Home / QBE / Determination 651850
Determination 651850
Scope of repairs for leaking pipe damage and slab replacement
Summary
The complainants disputed the insurer's refusal to pay for slab replacement after leaking pipe damage to their home. AFCA held the slab was not required because of the leaks, and ordered the insurer to indemnify the leak repairs by a quotation process with a 25% uplift.
The insurer is liable only for repairs caused by the insured leak, and slab defects unrelated to the leak are not covered under the agreed prior determination.
Issues
- Claim denial primary · not upheld“The available information does not show the slab requires replacement because of the leaking pipes. Therefore, the insurer is not liable for the works to the slab.”
- Claim amount dispute secondary · upheld“it is fair in all the circumstances that 25% be added to the relevant quotation or average.”
Subjects and remedies
pay claim
Related
Text of the determination
Determination
Case number 651850
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 651850 Page 2 of 7
Case number: 651850 2 March 2020
1 Determination overview
1.1 Complaint
The complainants previously lodged a complaint against the financial firm (insurer)
when it denied their claim for movement damage. A determination was made by the
panel that advised the parties to:
engage an independent structural engineer (at the insurer’s cost) to settle on a full
scope of works
obtain at least one quotation for this scope of works from a contractor prepared to
do the works for the complainants.
The parties agreed to engage engineer (BT) to prepare a scope of works. However,
the complainants believe this scope of works is incomplete as the slab needs to be
replaced.
This decision will consider the scope of works required to repair the damage caused
by the leaking pipe.
1.2 Issues and key findings
Is the insurer liable for works to the slab?
The available information does not show the slab requires replacement because of
the leaking pipes. Therefore, the insurer is not liable for the works to the slab.
How should the cost of repairs be determined?
The panel is satisfied the scope of works provided by BT should be used to obtain
quotations. The process to settle the costs of repairs is set out in section 2.2 of this
determination.
1.3 Determination
This determination is in favour of the insurer.
The insurer is required to indemnify the complainants pursuant to section 2.2.
Determination | Case number: 651850 Page 3 of 7
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
This decision has been made by a panel consisting of an Ombudsman, an individual
with extensive insurance experience and another individual with extensive consumer
experience. The decision follows consideration of all the material exchanged. It is
based on what is fair in all the circumstances having regard to the relevant legal
principles, terms of the policy, good industry practice (including codes of practice) and
previous decisions where applicable.
The complainants had a previous complaint with AFCA (510699). The determination
stated:
The parties must work together to determine the likely cost of repairs. This is to be
done through the following process:
engage an independent structural engineer (at the insurer’s cost) to settle on a
fill scope of works
obtain at least one quotation for this scope of works from a contractor
prepared to do the works for the complainants – if more than one quotation is
obtained, then the average of all the quotations is applicable.
An engineer was appointed (BT), and a scope of works was completed. However, the
complainants are of the view the scope of works are not complete as it does not
include remediation of the slab. No quotation has been obtained based on BT’s scope
of works.
2.1 Should the scope of works include replacement of the slab?
Circumstances of the claim
The complainants lodged a complaint with AFCA (510699) when the insurer denied
their home building claim for damage to their property. The panel determined the
cause of the damage was leaking pipes at the property.
However, the panel was unable to decide on a fair amount payable given the extent of
the damage caused by the leaking pipes was unclear.
BT completed a scope of works dated 30 May 2019. The complainants are concerned
these are incomplete as it does not include the slab. The complainants are of the view
the slab needs to be replaced prior to repairs being completed.
Determination | Case number: 651850 Page 4 of 7
The complainants have provided a quotation of $107,500. This includes the
demolition of and removal of the building and ‘pad’ and the supply a nd construction
for a new ‘pad’.
No quotation has been provided by either party based on BT’s scope of works or for
the construction of a new house.
The complainants say the overall costs will likely exceed the maximum amount
payable and are therefore seeking the sum insured ($250,000) plus the 30%
safeguard allowed under the policy.
BT says the slab needs replacement because it is not adequate
BT, in his letter dated 17 May 2019, said the slab requires replacement because:
the original slab and footing system is not adequate to resist the predicted ground
surface movements detailed in the [STSGR] dated 12/6/2009
Following this, BT said:
As such there is no benefit in just repairing the building fabric and structural
damage that has resulted from the past ground movements, any further water
ingress to the sub-soils and founding material will result in a reoccurrence of the
ground surface movement, and hence a similar level of damage occurring once
again
Therefore BT’s letter effectively recommended the hom e should be demolished,
including the slab, and replaced.
The insurer sought to clarify BT’s letter noting his comments about the slab appeared
to relate to the adequacy of its original construction. BT then issued a scope of works
dated 30 May 2019 that set out all the repairs related to the water leaks but noting
under the heading ‘3.3 Further Slab Movement’:
The remedial repairs listed above will restore the condition of the dwelling to its
original as-constructed state, but will not protect the building fabric, finishes,
fixtures or fittings from the effects of ongoing slab movements.
Upon receipt of this scope of works, the insurer’s loss adjuster raised the point there
was no slab remediation. BT responded with the following:
I don’t believe slab injec tion, screeding, topping or underpinning will suffice, any
further water ingress to the sub soils will cause the slab to heave again.
Wholesale replacement of the slab on an engineered pad is the only satisfactory
solution
Determination | Case number: 651850 Page 5 of 7
Insurer not required to replace the slab
The complainants submit that based on BT’s letter dated 17 May 2019, the slab and
home should be replaced. They say it is irrelevant if the slab was not built to
standards as the ongoing slab movements will continue to affect the building fabric
due to the leaks.
The panel is not persuaded by this.
The panel has carefully reviewed BT’s evidence. At no point does BT say the slab
should be replaced because of the leaking pipe. Instead, BT’s comments explicitly
refer to the slab being replaced because it was not adequate to resist the predicted
ground surface movement.
The panel notes the previous decision was accepted by both parties. Both parties
agreed to engage BT to ‘settle on a full scope of works’.
It is clear BT’s scope of works dated 30 May 2 019 was to repair the damage he says
was caused by the leaking pipe. This is consistent with the previous determination.
This does not include rectifying any alleged poor workmanship. BT’s evidence shows
that he does not agree the slab needs to be replaced due to the leaking pipe. Instead,
he says it needs to be replaced because it was not designed to withstand predicted
ground movements.
Therefore, the panel does not agree that pursuant to the agreed determination, the
insurer is required to include the slab replacement as part of the full scope of works.
Other information shows there are issues with the slab unrelated to the leaks
The complainants have raised legitimate concerns that BT’s scope of works would not
protect their property given the absence of any slab remediation. BT acknowledges
this.
However, BT has put together the scope of works he agrees would restore the
property to the condition it would be in if the leaks had not occurred.
The panel acknowledges it places the complainants in a difficult situation as any cash
settlement would likely not enable them to have a stable and protected home. The
difficultly though is the available information indicates this may be due to the slab not
being fit for purpose rather than the damage caused by the leaks.
The panel notes the complainants have spent years pursuing issues with the
building’s construction through QCAT and the QBCC. Based on the exchanged
information, the last correspondence provided by QBCC was an email dated 10 July
2019 that contained the following relevant comments:
Determination | Case number: 651850 Page 6 of 7
… a QBCC subsidence expert has recently reviewed the proposed QBCC scope
of work and the engineering report it relied upon and considered your concerns
raised about it not returning the house slab to level.
The QBCC expert advised [J] that he considered that due to the severity of the
slopes across the slab, the rectification put forward by [LR] is not suitable, and the
only suitable method that should be applied to the slab is structural underpinning.
It was recommended by the expert that it would be necessary for QBCC to
engage another structural engineer to provide an underpinning design and
confirm the suitability of proposed underpinning.
Based on this, it appears QBCC have identified a workmanship issue associated with
the slab and recommended a potential course of action.
The panel noted the engineer referred to in this email (LR) had provided a report
dated 24 August 2015 which identified the following flaws in the design:
the piers should not have been tied into the slab with reinforcing steel
the slab was not designed to act as a suspected slab and was therefore not
capable of spanning between the supporting piers.
Notwithstanding this, LR did not accept there was any detrimental outcome and
concluded the slab met required standards.
In QCAT proceedings, expert evidence was led by the complainants and QBCC. In a
‘Joint Experts Report’, LR maintained the slab system complied with Australian
Standards. The complainants’ engineer (PW) disagreed noting the piers tie the footing
system to the ground surface preventing lift off.
Given all this, there are legitimate concerns about whether the slab was fit for
purpose. At the least, PW and BT say it is not. LR also agreed there were issues with
the design but said it still complied with standards.
This all supports the proposition that if the slab needs to be replaced, it is not because
of the leaking pipes. Therefore, any issue with the slab is unfortunately one that can
only be pursued with QBCC.
2.2 How should the cost of repairs be determined?
BT scope of works to be used to obtain a quote
The panel notes that no quotation was provided by either party due to the dispute
about BT’s scope of works. Therefore, the panel has no basis to determine a fair cash
amount.
The pane l accepts BT’s scope of works set out in the document dated 30 May 2019
satisfies the first step set out in the previous decision. He was appointed by
Determination | Case number: 651850 Page 7 of 7
agreement by the parties. He has provided a scope of works he says would be
required to repair the damage caused by the leaking pipe.
Given this, the panel accepts the parties should follow the next step of the previously
agreed determination. That required the parties to do the following:
obtain at least one quotation for this scope of works from a contractor prepared to
do the works for the complainants – if more than one quotation is obtained, then
the average of all the quotations is applicable
This should be done within 14 days of the complainants accepting this determination.
The panel notes that if any of the contractors require access to the property in
preparing the quotation, the complainants must facilitate this.
The previous decision also noted the complainants had the choice to either have the
insurer repair the damage or cash settle. However, give n the issues with the slab, it is
clear repairing the damage is not a practical option. It is also clear that no contractor
would be able to do the works for the complainants with the slab issue not being
addressed.
Therefore, the panel considers that any quotation is likely to be an estimate given the
issues with the slab. Given this, it is likely these estimates would have possible
variances in the works. Further, the panel notes a cash settlement transfers the risk of
the works to the complainants.
In such a context, it is fair in all the circumstances that 25% be added to the relevant
quotation or average.
Interest is not payable on the cash settlement sum. This is because it will be based on
current rates for the cost of repairs.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.