Home / IAG / Determination 653906

Determination 653906

Denial of storm/flood claim for collapsed access causeway

FirmIAG
Decided2020-03-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A rural causeway partially collapsed after a January 2018 storm, and the insurer denied the claim citing exclusions. AFCA found the damage was storm-caused and the 2005 repairs by the insurer's contractor were inadequate, so the insurer must cash settle the remediation works with interest and pay the expert report costs.

Once the claimant establishes a valid storm or flood claim, the insurer must prove an exclusion applies, and it could not show gradual deterioration, erosion or maintenance failure caused the loss rather than the inadequate 2005 works.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interest

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 653906 Financial firm Insurance Australia Limited Determination | Case number: 653906 Page 2 of 10 Case number: 653906 5 March 2020 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) after an access causeway on her rural property partially collapsed. This followed a storm/flash flooding in January 2018. A similar event occurred for the same part of the causeway in 2005. In this matter, the insurer accepted the claim, and its contractor carried out repairs. The insurer has denied cover for the 2018 claim. The insurer says the damage was not caused by storm/flood. The insurer says various exclusions in the policy apply, including gradual deterioration, erosion, inadequate design, subsidence and lack of maintenance. The complainant disputes this. She says she maintained the causeway and that the 2005 repair works by the insurer’s contractor were defective. She seeks for the insurer to accept the claim. 1.2 Issues and key findings What is the insurer’s liability regarding the causeway? The evidence shows that the causeway collapsed in January 2018 after a storm event in the area. The evidence also shows that the 2005 repair works were inadequate. Given this, the insurer is liable for the cost to repair the causeway. 1.3 Determination This determination is substantially in favour of the complainant. The insurer is to cash settle the complainant’s claim as set out in section 2.1. Determination | Case number: 653906 Page 3 of 10 2 Reasons for determination 2.1 What is the insurer’s liability regarding the causeway? Complainant has established a valid claim The onus is on the complainant to establish a prima facie, or valid, claim. That is, she must show the damage was caused by storm or flash flood. The complainant says the damage occurred after storms/flash flooding in the area. The insurer says the reported level of rainfall during January 2018 (when the causeway collapsed) was not abnormal or excessive. It notes that rainfall for the 3 years prior to the reported event was significantly higher. The complainant provided a statutory declaration from MF. The causeway was part of a track. MF maintained and repaired the track between January 2012 and February 2019. MF advised that there were two large flood events that damaged the causeway. This included a flash flood in March 2017, after which sink holes began to appear on the up slope (which he subsequently filled). He noted that on 4 January 2018, he arrived at work to find a partial collapse on the down slope of the causeway, at the site of the 2005 repair. MF says there was evidence of flooding on the track. MF said that pockets of localised heavy falls are quite common along the mountain and adjoining ranges. He said that it was clear that this damage was from recent heavy rain events within the previous few days. The panel finds MF’s evidence compelling. He is familiar with the track and causeway. There is no dispute he is sufficiently qualified to maintain the track and causeway. He ob served the causeway’s collapse contemporaneous to the event. The panel acknowledges the insurer’s engineer’s (FM ’s ) reference to the rainfall records for 1-10 January 2018 and other daily events of much higher volume. However, these appear to be daily rainfall records and do not necessarily measure the intensity of rainfall. For example, a distinction must be drawn between 20mm falling in 15 minutes compared to 100mm in 24 hours. The former would more than likely result in flash flooding. Further, MF referred to the fact that pockets of localised heavy falls are common. The complainant’s expert (TI) also said that rainfall can take a few days to ‘percolate through the subsoils to the site’. This supports the complainant’s view the causeway collapsed following a flash flood or storm. Given all this, the panel is satisfied the complainant has established a valid claim. Determination | Case number: 653906 Page 4 of 10 Expert evidence highlights issues with the 2005 works As the complainant has established a valid claim, the onus now moves to the insurer to demonstrate that it can rely on an exclusion or is otherwise entitled to deny the claim. The insurer seeks to rely on the exclusions for deterioration, erosion and inadequate design. It says that long term erosion resulted in a subsidence event, which is also excluded. Further, the insurer also says the complainant did not maintain the causeway. The complainant obtained an engineer’s report from TI. TI made several key findings about the 2005 works. This included the following:  the insurer’s contractors use d existing timber members, which are prone to deterioration – these could not have been maintained over the last 13 years, and were likely to deteriorate further and deform  a suitable founding stratum was not identified for the remediated part of the embankment in 2005 – this is despite the fact the area is a known landslide risk  the design did not consider whether the existing culvert provided enough capacity  works to the downstream slope of the embankment did not consider the need to provide erosion protection at the culvert outlet. FM noted that given the relatively harsh environment of the site, one of the most critical design considerations for the embankment should have included details and provisions for durability of the timber members. However, FM observed that re-used timber logs indicate that: the original timber member had been untreated, and as such is susceptible to decay/deterioration when exposed to frequent/constant water/moisture. FM also noted the failure mode of the collapsed stones ‘suggests that the stones have lost support due to the erosion of supporting materials’. This included the tree log. FM’s opinion was that a well -designed embankment should incorporate long- lasting materials that can withstand the recurring immersion/inundation. FM concluded that if the embankment had been adequately designed and constructed, the damage to the downstream slope would not have occurred. Determination | Case number: 653906 Page 5 of 10 Proximate cause is the inadequate works in 2005 Both experts highlight issues with the 2005 works. They agree the use of the existing timber members left the causeway susceptible to damage. FM provided options as to what features the embankment should have utilised. TI highlighted various issues that should have been addressed to protect the causeway. It appears the 2005 works did not consider these factors. It is unclear what expert advice was sought in reinstating the damage to the causeway back then. The current evidence of the two engineers show the works conducted would not have protected the causeway from failure in the future. The insurer said the 2005 works were on the opposite side of the causeway. The complainant refutes this, noting it is on the same side. The photographs appear to support the complainant. The insurer also noted the timeframe between the works conducted and the damage occurring show the cause was gradual deterioration, erosion or wear and tear. The panel disagrees. Both TI and FM highlight issues with the design and the choice to use the existing timber members. In their view, the reinstatement works left the causeway susceptible to this damage. Further, it appears that in their view, the causeway should be designed in such a way as to avoid this risk from manifesting. This makes sense, as the risk of serious injury occurring if the causeway collapsed whilst in use could be significant. Therefore, the panel accepts the 2005 works were inadequate and this was the proximate cause of the damage. Evidence shows complainant maintained the causeway The insurer also said the complainant did not maintain the causeway. MF confirmed in his statutory declaration that sink holes had begun to appear after a flash flood in March 2017, and that he commenced filling these holes with stones and concrete. He also spoke of the other maintenance works the complainant had done over his tenure with her. This included employing a contractor to grade and repair the road on an annual basis. Again, MF’s statutory declaration is compelling. It is not refuted by any of the available information. It is supported by the complainant. This shows the complainant regularly maintained the track and causeway. Therefore, the panel does not accept the insurer has shown that the complainant did not maintain the causeway. Determination | Case number: 653906 Page 6 of 10 Insurer’s other arguments do not assist it The insurer raised the Wayne Tank principle in its final submission. This is not applicable. This is because the panel has concluded that the proximate cause of the damage was the inadequate works done in 2005. The information does not show there were other proximate causes to the loss. The insurer submits the embankment is essentially a retaining wall and the policy excludes this for storm damage. The panel disagrees. The claim is for damage to the causeway, not a retaining wall. Further, the parties (including the experts) have continually referred to the area as an embankment, not a retaining wall. Embankment is defined by the Macquarie and Oxford dictionaries to include the following: A bank, mound, dyke, or the like, raised to hold back water, carry a road etc [Macquarie] A wall or bank of earth or stone built to prevent a river flooding an area [Oxford] A bank of earth or stone built to carry a road or railway over an area of low ground [Oxford] . It is clear there is a distinction between a retaining wall and embankment. Therefore, the panel does not accept the embankment is a retaining wall for the purposes of the policy. Conclusion Given that the causeway collapsed due to the inadequate works in 2005, the insurer is liable to accept the claim. The insurer has not established that any of the other exclusions apply. In terms of the recent remediation works, the panel notes that they included a new working platform and two twin culverts. The panel does not consider these items represent betterment. This is because the panel accepts these works were necessary to repair the causeway to a working and safe condition, due to both the claimed event and inadequate works. Further, the policy does not exclude any additional works required to repair an item to current standards. The insurer therefore is to cash settle the complainant for the cost of remediation works to the causeway. The insurer is also to pay interest on this sum, pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from 14 May 2018 (the date it denied the claim) or when the costs were incurred, whichever is later, until payment is made. Determination | Case number: 653906 Page 7 of 10 The complainant incurred professional costs Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant during a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000, unless exceptional circumstances apply. The panel accepts TI was reasonably engaged given the technical issues involved and assisted the complainant in establishing her claim. The insurer should therefore reimburse TI’s report costs. Determination | Case number: 653906 Page 8 of 10 3 Supporting information 3.1 Key references Policy documents Document Provi sion Certificate of Insuranc e Home insured [insured property] … The home  is occupied as owner’s holiday home/ week ender Product Disclosure Statement (PDS) 1 March 2011 Pages 21 - 23 The events we cover We cover your home or contents when certain things happen. These are known as 'listed events'. You can make a claim if a listed event takes place and causes loss or damage to your home or contents during the policy period. In this section, we tell y ou what events you’re covered for and any specific exclusions and conditions that apply to the event. General exclusions may also apply — see Section 5. … Storm Home Home Plus If loss or damage is caused by a storm. For example, h ail damages your roof or a storm in your local area may cause water to build up in your street gutters. Covered  violent wind, cyclone or tornado  thunderstorm, hail, rain or snow  sudden, excessive run - off of water as a direct result of a storm in your local area. Not covered under Buildings Insurance  loss or damage to: ‒ retaining walls ‒ gates, fences or free standing walls if they are not structurally sound or well maintained ‒ pontoons, jetties or bridges ‒ gravel driveways ‒ swimming pool/spa covers that are more than 5 years old ‒ swimming pool/spa liners Determination | Case number: 653906 Page 9 of 10 Document Provi sion  loss or damage caus ed by wat er which ent ers your home through any tarpaulins or fixings set up while you’re renovating or altering your home  loss or damage caus ed by flood – see this page for this cover  loss or dam age caus ed by storm surge – see page 79 for the storm surge definition. Not covered under Contents Insurance  loss or damage to: ‒ swimming pool/spa covers that are more than 5 years old ‒ swimming pool/spa liners  loss or damage caus ed by wat er which ent ers your home through any tarpaulins or fixings set up while you’re renovating or altering your home  loss or damage caus ed by flood – see this page for this cover  loss or damage caus ed by storm surge – see page 79 for the storm surge definition. Flood Home Home Plus If loss or damage is caused by a flood. For example, heavy or sustained rainfall upriver causes a river or creek near you to overflow. Covered  flood. Flood means:  rain which results in water pooling on, flowing from or failing to d rain away from: ‒ a body of water ‒ land ‒ roads and streets  water that escapes or is released from a body of wat er. A body of water can include a river, lake, dam, stormwater channel or canal, but not the sea. If we have identified that your home is prone to fl ooding, then:  we need to charge you a higher premium, or  you can choose to vary your policy by removing flood cover. We will tell you if you are eligible to remove flood cover on your current Certificate of Insurance. Flood does not include sudden, excessive run - off of water as a direct result of a storm in your local area – see page 23. Determination | Case number: 653906 Page 10 of 10 Document Provi sion Not covered  loss or damage to: ‒ retaining walls ‒ gates, fences or free standing walls if ‒ they are not structurally sound or well maintained ‒ pontoons, jetties or bridge s ‒ gravel driveways ‒ swimming pool/spa covers that are more than 5 years old ‒ swimming pool/spa liners  loss or damage caus ed by storm surge unless it takes place at the same time as a flood which causes the same loss or damage to your home or cont ents – see p age 79 for the storm surge definition  loss or damage caus ed by flood, if your current Certificate of Insurance shows that you have chosen to remove flood cover. Page 53 Exclusions for all cover These exclusions apply to all cover under your policy. What we don’t cover Loss, damage, injury or death arising from:  rust, corrosion, gradual deterioration, depreciation, wear or tear  erosion  subsidence or landslide unless it happens immediately as a result of an earthquake or ex plosion ... Maintaining and occup ying your home We don't cover loss, damage, injury or deat h arising from:  faulty design or workmanship  you not maint aining your site in good repair and condition

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.