Text of the determination
Determination
Case number 653077
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 653077 Page 2 of 12
Case number: 653077 6 April 2020
1 Determination overview
1.1 Complaint
The complainant held a home and contents policy with the insurer and lodged a claim
after her property was damaged by a storm on 6 January 2014. Subsequent claims
were lodged for storms on 4 December 2014 and 30 January 2015.
The insurer has partially settled the claim. It says much of the damage is a result of a
defective slab and the complainant’s failure to undertake maintenance and repairs at
the property. Such damage is excluded from cover under the policy.
The complainant seeks for the insurer to pay all damage caused by the storms. The
complainant says the insurer has consistently delayed the claim, which caused stress
and financial difficulty. She says she was forced to accept the insurer ’ s earlier offer
due to financial constraints, yet the settlement is inadequate.
1.2 Issues and key findings
Is the settlement sufficient to cover the insured damage?
The panel considers the settlement is not adequate to cover the insured damage.
While not all the damage is related to the insured events, the insurer has relied on
exclusions that do not apply to the storm event or that are not supported by the
available information.
Is the complainant entitled to any compensation?
The complainant is entitled to compensation for non-financial loss but not for the
professional costs incurred.
The Panel accepts the complainant suffered an unusual degree of stress and
inconvenience during the claim process because of the insurer’s actions . The insurer
is not liable for the complainant’s professional costs as the complexity of the
complaint did not require a professional representative to support the complainant.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is required to settle the claim for damage arising from the ongoing
movement as set out under section 2.1 of this determination. In addition, the Insurer
must pay compensation of $4,000 for non-financial loss.
Determination | Case number: 653077 Page 3 of 12
2 Reasons for determination
2.1 Is the insurer entitled to rely on policy exclusions to limit cover?
Onus on complainant to establish a valid claim
It is an established principle that the complainant is required to establish a valid claim,
within the terms of the policy. Should the complainant establis h a valid claim, the onus
shifts to the insurer to establish that an exclusion applies, or that it is otherwise
entitled to refuse the claim.
The policy provides cover against loss or damage caused by certain insured events,
subject to specific and general exclusions. The product disclosure statement (PDS)
lists the insured events, one of which is storm.
The complaint relates to multiple claims lodged for storm related damage in 2014 and
2015. That damage continues to occur. There is no dispute these storms did occur.
The insurer found the underlying cause of the initial movement which caused the
damage was a storm on 6 January 2014. Further claims were lodged following storms
on 4 December 2014 and 30 January 2015. The complainant says these later storms
have caused further movement damage.
The panel accepts the complainant has established a valid claim. For this
determination the Panel will treat the damage in 2014 and 2015 as arising from the
insured event of storm.
Insurer says some damage is a result of causes excluded under the policy
The onus is on the insurer to show an exclusion applies if it is to avoid cover for the
loss. The policy excludes damage caused directly or indirectly by:
settling, shrinkage or any movement of earth
settling, shrinkage or expansion in buildings, foundations, walls or pavements
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear
a defect in an item, structural defects, faulty or poor workmanship or design.
The insurer also refers to a policy condition which requires a policy holder to take
reasonable precautions to prevent further loss after making a claim. It says the
complainant failed to take all reasonable precautions to avoid further damage.
On 17 July 2015, the insurer declined cover for damage which resulted from structural
defects and design. It says the slab was not constructed to modern standards, and
damage would not have occurred if it were.
It also declined cover for damage caused to a balcony by wood which had rotted over
time, however the complainant does not contest this.
Determination | Case number: 653077 Page 4 of 12
On 7 August 2017 the insurer issued a second decline letter for the same claim, this
time saying the damage was due to the complainant’s inaction in carrying out repairs
to gutters and improvements to drainage. It did not refer to the potential impact of the
slab in this letter.
Expert says storm is the proximate cause of movement
The insurers engineer (IP) in August 2014 found that the damage was caused by a
storm. IP concluded that the large volume of water which flowed around the property
following the storm had caused swelling of clay soils, lifting the front portion of the
building. Soils later dried at an uneven rate. IP considers this movement to be the
cause of damage at the property.
IP recommended ongoing monitoring of floor levels over the following 12 months to
determine if movement was ongoing, and to determine if this is consistent with its
opinions. It suggested a more detailed examination should be conducted if ongoing
movement inconsistent with its opinion was observed during this monitoring period.
The insurer did not follow this recommendation.
Expert says damage due to storms, inadequate drainage and slab design
IP reattended after a second storm on 4 December 2014. IP identified damage to
internal walls at the rear of the home, and further damage to a kitchen located above
the area originally investigated. IP described the damage as being typical of ground
movement, with gaps, doors and cupboards unable to be closed, cracked tiles and
loose gutters.
IP considered the recent onset of wet weather had caused soil to again swell, lifting
the external walls of the property. It describes how lifting external walls, while internal
walls remain level, has caused separation gaps between walls and ceiling.
IP notes that while some movement is attributable to seasonal rainfall, the rear gutters
at the property were loose and contained growing vegetation, and the right gutter was
deteriorated and overflows during storms.
The second report prepared by IP recommends repairs to the gutters and
improvements to overall site drainage, to ensure water does not pool beside the
foundations. It also suggested a review of the original footing design, obtaining a
geotechnical report to compare this design with the onsite soil conditions, and
engaging a plumber check the condition of drains and pipes. IP again recommended
the property should be monitored for movement over the following 12 months.
Determination | Case number: 653077 Page 5 of 12
Expert incorrectly determined the slab was not compliant with building
standards
IP supplied a third report dated 18 May 2015 after it received information relating to
plumbing, foundations and soil conditions. IP noted:
the slab and footing system are not consistent with the current Australian standard
for residential footings and slabs; however, the property was constructed six years
prior to the earliest edition of this code coming into force
the slab and footing design is insufficient to prevent damage due to changes in soil
moisture content
improvements and changes should be made to direct water flow and drainage
away from the home
blocked stormwater drainage will be contributing to water pooling beside the
house.
The insurer refused the claim on 17 July 2015 based on this report. The panel notes
the insurer relied on the policy exclusions relating to defects in design. This is despite
knowing the slab was constructed before the current standards came into force.
The panel accepts the slab was built to the standards of the day. The slab was
approved by council and as now conceded by the engineer, compliant with the
standards at the time of construction.
Insurer unable to determine what damage arose from the different events
In June 2017 the insurer engaged IP again. In its fourth report dated 12 July 2017 IP
included a copy of instructions. These note the insurer is considering accepting
damage to the property because of slab movement.
IP found the current level of damage and ongoing issues to be a direct result of earlier
recommendations relating to maintenance of gutters and improvements to site
drainage not being followed.
IP issued a fifth report on 8 November 2017 and a sixth on 28 November 2017. It’s
fifth report found damage to ceilings occurred because of a seized ‘whirly bird’ roof
ventilator and failed sealant around the ventilator.
In its sixth report, IP notes the policy only covers damage occurring within 72 hours of
a storm. It finds most of damage occurred outside of 72 hours and was primarily due
to the complainant’s failure to rectify drainage issues.
The Panel notes that on 1 July 2017, IP raised concerns with the insurer citing the
difficulty in determining what damage was due to the first storm, and what is due to
subsequent events.
Determination | Case number: 653077 Page 6 of 12
Settlement based on damage which occurred within 72 hours of initial event
The policy limits cover for loss or damage because of landslide or subsidence to
damage that occurs within 72 hours of certain events, including a storm. A review of
available materials suggests the insurer relied on the sixth IP report to argue most of
the damage occurred outside of 72 hours following the storm.
The panel notes the insurer continued to treat the claim under the insured event of
storm. The insured event of storm has no such 72-hour limit. More to the point, the
insurer has not formally relied on the condition in denying any aspect of the claim.
The panel does not consider it is fair or reasonable for the insurer to limit its exposure
to damage which occurred within 72 hours of the storm. The damage was not due to
landslide or subsidence but to movement of the slab caused by the storms/s.
Some damage likely due to lack of maintenance
The Panel accepts that some of the damage may be attributed to lack of maintenance
which is excluded from cover under the terms of the policy. However, the panel does
not consider the insurer has established the extent to which the lack maintenance and
blocked stormwater outlets contributed to the damage.
The available information indicates that there were overflowing gutters and poor site
drainage exacerbating the excess soil moisture. This is highlighted in the reports from
IP. The panel accepts this can cause a degree of movement
IP identified blocked stormwater drainage contributing to water pooling beside the
house. The insurer did not seek to clarify the extent to which blocked stormwater
outlets contributed to any damage.
Additionally, the insurer has not shown when the gutters became deteriorated to the
point water overflowed and pooled beside the home. The panel notes damage was
initially deemed solely due to the storm. The possible contribution due to gutters was
not noted until 29 January 2015, over 12 months after the initial loss.
While the panel accepts the gutters likely deteriorated, the available information
suggests there was no reason to accept this was the case at the time the claim was
first lodged.
In its report dated 18 May 2015 IP found stormwater outlets were blocked, causing
water to pool beside the building regardless of the condition of the gutters. The panel
notes the escape of liquid from a fixed pipe and/or a fixed gutter is an insured event
under the policy.
Nevertheless, the panel considers it fair to reduce the insurers liability by 25% to allow
for the maintenance issues.
Determination | Case number: 653077 Page 7 of 12
Insurer accepts liability for damage due to slab movement
The insurer’s submission to AFCA on 29 August 2019, notes the parties agreed to a
final settlement of $56,278.25. It is unclear how this amount was reached.
The insurer says it provided settlement for works necessary to repair cracking to the
property and other damage due to movement of the slab. It says this settlement was
made in good faith.
The insurer had previously refused to cover damage caused by slab movement based
on policy exclusions relating to defects. As indicated earlier the slab was compliant to
the standards of the day.
Insurer has not shown it is entitled to refuse cover for damaged contents
The complainant says content items were damaged during the initial storm. The
insurer says the complainant disposed of damaged contents without providing
evidence of ownership for the items. In response, the complainant explained she was
directed to dispose of these items, and her representative says the items are visible in
images taken by the insurer’s assessor.
The complainant also says carpets were damaged after the property was flooded
numerous times. The insurer has not responded to the complainant’s comments
regarding the carpet, beyond stating it has not altered its position as drainage works
have not been completed by the complainant.
The panel does not consider the insurer has articulated why it is entitled to refuse
cover for damaged contents. The panel considers the insurer is liable for damaged
carpet, and liable for contents depictured in images taken by its assessor.
Complainant says property cannot be insured in current condition
The complainant says the property has been impacted by ongoing storms, however
the property is unable to be insured in its current condition. The complainant
previously cancelled her policy with the insurer as she felt it would not provide cover
in the event of a claim.
The scope of works and subsequent quote on which settlement was based includes
allowances for replacement and repair of guttering and downpipes. The insurer made
this payment on 5 March 2019. At this time the complainant was aware IP viewed site
drainage issues as having the potential to contribute to ongoing damage.
Determination | Case number: 653077 Page 8 of 12
Settlement does not fairly reflect the loss.
The complainant says she accepted the settlement as she was unable to afford to
continue to pursue the matter. This is reflected in correspondence from LM noting the
complaint wants the following statement on record:
The insured has no choice but to agree to the settlement under undue influence
because of her financial situation and health condition.
The panel considers the settlement does not fairly reflect the extent of the damage
due to the insured events. The panel does not accept given the uncertainty in the
engineering reports that it is fair to consider the payment of $56,278.25 constitutes full
and final settlement of the claim.
The panel considers it fair that the Insurer obtain a further scope of works and an
actionable quote to repair all the movement and water related damage. The quote is
to be exchanged with the complainant. Subject to agreement that the quote is a fair
and reasonable quote the Insurer can then deduct 25% of the quoted cost to allow for
the damage caused by lack of maintenance. As the settlement will be based on a
current quote then no interest is payable on the cash settlement.
2.2 Is the complainant entitled to any compensation?
AFCA may award compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-
financial loss (capped at $5,000) where there has been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear
a normal degree of inconvenience during a claim.
We can also award compensation for indirect financial loss (out of pocket expenses or
other liabilities, which are caused directly because of the insurer’s conduct) this is
capped at $5,000 per claim.
Complainant entitled to costs and compensation for non-financial loss
Significant delays have occurred because of the insurer reliance on policy exclusions
relating to defects in the slab. The slab was compliant with relevant legislation when
the building was constructed. Seeking to deny liability based on a defect given the
slab was compliant with legislation when co nstructed is unreasonable, unfair and
contrary to the panel’s expectations on how an insurer should apply defect
exclusions.
Determination | Case number: 653077 Page 9 of 12
T he insurer’s communication with the complainant has been poor. The
communications to the complainant and AFCA do not make clear the policy
conditions relied upon when the insurer made its settlement offer.
The complainant discussed the conduct of an assessor engaged by the insurer
throughout the complaint. She questioned why this conduct was not addressed in the
insurer’s response. H er initial complaint to AFCA noted that, in her view, the assessor
deliberately delayed the process. These sentiments were echoed in telephone
discussions with the complainant.
The panel does not consider that the claim has been managed in line with normal
community expectations. The issues have been unresolved for years. The
complainant has suffered significant interruption, inconvenience and stress as a
result. The panel considers it appropriate that the insurer pay $4,000 in compensation
for non-financial loss.
Complainant seeks compensation for representative’s costs
AFCA provides a service that is free for complainants. It is not usually necessary for
either party to be represented. Financial firms are unable to pass on their legal costs
of an AFCA complaint. If a complainant chooses to be represented, these costs will
generally be borne by the complainant themselves.
AFCA may decide a financial firm contribute towards legal or professional costs
incurred by a complainant during a complaint if we consider because of the
complexity of a complaint and the complainants circumstances the complainant
needed assistance to understand and establish the claim.
The complainant was represented a commercial fee-charging representative (LM).
She says she engaged LM as she felt unable to obtain a fair outcome or
consideration from the insurer, primarily because of the assessors’ approach.
The panel accepts it would have been an extra burden for the complainant to have
had to continue managing the claim and complaint herself. However, the panel does
not consider the dispute was overly technical or complex, such that it required the
services of any external professional or expert to understand or establish the
complaint. The Panel is not satisfied it was necessary to obtain paid representation
and determines the Insurer need not contribute to the professional costs incurred.
Determination | Case number: 653077 Page 10 of 12
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Relevant policy wording
When your buildings are protected
The specific events that your buildings will be covered for are listed in the table below. This
cover is subject to the exclusions outlined on pages xx-xx.
Event We will cover We won’t cover
Storm, rainwater, flood
or wind
Storm, rainwater, flood
or wind
(continued)
Loss or damage as a result of
storm (including named cyclone),
rainwater
flood
or wind.
Water entering your buildings:
through an opening made for
any building, renovation or
repair work
because of a structural defect,
faulty design or faulty
workmanship.
Action by the sea.
High tide.
Storm surge except where it
happens at the same time as
flood.
Loss or damage caused by a flood
or named cyclone that occurs
within 48 hours of the start date of
Determination | Case number: 653077 Page 11 of 12
Event We will cover We won’t cover
Free - standing gates and fences, but
only if they have been installed and
constructed according to the
manufacturer’s specifications.
your Policy unless you took out
your insur ance with us
immediat ely after:
another insurance policy
covering the same buildings
expired, without a break in
cover, or
the risk passed to you as
purchaser of your buildings.
Swimming pool covers, including
solar covers and plastic liners.
Free - standing gates and fences
that are made of timber and are
more than 15 years old.
Trees, plants and shrubs except
for the cost of removal of storm
(including named cyclone),
rainwater, flood or wind damaged
trees, plants and shrubs.
Landslide or
subs idence
Loss or damage as a result of a
landslide or subsidence if the loss or
damage occurs within 72 hours of an
event being:
an earthquake or tsunami
explosion
storm, rainwater, flood or wind
liquid escaping from:
– a fixed pipe
– an object attached to a pipe, fixed
gutter, fixed tank or a drain, or
– a standalone swimming pool or a
standalone water tank.
Any other erosion, subsidence,
landslide or earth movement
event.
Water or liquid damage Loss or damage caused by water or
liquid escaping from:
a fixed pipe or an object attached to
a pipe, fix ed gutter, fixed tank or a
drain
a bath, basin, sauna, spa, shower
base or shower wall, sink, toilet or
tiled floor that has drainage holes
a washing machine or dishwasher
an aquarium
a waterbed
a swimming pool
Y our buildings for loss or damage
caused by water or liquid entering
your buildings:
through an opening made for
any building, renovation or
repair work
because of a structural defect,
faulty design or faulty
workmanship.
Determination | Case number: 653077 Page 12 of 12
Event We will cover We won’t cover
a standalone water tank.
Cost of finding where the water or
liquid escaped from, including the
cost of repairing any damage that
occurs while looking for the cause.
Cost of repairing the item from
which the water or liquid escaped.
Buildings and contents cover exclusions
We will not pay for any loss or damage which is caused directly or indirectly by:
settling, shrinkage or any movement of earth
settling, shrinkage or expansion in buildings, foundations, walls or pavements
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear
a defect in an item, structural defects, faulty or poor workmanship or design
Conditions you must comply with when making a claim
Where allowed by law, we have a right to recover from any person, the amount of
any monies payable to you under the Policy and we have sole discretion in the
way we handle these matters. We will only pay a claim where you have complied
with the following conditions:
you must take reasonable precautions to prevent and mitigate any further loss,
damage or liability arising.
3.3 Other matters
The complainant also says injuries were sustained due to the insurer’s actions. This
included an injury caused by the insurer’s failure to arrange repairs, and another
caused by a depression left after soil testing. The available material does not include
medical reports or information to allow the panel to draw a definitive conclusion
regarding liability. In absence of such information, the panel does cannot find the
insurer is liable for any alleged negligence.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.