Determination 652716
Flood exclusion applied to inundation damage to thirteen units
Summary
A body corporate claimed for water inundation of thirteen units in Townsville in February 2019 and the insurer refused on the flood exclusion. AFCA found the sewerage and drainage inundation covered, allowing for 100mm above floor level, and that the balance was flood. Interest under section 57 of the Insurance Contracts Act applies if the insurer cash settles.
Water discharging from sewerage and drainage within the property before floodwater arrived is not flood as defined, and the insurer bore the onus of establishing the flood exclusion for that portion.
Issues
- Claim denial primary · upheld
“The insurer is liable for the initial inundation as a result of water discharging or overflowing from toilets, drainage and/or sewerage systems within the property.”
- Product terms interpretation secondary · upheld
“The panel does not consider that water which could not enter the river because the river level was high meets the definition of flood.”
Subjects and remedies
pay claimpay interest
Text of the determination
Determination
Case number 652716
Financial firm Insurance Australia Limited
Determination | Case number: 652716 Page 2 of 8
Case number: 652716 5 February 2020
1 Determination overview
1.1 Complaint
The complainant is a body corporate that holds an insurance policy with the financial
firm (insurer). The insured property is comprised of thirteen residential units located in
Mundingburra, Queensland.
A claim was lodged under the policy after the insured property was inundated with
water on or about 3 February 2019.
The insurer maintains the inundation was caused by flood, which is excluded from
cover under the terms of the policy.
1.2 Issues and key findings
Is the damage covered under the terms of the policy?
Based on the available material, the panel is satisfied that inundation of the insured
property occurred as a result of water discharging or overflowing from toilets,
drainage and/or sewerage systems within the property, prior to the inundation by
floodwater.
The panel is satisfied that the remaining damage was caused by flood.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is required to meet its liability for loss and damage sustained as a result
of water discharging or overflowing from toilets, drainage and/or sewerage systems in
accordance with the policy, and as set out under section 2.1 of this determination.
The insurer is otherwise entitled to refuse payment of the balance of the
complainant’s claim on the grounds that the damage was caused as a result of flood.
Determination | Case number: 652716 Page 3 of 8
2 Reasons for determination
2.1 Is the damage covered under the terms of the policy?
The complainant’s strata policy with the insurer provides cover for accidental, physical
loss or destruction to building and common contents which occurs during the period of
insurance, subject to the terms and conditions of the policy.
The policy specifically excludes claims for damage to insured property arising directly
or indirectly from flood.
Flood is defined on page 8 of the product disclosure statement as:
Flood
means the covering of normally dry land by water that has escaped or been
released from the normal confines of:
1. a lake (whether or not it has been altered or modified);
2. a river (whether or not it has been altered or modified);
3. a creek (whether or not it has been altered or modified);
4. another natural watercourse (whether or not it has been altered or modified);
5. a reservoir;
6. a canal;
7. a dam.
It is accepted insurance law that the insurer carries the onus to establish the
application of its policy exclusion for damage caused by flood.
Circumstances of the loss
In late January and early February 2019, the city of Townsville and surrounding areas
of north Queensland experienced a significant weather event.
Heavy rainfall occurred over the Townsville catchment over several days, and at or
about the complainant’s property.
The insured property is a unit complex comprised of thirteen single storey units. There
are three separate buildings with three units each in the front two buildings, and
seven in the rear structure.
Determination | Case number: 652716 Page 4 of 8
The insured property is located approximately 650m from the Ross River to the south.
The insurer’s assessor (C) conducted a site inspection on 12 Februar y 2019 and
completed an initial report dated 4 March 2019. C noted that there was minor storm
damage to the bedroom and bathroom ceiling of unit 2.
The insurer also engaged a hydrologist (BM) to investigate the cause of the
inundation to the insured property. BM provided a report dated 21 March 2019,
following a site inspection on 21 February 2019, together with a supplementary report
dated 25 June 2019, in response to further information provided by the complainant.
BM stated that all the units suffered damage as a result of the water inundation to a
depth of between 0.3m to 0.5m above floor level in the living areas, and between
0.5m to 0.7m above floor level in the garages.
BM observed that there is an open, concrete lined drain to the north of the insured
property which has an invert elevation of 3.1 mAHD. The drain passes into a culvert
and stormwater pipes from the surrounding area discharge into this drain. There is
also a grated kerb inlet on B street adjacent to, and likely discharging into the open
drain.
BM indicated that the insured property is slightly elevated above B street, with the
elevation at the entrance of the property at 4.8 mAHD, whilst the lowest point of B
Street near the grated pit inlet is 4.3 mAHD.
Following the site inspection and review of data from the Bureau of Meteorology, BM
concluded that any water damage to/via ceilings was due to the ingress of rainfall
from the roof. However, water damage at floor level and up to a depth of 0.5m was
due to flooding from the Ross River.
It appears that unit 2 was the only unit which sustained damage to the ceilings from
stormwater ingress, in which case the policy responds. However, the exchanged
material indicates that the repair costs to unit 2 for such damage are less than the
policy excess.
Complainant says initial inundation by stormwater and sewerage
The complainant disputes the claims decision and says initial inundation was by
stormwater.
A number of residents and non-resident owners met with BM at the site inspection.
The exchanged material suggests that:
the residents vacated the insured property between 1-3 February 2019 and were
not onsite at the time of inundation
it is believed that water entered the units between 6.00pm and 6.30pm on 3
February 2019
Determination | Case number: 652716 Page 5 of 8
the resident of until 11 noticed the water level was up to her driveway at 4.30pm on
3 February 2019
residents at unit 2 and unit 12 noted that the drain running to the north was blocked
and the water could not get away
the owner of unit 9 says that clear water entered the units first, followed by
sewerage and then water from the river.
The complainant has also provided a report from an engineer (LC) dated 13 June
2019.
LC says that there were two identifiable inundation events that preceded the peak
inundation:
initial inundation was due to building hydraulic failure with sewerage entering units
2 and 12 via the drains
secondary inundation occurred from at least 6.00pm on 3 February 2019 from an
overflow of the adjacent concrete lined stormwater drain. LC stated that the open
drain is 1.25m deep by 2.5m wide.
LC conceded that the final inundation was due to floodwaters.
Inundation by sewerage covered under the policy
According to the resident in unit 2, sewerage was intermittently overflowing from the
floor drain in his bathroom from at least 10.00am on 2 February 2019, and the
sewerage network continued to overflow up until he vacated his property at 6.00pm
on 3 February 2019. This was also verified by the resident of unit 12 who advised that
her sewerage network was overflowing before she vacated her unit at 6.30pm on 3
February 2019.
The panel notes that BM in their supplementary report, agreed this was plausible.
However, BM says the cause of the inundation by sewerage was due to elevated
levels in the Ross River, and that floodwater would have entered the sewer system
through infiltration of the soil.
The panel does not consider that floodwater was the source of the initial i nundation
out of the sewer system into units 2 and 12.
The panel notes that there is also evidence from other unit holders of initial inundation
in those units from sewerage.
The panel notes that the policy definition of flood refers to ‘…water that has es caped
or been released from the normal confines of any…river…natural watercourse…’.
The panel does not accept that water which cannot enter the Ross River through
drains and other infrastructure due to the amount of water already in that river, is
water which has escaped or is released from the Ross River. In other words, the
panel does not consider that water which could not enter the river because the river
Determination | Case number: 652716 Page 6 of 8
level was high meets the definition of flood. Further, the panel is not satisfied that the
insurer has established that the water out of the sewer system had mixed with
floodwater.
Accordingly, insofar as there was initial inundation as a result of water discharging or
overflowing from toilets, drainage and/or sewerage systems within the property, the
panel is satisfied that such water is covered under the policy, as this was not
floodwater as defined.
Insurer is required to meet the complainant’s claim for inundation by sewerage
The insurer is liable for the initial inundation as a result of water discharging or
overflowing from toilets, drainage and/or sewerage systems within the property.
Without precise information on which to determine the level of the initial inundation by
such water, the panel can only do what is fair in all the circums tances.
In the absence of precise measurements, the panel is satisfied it is fair in the
circumstances to allow for the initial inundation through the drainage and/or sewerage
system to a level of 100mm above floor level of all units.
The panel notes that the complainant has provided a number of quotations and tax
invoices for repair costs for the units.
Subject to acceptance of this determination by the complainant, the parties are asked
to work cooperatively together to establish the extent of the loss and damage as a
result of the covered inundation and in accordance with the terms of the policy.
If the insurer cash settles this portion of the complainant’s claim, then the insurer is to
pay interest in accordance with Section 57 of the Insurance Contracts Act 1984 (the
Act) from 22 March 2019 (date of insurer’s denial letter) to the date of payment of the
claim.
If the parties are unable to reach agreement as to any cash settlement, then the
parties may return the matter to the Authority for determination as to quantum.
The balance of the loss was caused by flood
Given the fact that the open drain is substantially lower than the floor level of the
property, the panel considers that rainwater alone, even at its most intense would not
have been sufficient to cause inundation of the insured property above floor level.
Based on all the information provided, the panel is satisfied, on balance, that given
the elevation of the property, stormwater runoff alone would not have reached the
floor level of the property before mixing with flood water which had backed up into the
drain. It is well established in insurance law that water which has escaped
(overflowed) from a watercourse or canal is flood water and when mixed with
rainwater, all is floodwater. That is, the water that escaped from the open drain is
floodwater by definition, even if it originated as stormwater.
Determination | Case number: 652716 Page 7 of 8
The insurer is otherwise entitled to refuse payment of the balance of the
complainant’s claim on the grounds that the damage was caused as a result of flood.
Determination | Case number: 652716 Page 8 of 8
3 Supporting information
3.1 AFCA approach to this dispute
We have considered it appropriate to expedite this complaint in accordance with the
Operational Guidelines to the AFCA Rules, due to the nature of the complaint.
Accordingly, this complaint has not been the subject of a preliminary assessment and
has proceeded directly to determination.
The determination is made by a panel consisting of the Ombudsman together with a
consumer representative who has extensive experience in consumer claims and a n
industry representative who has extensive experience in the insurance industry.
The Ombudsman, who has had extensive experience with flood complaints, viewed
the general area and specific site in November 2019.
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.2 Rainwater that mixes with flood water is flood
The Courts have established that once rainwater mixes with flood water, it is all
considered flood water. Where rainwater mixes with flood water and causes damage,
a flood exclusion will usually apply to defeat the claim.
Accordingly, when deciding complaints, consideration has been given to whether
there was any rainwater runoff damage before the flood water arrived at the insured
property.