Text of the determination
Determination
Case number 656904
Financial firm AAI Limited
Determination | Case number: 656904 Page 1 of 14
Case number: 656904 16 July 2020
1 Determination overview
1.1 Complaint
The complainant is an owner’s corporation wh ich holds strata building insurance
underwritten by the financial firm (the insurer). By agreement with the complainant, a
hotel business caretakes and leases the insured apartment complex to guests, and
acts as the complainant’s agent . I n this determination the term ‘complainant’ is used
to refer to both the owner’s corporation and the hotel business , as the context allows.
On 28 March 2017, Cyclone Debbie damaged the hotel. The insurer accepted the
complainant’s cla im and authorised repairs.
In late 2017, the complainant discussed with the insurer whether the policy would
cover costs of relocating the hotel guests to alternative hotels during the repairs. The
complainant says the insurer promised to cover these costs under the policy during
the period of repairs, but has since denied liability.
The complainant disputes the insurer’s decision and seeks $152,837 plus interest ,
and its advisor’s fees.
1.2 Issues and key findings
What is the extent of the insurer’s liability for the guest relocation costs?
On the available evidence, it is fair that the insurer be liable for the claimed shortfall
relocation costs for the period between 8 January 2018 and 30 April 2018.
The insurer has already paid the complainant claims preparatio n costs up to the
policy limit and is not liable for additional advisor’s fees.
1.3 Determination
This determination is substantially in favour of the insurer.
Within 14 days of the complainant’s acceptance of this determination, the insurer is to
pay the claimed shortfall relocation costs for the period 8 January to 30 April 2018,
calculated as set out in the complainant’s supporting evidence provided (less the
$13,542.59 already paid). The insurer must pay interest on the settlement sum in line
with section 57 of the Insurance Contracts Act 1984 (Cth), from 31 August 2018 until
the date of payment.
Determination | Case number: 656904 Page 2 of 14
2 Reasons for determination
There has been a full exchange of material between the parties, and each party has
had the opportunity to address the issues arising from that.
Due to the nature of/complexities involved in this dispute, it has been referred to a
panel for determination.
The panel has reviewed and considered all the material provided by the parties. While
the parties raised various issues in their submissions, for the purposes of this
determination, the panel has restricted its commentary to only those issues which it
considers directly relevant to the outcome.
This determination follows consideration of all the information exchanged, and is
based on what is fair in all the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
previous AFCA decisions where applicable.
2.1 What is the extent of the insurer’s liability for guest relocation costs?
Complainant says insurer promised to cover relocation costs under policy
The complainant says:
the insurer promised in writing on 29 November and 12 December 2017 to cover
the costs of relocating existing guest bookings under the policy
the resort was closed from 8 January 2018 to allow repairs to the apartments. It re-
opened on or about 10 August 2018
in reliance on the insurer’s promise, the complainant incurred $166,380 in
relocation costs for the period 8 January to 6 August 2018
of this amount the insurer has paid $13,543, which means the insurer still owes
$152,837
the insurer classified and paid the relocation costs variously as ‘loss of rent’ and
‘temporary accommodation’ payments under the policy
more recently (in May 2019) the insurer reneged on its promise, denying liability for
the claimed costs.
The complainant disputes the insurer ’s decision and seeks $152,837 plus interest and
its advisor’s fees.
Insurer says it only agreed to cover reasonable costs
The insurer says:
it has paid loss of rent to the extent of its liability for the uninhabitable units
the policy does not cover relocation costs of guests
Determination | Case number: 656904 Page 3 of 14
it did not represent that all relocation costs would be unconditionally covered
it only agreed to cover reasonable relocation costs incurred for a defined period,
initially from 8 January to 31 March 2018
the additional costs claimed by the complainant constitute unreasonable costs for
which the insurer is not liable
the complainant contributed to and/or failed to mitigate its losses by not being
transparent about the extent of the costs to be incurred, failing to secure more
cost-effective accommodation and delaying the re-opening of the hotel
the insurer has already paid the complainant claims preparation costs up to the
policy limit and is not liable for additional advisor’s fees.
Policy did not strictly cover complainant’s shortfall relocation costs
Among other things, the policy covers loss of rent and temporary accommodation.
The relevant policy terms are set out at section 3 of this determination.
In summary, the loss of rent benefit applies when a lot in the complex is leased/would
have been leased and the lot owner has incurred a loss of rent following an insured
event which renders the lot uninhabitable.
The temporary accommodation benefit applies where the lot owner – who is living in
the lot – is forced to pay for temporary accommodation beca use the insured event
makes the lot unfit to be occupied for its intended purpose.
For a claim in respect of a given lot, both benefits would not normally apply for the
same period during which it could not be occupied. That is because the lot would
either be rented out/available for rent (in which case the ‘loss of rent’ provision would
apply), or it would be occupied by the lot owner (in which case the ‘temporary
accommodation’ provision would apply) .
‘Lost rent’ – as that term was used by the parties in practice – typically referred to
income from booked rooms, during the time the hotel was closed, which the hotel
effectively lost when it paid to re-book its guests in alternative hotels for the period of
closure.
The term ‘ r elocation costs’ was sometimes used loosely by the parties to refer to lost
rent. However, the parties also used the term to refer to additional amounts paid by
the hotel in re-booking the guests in alternative hotels, incurred due to the difference
in rates between the existing bookings and the bookings for the new hotels. This
complaint concerns these ‘shortfall’ amount s.
For the sake of clarity, this determination will adopt the term ‘shortfall relocation costs’
to refer to the disputed guest relocation costs.
Determination | Case number: 656904 Page 4 of 14
The parties agree that the policy, on a strict reading, did not cover the shortfall
relocation costs, but for commercial reasons the insurer decided to pay a portion of
these costs as ‘temporary accommodation’ under the policy.
In this determination, the panel has considered the legal and equitable implications of
the insurer’s decision , including the principles governing contractual variations,
misrepresentation and estoppel, within the overarching context of what is fair in all the
circumstances.
Policy varied, but variation is ambiguous
The policy states that no change in its terms will be valid unless the insurer agrees in
writing, nor will the requirements of any section be deemed to be waived unless the
insurer agrees in writing.
The complainant says that discussions in November and December 2017 culminated
in the insurer agreeing by email to cover the guest relocation costs under the policy.
The complainant says this constituted a binding contractual variation and/or promise
on which the complainant reasonably relied to its detriment; and on this basis, it is a
breach of contract and unfair for the insurer to renege on its promise, and it should be
estopped from doing so.
The key emails referred to by the complainant are as follows:
Email from hotel to insurer’s loss adjuster – 27 November 2017
We are currently working through the options to relocate existing bookings from
8th Jan 2018 until 31 Mar 2018 to allow the closure of [the] Resort.
There are variances in rates for like for like (4.5 star) with the best option to offer
[W] Resort, centrally located 4.5 star property or [M Resort], similarly priced 5 star
property situated at [A] Marina.
Does the policy cover the shortfall in relocation costs?
Reply email from loss adjuster to hotel – 12 December 2017
We have no issues over that extra cost being covered under the Policy.
The difference only of course - with the initial amount being included as part of
their rent income.
Confirmation email from hotel to loss adjuster and others – 12 December 2017
Thanks [Mr R],
Determination | Case number: 656904 Page 5 of 14
[Mr G] – please note – I think the best option is to set up an account for [the
insurer] – the guest will pay the amount they were scheduled to pay at [our resort]
and the difference being charged to the [insurer] based on best available
preferred rates. I will discuss with both properties in due course.
The email in which the insurer subsequently declined any further payment is:
Email from insurer to broker - 17 May 2019
The relocation cost issue has been reviewed and we can confirm the policy does
not respond to relocation costs.
Any payment for relocation costs was not ex gratia it was a commercial decision
made at the time to assist the Insured so as not to lose customers and retain a
good rating with their guests.
A central issue is what the parties agreed or intended, objectively speaking, in relation
to the shortfall, including the extent and duration of coverage, and the basis of
quantification.
What the initial three emails establish is:
the complainant expected the costs of relocating existing guest bookings to other
hotels to be covered under the policy
the insurer confirmed that these costs – insofar as they matched the rates/costs of
the existing bookings – would be covered under the policy as ‘loss of rent’
the complainant expected there would be a ‘shortfall’ that it would need to pay in
relocation costs due to the variation between the hotel’s rates and the rates of the
substitute hotels. The complainant wanted to know whether the policy covered the
shortfall in those accommodation costs
the insurer agreed to cover the shortfall relocation costs under the policy during the
expected hotel closure and repair period of 8 January to 31 March 2018.
However, those initial emails, on which the complainant then relied, leave certain
points unclear or ambiguous. In particular:
what the insurer meant when it said ‘we have no issues over that extra cost being
covered’; whether the insurer was exerci sing a discretion / granting a commercial
concession to cover ‘that extra cost’ (being the cost for the defined period until 31
March) or whether it was giving advice that in general terms the policy covered the
shortfall costs
the meaning of ‘coverage’; w hether the insurer intended to extend cover
unconditionally for the costs or whether it would be subject to the requirements /any
limitations of the policy
Determination | Case number: 656904 Page 6 of 14
the policy provision under which the costs would be covered
the extent of coverage in the event the repair process blew out beyond the defined
window of January to 31 March
the rates to be applied and the method of calculation, given the complainant told
the insurer it would try to obtain the ‘best available preferred rates’ and the insurer
did not respond to this.
In order to clarify the matter, the panel considered not only the above email
exchanges, but also the policy terms and surrounding contemporaneous documents,
including correspondence, minutes of meetings between the parties, and the loss
adjuster’ s reports.
Insurer initially agreed to cover shortfall costs up to 31 March 2018
As noted, in the emails the insurer agreed to ‘cover’ the shortfall costs between
January and 31 March 2018 ‘ under the policy ’ . However, it is unclear at that point
whether the insurer’s communications extended coverage beyond 31 March 2018.
Around the time the insurer made the promise to cover the costs, the parties
anticipated an event-related repair period of between January and late March or 17
April 2018. This is evident from the key emails and the minutes of the meeting
between the parties on 19 December 2017. According to the minutes, the insurer told
the complainant that the indemnity period for loss of rent was from 8 January 2018
until 28 March 2018, and expressed concern that the program of repairs should not
exceed this period, in order to avoid uninsured losses.
This may have been based on the insurer’s assumption that the policy contains an
indemnity period of 12 months from the date of loss (which was 28 March 2017). The
panel notes there is no such limitation in the policy which would restrict coverage for
that period. Nevertheless, the minutes and the wording of the emails indicate that, as
at December 2017, both parties believed and intended that the policy benefits –
including the variation – would only apply until the end of March 2018.
This interpretation of the scope of the promise is reinforced by an analysis of what
‘ valuable consideration ’ (in the legal sense of the term) – if any – the insurer received
in exchange for the promise. The parties provided very little information about this
issue and the ‘ consideration ’ appears somewhat tenuous. Based on the limited
available information, the panel accepts on balance that, in exchange for the promise
to cover the shortfall until 31 March, the insurer sought and expected to receive
practical commercial benefits. For instance, if the hotel were closed, the repair
process could reasonably be expected to be expedited since the builder would have
unimpeded access. This may have yielded a shorter disruption to the hotel’s
business, resulting in a potentially shorter indemnity period (and costs) for the insurer.
The insurer’s subsequent email of 17 May 2019 would appear to support such an
understanding, in that its stated support for the insured in minimising a loss of custom
Determination | Case number: 656904 Page 7 of 14
would effectively translate into the minimising of its own liability for an extended
period of disruption.
As it happened, there were extensive delays which pushed the repair period back
several months. In light of these delays and any associated extension of cover, the
value of the ‘valuable consideration’ under the agreement for the insurer might appear
to be reducing. From that perspective, there are questions about the extent/efficacy of
the variation; it seems unlikely the insurer would have intended to extend coverage
irrespective of the ongoing, unanticipated delays and a diminishing benefit to it.
Insurer agreed to cover costs under ‘temporary accommodation’ benefit
As noted above, the panel has concerns regarding the certainty or completeness of
the terms of the variation. However, based on the information that is available, the
panel accepts the insurer intended to vary the policy by extending coverage for the
shortfall costs under the temporary accommodation benefit. The key emails refer to
‘coverage under the policy’ and the insurer made one payment for the shortfall costs
in August 2018 – discussed further below – which it classified as ‘temporary
accommodation’.
The panel also notes that the insurer did not waive the relevant policy requirements
under the temporary accommodation benefit relating to quantification. The provisions
of the benefit are set out at section 3 of this determination. In the panel’s view, the
effect of those requirements is essentially that the costs between January and 31
March 2018 (the period of the variation as first agreed) need to be ‘reasonable’ and
based on the rates of similar hotels.
January to 30 April 2018: insurer liable for shortfall relocation costs
The insurer has acknowledged that when it was agreed the complex would be closed
from 8 January 2018 to allow for the reinstatement of the damaged apartments, it
accepted the guest relocation costs would be considered against the additional
benefits in the policy for loss of rent and temporary accommodation. After the
variation agreement, it then agreed to ‘an indemnity period of up to 30 April 2018 for
relocation costs’ . That extension was given, it said, in an effort to minimise the loss
and protect the policyholder’s relationship with its customers. In its loss adjuster’s
report of 18 August 2018, it is also explained as representing the period ‘ which
reflected Insurable works indemnified by the Policy, and the allowance for defects,
reinstatement of contents, and re-letting ’ .
On that basis, the panel considers it fair to treat the insurer ’s liability for shortfall
relocation costs as extending beyond 31 March 2018 (which is covered by the policy
variation and subject to the requirements discussed above), up to 30 April 2018.
That is because the insurer induced the complainant to believe that the shortfall costs
would be covered under the policy, at least for the period between January and late
April 2018, and so it would not be fair in the circumstances for it to resile from that
position.
Determination | Case number: 656904 Page 8 of 14
In the panel’s view, the complainant reasonably relied on that understanding in
incurring costs for the relevant period, since:
the initial repair and closure period was defined by the key email exchange and
meeting in December 2017
the insurer’s promise to cover the costs was not qualified
the complainant put the insurer on notice it would obtain the ‘best available
preferred rates’ and the insurer did not object to this or explain any limitation to
cover
in late March 2018, the complainant submitted the January relocation costs to the
insurer, who did not deny liability
the parties ought reasonably to have expected there would be weather and other
project-based delays, later estimated to be in the range of a few weeks
allowing for refurbishment and reletting processes, the parties reasonably expected
the re-opening may be delayed to the end of April.
In reliance on the insurer’s representations as to cover, the complainant incurred the
claimed shortfall relocation costs and has provided evidence in support of this. But for
the representations, the complainant might well have acted differently to avoid at least
some of the detriment incurred.
T he panel accepts the complainant’s claim for the shortfa ll costs during this time was
reasonable, particularly given:
the complainant had to act swiftly to secure substitute accommodation at very short
notice
it was peak holiday season, so new bookings could be expected to be expensive
the evidence suggests the complainant obtained the ‘best available preferred
rates’, as they said they would in the key email exchange.
Although the loss adjuster suggests the complainant’s agent (the ho tel) had a conflict
of interest, since bookings were transferred to hotels managed by the agent, this is
not supported. If anything, as the complainant suggests, the bookings were more
smoothly facilitated by the agent’s existing relationship with the substitute hotels.
The insurer sought to limit its liability based on the average room rate of one of the
complainant’s major corporate clients ($110 per day). The complainant says this is
unreasonable given the rate is discounted and not representative of the rates
normally available. The panel accepts this submission. The insurer’s li mitation is not
justified by the policy calculation method in the temporary accommodation benefit, or
the general duty to mitigate loss. The insurer has not otherwise provided compelling
evidence to refute the reasonableness of the complainant’s costs and, in any event, it
induced the complainant into incurring those costs. The panel is satisfied the
complainant has established it acted reasonably in securing the best available
preferred rates in the particular circumstances.
Determination | Case number: 656904 Page 9 of 14
That means the insurer is liable for the complainant’s temporary accommodation/
shortfall relocation costs in full for the period 8 January to 30 April 2018.
May – August 2018: reliance not reasonable, loss not established
The panel is not persuaded that a reasonabl e party in the complainant’s position –
being commercially sophisticated and well-advised – would presume from the
December 2017 email promise and surrounding circumstances that cover for the
shortfall would continue unconditionally after 30 April 2018. The panel is not satisfied
the insurer’s representations or conduct would have induced a reasonable party in the
complainant’s position to adopt the assumption of further coverage and incur costs in
reliance on the assumption.
Firstly, as set out above, the wording of the key 2017 email exchange is directed at
the period ending 31 March 2018 and this is consistent with the discussions between
the parties at the time. The emails are otherwise not specific enough to have induced
a reasonable party to believe costs would continue to be covered indefinitely
regardless of a significant change in circumstances.
Secondly, the insurer’s conduct after these emails would not have encouraged the
complainant to reasonably believe coverage was ongoing:
in late March 2018 the shortfall costs for January were submitted to the insurer, but
in July and August 2018 the insurer disputed the extent of the costs claimed
when the ongoing nature of the costs was made clear in July 2018, the insurer
disputed the costs
the insurer only made one payment to the complainant for the shortfall relocation
costs. This was in August 2018, for $13,542.59, calculated by the insurer at $110
per day and only related to a portion of the January 2018 shortfall, which it
classified as ‘temporary accommodation’. It said it would consider paying the
balance of the costs pending substantiation by the complainant.
Furthermore, on 16 May 2018, the insurer’s loss adjuster had sent the complainant an
email about coverage and the ongoing delays, noting:
… d elays in decision-making and approvals in relation to private works or
decisions as to timing of any rebranding works/issues which have directly
impacted the timetable of insurance related works, do not constitute a valid cause
for additional loss of rent consideration.
From a review of the available documents, the panel is satisfied this position was
conveyed to the complainant at different stages throughout the claim (including, for
instance, in emails in October 2017 from the hotel to the body corporate).
What can be said is that the complainant was on notice at or before 16 May 2018 that
the insurer would not pay the loss of rent benefit for delays due to reasons unrelated
Determination | Case number: 656904 Page 10 of 14
to the insured event, and that is reflected in the ‘loss of rent’ payment the insurer
made on 31 May 2018 for the 31 March to 30 April 2018 period. If the insurer was – at
16 May 2018 – refusing to pay any further loss of rent, then it is reasonable to expect
that would also apply to its liability for the shortfall variation benefit.
In this context, the ongoing delays in the project – both in terms of repairs and re-
opening the hotel – made it unreasonable for the complainant to continue to rely on
the December 2017 promise without further consulting the insurer.
It also appears that the complainant submitted invoices for the shortfall costs to the
insurer in late March 2018, but did not submit further invoices until after the parties
began their dispute about the costs. The complainant did not keep the insurer
informed about the quantum of shortfall relocation costs progressively accruing
throughout the course of the claim, which meant the insurer could not re-assess
whether the commercial benefit would outweigh the costs of extending cover, whether
under the policy or otherwise. It also meant the complainant obtained no ongoing
assurance from the insurer that the costs would be covered.
In these circumstances, and given the identity of the complainant as a commercially-
sophisticated party, it was not reasonable for the complainant to:
fail to clarify – at least in early May 2018 – the liability for the shortfall relocation
costs with the insurer
adopt the assumption that the shortfall would continue to be covered
rely on the assumption to incur costs.
This means the panel does not accept that the complainant’s financial detriment was
caused by its reliance on the insurer’s promise. Even if the reliance could be said to
be reasonable, the panel is not persuaded, on the evidence, that this is responsible
for the compla inant’s losses beyond April 2018.
The insurer says the complainant was responsible for most of the delays because:
the issues with the private (non-claim-related) works to the bathrooms and
penthouse domes caused extensive delays. For instance, delays we re caused by
the parties being in dispute about liability for the penthouse domes and the
complainant failing to provide the signed contracts for the private works (which
meant the insurer’s builder, RP, could not begin these works)
by April 2018, the builder had reinstated about 26 of the lots, but the work on 22 of
the lots was delayed due to issues with the private works. But for the delays, the
claim repairs would have been completed by about 30 April 2018
the hotel could have re-opened at least partially in April and operated in a similar
way to how it did between July and November 2017 following the cyclone.
However, the complainant chose not to do so , in order to minimise inconvenience
to the guests
Determination | Case number: 656904 Page 11 of 14
the complainant then unilaterally decided to delay the re-opening of the hotel until 2
July 2018 for commercial reasons, including re-branding of the hotel, without
consulting the insurer about the decision beforehand
the hotel was almost ready to be opened by 2 July but the date was pushed back
to 27 July 2018 because the complaint ordered a replacement carpet for the hotel
as part of the re-branding process. Both the ordering of the carpet and the
replacement work were delayed
the re-opening was again delayed from 27 July to 10 August 2018 because of
compliance issues regarding fire evacuation signs and exit lighting.
It is arguable that the delay from mid-July to early August was the responsibility of the
insurer’s builder who neglected to reinstate the required signage. However, the
responsibility for the delays between April and July is less clear. There is insufficient
information to conclude that any contribution to the delays by the insurer caused the
complainant a compensable loss. In any event, it is not necessary to decide this
question given the panel is not satisfied the insurer induced the complainant into
ongoing reliance or that the complainant’s reliance was reasonable, as explained
above.
Finally, the panel is not satisfied the complainant has provided sufficient information
to fully establish its loss. The complainant has not sufficiently established what it
would have done had the insurer made it clear that shortfall relocation costs would not
be covered at an earlier stage. Based on the limited available information, it is not
clear the complainant would have acted differently to avoid its detriment.
For all the reasons above, the panel considers it fair in the circumstances that the
insurer be only liable for the claimed shortfall relocation costs between 8 January
2018 and 30 April 2018.
Within 14 days of the complainant’s acceptance of this determination, the insurer is to
pay these costs, as set out in the complainant’s supporting evidence /spreadsheets
provided (less the $13,542.59 already paid). The insurer must pay interest on the
settlement sum in line with section 57 of the Insurance Contracts Act 1984 (Cth) from
31 August 2018 until the date of payment.
Insurer not liable for additional claims preparation fees
The insurer has already paid the complainant claims preparatio n costs up to the
policy limit and is not liable for additional fees.
Determination | Case number: 656904 Page 12 of 14
3 Supporting information
3.1 Key emails between parties – November-December 2017
Email from hotel to loss adjuster / forensic accountant – 27 November 2017
We are currently working through the options to relocate existing bookings from
8th Jan 2018 until 31 Mar 2018 to allow the closure of [the] Resort.
There are variances in rates for like for like (4.5 star) with the best option to offer
[W] Resort, centrally located 4.5 star property or [M Resort], similarly priced 5 star
property situated at [A] Marina.
Does the policy cover the shortfall in relocation costs?
Reply email from loss adjuster to hotel – 12 December 2017
We have no issues over that extra cost being covered under the Policy.
The difference only of course - with the initial amount being included as part of
their rent income.
Confirmation email from hotel to loss adjuster and others – 12 December 2017
Thanks [Mr R],
[Mr G] – please note – I think the best option is to set up an account for [the
insurer] – the guest will pay the amount they were scheduled to pay at [our resort]
and the difference being charged to the [insurer] based on best available
preferred rates. I will discuss with both properties in due course.
3.2 Key policy provisions
Definitions
Annual Rentable Value
The amount specified in a lease agreement or the Annual Rentable Value of similar or
like Lots/Stratum Lots, including any outgoings payable by the tenant or lessee.
The Annual Rentable Value is adjustable:
a) in accordance with any existing increases or decreases in Rent specified in the
lease agreement; or
Determination | Case number: 656904 Page 13 of 14
b) in the absence of a rental agreement or where no such decreases or increases
in Rent are specified, upon the (12) month anniversary of the Event, an increase in
accordance with the change in the Housing Group for the weighted average of the
eight capital cities within the Consumer Price Index (CPI) costs for the proceeding
four (4) CPI quarters prior to the anniversary date.
Rent / Loss of Rent
Means, as regards any Lot or Stratum Lot or part of Your Common Area leased to a
tenant, an amount of money for lost rent calculated on the basis of the Annual
Rentable Value that applied immediately prior to the Event causing loss or damage.
Temporary Accommodation
Means:
Any Lot or Stratum Lot occupied by the Lot Owner or Stratum Lot Owner, an amount
of money for temporary accommodation calculated on the basis of the Annual
Rentable Value that would have applied had Your property been tenanted
immediately prior to the Event causing loss or damage.
Loss of rent and temporary accommodation
i) Loss of Rent
Where the Lot is leased out or would have been leased out, the Loss of Rent incurred
by the Lot Owner if the Lot or Common Area is made unfit to be occupied for i ts
intended purpose.
We will pay from the time of the loss, destruction or damage until the time the Lot is
re-let following completion of Reinstatement or Replacement of Your Insured
Property, provided the Lot Owner takes all reasonable action to obtain a new tenant.
ii) Temporary Accommodation
Where the Lot Owner occupies the Lot, the reasonable cost of:
a) immediate emergency accommodation and meals up to $2,500, and
b) Temporary Accommodation,
necessarily incurred by the Lot Owner if the Lot is made unfit to be occupied for its
intended purpose.
We will pay from the time of the loss, destruction or damage until the time the Lot
Owner re-occupies the Lot following completion of Reinstatement or Replacement of
Your Insured Property.
Determination | Case number: 656904 Page 14 of 14
However, Our maximum liability for Loss of Rent, and Temporary Accommodation is
limited to the amount or percentage of the Limit of Liability shown in Your Policy
Schedule.
Claims preparation fees
9.2 Claims Preparation Fees
We will pay up to $50,000 or any higher amount shown in the Policy Schedule for
professional fees and other expenses for preparation of claims that You reasonably
and necessarily incur with Our consent and which are not otherwise recoverable
under this Policy.
Insured’s obligations
a) take all reasonable precautions to avoid or minimise loss, damage,
disablement or liability;
b) maintain all business premises, fittings, appliances and equipment in sound
condition;
c) comply with all statutory obligations, by-laws and regulations imposed by any
public authority, for the safety of persons or property; and
d) obtain certificates of inspection for all equipment required by any statute or
regulation to be so certified.
Changes to the policy
4. Changes in this Policy
No change in this Policy will be valid unless We agree in writing nor will the
requirements of any Policy Section be deemed to be waived unless We agree in
writing.