Home / Strata Community Insurance Agencies Pty Ltd / Determination 657098

Determination 657098

Burst pipe water damage claim not accepted; insurer alleged failure to cooperate and prejudice

FirmStrata Community Insurance Agencies Pty Ltd
Decided2020-05-08
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$11,709
SourceAFCA PDF

Summary

A lot owner's representative claimed for water damage from a burst pipe under a residential strata policy about eight weeks after the event. The insurer declined to pay, saying repairs were done without authority and information was not provided. AFCA affirmed that the insurer was not required to pay.

The policy and the Insurance Contracts Act require cooperation and utmost good faith, and the insurer was prejudiced by unauthorised repairs and delayed information, reducing its liability to nil.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Strata Community Insurance Agencies Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 657098 Financial firm Strata Community Insurance Agencies Pty Ltd Determination | Case number: 657098 Page 2 of 7 Case number: 657098 8 May 2020 1 Determination overview 1.1 Complaint The complainant lodged a claim under the residential strata insurance policy held with the financial firm (insurer) for property damage following a burst pipe. The insurer has not accepted liability for the claim (made about eight weeks after the event), as it maintains the complainant has failed to cooperate in the claim investigation, and has therefore prejudiced the insurer’s ability to assess its liability, if any, under the policy. The complainant believes the claim should be paid. 1.2 Issues and key findings Is the insurer required to pay the claim? There is no dispute there was damage to the property from a burst/leaking water pipe(s). That is an insured event under the policy, but subject to certain conditions. The insurer has been prejudiced in its ability to properly investigate the claimed event, since repairs (including work involving a concrete slab) were completed without its prior authority, contrary to the terms of the policy. The complainant has also not fully co-operated with the insurer in its reasonable requests for information relevant to the claim and an assessment of its potential liability. Based on the broad statement of repairs and associated costs for the work already undertaken , the insurer’s auditor has estimat ed the claimable amount would be $9,530.90 (which is less than the policy excess of $10,000 in any case). On the available evidence, that reasonably represents the extent of the insurer’s likely liability. Under the circumstances, it is not fair or reasonable to require the insurer to make any payment in settlement of the claim. Were there unreasonable delays by the insurer in assessing the claim? The information shows that delays were largely because of the complainant’s failure to provide the insurer with information that was reasonably requested to enable it to properly assess the claim. No compensation is warranted in the circumstances. 1.3 Determination This determination is in favour of the insurer. It is not required to take any further action. Determination | Case number: 657098 Page 3 of 7 2 Reasons for determination I have decided this case on the basis of what I consider fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous AFCA decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. For the purposes of this determination, I will deal with only those points considered relevant. This complaint has been brought by a third-party representative on behalf of a lot owner in the insured development. I will refer in this determination simply to the ‘complainant’. 2.1 Is the insurer required to pay the claim? Policy covers damage from bursting/leaking pipes The policy covers loss or damage to the insured property as a result of ‘ bursting, leaking, discharging or overflowing of water tanks, water apparatus or water pipes ’ , subject to certain monetary limits and exclusions. Cover includes the reasonable costs of locating the cause of the damage, and for any damage caused in locating the leak; as well as up to $1,000 for the repair or replacement of the defective part or parts of the apparatus, pipes or other installations giving rise to the damage. The policy excludes cover if the bursting or leaking is ‘ caused by a building defect, building movement, faulty workmanship, rust, oxidization, corrosion, wear, tear, gradual corrosion, gradual deterioration, earth movement or by trees, plants or their roots ’. Complainant has established a prima facie claim I am satisfied on the evidence that the complainant has shown a prima facie claim for damage from burst or leaking pipes: the complainant’s plumber identifie d and repaired damage from at least one water leak, although it is possible there were several. The onus then shifts to the insurer to show that an exclusion applies, or that it is otherwise entitled to decline the claim. Insurer prevented from properly investigating the circumstances of the claim The complainant lodged a claim with the insurer on 4 October 2018 for a water leak said to have occurred on 6 August 2018 : ‘hot water line required replacement after water leak discovered in concrete slab’. Determination | Case number: 657098 Page 4 of 7 The complainant provided their plumber’s invoice dated 2 September 2018 for work totalling $17,116.40. An invoice dated 21 July 2018 for $990 for ‘emergency repairs’ (apparently carried out on 16 July 2018), and one dated 12 August 2018 for $11,785.30 dea ling with more extensive work had also been provided with reference to an earlier reported issue on 20 July 2018. The evidence indicates the initial exploratory/emergency work, and then the broader repairs had been undertaken without the insurer’s authority (in the case of the latter repairs, that was contrary to the policy requirements), and before the insurer could carry out its own investigation. The insurer explained it decided not to undertake a further invasive review of the work itself, given the nature and extent of that already completed, and out of consideration for the complainant’s circumstances/disability. Instead it asked the complainant to provide certain information/an expert opinion from their plumber to clarify the cause and extent of the damage, so that it could assess its liability under the policy. I consider that was reasonable in the circumstances. Exclusions not shown to apply, but were a possible factor in damage In particular, the insurer needed to identify any exclusions which might apply, including the possibility the damage was caused by building movement. The complainant’s plumber is reported to have mentioned building movement as a possible contributing factor to the leak/damage, although the complainant did point out he was not a structural engineer. However, the plumber had also observed ‘ minimal protection around the existing copper pipe if any from experience on site ’ , which suggests he did have knowledge of the site and so may well have been able to provide relevant insights. There are also other communications between the strata manager and the complainant in February/March/April 2019 that indicate the complainant was aware building movement was an exclusion. This led to a statement from the strata manager that ‘plumber did not note signs of building movement’ but was only able to say ‘the pipe simply failed’. In the absence of further clarification from the plumber, and any other compelling evidence, the insurer has not been able to show that or any other specific exclusion would apply, even if it is a possibility. That means it cannot decline the claim on that basis. Complainant obliged to co-operate with insurer There are, however, other possible circumstances which would entitle the insurer to deny the claim or limit its liability, both under the terms of the policy and the Insurance Contracts Act 1984 ( the Act). Determination | Case number: 657098 Page 5 of 7 The policy obliges the complainant to co-operate with the insurer when making claims. That includes providing information and assistance that the insurer reasonably requires. If the complainant fails to comply with those obligations, the insurer may not pay a claim under the policy. As well, section 13 of the Act requires the parties to act with the utmost good faith, in respect of any matter arising under or in relation to the contract of insurance . The duty of utmost good faith obliges the complainant to provide reasonable assistance to the insurer to enable it to make an accurate assessment of what is being claimed. By extension, the basic principles of fairness suggest it is inappropriate not to assist as far as reasonably possible in allowing the insurer to properly investigate a claim. Insurer acted reasonably in seeking additional information The insurer is entitled to make reasonable enquiries and conduct investigations to clarify the circumstances surrounding the claim, so that it can make an informed decision as to whether the claim falls within the scope of the policy, and if so, the extent of its liability. In this case, I consider the requests made by the insurer were not unreasonable, and the complainant should reasonably have been able to comply. While some information has been provided, the critical omission remains the lack of an ‘expert’ opinion from the plumber about the likely cause of loss. Given the plumber was the person on site physically locating, investigating and then repairing the initial leak and associated areas, I consider he (despite not being an engineer) would be well placed to provide an authoritative view as to the cause of the issue. He would also, at the very least, have been best placed to readily clarify elements of the invoices he submitted. The complainant has said, however, that the plumber has nothing more to add. The plumber cannot be compelled by AFCA to provide any further information, although I consider the complainant was in a position to obtain further detail from him but failed to do so. Insurer has been prejudiced by complainant’s actions I am satisfied the insurer has been prejudiced in its ability to appropriately assess the claim and its liability, if any, under the policy. That has been because of the actions of the complainant both in proceeding with repairs without first obtaining the insu rer’s authority to do so (then not lodging the claim until about eight weeks after the event) , and then by failing to/delaying in providing reasonably requested information that would have assisted in its investigations. That includes information which might have clarified whether there had been more than one leak event, and therefore necessarily more than one claim, each with the applicable policy excess. Determination | Case number: 657098 Page 6 of 7 Even though some information has now been provided, I consider the complainant breached their obligations under the policy in those respects and the insurer’s interests have been prejudiced as a result. In such situations, the Act provides that the insurer may reduce its liability for a claim by the amount that fairly represents the extent of its prejudice. Excess for water damage and/or burst pipes under the policy is $10,000 I consider it clear there was a burst pipe(s) and water damage. The policy excess payable for each water damage claim is $10,000.00. The complainant believes the amount of $11,708.90 represents a fair and reasonable settlement, although the precise basis for that is not clear. However, the insurer’s auditor has calculated the claimable amount is $9,530.90 (by reference to the plumber’s invoices , but without the full clarification previously requested by the insurer). That is less than the policy excess, and so nothing would be payable based on that figure. In the absence of compelling evidence as to the cause and extent of what might be claim-related damage, and the respective costs for that alone, I am satisfied it is fair in the circumstances to accept the insurer’s calculations. Insurer not required to pay the claim On the basis that the insurer’s liability for the claim is $9,530.90, it is not required t o make any payment in settlement. 2.2 Were there unreasonable delays by insurer in assessing the claim? Complainant has contributed to delays The complainant is unhappy with the way the claim has been handled, and in particular says the insurer has failed to meet required timeframes. However, I consider, on the evidence, that the insurer made reasonable attempts to progress the matter, and that delays were in large part because of the actions of the complainant and their failure to provide the requested information fully and in a timely manner. Awards of compensation for non-financial loss are only made in situations where the complainant has experienced an unusual degree of upset or inconvenience because of the actions of the insurer. That is distinct from the inconvenience that might reasonably be expected in circumstances where there has been property damage and the need to make and pursue a claim in the normal course of events. I am not satisfied that compensation is warranted in this case. Determination | Case number: 657098 Page 7 of 7 3 Supporting information Relevant sections of the policy Page Provision 15 You must assi st Us Before We will pay anything under this Policy, You must: (a) comply with all the requirements of this Policy; (b) give Us all information and assistance which We reas onably require in relation to the claim and any proceedings; and (c) allow Us access to any and all doc uments that We reasonably require to ascer tain the maintenance history of the Building. 17 Event means a happening or an incident not intended to happen that occurs during a particular interval of time, or a series of happenings or incidents consequent upon or attributable thereto, which causes or res ults in Loss or Damage or a legal liability to pay compensation which is claimable under this Policy. Indemni ty Value means the cost to rebuild, replace or repair property to a condition that is equivalent to or substantially the same as but not b etter nor more extensive than its condition at the time of loss tak ing into consideration age, condition and remaining useful life. 19 Loss or Damage means direct physical loss of, destruction of, or damage to propert y from any sudden and accident al cause not otherwise excluded by this Policy . 24 Exploratory costs, Replacem ent of defecti ve parts When Your Insured Property suffers Loss or Damage as a result of: (a) bursting, leak ing, discharging or overflowing of water tank s, water apparatus or water pipes; or (b) bursting, leak ing, discharging of gas tank s, gas apparatus or gas pipes; or (c) leak age of oil from any fixed oil installation, including tank s, appa ratus and pipes ;

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.