Text of the determination
Determination
Case number 651925
Financial firm AAI Limited
Determination | Case number: 651925 Page 2 of 8
Case number: 651925 11 February 2020
1 Determination overview
1.1 Complaint
The complainant is a body corporate that holds an insurance policy with the financial
firm (insurer). The insured property is comprised of eleven townhouses located in
Hermit Park, Queensland.
A claim was lodged under the policy after the complainant ’s property was inundated
with water on or about 2 February 2019, during a heavy rainfall event.
The insurer maintains the inundation was caused by flood, which is excluded from
cover under the terms of the policy.
1.2 Issues and key findings
Is the damage covered under the terms of the policy?
Based on the available material, the panel is satisfied that the initial inundation of the
insured property occurred as a result of water discharging or overflowing from toilets,
drainage and/or sewerage systems within the property.
The panel is satisfied that the remaining damage was caused by flood.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is required to meet its liability for loss and damage sustained as a result
of water discharging or overflowing from toilets, drainage and/or sewerage systems in
accordance with the policy and as set out under section 2.1 of this determination.
The insurer is otherwise entitled to refuse payment of the balance of the
complainant’s claim on t he grounds that the damage was caused as a result of flood.
Determination | Case number: 651925 Page 3 of 8
2 Reasons for determination
2.1 Is the damage covered under the terms of the policy?
The complainant’s strata policy with the insurer is an accidental damage policy which
provides cover for physical loss or destruction of or damage to buildings and common
contents occurring during the period of insurance.
However, the policy specifically excludes damage caused by or arising directly or
indirectly from flood, unless the policy schedule specifies that optional flood cover is
included.
Flood is defined on page 9 of the product disclosure statement as:
Flood
The covering of normally dry land by water that has escaped or been released
from the normal confines of any of the following:
a) a lake (whether or not it has been altered or modified);
b) a river (whether or not it has been altered or modified);
c) a creek (whether or not it has been altered or modified);
d) another natural watercourse (whether or not it has been altered or modified);
e) a reservoir;
f) a canal;
g) a dam.
The policy schedule states that the body corporate was not insured for flood.
Circumstances of the loss
In late January and early February 2019, the city of Townsville and surrounding areas
of north Queensland experienced a significant weather event.
Heavy rainfall occurred over the Townsville catchment for several days and at or
about the complainant ’ s property.
The insured property is comprised of eleven double storey townhouses which are
located on either side of a common driveway (eight units to the north of the driveway
and three units to the south of the driveway). The property is situated on the corner of
M Street and R Street.
According to the insurer’s assessor, the insured property is located 731m from the
Ross River. The Hermit Park Drain forms the southwestern boundary of the insured
property.
The insurer has provided a report from an engineering firm (JH) dated 28 February
2019, which was prepared following a site inspection on 18 February 2019.
Determination | Case number: 651925 Page 4 of 8
Following the site inspection, JH concluded that the insured property was inundated
by Ross River floodwaters. Further, local rainfall intensities at the time of inundation
would not have been sufficient to cause the inundation at the insured property. JH
said there was no evidence of blockages within the stormwater system or drains that
caused backup and overflow of the stormwater system.
The insurer subsequently agreed to appoint a hydrologist (WR) to report on the cause
of inundation to the insured property. WR conducted a site inspection on 11 April
2019 and produced a report dated 8 May 2019.
WR says the ground level of the driveway opposite the entrances to the units is
around 3.25 mAHD. The ground floor level of the units is about 0.15 m above the
adjacent driveway ground level, indicating a ground floor level in each unit of around
3.4 mAHD. All the units and the toilet building located within the swimming pool
compound, were inundated to a maximum depth of about 0.72 m above their ground
floor level.
Following the site inspection and review of data from the Bureau of Meteorology and
Townsville City Council, WR concluded that the initial and maximum inundation above
floor level of the units at the insured property was caused by floodwater overflowing
from the Ross River.
WR also stated that stormwater runoff alone would not have inundated the units at the
insured property above floor level. Further, overflows from Hermit Park Drain and
Campbell Street Sump, would not have caused above floor inundation of the units
prior to the arrival of Ross River overflows.
Complainant says initial inundation by stormwater and sewerage
The complainant’s representative has provided extensive submissions which, for the
sake of brevity, will not be repeated.
Essentially, however, the complainant says that there was considerable stormwater
activity and sewerage overflows in the Rosslea and Hermit Park vicinities prior to the
arrival of floodwaters late on 3 February 2019. The complainant suggests that
although the residents had been evacuated, the likely initial inundation of stormwater
and sewerage at the insured property on 2 February 2019, would have been in the
range of 50mm to 200mm.
The complainant has provided a response to the report from JH which was prepared
by the owners of unit 9. The owners say that although the front section of the property
on M Street (being the driveway entrance) was not inundated by water on 2 February
2019, R Street was. They have provided photographs of the Hermit Park Drain which
they say was significantly blocked, including with debris. They say due to the failure of
the stormwater drain, local stormwater runoff would have been unable to drain
causing localised overflows prior to the river breaking its banks. They also say that
the stormwater drain flooded at approximately 6.00pm on 2 February 2019.
Determination | Case number: 651925 Page 5 of 8
The complainant has provided a hydrology report for an adjoining property on R
Street, which is also adjacent to the drain (that is, the drain bisects the two
properties). The hydrologist for the adjoining property (MC) concluded that the initial
inundation on 2 February 2019, resulted from direct overflow from the open
stormwater drain, together with surcharge from the piped stormwater drainage system
along R Street. Given the proximity, the complainant says the insured property would
have been affected in the same way as the adjoining property.
The owners also reported that the tenants in unit 8 had water coming up through the
laundry floor drain first, then the toilet. A photograph has been provided showing raw
sewerage on the floor of one of the units. Another tenant in unit 11, also reported to
have inundation by sewerage.
The complainant also relies on numerous hydrology reports for other properties in the
area and neighbouring suburbs, inclusive of witness statements. The complainant
says there is a disparity of opinions and conclusions between hydrologists and
highlights that there are inaccuracies with water level data.
Additionally, the complainant has provided a report from an engineer (LC) dated 26
July 2019, outlining that the Hermit Park Drain is being incorrectly labelled as a
watercourse as opposed to a drain.
Further, the complainant has referenced a number of previous determinations by the
Authority’s predecessor scheme (the Financial Ombudsman Service) , which they say
should be considered in this complaint.
Inundation by sewerage covered under the policy
WR concluded that the overflow of toilets in some of the units was caused by
surcharging of Ross River floodwaters that had entered the sewerage pipe system.
The panel is not satisfied that floodwater was the source of the inundation out of the
sewer system into some of the units.
The panel notes that the policy definition of flood refers to ‘…water that has escaped
or been released from the normal confines of any…river…natural watercourse…’.
The panel does not accept that water which cannot enter the Ross River through
drains and other infrastructure due to the amount of water already in that river, is
water which has escaped or is released from the Ross River. In other words, the
panel does not consider that water which could not enter the river because the river
level was high, meets the definition of flood. Further, the panel is not satisfied that the
insurer has established that the water out of the sewer system had mixed with
floodwater.
Accordingly, insofar as there was initial inundation as a result of water discharging or
overflowing from toilets, drainage and/or sewerage systems within the insured
Determination | Case number: 651925 Page 6 of 8
property, the panel is satisfied that such water is covered under the policy, as this was
not floodwater as defined.
Insurer is required to meet the complainant’s claim for inundation by sewerage
The insurer is liable for the initial inundation as a result of water discharging or
overflowing from toilets, drainage and/or sewerage systems within the property.
Without precise information on which to determine the level of the initial inundation by
such water, the panel can only do what is fair in all the circumstances.
Whilst the insurer’s assessor provided a report dated 20 February 2019, outlining the
nature and extent of the loss to each unit, the available material does not allow the
panel to assess the extent of the damage caused as a result of the inundation of
water discharging or overflowing from the toilets, drainage or sewerage systems.
In the circumstances, the panel believes it is only fair and reasonable that the insurer
be given the opportunity to provide a scope of works and estimate as to the likely
costs associated with repairs and damage sustained as a result of the inundation of
the insured property from the discharge or overflow of water or liquids from the toilets,
drainage or sewerage systems. The scope of works must be prepared within 14 days
of the complainant’s acceptance of the Determination , subject to the availability of an
appropriate person(s) to conduct the assessment.
Upon receipt of the particulars of the scope of works, the parties are asked to work
cooperatively together to agree as to the extent of damage sustained as a result of
such inundation and in accordance with the terms of the policy.
If the insurer cash settles the claim, then the insurer is to pay interest in accordance
with Section 57 of the Insurance Contracts Act 1984 (the Act) from 17 May 2019 (date
of insurer’s denial letter) to the date of payment of the claim.
If the complainant or unit holders have already completed repairs then interest is to be
paid from the date the repairs were paid for.
If the parties are unable to reach agreement as to any cash settlement, then the
parties may return the matter to the Authority for determination as to quantum.
Inundation by stormwater prior to flood unlikely
Whether there is coverage under an individual policy depends upon the particular
terms of that policy and the evidence relating to the circumstances of the actual
damage at the complainant’s premises. The fact other policy holders were covered
does not assist the complainant, as each claim will depend upon the relevant policy
and the individual circumstances.
WR considered that Ross River floodwater began overflowing into the Campbell
Street Sump area and subsequently the Hermit Park Drain after 9.00am on 2
February 2019, with significant overflows commencing the following morning.
Determination | Case number: 651925 Page 7 of 8
The panel notes that peak rainfall did not occur until between 4.00pm and 5.00pm on
3 February 2019. This was well after the reported initial inundation on 2 February
2019. The panel would expect significant stormwater runoff to occur at the time of
peak rainfall intensity, not before.
The Hermit Park Drain was observed by the Ombudsman during the site visit. Given
the height of the ground and floor levels of the property, the panel considers that
rainwater alone would not have been sufficient to cause inundation above floor level
prior to the arrival of floodwaters. In other words, the panel considers that the overflow
water would have mixed with rainwater that had pooled in the area.
Based on all of the information provided, the panel is satisfied, on ba lance, that
stormwater runoff alone would not have reached the floor level of the property before
mixing with flood water. It is well established in insurance law that water which has
escaped (overflowed) from a watercourse is flood water and when mixed with
rainwater, all is floodwater. That is, the water that escaped from the Hermit Park Drain
is flood water by definition even if it originated as stormwater.
For the sake of completeness, the panel confirms that the Hermit Park Drain is a
watercourse for the purposes of the insurance definition of flood.
In the circumstances, the panel is satisfied that the insurer is entitled to apply the
policy exclusion for flood, to deny the balance of the complainant’s claim.
However, the panel notes the reference within the Notice of Response to the insurer’s
acceptance of damage that was caused by rainwater entering the property from the
roof.
The panel is satisfied that this is clearly not damage subject to the exclusion for flood
and the insurer is to pay for any damage caused in that way under the terms and
conditions of the policy.
Determination | Case number: 651925 Page 8 of 8
3 Supporting information
3.1 Complainant represented by consumer advocate
The complainant has been represented in this complaint by a consumer advocate.
For the purposes of this determination, any submissions made by the consumer
advocate have been treated as if they have been made by the complainant.
3.2 AFCA approach to this dispute
We have considered it appropriate to expedite this complaint in accordance with the
Operational Guidelines to the AFCA Rules, due to the nature of the complaint.
Accordingly, this complaint has not been the subject of a preliminary assessment and
has proceeded directly to determination.
The determination is made by a panel consisting of the Ombudsman together with a
consumer representative who has extensive experience in consumer claims and an
industry representative who has extensive experience in the insurance industry.
The Ombudsman, who has had extensive experience with flood complaints, viewed
the general area and specific site in November 2019.
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.3 Rainwater that mixes with flood water is flood
The Courts have established that once rainwater mixes with flood water, it is all
considered flood water. Where rainwater mixes with flood water and causes damage,
a flood exclusion will usually apply to defeat the claim.
Accordingly, when deciding complaints, consideration has been given to whether
there was any rainwater runoff damage before the flood water arrived at the insured
property.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.