Home / QBE / Determination 655038

Determination 655038

Woolshed skylight roof repairs leaking after insurer's storm repair

FirmQBE
Decided2021-01-29
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

After the insurer repaired a storm-damaged woolshed roof, it kept leaking. AFCA ordered the insurer to rectify the roof to current standards and pay $1,500 for non-financial loss, but rejected claims for homestead movement and resultant woolshed damage.

Claim-related repairs must comply with current building standards, and causation for the structural movement and resultant damage was not shown to lie with the insurer's works rather than pre-existing issues.

Issues

Subjects and remedies

home or building damagepay non financial lossrepair or rectify

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 655038 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 655038 Page 2 of 8 Case number: 655038 15 December 2020 1 Determination overview 1.1 Complaint The complainant holds a farm insurance policy with the financial firm (the insurer). She lodged a claim after buildings on her property were damaged by a hail storm on August 2015. The insurer accepted the claim and chose to repair the damage. After the repairs were completed, the complainant contacted the insurer saying there was water leaking from the woolshed. The complainant says the insurer:  is liable for the defective skylights and resulting damage  is liable for damage to the home caused by ground movement and water ingress  is entitled to compensation for poor claims management and because the insurer replaced the glass in the skylight on the woolshed, contrary to heritage advice. The insurer says it has fulfilled its policy requirements and it is not liable for skylight repairs or damage caused by earth movement. It also says the skylight glass panes were not replaced by its repairers. 1.2 Issues and key findings Is the insurer liable for skylight repairs to the woolshed? Yes. The available information shows the repairs were not done in accordance with relevant building standards. The insurer must rectify the roof so that it complies with both relevant building standards and the heritage requirements. Is the insurer liable for structural movement to the homestead? No. The available information does not show the structural movement was caused by the insurer’s repairs. Should the insurer pay non-financial loss? Yes. Given the complainant’s claims experience, the insurer should pay $1,500 in non-financial loss. 1.3 Determination This determination is partially in favour of the complainant. The insurer is to rectify the woolshed roof repairs and pay $1,500 in non-financial loss. Determination | Case number: 655038 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer liable for skylight repairs to the woolshed? Engineer DB says roof is not compliant with current building standards The insurer had accepted there was storm damage to the woolshed roof. The insurer agreed to replace the roof. Since the insurer replaced the roof, water entry has continually occurred. Various experts have reviewed the issue and provided opinions. Engineer C provided a report dated 24 April 2019. C considered the leak was due to a design fault associated with the roof. Engineer DB provided a report dated 12 December 2019. DB noted the complainant acknowledged water entry through the skylights has been an ongoing and long term issue. DB also highlighted various issues with the roof replacement which does not comply with current building standards. These included the following:  large roof penetrations should be flashed using an aluminium tray and sleeve in a configuration where free-flowing downstream water is unobstructed  there was an assortment of different skylights across the roof – glasses with the new skylight have cracked due to expansion over time and the absence of thermal movement  a stop end should be installed on the upper gutter and the gutter alignment should be readjusted. The complainant believes that the skylights glass panes were not the original and were replaced by the insurer’s contractors. The insurer, and its contractors, dispute this. This will be deal with later in the determination. Insurer likely replaced the roof inconsistent with current building standards Based on this available information, the panel notes the following. It appears the insurer’s contractors have replaced the roof to its original design. However, there appeared to be issues with this design. The evidence shows the roof had been continually leaking both before and after the claimed event. This was confirmed by C and DB. The available information shows the insurer’s contractors were liaising with other stakeholders regarding the heritage requirements. This shows they were attempting to ensure they preserved, as much as possible, the original layout. However, DB noted that whilst the original design and configuration of the skylights had to be preserved, this did not negate the responsibility to provide a compliant Determination | Case number: 655038 Page 4 of 8 solution to the problem. Further, DB identified issues with the original desi gn that are not compliant with current standards and are the likely cause of the water entry. The complainant, in her submission dated 11 September 2020, believes the configuration is different. She says there were six skylights on the western side and fiv e on the eastern. Now it is the other way around. She also says the ‘suntuf sheet below the eastern side is no longer centred’. The complainant has provided photos. This distinction is not apparent. It appears correct but the photos are at a distance with some rusted areas on the western side. The windows and skylights are not all easily identified. Regardless, it is not clear to what extent this configuration has made a difference. The issues identified by DB are not dependent upon the placement of the skylights. Instead, it was based on how they were designed. Given all this, the panel is persuaded by DB’s opinion. It is plausible, logical and consistent with the available information. Insurer must rectify the woolshed roof The information shows that whilst the insurer attempted to replicate the original design when replacing the roof, it did so in a way that was contrary to current standards and resulted in continual water entry. The panel does not accept this meets its requirements under the policy. That is, when repairing or replacing claim related damage, the insurer cannot do so in a way that would both be inconsistent with current building standards and would result in continual damage to the insured property. Instead, it must be required to repair the damage in a way that complies with relevant standards. The insurer raises concerns that any design to prevent future leaking would not be approved by the heritage officer. However, there is no evidence that such a solution could not be achieved. Further, it is difficult to accept that a heritage officer would insist on a design that is not compliant with relevant standards and results in continual leaks and damage internally. The panel notes DB believes such a solution must be possible. Given this, the insurer is liable for the rectification of the roof to ensure it meets current standards. Information does not show the insurer’s contractors replaced skylight glass On this point, the panel is not persuaded by the complainant’s position. There is no documentary evidence the insurer was charged, or that the contractors sourced, replacement glass for these skylights. The contractors involved dispute this. Determination | Case number: 655038 Page 5 of 8 Further, DB says there is a variety of different glasses. If the contractor was to replace some skylights, it is likely to have been of one variety. The information does not show that the glass only includes the original and one different form. The woolshed is over 100 years old. The complainant has not owned the property throughout this time. She cannot confirm the previous occupants never changed the glass. The complainant has provided statutory declarations of people saying they were of the belief it was original glass. However, it is not clear these people specifically observed the glasses and were able to verify they were all the original design. Given all this, the panel is not persuaded there is sufficient evidence to conclude the insurer’s contractors replaced the skylight glasses. Insurer not liable for resultant damage to the woolshed The panel acknowledge there has been resultant damage to the woolshed following the repairs. However, it is not clear if this has resulted in new damage or exacerbated previous damage. This is because the panel notes the design of the roof was inadequate based on current standards and it is likely:  leaks have been occurring for a long period, and  these leaks are likely sourced from similar issues and similar areas. This is supported by C and DB who say there has been long -term damage. The panel acknowledges there is a possibility that one of skylights has moved when the roof was replaced. However, there is no evidence that this moved skylight has caused new damage. Therefore, the panel is not persuaded that any resultant damage to the woolshed can be said to be caused by the insurer’s works as opposed to the pre -existing issues with the roof. Accordingly, the insurer is not liable for any resultant damage to the woolshed. 2.2 Is the insurer liable for structural movement to the homestead? Complainant says homestead is moving due to the insurer’s repairs The complainant says water entry through the roof has caused the homestead ground to move. This has resulted in cracking and structural damage. The insurer disputes this and says this movement is attributed to long-term issues. Both parties have provided engineering evidence in support. Determination | Case number: 655038 Page 6 of 8 Both parties have relied upon expert evidence The complainant is relying upon engineer BJ. BJ had visited the property before the claim. He provided a report back in 2007 noting there was structural movement which he said was mainly due to plumbing issues. In another report dated 2016, he noted there may have been other plumbing issues that were still causing the movement. Following the claim, the complainant has provided several reports from engineer BJ. In one report, BJ concluded the likely cause of damage was: … that the new foundation movements in the centre and eastern parts of the homestead can be attributed to a greater or lesser extent to the ingress of water from faulty roof plumbing … In another report, BJ expanded on this to say: The key observation in this case was the fact that plumbing repairs had limited further movements at the western end of the building, and underpinning had limited further damage on the southern side, but internal movements were of recent origin and were most likely to have been associated with a change in foundation moisture in the vicinity of the skylight The insurer engaged DB to provide an opinion on this issue. DB concluded the damage was consistent with ‘ground reactivity and building movement’. In doing so, DB noted that the home is susceptible to movement due to its location as well as drought conditions followed by increased moisture in recent rainfall periods. DB also noted that a slight differential movement within the footing system causes non-uniform shifting within the building’s frame. DB did not agree the damage was due to any specific roofing defect. He noted rainfall would naturally penetrate the ground and cause reactivity irrespective of the dy sfunctional drainage. DB did not agree with the complainant’s view that she has rectified pre-existing issues. One of the reasons is that the home and surrounds is ‘vast, open and uncontrollable against such natural occurrence’. DB’s evidence is persuasive Having carefully reviewed the available information, the panel notes the following. BJ’s view is not persuasive. It is plain the homestead has experienced long -term movement issues. This appears to have been continuing from at least 2007 and with issues still outstanding in 2016 identified. These issues appear to have possibly extended to the woolshed given that had recent footing work done. Determination | Case number: 655038 Page 7 of 8 The panel is not persuaded that by the time the claimed event occurred, all these pre- existing issues were brought under control and the damage can now be solely, or mainly, attributed to the insurer’s repairs. In support of this is DB’s evidence. He is not persuaded by this. He has provided compelling reasons. One of which is the open catchment area. The other is the fact the area has had drought conditions following by wet periods. This would plausibly be a causal factor to the structural movement. His views are consistent with the fact the homestead has had longstanding issues. Further, whilst BJ and the complainant believe the pre-existing issues were addressed, this has not been substantiated. Issues were identified up to 2016. There has been no point where it can be verified that the property’s long -standing issues were completely addressed. Insurer not liable for the movement and cracking damage Given all this, the panel is not persuaded the information shows the structural movement is caused by the insurer’s works. Therefore, the insurer is not liable for any of this movement and cracking damage. 2.3 Should the insurer pay non-financial loss? AFCA can award compensation for non-financial loss Under its rules, AFCA can award compensation for non-financial loss (capped at $5,000) where it considers the complainant has suffered an unusual degree of stress or inconvenien ce due to the insurer’s actions. AFCA takes a conservative approach when assessing non-financial compensation. Complainants are expected to be moderately robust and bear the usual degree of stress and inconvenience experienced during an insurance claim. The claim has been protracted There is no dispute this claim has been protracted. The issues with the woolshed remain outstanding more than five years later. The information shows that it is not currently compliant with building standards and has continual water entry. A case analyst provided a recommendation on this issue and awarded $1,500. The insurer appeared to agree with this as it only objected to the issue regarding the woolshed roof. The complainant is seeking the maximum amount given her claims experience. She is also seeking this because she maintains her position that the insurer’s contractor replaced skylights that are not compliant with heritage requirements. For reasons expressed, the panel is not persuaded on this last point. Determination | Case number: 655038 Page 8 of 8 Insurer should pay $1,500 in non-financial loss The panel acknowledges the claim has been protracted and the complainant has suffered an unusual degree of inconvenience and stress. However, the panel also notes the insurer agreed to pay for the complainant’s legal costs regarding the contract works and the preliminary assessment. In doing so, the insurer paid $7,705. This was beyond its liability under the policy. Given the complainant’s claims experience, and considering the insurer has agreed to fund legal costs that were not covered by the policy, the panel considers the outcome provided in the recommendation is fair.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.