhang and is protected by wind driven rain by a thick tree plantation on the right - hand side of the property which indicates wind driven rain to be an unlikely cause of damage. Complainant’s quotation (DT) 27 July 2019  Remove and replace Kempas floor including installation, underlay, terminations, 42 x 19 skirting Determination | Case number: 657452 Page 18 of 18 Date Action board pick up and removal and storage of furniture and re - deliver, sanitation, of slab, re - painting skirting boards, including GST $10,271.77. 3.3 Other relevant material considered and relied on  Parties’ submissions/emails and all attachments to all submissions/emails.  Assessment reports, photographs, video, invoices and quotations.  Certificate of insurance and policies.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.