Home / IAG / Determination 653906
Determination 653906
Denial of storm/flood claim for collapsed access causeway
Summary
A rural causeway partially collapsed after a January 2018 storm, and the insurer denied the claim citing exclusions. AFCA found the damage was storm-caused and the 2005 repairs by the insurer's contractor were inadequate, so the insurer must cash settle the remediation works with interest and pay the expert report costs.
Once the claimant establishes a valid storm or flood claim, the insurer must prove an exclusion applies, and it could not show gradual deterioration, erosion or maintenance failure caused the loss rather than the inadequate 2005 works.
Issues
- Claim denial primary · upheld
“The insurer has denied cover for the 2018 claim... The panel finds MF's evidence compelling... the complainant has established a valid claim.”
- Repairs or contractors secondary · upheld
“The panel accepts the 2005 works were inadequate and this was the proximate cause of the damage.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interest
Text of the determination
Determination
Case number 653906
Financial firm Insurance Australia Limited
Determination | Case number: 653906 Page 2 of 10
Case number: 653906 5 March 2020
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) after an access
causeway on her rural property partially collapsed. This followed a storm/flash
flooding in January 2018.
A similar event occurred for the same part of the causeway in 2005. In this matter, the
insurer accepted the claim, and its contractor carried out repairs.
The insurer has denied cover for the 2018 claim. The insurer says the damage was
not caused by storm/flood. The insurer says various exclusions in the policy apply,
including gradual deterioration, erosion, inadequate design, subsidence and lack of
maintenance.
The complainant disputes this. She says she maintained the causeway and that the
2005 repair works by the insurer’s contractor were defective. She seeks for the
insurer to accept the claim.
1.2 Issues and key findings
What is the insurer’s liability regarding the causeway?
The evidence shows that the causeway collapsed in January 2018 after a storm event
in the area. The evidence also shows that the 2005 repair works were inadequate.
Given this, the insurer is liable for the cost to repair the causeway.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is to cash settle the complainant’s claim as set out in section 2.1.
Determination | Case number: 653906 Page 3 of 10
2 Reasons for determination
2.1 What is the insurer’s liability regarding the causeway?
Complainant has established a valid claim
The onus is on the complainant to establish a prima facie, or valid, claim. That is, she
must show the damage was caused by storm or flash flood.
The complainant says the damage occurred after storms/flash flooding in the area.
The insurer says the reported level of rainfall during January 2018 (when the
causeway collapsed) was not abnormal or excessive. It notes that rainfall for the 3
years prior to the reported event was significantly higher.
The complainant provided a statutory declaration from MF. The causeway was part of
a track. MF maintained and repaired the track between January 2012 and February
2019.
MF advised that there were two large flood events that damaged the causeway. This
included a flash flood in March 2017, after which sink holes began to appear on the
up slope (which he subsequently filled). He noted that on 4 January 2018, he arrived
at work to find a partial collapse on the down slope of the causeway, at the site of the
2005 repair. MF says there was evidence of flooding on the track. MF said that
pockets of localised heavy falls are quite common along the mountain and adjoining
ranges. He said that it was clear that this damage was from recent heavy rain events
within the previous few days.
The panel finds MF’s evidence compelling. He is familiar with the track and
causeway. There is no dispute he is sufficiently qualified to maintain the track and
causeway. He ob served the causeway’s collapse contemporaneous to the event.
The panel acknowledges the insurer’s engineer’s (FM ’s ) reference to the rainfall
records for 1-10 January 2018 and other daily events of much higher volume.
However, these appear to be daily rainfall records and do not necessarily measure
the intensity of rainfall. For example, a distinction must be drawn between 20mm
falling in 15 minutes compared to 100mm in 24 hours. The former would more than
likely result in flash flooding.
Further, MF referred to the fact that pockets of localised heavy falls are common. The
complainant’s expert (TI) also said that rainfall can take a few days to ‘percolate
through the subsoils to the site’. This supports the complainant’s view the causeway
collapsed following a flash flood or storm.
Given all this, the panel is satisfied the complainant has established a valid claim.
Determination | Case number: 653906 Page 4 of 10
Expert evidence highlights issues with the 2005 works
As the complainant has established a valid claim, the onus now moves to the insurer
to demonstrate that it can rely on an exclusion or is otherwise entitled to deny the
claim.
The insurer seeks to rely on the exclusions for deterioration, erosion and inadequate
design. It says that long term erosion resulted in a subsidence event, which is also
excluded. Further, the insurer also says the complainant did not maintain the
causeway.
The complainant obtained an engineer’s report from TI. TI made several key findings
about the 2005 works. This included the following:
the insurer’s contractors use d existing timber members, which are prone to
deterioration – these could not have been maintained over the last 13 years, and
were likely to deteriorate further and deform
a suitable founding stratum was not identified for the remediated part of the
embankment in 2005 – this is despite the fact the area is a known landslide risk
the design did not consider whether the existing culvert provided enough capacity
works to the downstream slope of the embankment did not consider the need to
provide erosion protection at the culvert outlet.
FM noted that given the relatively harsh environment of the site, one of the most
critical design considerations for the embankment should have included details and
provisions for durability of the timber members. However, FM observed that re-used
timber logs indicate that:
the original timber member had been untreated, and as such is susceptible to
decay/deterioration when exposed to frequent/constant water/moisture.
FM also noted the failure mode of the collapsed stones ‘suggests that the stones
have lost support due to the erosion of supporting materials’. This included the tree
log. FM’s opinion was that a well -designed embankment should incorporate long-
lasting materials that can withstand the recurring immersion/inundation.
FM concluded that if the embankment had been adequately designed and
constructed, the damage to the downstream slope would not have occurred.
Determination | Case number: 653906 Page 5 of 10
Proximate cause is the inadequate works in 2005
Both experts highlight issues with the 2005 works. They agree the use of the existing
timber members left the causeway susceptible to damage.
FM provided options as to what features the embankment should have utilised. TI
highlighted various issues that should have been addressed to protect the causeway.
It appears the 2005 works did not consider these factors. It is unclear what expert
advice was sought in reinstating the damage to the causeway back then. The current
evidence of the two engineers show the works conducted would not have protected
the causeway from failure in the future.
The insurer said the 2005 works were on the opposite side of the causeway. The
complainant refutes this, noting it is on the same side. The photographs appear to
support the complainant.
The insurer also noted the timeframe between the works conducted and the damage
occurring show the cause was gradual deterioration, erosion or wear and tear.
The panel disagrees. Both TI and FM highlight issues with the design and the choice
to use the existing timber members. In their view, the reinstatement works left the
causeway susceptible to this damage. Further, it appears that in their view, the
causeway should be designed in such a way as to avoid this risk from manifesting.
This makes sense, as the risk of serious injury occurring if the causeway collapsed
whilst in use could be significant.
Therefore, the panel accepts the 2005 works were inadequate and this was the
proximate cause of the damage.
Evidence shows complainant maintained the causeway
The insurer also said the complainant did not maintain the causeway.
MF confirmed in his statutory declaration that sink holes had begun to appear after a
flash flood in March 2017, and that he commenced filling these holes with stones and
concrete. He also spoke of the other maintenance works the complainant had done
over his tenure with her. This included employing a contractor to grade and repair the
road on an annual basis.
Again, MF’s statutory declaration is compelling. It is not refuted by any of the available
information. It is supported by the complainant. This shows the complainant regularly
maintained the track and causeway.
Therefore, the panel does not accept the insurer has shown that the complainant did
not maintain the causeway.
Determination | Case number: 653906 Page 6 of 10
Insurer’s other arguments do not assist it
The insurer raised the Wayne Tank principle in its final submission.
This is not applicable. This is because the panel has concluded that the proximate
cause of the damage was the inadequate works done in 2005. The information does
not show there were other proximate causes to the loss.
The insurer submits the embankment is essentially a retaining wall and the policy
excludes this for storm damage. The panel disagrees. The claim is for damage to the
causeway, not a retaining wall.
Further, the parties (including the experts) have continually referred to the area as an
embankment, not a retaining wall. Embankment is defined by the Macquarie and
Oxford dictionaries to include the following:
A bank, mound, dyke, or the like, raised to hold back water, carry a road etc
[Macquarie]
A wall or bank of earth or stone built to prevent a river flooding an area [Oxford]
A bank of earth or stone built to carry a road or railway over an area of low ground
[Oxford] .
It is clear there is a distinction between a retaining wall and embankment. Therefore,
the panel does not accept the embankment is a retaining wall for the purposes of the
policy.
Conclusion
Given that the causeway collapsed due to the inadequate works in 2005, the insurer
is liable to accept the claim. The insurer has not established that any of the other
exclusions apply.
In terms of the recent remediation works, the panel notes that they included a new
working platform and two twin culverts. The panel does not consider these items
represent betterment. This is because the panel accepts these works were necessary
to repair the causeway to a working and safe condition, due to both the claimed event
and inadequate works.
Further, the policy does not exclude any additional works required to repair an item to
current standards.
The insurer therefore is to cash settle the complainant for the cost of remediation
works to the causeway. The insurer is also to pay interest on this sum, pursuant to
section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from 14
May 2018 (the date it denied the claim) or when the costs were incurred, whichever is
later, until payment is made.
Determination | Case number: 653906 Page 7 of 10
The complainant incurred professional costs
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant during a complaint. These costs can be awarded if the
complainant needed an expert to understand or establish their claim. These costs are
normally capped at $5,000, unless exceptional circumstances apply.
The panel accepts TI was reasonably engaged given the technical issues involved
and assisted the complainant in establishing her claim. The insurer should therefore
reimburse TI’s report costs.
Determination | Case number: 653906 Page 8 of 10
3 Supporting information
3.1 Key references
Policy documents
Document Provi sion
Certificate of
Insuranc e
Home insured [insured property]
…
The home
is occupied as owner’s holiday home/ week ender
Product Disclosure
Statement (PDS)
1 March 2011
Pages 21 - 23
The events we cover
We cover your home or contents when certain things happen. These are known
as 'listed events'. You can make a claim if a listed event takes place and causes
loss or damage to your home or contents during the policy period.
In this section, we tell y ou what events you’re covered for and any specific
exclusions and conditions that apply to the event. General exclusions may also
apply — see Section 5.
…
Storm
Home Home Plus
If loss or damage is caused by a storm. For example, h ail damages your roof or
a storm in your local area may cause water to build up in your street gutters.
Covered
violent wind, cyclone or tornado
thunderstorm, hail, rain or snow
sudden, excessive run - off of water as a direct result of a storm in your local
area.
Not covered under Buildings Insurance
loss or damage to:
‒ retaining walls
‒ gates, fences or free standing walls if they are not structurally sound
or well maintained
‒ pontoons, jetties or bridges
‒ gravel driveways
‒ swimming pool/spa covers that are more than 5 years old
‒ swimming pool/spa liners
Determination | Case number: 653906 Page 9 of 10
Document Provi sion
loss or damage caus ed by wat er which ent ers your home through any
tarpaulins or fixings set up while you’re renovating or altering your home
loss or damage caus ed by flood – see this page for this cover
loss or dam age caus ed by storm surge – see page 79 for the storm surge
definition.
Not covered under Contents Insurance
loss or damage to:
‒ swimming pool/spa covers that are more than 5 years old
‒ swimming pool/spa liners
loss or damage caus ed by wat er which ent ers your home through any
tarpaulins or fixings set up while you’re renovating or altering your home
loss or damage caus ed by flood – see this page for this cover
loss or damage caus ed by storm surge – see page 79 for the storm surge
definition.
Flood
Home Home Plus
If loss or damage is caused by a flood.
For example, heavy or sustained rainfall upriver causes a river or creek near
you to overflow.
Covered
flood.
Flood means:
rain which results in water pooling on, flowing from or failing to d rain away
from:
‒ a body of water
‒ land
‒ roads and streets
water that escapes or is released from a body of wat er.
A body of water can include a river, lake, dam, stormwater channel or canal, but
not the sea.
If we have identified that your home is prone to fl ooding, then:
we need to charge you a higher premium, or
you can choose to vary your policy by removing flood cover.
We will tell you if you are eligible to remove flood cover on your current
Certificate of Insurance.
Flood does not include sudden, excessive run - off of water as a direct result of a
storm in your local area – see page 23.
Determination | Case number: 653906 Page 10 of 10
Document Provi sion
Not covered
loss or damage to:
‒ retaining walls
‒ gates, fences or free standing walls if
‒ they are not structurally sound or well maintained
‒ pontoons, jetties or bridge s
‒ gravel driveways
‒ swimming pool/spa covers that are more than 5 years old
‒ swimming pool/spa liners
loss or damage caus ed by storm surge unless it takes place at the same time
as a flood which causes the same loss or damage to your home or cont ents –
see p age 79 for the storm surge definition
loss or damage caus ed by flood, if your current Certificate of Insurance shows
that you have chosen to remove flood cover.
Page 53 Exclusions for all cover
These exclusions apply to all cover under your policy.
What we don’t cover
Loss, damage, injury or death arising from:
rust, corrosion, gradual deterioration, depreciation, wear or tear
erosion
subsidence or landslide unless it happens immediately as a result of an
earthquake or ex plosion
...
Maintaining and occup ying your home
We don't cover loss, damage, injury or deat h arising from:
faulty design or workmanship
you not maint aining your site in good repair and condition
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.