Text of the determination
Determination
Case number 656349
Financial firm AIG Australia Limited
Determination | Case number: 656349 Page 2 of 10
Case number: 656349 25 June 2020
1 Determination overview
1.1 Complaint
The complainant (via his broker) lodged a claim for storm damage on his business
insurance cover with the financial firm (insurer), after a storm on 24 July 2018.
There was no dispute that the roof itself does not fall within cover, due to issues with
the box gutters. However, the complainant is seeking cover for the resultant internal
water damage. While the insurer has denied the claim, it offered to cash settle the
claim for $13,000, which the complainant refused.
The complainant says the insurer’s quote is not comprehensive enough (in that it only
considered superficial internal damage, plus did not consider the presence of mould),
and seeks cash settlement.
The complainant has also made a public liability claim on the insurer, after the tenant
lodged proceedings against him for damages due to health issues arising out of the
presence of mould, due to the damage being unrectified for long periods of time.
However, the public liability claim is separate and will not be considered as part of this
complaint at AFCA.
1.2 Issues and key findings
Is the insurer liable to accept the claim?
Based on the expert reports presented, the panel considers that the complainant has
established a valid claim, on the basis that there was a storm at the time of the two
loss events.
However, the panel considers the proximate cause of damage to be structural
defects, faulty design and faulty workmanship, which is excluded from coverage
under the policy.
Is the insurer liable to pay compensation for loss of rental income?
The insurer is not liable to pay any compensation for loss of rental income. The
complainant does not have business interruption cover and consequential losses are
specifically excluded under the policy.
Further, the complainant has not demonstrated that the insurer’s delays resulted in a
loss of rental income.
The insurer is also not liable for the related expenses, or legal costs.
Determination | Case number: 656349 Page 3 of 10
1.3 Determination
This determination is substantially in favour of the insurer.
Upon acceptance of this determination by the complainant, the insurer is to cash
settle the complainant for the cost of internal repairs in the amount of $16,500. The
insurer is not required to pay interest on this amount.
The insurer is not liable to pay any amounts for the damage to the roof, loss of rental
income or related expenses, non-financial loss, or legal costs.
Determination | Case number: 656349 Page 4 of 10
2 Reasons for determination
2.1 Is the insurer liable to accept the claim?
Complainant established there were storm events
The insurer noted that a storm was an insured event and agreed with the complainant
that, as at the first date of loss, the insured had established that it had a valid claim.
The panel notes the complainant had submitted some Internet links, showing there
was a storm in the area at the relevant time.
Following a second loss event, the insurer ’s builder PI, relied on an expert roofing
report by SC, which noted box gutter issues ‘as a direct result during recent heavy
rainfall’.
The panel is satisfied there were storms during loss event 1 (24 July 2018) and loss
event 2 (a few days prior to 29 May 2019, according to the export report by PI).
The panel considers that the complainant has established a valid claim under the
policy coverage for storm damage.
Insurer relies on exclusions to decline claim for storm damage
The insurer, although offering to settle the matter, has declined liability for storm
damage based on two exclusions in the policy relating to storm:
Faulty design or workmanship
Gradual entry of water into the building.
Several building assessment reports were obtained in this matter.
BB building report – attended 29 November 2018
The tenant’s builder BB found that the cause of damage was water overflow from the
box gutter above, where damage was present.
He also noted that:
The roof was in poor condition, due to old age and wear and tear.
The box gutter location on the front of the building had rainwater which had not
drained out.
On rainfall days, the water overflows from the box gutter and penetrates the
property.
The tenant advised there has been 6 prior occurrences of there being a leak, for
which she incurred cleaning costs.
Due to the water penetration, the internal ceiling and walls had become exposed to
constant water flooding the cavities. This had caused the plaster to expand, shrink,
Determination | Case number: 656349 Page 5 of 10
warp and sag. Water stains and flaking paint was visible to the ground floor and
first floor areas.
Maintenance/defect issues included insufficient fall on box gutter. He
recommended the box gutter be reframed with appropriate fall, with a new box
gutter to be installed with adequate overflow protection.
HR building report – attended 5 February 2019
HR (the complainant’s builder) described the problem as water ingress to the top level
through various positions.
HR found that:
The downpipes could not cope with rainfall intensities.
There were no sumps in the box gutters as the building was over 30 years old.
The downpipes were built in the cavity, which made it difficult to access and very
difficult to repair, but HR suspected they were in poor condition.
Additional overflows had been installed but were not coping with the heavy rainfall.
Previous roof repairs had been done poorly and screws put through sole of the box
gutter and flashings impeding water flow on roof sheeting.
The west side apron flashing was holding water and not falling correctly; silicon
had split on cappings; air conditioning duct penetration flashings were in poor
condition on both sides of the roof; the roof sheets on the north side were in poor
condition.
The photos provided in HR ’s report show extensive corrosion/rust to the roof sheets
and evidence of the poor condition of the roof, along with several different defects.
PI building report – 29 May 2019 (based on SC roof report – attended 24 April
2019)
The insurer obtained a building report from PI. According to this report, PI met with
the tenant on 29 April 2019 after further water ingress to the property.
PI obtained a specialist roof report from SC, who noted that:
There was leaf debris in gutters/outlet.
In the front box gutter, there was thick leaf debris built up and trapped behind a
wire grate which had been installed over the downpipe outlet. This caused the box
gutter to backflow and then overflow as a direct result, during recent heavy rainfall.
A sheet of aluminium flashing has been installed to this front box gutter as a
previous repair. Screws had been used to screw this sheet to the box gutter. The
screw hole penetration was poor quality workmanship and could also be allowing
water ingress.
A box gutter had been painted with a sealant in a previous attempt at repair. SC
suspected this was an attempt to kill surface rust within this gutter.
Determination | Case number: 656349 Page 6 of 10
The RHS box gutter was also found blocked with thick leaf debris, which was
causing rain water within it to dam up, backflow and overflow during recent heavy
rainfall.
Another photo showed a small outlet servicing a larger roof area. SC felt water had
not drained quickly enough before overflowing.
There was a poorly installed and sealed flashing along the RHS parapet wall. Rain
water was pooling in low spots on this flas hing. If the seals were split or broken,
this could allow water ingress, although SC could not find any broken seals with
the naked eye.
Low spots on the flashings could be allowing rain water to seep into the roof cavity,
where they are holding dormant rain water.
White paintable sealants found within the box gutters suggested this was an
attempt to fix rust.
The photos provided in the SC report show extensive corrosion to the roof sheets.
The panel notes that the first date of loss was 21 July 2018. The evidence shows the
tenant arranged her own building report as none was forthcoming from either the
complaint or the insurer. Her building report is dated 29 November 2018. The
complainant’s builder then attended on 5 February 2019, while the insurer’s bui lder’s
roof expert attended on 24 April 2019.
Resultant internal water damage due to structural defects and faulty
workmanship
BB, the first builder onsite, found that the cause of damage was water overflow from
the box gutter above, where damage was prese nt.
HR noted numerous building defects.
Both HR and PI (based on SC’s roof report) found evidence of previous work that was
poorly done. This faulty workmanship was thought to possibly contribute to the issues.
The exchanged material confirms structural defects and faulty design together with
previous repairs that appear to have caused further damage and entry points for
water. A lack of maintenance in relation to the box gutter may have contributed to the
downpipes not coping with the rainfall intensities.
On the balance of probabilities, the panel is satisfied that the proximate, or dominant,
cause of damage was structural defects, faulty design and poor workmanship.
The insurer is therefore entitled to rely upon the policy exclusions from coverage for
structural defects, faulty design and faulty workmanship, and to refuse the claim for
damage caused by the water ingress.
However, the panel notes that the insurer offered to cash settle the complainant in the
amount of $13,000, being the likely cost of repairs following the first loss event.
Determination | Case number: 656349 Page 7 of 10
Notwithstanding that the tenant had reported six previous water damage events, the
panel is of the view that it is fair that the insurer maintains an offer in relation to the
first loss event.
The offer was based upon an initial quotation of $12,331.70.
The panel notes that by cash settling this aspect of the claim the insurer has
transferred the risk of repairs to the complainant. In addition, the insurer is not
required to provide a lifetime guarantee for those repairs.
Given the transfer of risk and passage of time, the panel is satisfied that upon
acceptance of this determination by the complainant, the insurer will finalise its
obligations to the complainant by payment of the amount of $16,500. The insurer is
not required to pay interest on this amount.
For the sake of clarity, the panel confirms that the amount of $16,500 includes the
amount of $13,000 previously offered.
2.2 Is the insurer liable for loss of rent and related expenses?
No cover for business interruption; consequential losses excluded
The complainant’s policy does not cover him for business interruption.
The policy also excludes cover for consequential loss, including loss of use, and loss
resulting from delay.
Insurer not liable for loss of rental income due to claim processing delays
The complainant has not established that due to the delays of the insurer, the tenant
moved out, thereby resulting in a loss of rental income to him.
The panel agrees with the insurer that the chronology of the claim demonstrates
inactivity from the complainant and broker’ s side. At times, the insurer was waiting on
further information from experts or from the complainant and his broker.
Overall, the panel considers that the insurer did not unreasonably delay processing
the claim, and is therefore not liable to pay any compensation for non-financial loss to
the complainant.
The panel notes the broker’s advice in a phone call that the complainant would
consider seeking any shortfall in loss of rent through a court, after the issuing of the
AFCA determination.
The panel agrees with the insurer that the complainant should not use AFCA’s
complaint process to claim damages in the form of compensation for something
otherwise not coverable under the policy.
Determination | Case number: 656349 Page 8 of 10
While it has been established that the insurer caused some delay in this matter, the
complainant has not established that this caused him excessive stress and
inconvenience. The insurer therefore is not liable to pay any compensation for non-
financial loss.
The panel notes the insurer is not liable to pay any amount to the complainant for loss
of rental income. The complainant is not co vered for this under the policy and he has
not established that the insurer’s delays in processing the claim were the cause of the
tenant vacating the premises.
Based on the evidence presented, the tenant appears to have vacated due to the
ongoing mould issues at the property and the related health concerns (which are the
subject of the separate public liability claim, not at AFCA).
Insurer not liable for other expenses
The complainant presented several other invoices in this matter, claiming various
additional costs. When the insurer requested further information regarding the South
East Water, Prom Scheme and Oz Equipment invoices, this was not provided by the
complainant. The complainant’s broker advised in a phone call that the water bill was
part of the outgoings and that the outgoings form part of the tenancy agreement. She
then advised this would be submitted for the public liability matter.
The insurer is not liable for these additional expenses.
Insurer not liable for legal costs
The insurer disputes that the legal costs are part of the AFCA complaint, as per its
correspondence dated 25 November 2019. In this email, the insurer invited t he
complainant to submit a notification under the liability section of the policy if he wished
to have these costs considered. The insurer says that AFCA does not have
jurisdiction to make a determination for liability matters, as it falls outside our
jurisdiction.
Further to this, the complainant has not demonstrated that he incurred any legal costs
in relation to the matter the subject of his AFCA complaint. Whilst proceedings have
been lodged by and against the tenant regarding the public liability claim, it does not
appear legal advice has been obtained for the matter that is the subject of the AFCA
complaint. The panel considers therefore that it is not appropriate to award legal costs
in this complaint.
Determination | Case number: 656349 Page 9 of 10
3 Supporting information
3.1 Key references
Policy documents
Document Provi sion
‘My Business
Pack’ Product
Disclosure
Statement (PDS)
2015
Pages 6 - 7
General exclusions
These exclusions apply to all policy sections.
This policy does not cover any loss, damage, injury, destruction or liability, cost or
expense directly or indirectly caused by, or in connection with, or contributed to or
arising from:
…
9. Consequential loss
This policy does not cover loss of use, loss resulting from delay or lack of
performance, depreciation in the value of land or stock and any other kind of
consequential or indirect loss including but not limited to loss of profit.
This exclusion does not apply to polic y secti on 2 - Business Interruption.
Policy section 1: Fire and Other Events.
…
We cover/insured events
Your cover i s for the following insured events:
…
5. Storm including rain, hail, snow and wind
We do not cover
Loss or damage caused:
…
(d) by water entering the building as a result of structural defects, faulty design or
faulty workmanship;
(e) by gradual entry of water in the building.
…
10. Accidental damage
Determination | Case number: 656349 Page 10 of 10
Document Provi sion
We do not cover
Loss of or damage to property insured:
(a) by insured events 1 to 9 under this policy section or covered under any other
policy section, regardless of whether such coverage is shown on the
schedule as insured; or
….
(d) wear and tear, gradual deterioration, scratching, marring, developing flaws,
normal upkeep or making g ood or other gradual cause.