1 Determination overview
1.1 Complaint
The complainant is a unit owner in a residential strata development insured with the
financial firm (the insurer). There are 4 units in the complex. The complainant lodged
a claim for damage to unit 1 following heavy rains in Townsville. The policy covers –
among other things – damage due to storm and accident. It excludes flood damage,
unless the cover is specifically taken out, which in this case it was not.
The insurer assessed damage to two areas of the property: the upstairs bedrooms
and the ground level. The insurer accepted the upstairs damage was caused by storm
water and offered a cash settlement. The insurer denied the ground level damage as
it was caused by flood, but performed a makesafe / strip out, it says, on a goodwill
basis.
The complainant says the cash settlement is inadequate. He also says the property
was made uninhabitable due to the strip out and if the insurer had made it clear that it
would not cover the damage or reinstate the property, he would not have agreed to
the strip out.
1.2 Issues and key findings
Is the insurer’s cash settlement fair and reasonable ?
Yes. The insurer‟s proposed cash settlement is fair in the circumstances.
Is the complainant entitled to compensation for the strip out?
No. The available evidence does not establish the insurer‟s agents misled the
complainant to believe the ground level damage would be covered. In any event, the
complainant has not suffered any loss.
1.3 Determination
This determination is in favour of the insurer.
Within 14 days of the complai nant‟s acceptance of this determination, the insurer is to
pay the complainant $9,033.24 in line with its cash settlement offer. No interest is
payable.
The insurer is not otherwise required to take any further action in relation to the claim
or complaint.
Determination | Case number: 654777 Page 2 of 12
2 Reasons for determination
2.1 Is the insurer’s proposed cash settlement fair and reasonable ?
Complainant says cash settlement inadequate
The complainant does not want the insurer's builder, RP, to conduct the repairs to the
upstairs bedrooms.
The insurer therefore offered to cash settle the damage based on the quote from its
builder for $7,119.37, plus 20% to account for the transfer of risk to the complainant.
The insurer also offered $490 for two weeks‟ lost rent.
The complainant believes that the insurer's proposed cash settlement is insufficient
for him to engage a builder privately to do the repairs. He says the quote does not
include the cost to repair the area upstairs where water entered externally. He seeks
a cash settlement of $11,000.
Cash settlement should reflect reasonable cost of repairs
Where a claim is to be settled by a cash settlement, the insurer is required to pay the
complainant the reasonable cost of repairing the damage to the property. A cash
settlement amount should be sufficient to ensure that the complainant is able to
engage his own contractors to complete the necessary repairs.
Insurer’s offer is fair in the circumstances
Having reviewed the insurer‟s offer together with the available evidence, the panel is
satisfied that:
RP‟s quote is based on an appropriate scope of works. Whilst the complainant
asserts that the scope of works is inadequate, this is not supported and RP's
quote, on its face, appears sufficient to address the insured damage
RP‟s quote is actionable
the insurer's offer accounts for lost rent under the policy. It contains a component
for two weeks ‟ loss of rent; the building evidence suggests this is a reasonable
repair period and the complainant has not provided evidence to the contrary, or to
establish his loss of rent is greater than that offered
unexpected variations seem unlikely (subject to the matters mentioned below)
based on RP‟s evidence, which the complainant has not challenged
RP has confirmed the pricing in its quote is still accurate
the complainant‟s evidence does not challenge the fairness of RP‟s quote. T he
complainant has not provided any quote from his preferred builder or any other
evidence in support of his position as to the fair and reasonable value of the
repairs.
Determination | Case number: 654777 Page 3 of 12
For these reasons, the insurer‟s offer represents a reasonable starting point for
determining an appropriate cash settlement amount.
The panel acknowledges that in cash settling the claim, the complainant gives up the
lifetime guarantee provided under the policy. Furthermore, a cash settlement transfers
all the risk from the insurer to the complainant of any unforeseen damage and any
additional work required once repairs commence . Although in this case there is little
to suggest the likely requirement of additional works, the panel notes:
RP‟s quote contains a provisional sum regarding the removal of mould -damaged
linings and the drafting of a scope for sanitization; the cost of this item is not
entirely certain
RP concedes that in the time elapsed since the original quote was drafted, it is
possible that the property has deteriorated, or some unknown latent condition has
manifested.
The panel considers it fair in the circumstances to allow 20% on top of the quote to
account for the transfer of the risk to the complainant, as the insurer proposes.
In addition, based on the available evidence from the hydrologists and the builders,
the panel is satisfied the unit overall was rendered uninhabitable due to the flood, not
the storm.
Accordingly, within 14 days of the complainant‟s acceptance of this determination, the
insurer is to:
cash settle its accepted liability for the upstairs building repairs for $8,543.24, being
the RP quote of $7,119.37 plus 20%
pay the complainant $490, representing two weeks‟ lost rent, as per its offer.
The insurer is not required to pay interest on the settlement sum. This is because its
quote reflects the current market costs of labour and materials, it has offered two
weeks‟ lo ss of rent, and the complainant only recently asked for a cash settlement.
2.2 Is the complainant entitled to compensation for the strip out?
Complainant says insurer told him damage would be covered
Based on the available evidence, the panel accepts that the complainant had no
coverage for flood, that the ground level damage is not covered under the policy, and
that the flood rendered the unit uninhabitable. The complainant does not dispute
these matters.
However, the complainant says he was misled by the insu rer‟s builder, RP, into
believing that, since RP was instructed to conduct strip out / mitigation works, this
meant the flood damage would be covered.
Determination | Case number: 654777 Page 4 of 12
RP commenced the strip out works on 3 April 2019 and completed the works on 6
May 2019.
The complainant says:
on 27 March 2019 the insurer's building assessor, RP, attended the property and
told the complainant's daughter he was there to quote the repairs, and that he
believed this meant the insurer had authorised repairs
on 3 April 2019, another of the employees phoned the complainant's daughter,
asking for the keys to the units as the builder had been approved to begin stripping
them out. Later, the complainant and his daughter discussed the matter in person
with the RP employee, who gave them the impressio n that the strip out was
happening because repairs were authorised
he was never told the strip out was done on a goodwill basis only
the complainant's daughter attests to these matters in a statutory declaration
had he known that the insurer would not authorise repairs or reinstate the property
to how it was before the make safe, he would not have allowed the insurer to do
the strip out
if the insurer had not misled him about what it would cover, he could have cleaned
the damage himself and saved thousands of dollars in the process. RP over-
stripped the ground floor. Because RP believed repairs would be authorised in full,
it disposed of a number of potentially restorable items, such as the toilet, laundry
sink and floor tiles
the strip out also made the unit uninhabitable, which caused him a significant loss
of rent
he is therefore entitled to a cash settlement in the amount of $102,000.
Insufficient evidence of misleading conduct
AFCA can investigate a claim that an insurer misled a complainant and caused them
to suffer loss.
The onus is on the complainant to establish he was misled. He must be able to
establish, on the balance of probabilities, that the representation was clearly made,
and he reasonably relied on it to his detriment.
Having reviewed the available evidence, the panel notes two issues which may be
said to support the complainant‟s position. The first is that the claim file notes contain
an entry which says the loss adjuster may not have authorised the full extent of the
strip out; it may have been that RP was not entirely certain about the extent of the
strip out works they were to undertake.
The second issue is that, if indeed the insurer was carrying out the strip out works on
a goodwill basis, it may be expected that it would make this clear in writing to the unit
owners; yet apparently it did not do so.
Determination | Case number: 654777 Page 5 of 12
Whilst the insurer has not comprehensively addressed these issues, the panel is not
persuaded they are sufficient to establish the complainant‟s allegations of misleading
conduct given:
there is insufficient evidence to support or corroborate his account of the
conversations with RP, and RP denies giving him the impression the strip out
meant the claim would be covered
on around 12 March 2019, the complainant‟s broker says he ha d a conversation
with the complainant in which he explained the ground flood damage was due to
flood and not covered. Having regard to the email evidence and the typical
relationship between broker and client, the panel accepts that this conversation (or
one like it) occurred after the claim was lodged and before the strip out began
the complainant has not disputed having this conversation, but says there were
communication issues with the broker and he did not understand that the claim for
the ground floor would be denied
the broker asked the loss adjuster to brief the hydrologist WR for a „second
opinion‟ . It is likely he updated the complainant about this
the 12 March conversation(s) put the subsequent conversations between the
complainant and RP into a context which suggests it was unreasonable for the
complainant (or a reasonable person in his position) to presume the claim would be
covered for flood damage to the ground floor
on about 19 March 2019, the loss adjuster instructed RP to quote for the repair of
the damage to the upstairs area only, not the ground floor. Given the hydrology
evidence available to the loss adjuster at the time, it seems unlikely they told RP
the unit 1 damage would be covered.
e ach of the loss adjuster‟s reports note that the loss adjuster is assessing all
damage on a „without prejudice‟ basis pending the final evidence from the
hydrologists. When RP did quote around 27 March, it was for the upstairs damage,
not the flood damage.
For these reasons, the panel is not satisfied the complainant has discharged his
burden to establish the insurer‟s agents misled him.
Evidence does not establish insurer’s actions or insured event caused loss
The remedy for misleading conduct is not to compel the insurer to make the
misrepresentation come true, but to compensate the complainant for any loss
incurred in reliance on it. The complainant has not shown he suffered a loss because
of any misrepresentation.
There is a brief entry in the claim notes suggesting RP may not have been entirely
certain about the extent of mitigation works they had to do however RP and the
insurer have provided evidence that:
Determination | Case number: 654777 Page 6 of 12
the unit was uninhabitable given the degree of water inundation and mould
contamination from the flood
the strip out was necessary to properly mitigate and sanitize the water and mould
damage following the flood; otherwise mould would have spread to the wall cavities
posing a health risk to tenants
the strip out works were not excessive; they were basic mitigation measures , done
to industry standard, and could not have been more cost-effective
replacement rather than restoration of the ground floor materials was necessary,
as they were not designed to maintain structural integrity in these circumstances.
These statements are supported by the nature of the damage, the hydrologists‟
reports and the loss adjuster‟s reports . The complainant has not provided any
evidence to the contrary.
The complainant has not established what he would have done had RP told him the
strip out was a „goodwill‟ job. He says RP over-stripped the unit and he would have
been able to save money doing it himself, but beyond this assertion he has provided
no evidence in support.
The panel is satisfied that:
RP did not mislead the complainant into believing the flood damage would be
covered
in any event, the strip out was necessary to address the flood damage
the strip out was a basic measure and was not excessive
the complainant would not have been able to save money on the strip out if he did
it himself, including by restoring certain items
the flood rendered the ground level uninhabitable, not the storm or the strip out.
The panel also notes that the complainant has provided no evidence to support his
claim for loss of rent.
For these reasons, the complainant has not established he suffered a loss in respect
of the ground floor because of the insurer‟s conduct or any insured event. The insurer
is not required to compensate the complainant or restore the ground floor to the pre-
makesafe condition.
Determination | Case number: 654777 Page 7 of 12
3 Supporting information
3.1 Key evidence
Chronology
Date Event / document details
2 February 2019 Claim lodged , Loss adjuster M appointed
19 February 2019 Site inspection with lot owners and loss adjuster M , whose reports
says „enquiries are on a without prejudice to liability basis. At this
stage the cause of inundation has not been declared, whic h will be
determined by hydrologists, JH‟
9 March 2019 M second report, summarises hydrologist findings that property
inundated by flood, policy does not cover this, broker updated
M to consider storm damage
12 March 2019 Email from insurer to broker:
“We have now received the 2nd Report from M along with the
Hydrology Report from JH .
I have attached a copy of the Hydrology Report which confirms that
the property was inunda t ed by the Ross River Floodwater. The
Insured does not have Flood cover on the policy and we can arrange
a 2nd opinion to be provided from WR to confirm the caus e of the
loss.
We await your advice on if you would like WR to be appointed.”
Broker replies:
" Could you please arrange for a second opinion on this."
“ I have had a conversation with the client regarding the report and
how flood cover is not on their pol icy. Whilst they are very upset that
the policy will not respond to flood claim, they did point out that there
is other damages to ceiling and walls upstairs. Could you please
have the assessors report brok en down into what is upstairs
(covered) and downstairs flood damage (not covered) and what the
repair process will be for this? ”
19 March 2019 Compla inant calls insurer to enquire about storm damage
Determination | Case number: 654777 Page 8 of 12
Date Event / document details
Insurer‟s claim file notes (dated 29 May 2019) say that on this day
the loss adjuster instructed RP to attend for “basic strip
out/mitigation”
RP pr ovides a repair quote for the upstairs rainwater da mage (the
quote is dated 3 June 2019, but refers to instructions by the loss
adjuster on 19 March)
27 March 2019 According to complainant, RP gives him the impression that the
damage will be covered
According to the ins urance claim file notes, RP has bee n engaged to
attend to the claimable damage but has been delayed due to lack of
trades in the area; the insurer has "welcomed a quote from the BC
which can be reviewed for settlement"; broker updated by assessor
3 April 2019 According to the complainant, another of the employees phoned the
complainant's daughter, asking for the keys to the units as the
builder had been approved to begin stripping them out. Later, the
complainant and his daught er discussed the matter in person with
the RP employee, who gave them the impression that the strip out
was happening because repairs were authorised
The insurer‟s claim file notes do not record any such contact taking
place on this day
According to RP, the strip out work began on this date
24 April 2019 WR hydrologi st report:
Conclusions:
The initial and maximum depth of inundation above the floor level of
the subject property was caused by floodwater overflowing from the
Ross River.
Local catchment runoff would not have inundated the subject
property above floor level.
30 April 2019 Insurer authorises RP to „cleanup‟ units 3 & 4, informs lot owner
6 May 2019 According to RP, the strip out work finished on this date
Determination | Case number: 654777 Page 9 of 12
Date Event / document details
13 May 2019 M loss adjuster email to complainant:
“ Strip out works are underway, and we h ave requested an update
from RP . We have at this stage appointed RP to repair any damages
from rainwater to ceilings etc and a basic strip out to the units as
courtesy from [the insurer] to assist.
H ave these works commenced by RP to your unit ?
The repairs to units 1 - 4 are unlikely to be covered as there is no
flood cover.
We also received the second hy drologist report from WR as of
24/04. Will need to review this and refer to [the insurer] for their final
det ermination on polic y response.”
28 May 2019 Loss adjust M‟s third report, noting “RP have attended site as per
our request to submit quotations for res ulting damages only, we
have yet to receive these quotes and have followed up RP .
We have however, received RPF quotes rela ting to flood related
damages ”
29 May 2019 Insurer‟s claim notes say: „quote has been received for flood related
damages but no resulting damages as yet - Flood email sent to
broker for review‟.
Complainant lodges complaint. The claim not es say: the
complainant is dissatisfied that the insurer „ has sent someone out to
strip out the units, but now that the claim may not be accepted, he
has been advised that [the insurer] will be doing nothing further,
including rectifying the strip out which the complainant has advised
should not have been done in the first place. OUTCOME(S)
SOUGHT: Seeking for the strip out that should not have been done
to be rectified.”
Claim notes say the insurer called RP who “confirmed that they
attended to two separate requests for basic strip out/mitigation, at
the request of [the loss adjuster]”… the complainant‟s daughter (the
BC manager) “advised that she provided keys to RPF on the
assumption t hat they would be reinstating the property after the strip
out… “Confirmed that the instructions were sent to RP on
19/03/ 2019, 10 days after [the insurer] notified the broker that the
claim was likely to be declined due to flooding/flood exclusion”
31 Ma y 2019 Insurer emails complainant, noting, among ot her things, that the
insurer doesn‟t accept the complainant was misled because the
broker told him on around 9 March 2019 that the claim for flood
would likely be declined.
Determination | Case number: 654777 Page 10 of 12
Date Event / document details
Complainant phones insurer to d iscuss complaint. Claim notes say:
“ He advised that there are issues with communication between his
broker and the individual owners. - He says he wasn't aware that the
claim was up for decline when the strip out was occurring. - He
believes that we have o ver - stripped the unit, including tiles which he
believes could have stayed in place.”
3 June 2019 Claim notes record the insurer‟s enquiries wit h RP re strip out:
“Outbound call to J at RP. He confirmed that with all commercial
claims, he is managing the strip out requests and talks with the site
contacts around the intent behind it. He advised that he met with
[complainant‟s daughter] and he believes it was [complainant] that
was with her. They met at a school, where he discussed the purpose
of the strip out and was provided with a bunch of keys to attend to
the strip out. He is on his way to the property now to check the
progress and take more photos. I have asked him to send through
any phot os and scopes for Unit 1 strip out.”
13 June 2019 Insurer issue s decision on strip out issue denying its contractors
were unclear about the purpose of the strip out, and noting: “RP
have also confirmed that they kept any works as minimal as possible
to ensure that the strip out was only directly related to prevention of
further damage and sanitisation.”
20 June 2019 Claim decline re flood damage to ground floo r
31 July 2019 Claim notes say: “M [loss adjuster] have advised that RP Building
were given no authority to complete $72K worth of strip out and they
also have 20% margin on Do and Charge. R are 16% (Builders 10%
and Admin 6%). – M want to know how we want him to approach
this with RP Building ”
1 August 2019 Claim notes say: loss adjuster M “advised that the works worth $70K
were not authorised by himself. I hav e advised M that we don¿t
really have any choice but to pay for the invoice. – M requested an
email be sent confirming our conversation and he would follow up
with RP Building”
27 August 2019 Claim notes say: “ RP Building have submitted an invoice for the strip
out works and after much discussion and emails, M are of the view
that the costs are to be accepted as per the invoice.”
2 September 2019 Claim notes say: in relation to unit 2, “M instructed RP Building to
complete the strip out but where not advised of the full extent of
Determination | Case number: 654777 Page 11 of 12
Date Event / document details
work they were undertaking”
19 December 2019 RP comments on the extent and necessity of the strip out :
“ 1. Was the strip out a necessary part of the repair process?
The property had not been handed to us until a couple of months
after the event so water had been sitting inside and creat ed extra
damage. The property had approx. 600 mm on water through it. It
was plaster wall linings with timber framing. It was absolutely
necessary to strip the property to the extent we did to mitigate any
further loss. When we arrived the mould was already above a
minimal half height strip.
2. Did the strip out increase the cost of repairs to ground level for the
owner?
No, the strip out would not have increased the cost to the owner, it
a ctually reduced the costs as the insurance company paid to have
the strip out complet ed. The strip out had to be done otherwise the
mould would have continued inside the wall cavities and would have
been dangerous to any occupant's health.
3. Could the cu stomer have done the strip out more cost effectively,
while still being compliant and complete?
No, the strip out was completed to an industry compliant standard
and could not have been completed more cost effectively.
4. Were the stripped out areas rest orable or was replacement
required?
Full replacement was required as the materials stripped were not
designed to maintain structural integrity given flood water inundation.
5. Prior to the strip out, could the ground floor be considered
habitable?
In no way was the ground floor habitable with that amount of mould
and cont aminated black water through it. ”
20 December 2019 RP comments on the extent of the strip out :
“ When we picked up the keys from the owners of unit 1 and 2 we
advis ed them of the extent we had to go to mitigate any further
damage at the property. When we arrived, the mould was already
over half way up walls in some areas. We did the bare minimum to
mi tigate any further loss at the property.
While all care is taken to remove items without damaging them, The
Determination | Case number: 654777 Page 12 of 12
Date Event / document details
kitchen bench tops and toilets were damaged during the removal
process. The floor tiles in some areas were already drummy due to
the water ingress a nd had to be completely removed for sanit ation
purposes. The pantry was also part of thes e strip out as it was
inundated with water.
RP have done everything we could to mitigate further loss and risk
of exposure to the owners of a contaminated site. ”
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.