Determination 657374

Water escape damage claim partly declined on exclusion grounds and cash settlement offer

FirmSuncorp Group
Decided2019-11-14
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$92,526
Non-financial loss—
Amount claimed$98,958
SourceAFCA PDF

Summary

The landlord's claim for water damage to an investment property was partly declined on exclusion grounds (ground movement and construction defects). AFCA found escape of liquid was the proximate cause, held the insurer liable for 85 percent of repair costs, and ordered cash settlement with a 10 percent uplift, engineering cost contribution and interest.

The insured establishes a prima facie claim for escape of liquid, and the insurer must then prove an exclusion applied as the proximate cause, which it did not.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interest

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 657374 Financial firm AAI Limited Determination | Case number: 528118 Page 2 of 18 Case number: 657374 30 October 2019 1 Determination overview 1.1 Complaint The complainant holds a landlord insurance policy with the financial firm (the insurer) and lodged a claim in July 2018 for water damage to his property which was first observed in March 2016. Relying on expert reports, the insurer says some of the damage arose from circumstances which are excluded from cover under the policy. Whilst the insurer has accepted the portion of damage caused by the leaking pipe, a dispute has arisen over the extent of the insurer‟s liability relating to damage caused by the leaking pipe and by excluded events. Issues and key findings Is the insurer’s offer to settle the claim adequate? The panel:  is satisfied the complainant has established a prima facie claim because the available information establishes on the balance of probabilities the proximate cause of the claimed damage was escape of liquid which is an insured event.  is not satisfied the available information establishes the excluded events relied on by the insurer were the proximate cause of the damage.  considers the insurer‟s offer is not adequate as the panel is satisfied the insurer is liable for 85% of the claimed damage. Is the complainant entitled to any other benefits under the policy? The claim for loss of rent is to be settled according to the policy terms. Is the complainant entitled compensation? Upon provision of proof of the cost, the insurer is to contribute up to $5,000 to the cost of the complainant‟s engineering reports. 1.2 Determination This determination is substantially in favour of the complainant. Should the complainant accept this determination then within 14 days of notification of acceptance, the insurer is to settle the claim as set out in the determination under the heading “settlement options proposed by the panel”. Determination | Case number: 528118 Page 3 of 18 The insurer is also to settle the claim for loss of rent according to the policy terms. Within seven days of acceptance, the complainant is to provide the insurer with any invoices evidencing the cost of the complainant‟s engineering reports. The insurer is to immediately reimburse the complainant up to $5,000 upon receipt of those invoices. The insurer is also to pay interest pursuant to the section 57 of the Insurance Contracts Act (the Act) on the cost of the complainant‟s engineering reports from the date the reports were paid for by the complainant until settlement. Determination | Case number: 528118 Page 4 of 18 2 Reasons for determination 2.1 Is the insurer’s offer to settle the claim adequate? Complainant says damage was caused by leaking pipes The complainant says he discovered cracking damage to his investment property in March 2016. He appointed a design engineer (R) to investigate the cause of the damage noted to the southern elevation. In a report dated 14 March 2016, R noted:  highly reactive soil  fill uncontrolled and uncompacted particularly towards the rear of the building  minor internal defects suggesting minor differential foundation movement  external cracking damage  the relief valve outlet from the hot water system was leaking causing ground near to the eastern corner of the bathroom to be moist. R said the defects were primarily located along the southern elevation towards the eastern end of the house which correlated with the leaking hot water unit, shading from the fence and an increased depth in highly reactive fill. He submitted these were the causes of the excessive heaving noted within the foundation along the southern elevation. He also said the moisture control along the southern elevation was poor and recommended certain remedial works. The complainant says the hot water system relief valve was repaired in July 2016 as was the brickwork along the affected side. Subsequently, the complainant‟s tenant advised the main shower was leaking into the adjoining room. The complainant attributed this to a damaged shower membrane caused by foundation movement linked to the leaking hot water pipe. The complainant appointed a plumber (F) to investigate the cause of the damage. F carried out an inspection using CCTV in the main bathroom fixtures and the storm water lines around the entire property. F reported the bathroom floor waste and shower waste pipes did not meet buildi ng code. He also said the leak from the stormwater line contributed to the slab dropping. Insurer says damage caused by non-insured events The insurer declined the claim for damage to the bathroom on the basis the damage was caused by plumbing defects as identified by F. The complainant disputed the decline and submitted a further report from F on 7 August 2018. F acknowledged the Determination | Case number: 528118 Page 5 of 18 plumbing defects but argued that the damage was not caused by these defects. F attributes the damage to broken pipes located under the foundation slab. Differing expert opinion provided by the parties The insurer‟s assessor (BC) attended the property on 30 August 2018, together with its engineer (S). BC reported cracking damage in most of the rooms, evidence of internal and external damage which had been repaired in the past and re -opened and the presence of expansion joints that had been installed post construction. BC says this demonstrates ongoing movement damage at the property. BC also refers to excavation under the slab by S and the inadequate construction of the foundation slab and piers of the property. He concluded if the property was not properly constructed, then it is possible movement in the highly reactive soil would cause the pipework to fail. S determined the damage arose due to foundation movement because of inadequate foundation preparations. S said any damage to the pipes are symptoms only of the proximate cause which was the inadequate foundation preparations. Based on this information, the insurer denied the claim because the damage was not caused by an insurable event such as escape of liquid, but by an excluded event being construction defects. The complainant disagreed with the insurer‟s findings. Based on his own expert reports, the complainant said the damage arose due to water escaping from damaged pipes. He also contends the policy exclusion relied on by the insurer has no application to his claim because he was not aware of the defect. The insurer accepted the complainant was not aware of the defect. To resolve the impasse, a further engineer (J) was appointed. In late November 2018, both J and R inspected the property again to assess the damage caused by the leaking pipes. J also undertook a level survey which showed the lowest point of subsidence was at the back right-hand side of the house near the main bathroom. Insurer accepts liability for a portion of damage On 5 December 2018, J reported there were several reasons for excessive ground movement in the area. He concluded there was long -term differential foundation movement and long-term leaking pipes which damaged the back right-hand side of the house. He said:  the movement damage in the right hand rear corner of the dwelling was primarily due to leaking pipes  the movement damage at other locations throughout the house was due to ground movement and not due to leaking pipes. Determination | Case number: 528118 Page 6 of 18 Based on J‟s findings, and subject to further assessment and excavation, the insurer agreed to pay for the damage caused by the leaking pipe. Otherwise, it said it was not obliged to pay for damage caused by ground movement and construction defects. The engineers attended the property again in late January 2019. The structural design plans for the slab and pier system were reviewed and the site excavated to investigate whether the slab and piers had been installed as designed. J submitted a report dated 6 February 2019 which says:  the original foundation plans depicted the presence of seven concrete piers along the rear of the dwelling. J‟s inspection located only four piers and a disengaged fifth pier which was providing no support.  a geotechnical survey indicated significant fill at the rear of the dwelling which had not been adequately compacted and the piers were not founded in sound natural ground. This does not comply with the relevant building standard  a floor level survey showed an excessive variation of 131mm across the dwelling  the survey showed the lowest point was still at the rear right-hand side and was 12mm lower when compared with the earlier survey indicating further movement  over time significant differential foundation movement has occurred which has damaged the pipes under the bathroom resulting in leaks in the subsoil, softening the soils and causing further movement of the piers  over 50% of the movement of rear right of the house is attributable to pipe leaks  the rear half of the house will require rectification including underpinning  the estimated cost of the work was $95,000. R reviewed J‟s findings. In a report dated 9 February 2019, R says:  six foundation piers were installed at the time of construction and five of these remained connected to the slab  excavations suggest the fill depth was between 800mm and 1000mm  investigations did not determine the depth of the piers nor the founding material to which the piers bear  the level survey shows vertical displacement o f the foundation and piers varies from -49mm to -130mm along the rear of the dwelling  plumbing diagrams suggest increased settlement suggesting moisture in the soils  the central pier not being connected to the slab does not have a significant impact as the soil would have shrunken away during hot weather and frictional resistance would be minimal  highly probable the settlement of the piers was caused by softening of the founding material that the piers bear into due to the moisture from the leaking pipes. R also argues that: Determination | Case number: 528118 Page 7 of 18  the foundation performed suitably for 10 years after construction until 2016  based on loading and environment conditions , 70% of the initial settlement of foundation soil would have occurred in the first 5 years after construction  while the construction of the piers differs from the original design, given the measured settlements and the timing of the reported defects , moisture has induced excessive movement  primary cause of the defects noted since 2016 is excessive moisture within the soil caused by the leaking and the fracture of the plumbing  the moisture within the soil instigated the settlement of the foundation and piers  the impact of moisture on foundation movement is underestimated and a contribution greater than 50% should be attributed to it  failure of the plumbing has attributed to at least 85% of the settlement and the defects recorded  agrees with J‟s recommendations about remedial works but suggests an additional $15,000 (total sum of works $110,000 plus GST) is necessary for greater moisture controls around the perimeter of the dwelling. Scope of works, underpin design, and costings obtained In February 2019, J provided a scope of works and an underpin design based on the level survey and geotechnical testing. 10 underpins were located around the rear and sides of the house. In a report dated 8 May 2019, J submitted a supplementary report noting its initial scope of works included remediation of all movement damage to the rear of the dwelling. J says the remedial work caused by the plumbing leak was limited to the underpinning works at the rear right of the dwelling. These works were estimated to be approximately $40,000 plus GST. The insurer engaged a builder (RC) to cost all the works in the sum of $98,958. A summary of the expert opinions is provided in supporting section 3 this determination. Improvement works not covered and internal repairs not costed The insurer said remedial works covered under the claim would not include improvement works required to prevent future damage or upgrade the efficiency of the site drainage. As a settling period is required following underpinning, internal repairs were not costed. The insurer reiterated it is liable for the cost of rectification caused by the plumbing leak only and not for the areas affected by the building defect or ground movement. Determination | Case number: 528118 Page 8 of 18 Insurer offered to cash the claim for $30,239.50 In circumstances where some of the required remediation was covered by the policy and some excluded by the policy, the insurer opted to cash settle the claim. The insurer offered the complainant $30,239.50 calculated on 25% of the total costs quoted by RC plus an allowance for the establishment and overhead costs. The complainant required the claim to be met in full saying the damage was caused by the escape of liquid and he was not aware of the defective construction of the foundations. Complainant has established a prima facie claim The complainant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. In this claim, the complainant must establish the proximate cause of the claimed damage is the escape of liquid. The insurer has not declined the claim. The dispute is about the policy response to the claim, the extent of cover and the scope of works for which the insurer is responsible. The insurer accepts escape of liquid has damaged the property and has attempted to determine what damage was caused by the escape of liquid and what damage was caused by construction defects. It is not in dispute:  there is escape of liquid near right-hand side of the rear of the building  the foundations were not constructed according to design  the complainant did not know about the construction defects  the soil is highly reactive  there is ongoing movement damage S says the proximate cause of the loss is the inadequate foundation preparations. According to S, the pipes were broken by ground movement caused by the inadequate foundation preparations. J says there are two events which have caused damage. The first being the inadequate construction of the foundations and the second being the escape of liquid from the broken plumbing. R says the primary cause of the defects is excessive moisture in the soil caused by the leaking and fracturing of the plumbing. R says it is the moisture within the soil which caused the settlement of the foundations and piers. Determination | Case number: 528118 Page 9 of 18 Having carefully considered all the reports, the panel finds R‟s findings more persuasive. R has visited the site on several occasions from 2016. He was present when J undertook investigations and excavations in December 2018. The panel considers R persuasively challenges the findings made by J about the construction defects and the number of piers which were installed, and assumptions made by J about the depth of the piers. J has not rebutted these observations. Although R agrees the construction of the piers differs from the original design, R points out there were no problems until 2016, some 10 years after construction. This contention has not been rebutted by S or J. In the circumstances, on the available information, the panel is persuaded on the balance of probabilities the proximate cause of the loss is the escape of liquid. The panel is satisfied the complainant has established a prima facie claim. Proximate cause of the damage is not an excluded event Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. In this claim, the insurer must prove the damage was caused by a defect the complainant knew about or by ground movement. The panel does not accept the available information establishes the proximate cause of the damage is ground movement. While ground movement has caused the claimed damage, the panel is satisfied the available information establishes on the balance of probabilities the real or effective cause of the ground movement is water escaping from the leaking pipes into the reactive soil. If the damage was caused by inadequate construction of the foundations, the insurer accepts the complainant did not know of the defect. As for the argument about the interpretation of the “dealing with defects” clause, the panel need not make a finding thereon, because the panel is not satisfied the proximate cause of the damage was an unknown defect. Settlement options proposed by the panel R says the insured event has caused at least 85% of the settlement and the defects recorded. R agreed with J‟s recommendations about remedial work but suggested an additional $15,000 was necessary for greater moisture controls around the perimeter of the building. The panel does not accept the insurer is liable for work regarding greater moisture controls around the outside of the building. This is work required to mitigate future Determination | Case number: 528118 Page 10 of 18 damage and is not covered by the policy. It is not work required to repair the damage caused by the insured event. RC has provided costing on J‟s scope of works in the sum of $98,958. However, under the heading “notes”, RC refers to work which has not been quoted for or for which he has not made an allowance. The insurer‟s policy provides that if it agrees to pay a claim, it will decide whether it will repair the damage or pay the complainant what it would cost the insurer to repair the damage. Because of its view that its liability was limited, the insurer opted to cash se ttle the claim. The panel notes the complainant has opted to install an additional concrete pad under the water tank. Therefore, there is also some work to be undertaken which is not part of the accepted claim. However, in circumstances where the panel is satisfied the bulk of the cost of repairs is to be borne by the insurer and there are possible variations (as noted by RC), the panel considers it is fair in the circumstances the insurer repairs the damage. If the complainant agrees to this settlement approach, then the complainant is to pay 15% of the cost of repairs. If the insurer repairs the damage, the insurer is not liable to pay statutory interest on the cost of repairs. If the parties agree to cash settle the claim, then the insurer is required to pay 85% of the cost of repairs. In addition, the insurer is to make a further percentage allowance to take into account the following:  the complainant no longer has the benefit of the insurer‟s lifetime guarantee  variations and contingencies which may occur during repairs including the variations and contingencies already noted by RC under „Notes” . In the event the insurer elects to cash settle, the panel considers a 10% increase on the insurer‟s assessed 85% of the cost, will adequately address the ab ove dot points. Should the parties agree to a cash settlement, the insurer is also required to pay interest on any cash settlement pursuant to section 57 of the Insurance Contracts Act (the Act) from 27 May 2019 (when it made the cash settlement offer to the complainant) until settlement. The panel encourages the parties to work together to resolve the claim. The panel acknowledges once the underpinning is done, time should be allowed for the building to settle. Only then can internal repairs take place. Due to the paucity of Determination | Case number: 528118 Page 11 of 18 information about the cost of these future internal repairs, this determination does not deal with the cost of future internal repairs after the underpinning is done. Should the parties be unable to resolve the cost of future internal repairs, the parties can return to Australian Financial Complaints Authority (AFCA). 2.2 Is the complainant entitled to any other benefits under the policy? Claim for loss of rent to be settled according to the policy terms If the insurer accepts the claim and agrees the building cannot be lived in, the insurer will pay the weekly rental amount for the reasonable amount of time it decides it should take to repair the building, so it can be lived in again. The policy limits this benefit to 52 weeks and the most it will pay in total is $25,000. The complainant advised the tenant vacated on 21 January 2019. The insurer accepted the claim for loss of rent. The panel understands the insurer has paid the complainant $10,703 for loss of rent. The insurer indicates this aspect of the claim is not in dispute. The panel is satisfied the insurer is required to settle the claim for loss of rent according to the policy terms. 2.3 Is the complainant entitled to compensation? Insurer to contribute to the cost of the complainant’s engineering reports Pursuant to the AFCA Rules, AFCA may decide the insurer is to contribute to the legal or other professional costs incurred by the complainant during the complaint. Unless special circumstances apply, AFCA will not require the insurer to contribute more than $5,000 to these costs. The complainant has engaged a lawyer to advise on policy interpretation. AFCA provides a service which is free for complainants. It is not usually necessary for a party to engage a lawyer. If a complainant chooses to engage a lawyer, they will usually cover their legal fees themselves. In the claim circumstances, the panel considers the claim and complaint did not raise legal issues which reasonably required legal advice. However, the technical aspects of the dispute were complex. The insurer engaged expert assistance. Therefore, the panel considers it is fair in the circumstances the insurer contributes to the cost of the complainant‟s engineering report s. Determination | Case number: 528118 Page 12 of 18 Should the complainant accept this determination, then within seven days of acceptance, the complainant is to provide the insurer with any invoices evidencing the cost of the complainant‟s engineering reports. The insurer is to immediately reimburse the complainant upon receipt of those invoices. The insurer is also to pay interest pursuant to the Act on the cost of the complainant‟s engineering reports from the date the reports were paid for by the complainant until settlement. Determination | Case number: 528118 Page 13 of 18 3 Supporting information 3.1 Our Approach This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the AFCA Rules. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneous ly, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common-sense approach is taken to determine proximate cause. 3.3 Extract from reports Record Key points Determination | Case number: 528118 Page 14 of 18 Record Key points Financial firm ’s engineer ( S ) Report 12 September 2018  Observed and claimed building movement damage is a direct result of damaging foundation movements, particularly settlements and self - compaction/consolidation of loosely compacted uncontrolled site fill over the premis es.  Observed raft slab construction, together with an apparent absenc e of effective bored pier foundation improvements, is contrary to the requirements of the relevant standard at the time of construction and is a building defect.  Observed and claimed building movement damage is not the result of initial breaks through plumbing around the region of the main bat hroom. Any damage to pipework and wet areas, particularly to the subject main bathroom, are symptoms only of the proximate cause being inadequate foundation preparations/pier improvements and resultant foundation s ettlements to the placed uncont rolled fill across the site.  Observed and claimed building movement damage across the whole premises has been present for an extended period, represents a significant maintenance issue for the Ins ured and cannot possibly be a ttributed to an isolated plumbing leak event in one bathroom of the premis es. Financial firm’s engineer (J) Report 5 December 2018  Inspected and photographed with the complainant‟s engineer 29 November 2018.  Many internal wall and ceiling cracks as well as cracks in the external concrete slabs.  Reviewed plumbing reports which confirm the leak in the main bathroom and a leak in one of the stormwater pipes and a leak in the main line of the sewer. Leaks to be repaired immediately.  Hydraulic level survey showed an excessive variation ac ross the home with the lowest point at the back right - hand side of the house near the main bathroom.  This area has excessive ground movement for several reasons including subgrade movement, inadequate fill, highly reactive soil, environmental conditions and tree growth.  Concluded there was long - term differential foundation movement and long - term leaking pipes which have caused damage to the back right - hand side of the house.  Based on the report from S , there should be an investigation as to whet her the original bored piers were installed.  Foundations at the rear of the house should be underpinned.  M ovement and damage at the right hand rear corner of the house is primarily due to leaking pipes. The move ment and damage at other loc ations throughout the hous e is due to ground movement and is not due to leaking pipes. Financial firm’s engineer (J) Report 6 February 2019 Reins pected wit h the complainant‟s engineer on 30 January 2019 and carried out a geotec hnical investigation.  Reviewed structural design plans for the slab and pier system (supposed to be seven concrete piers along the back of the house). Determination | Case number: 528118 Page 15 of 18 Record Key points  Used an excavator to check the location of the concret e piers along the back of the house to ensure they were adequately founded.  Four concrete piers were found. A disengaged fifth pier was found but it provided no support.  Geotechnical investigation car ried out on soil profile showing significant fill at the rear of the house. Fill at the rear of the house has not been adequately compacted. Works do not comply with Australian standard.  Further hydraulic level survey carried out which shows the low point is still at the back right - hand side of the house which has dropped a further 12mm since the last survey. Further movement still occurring at the rear of the house.  Plumbing should be repaired. Bathroom should not be used. Based on the available informatio n obtained from the forensic investigation the following is known :  Home suffering from long term differential foundation movement.  F oundations have not been installed as required by the plan. S ite inspection confirmed that there are piers missing and that the piers are not adequately founded.  O ver time significant differential foundation movement has occurred. Because of this movement damage to the plumbing pipes under the bathroom has occurred . This has resulted in leaks to the subsoil under the dwelling.  G eneral direction of moisture movement is towards the rear left of the dwelling which is the deepest area of fill. The bathroom that is leaking is on the right of the dwelling.  Mo isture move ment has resulted in a softening of the soils at depth resulting in further gross movement of the piers and hence further gross movement of the rear of the dwelling.  Further gross movement is anticipated. E vidence suggest s over 50% of the movement of the dwelling at the rear right is attributable to the broken pipes.  Significant remediation is required to rectify the problem at the rear of the house including underpinning, lifting and stabilising. Estimated cost works $95,000. Financial firm’s engineer (J) Report 28 February 2019  Provided underpinned design and underpinning details (10 underpins) and scope of works based on its hydraulic level survey and geotechnical testing.  Engineered solution is to underpin the slab at the rear and sides of the hous e to reinstate the stability of the foundation. Financial firm’s engineer (J) Report 8 May 2019  Provided more detailed report about the area directly affected by the leaking pipes.  Earlier report related to rectification of all rear movement.  Firstly, there were settlement due to inadequately founded and inadequate number of piers installed at construction.  Secondly, there was additional movement caused due to the Determination | Case number: 528118 Page 16 of 18 Record Key points breaks in the pipes.  The first event was the caus e of the breaks to the pipes.  If only movement caused by second event, then six underpins at right hand rear of property.  Rectification of both events is required at the same time.  Estimated cost of installing the underpins for the second event only and remediation of the bat hroom ar ea and associated damage would be about $40,000 plus GST. Complainant’s engineer ( R ) Report 14 March 2016  Relief valve outlet from the hot water system is leaking as noted during the ins pection wit h the leaking occurring at approximately 2 - 3 second inte rvals. This continual leak had caus ed the ground around near to the eastern corner of the bathroom to be damp and moist. The moisture levels at the bathroom were wet when compared to other areas along the southern elevation.  In general, the observed defec ts were primarily located along the southern elevation toward the eastern end of the dwelling. This correlated to wit h the leaking of the hot water unit, shading from the southern fenc e and increased depth in highly reactive fill. These factors were consid ered the driving parameters in the excessive heaving noted wit hin the foundation along the southern elevation. Complainant’s plumber ( F ) Quote 10 July 2018  CCTV main bat hroom fixtures and describes cracking and dislodged pipes and non - complianc e with the plumbing codes.  CCTV stormwat er lines around property. Leak from the stormwater line is contributing to the slab dropping on the hous e.  Plumb quicks (rubbe r connectors used to join pipes together) were found on stormwater lines which are causing them not to be able to hold water and leaking.  Quoted to repair Complainant’s plumber (F) Email 7 August 2018  Pipes under the slab are not broken because of defective plumbing.  Plumb quicks met Australian Standards and can be used on sewer and stormwater lines. Complainant’s engineer (R) Report 9 February 2019  Complainant‟s engineer reviewed the report prepared by J.  Incorrect only four concrete piers were f ound. A connected pier was located under the rear northern corner of the building. Suggests six piers were installed with five piers still being connected to the raft.  Excavations suggest fill depth varies from 800mm to 1000m and investigations never det er mined the depth of the piers nor the founding mat erial.  Conc rete pier depths within the soils in the area tend to be 2400mm to 2700mm deep.  Regarding the hydraulic level survey, probable settlement noted to the piers induced by a softening of the founding material because of water from the leaking pipes. Determination | Case number: 528118 Page 17 of 18 Record Key points  As the constructive foundations have performed suitably for several years suggest external factor (moisture) has induced the excessive movement  Primary cause of the defects is excessive moisture caused by t he leaking and fracturing of the plumbing. This caused the excessive settlement of the foundation and the piers. Impact of moisture on the soil has been underestimated by J and contributes to greater than 50% of the movement.  Agrees with suggested remedial works and suggests other work required which would incur an additional cost of $15,000 making the total sum of the works to about $110,000 plus GST.  Based on observations since 2016 and the subsequent det ailed investigation works undertaken as not ed within the detailed reports prepared by J, say the primary cause of the damage as noted is the failure and fracturing of the plumbing .  I ntroduction of the moisture caused by the plumbing has caused the settlement in the slab and piers, thus resulting in the damage noted to the dwelling.  Ag ree the construction of the piers does differ from that as detailed by the designer, however, the timing of the defects in 2016 some ten (10) years later suggest s external factor ( excessive moisture resulting from the failure of the internal plumbing ).  F ailure of the plumbing has attributed to at least 85% of the settlement and therefore the defects as recorded.  Agr ee in p rinciple with the suggested remedial works, plus greater moisture cont rols around the perimeter of the dwelling are also required ( add s approximately $15,000 ). RC liability quote  Work on slab side patio and reinstall water tank $3,531.  Repair to concrete slab and pier positions to the rear half of the building $98,958. 3.4 Policy wording The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‟s Notices of Response dated 14 December 2018 and 25 July 2019. Both the policy document and the Notices have been exchanged with the complainant. Record Extract What you are covered for Insured events If you have a building insurance policy, we cover the building for loss or damage at the insured address caused by a n insured event during the period of insurance . Escape of liquid Loss or damage caused by liquid leaking, overflowing or bursting from any of the following: Determination | Case number: 528118 Page 18 of 18 Record Extract  refrigerators, freezers, dishwas hers and washing machines;  any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems;  fixed tanks;  swimming pools or spas;  waterbeds;  baths, sinks, toilets and basins;  fixed heating or cooling system;  water main, fire hydrant or water supply pipe;  an aquarium What we do not cover - general exclusions You are not covered under any section of the policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement … We will not  pay more than the relevant sum insured (unless you have the Building Complete Replacement Cover option) or policy limit;  pay extra to replace the building or landl ord contents to a better standard, specification or quality than they were before the loss or damage occurred except as stated in the meaning “new for old”;  fix a fault that existed before the loss or damage occurred. Dealing with defects If a known defect is the cause of the damage We do not pay for loss or damage caus ed by a defect, structural fault or design fault at the building that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred. If an un known defect is the cause of the damage If an incident covered by your policy damages the building and an unknown defect was the cause or part of the cause, we will pay for the resulting damage. If the unknown defective part of the building is also damaged by the same incident, we will fix this as well. We do not rectify structural or design faults When we accept a claim, we will not pay extra to rectify a structural or design fault at the building that you knew about (or should reasonably have known about) . We will only pay you what it would have cost us to fix the damage from the incident covered by your policy or, if we agree, you can pay us the extra amount it costs to rectify the structural or design fault at the building. 3.5 Other relevant material considered and relied on  Parties‟ submissions and emails and all attachments to all submissions and emails .  Parties‟ expert reports .  Photographs.  Scopes of work and costings.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.