Determination 651850

Scope of repairs for leaking pipe damage and slab replacement

FirmQBE
Decided2020-03-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$325,000
SourceAFCA PDF

Summary

The complainants disputed the insurer's refusal to pay for slab replacement after leaking pipe damage to their home. AFCA held the slab was not required because of the leaks, and ordered the insurer to indemnify the leak repairs by a quotation process with a 25% uplift.

The insurer is liable only for repairs caused by the insured leak, and slab defects unrelated to the leak are not covered under the agreed prior determination.

Issues

Subjects and remedies

pay claim

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 651850 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 651850 Page 2 of 7 Case number: 651850 2 March 2020 1 Determination overview 1.1 Complaint The complainants previously lodged a complaint against the financial firm (insurer) when it denied their claim for movement damage. A determination was made by the panel that advised the parties to:  engage an independent structural engineer (at the insurer’s cost) to settle on a full scope of works  obtain at least one quotation for this scope of works from a contractor prepared to do the works for the complainants. The parties agreed to engage engineer (BT) to prepare a scope of works. However, the complainants believe this scope of works is incomplete as the slab needs to be replaced. This decision will consider the scope of works required to repair the damage caused by the leaking pipe. 1.2 Issues and key findings Is the insurer liable for works to the slab? The available information does not show the slab requires replacement because of the leaking pipes. Therefore, the insurer is not liable for the works to the slab. How should the cost of repairs be determined? The panel is satisfied the scope of works provided by BT should be used to obtain quotations. The process to settle the costs of repairs is set out in section 2.2 of this determination. 1.3 Determination This determination is in favour of the insurer. The insurer is required to indemnify the complainants pursuant to section 2.2. Determination | Case number: 651850 Page 3 of 7 2 Reasons for determination There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. This decision has been made by a panel consisting of an Ombudsman, an individual with extensive insurance experience and another individual with extensive consumer experience. The decision follows consideration of all the material exchanged. It is based on what is fair in all the circumstances having regard to the relevant legal principles, terms of the policy, good industry practice (including codes of practice) and previous decisions where applicable. The complainants had a previous complaint with AFCA (510699). The determination stated: The parties must work together to determine the likely cost of repairs. This is to be done through the following process:  engage an independent structural engineer (at the insurer’s cost) to settle on a fill scope of works  obtain at least one quotation for this scope of works from a contractor prepared to do the works for the complainants – if more than one quotation is obtained, then the average of all the quotations is applicable. An engineer was appointed (BT), and a scope of works was completed. However, the complainants are of the view the scope of works are not complete as it does not include remediation of the slab. No quotation has been obtained based on BT’s scope of works. 2.1 Should the scope of works include replacement of the slab? Circumstances of the claim The complainants lodged a complaint with AFCA (510699) when the insurer denied their home building claim for damage to their property. The panel determined the cause of the damage was leaking pipes at the property. However, the panel was unable to decide on a fair amount payable given the extent of the damage caused by the leaking pipes was unclear. BT completed a scope of works dated 30 May 2019. The complainants are concerned these are incomplete as it does not include the slab. The complainants are of the view the slab needs to be replaced prior to repairs being completed. Determination | Case number: 651850 Page 4 of 7 The complainants have provided a quotation of $107,500. This includes the demolition of and removal of the building and ‘pad’ and the supply a nd construction for a new ‘pad’. No quotation has been provided by either party based on BT’s scope of works or for the construction of a new house. The complainants say the overall costs will likely exceed the maximum amount payable and are therefore seeking the sum insured ($250,000) plus the 30% safeguard allowed under the policy. BT says the slab needs replacement because it is not adequate BT, in his letter dated 17 May 2019, said the slab requires replacement because: the original slab and footing system is not adequate to resist the predicted ground surface movements detailed in the [STSGR] dated 12/6/2009 Following this, BT said: As such there is no benefit in just repairing the building fabric and structural damage that has resulted from the past ground movements, any further water ingress to the sub-soils and founding material will result in a reoccurrence of the ground surface movement, and hence a similar level of damage occurring once again Therefore BT’s letter effectively recommended the hom e should be demolished, including the slab, and replaced. The insurer sought to clarify BT’s letter noting his comments about the slab appeared to relate to the adequacy of its original construction. BT then issued a scope of works dated 30 May 2019 that set out all the repairs related to the water leaks but noting under the heading ‘3.3 Further Slab Movement’: The remedial repairs listed above will restore the condition of the dwelling to its original as-constructed state, but will not protect the building fabric, finishes, fixtures or fittings from the effects of ongoing slab movements. Upon receipt of this scope of works, the insurer’s loss adjuster raised the point there was no slab remediation. BT responded with the following: I don’t believe slab injec tion, screeding, topping or underpinning will suffice, any further water ingress to the sub soils will cause the slab to heave again. Wholesale replacement of the slab on an engineered pad is the only satisfactory solution Determination | Case number: 651850 Page 5 of 7 Insurer not required to replace the slab The complainants submit that based on BT’s letter dated 17 May 2019, the slab and home should be replaced. They say it is irrelevant if the slab was not built to standards as the ongoing slab movements will continue to affect the building fabric due to the leaks. The panel is not persuaded by this. The panel has carefully reviewed BT’s evidence. At no point does BT say the slab should be replaced because of the leaking pipe. Instead, BT’s comments explicitly refer to the slab being replaced because it was not adequate to resist the predicted ground surface movement. The panel notes the previous decision was accepted by both parties. Both parties agreed to engage BT to ‘settle on a full scope of works’. It is clear BT’s scope of works dated 30 May 2 019 was to repair the damage he says was caused by the leaking pipe. This is consistent with the previous determination. This does not include rectifying any alleged poor workmanship. BT’s evidence shows that he does not agree the slab needs to be replaced due to the leaking pipe. Instead, he says it needs to be replaced because it was not designed to withstand predicted ground movements. Therefore, the panel does not agree that pursuant to the agreed determination, the insurer is required to include the slab replacement as part of the full scope of works. Other information shows there are issues with the slab unrelated to the leaks The complainants have raised legitimate concerns that BT’s scope of works would not protect their property given the absence of any slab remediation. BT acknowledges this. However, BT has put together the scope of works he agrees would restore the property to the condition it would be in if the leaks had not occurred. The panel acknowledges it places the complainants in a difficult situation as any cash settlement would likely not enable them to have a stable and protected home. The difficultly though is the available information indicates this may be due to the slab not being fit for purpose rather than the damage caused by the leaks. The panel notes the complainants have spent years pursuing issues with the building’s construction through QCAT and the QBCC. Based on the exchanged information, the last correspondence provided by QBCC was an email dated 10 July 2019 that contained the following relevant comments: Determination | Case number: 651850 Page 6 of 7 … a QBCC subsidence expert has recently reviewed the proposed QBCC scope of work and the engineering report it relied upon and considered your concerns raised about it not returning the house slab to level. The QBCC expert advised [J] that he considered that due to the severity of the slopes across the slab, the rectification put forward by [LR] is not suitable, and the only suitable method that should be applied to the slab is structural underpinning. It was recommended by the expert that it would be necessary for QBCC to engage another structural engineer to provide an underpinning design and confirm the suitability of proposed underpinning. Based on this, it appears QBCC have identified a workmanship issue associated with the slab and recommended a potential course of action. The panel noted the engineer referred to in this email (LR) had provided a report dated 24 August 2015 which identified the following flaws in the design:  the piers should not have been tied into the slab with reinforcing steel  the slab was not designed to act as a suspected slab and was therefore not capable of spanning between the supporting piers. Notwithstanding this, LR did not accept there was any detrimental outcome and concluded the slab met required standards. In QCAT proceedings, expert evidence was led by the complainants and QBCC. In a ‘Joint Experts Report’, LR maintained the slab system complied with Australian Standards. The complainants’ engineer (PW) disagreed noting the piers tie the footing system to the ground surface preventing lift off. Given all this, there are legitimate concerns about whether the slab was fit for purpose. At the least, PW and BT say it is not. LR also agreed there were issues with the design but said it still complied with standards. This all supports the proposition that if the slab needs to be replaced, it is not because of the leaking pipes. Therefore, any issue with the slab is unfortunately one that can only be pursued with QBCC. 2.2 How should the cost of repairs be determined? BT scope of works to be used to obtain a quote The panel notes that no quotation was provided by either party due to the dispute about BT’s scope of works. Therefore, the panel has no basis to determine a fair cash amount. The pane l accepts BT’s scope of works set out in the document dated 30 May 2019 satisfies the first step set out in the previous decision. He was appointed by Determination | Case number: 651850 Page 7 of 7 agreement by the parties. He has provided a scope of works he says would be required to repair the damage caused by the leaking pipe. Given this, the panel accepts the parties should follow the next step of the previously agreed determination. That required the parties to do the following: obtain at least one quotation for this scope of works from a contractor prepared to do the works for the complainants – if more than one quotation is obtained, then the average of all the quotations is applicable This should be done within 14 days of the complainants accepting this determination. The panel notes that if any of the contractors require access to the property in preparing the quotation, the complainants must facilitate this. The previous decision also noted the complainants had the choice to either have the insurer repair the damage or cash settle. However, give n the issues with the slab, it is clear repairing the damage is not a practical option. It is also clear that no contractor would be able to do the works for the complainants with the slab issue not being addressed. Therefore, the panel considers that any quotation is likely to be an estimate given the issues with the slab. Given this, it is likely these estimates would have possible variances in the works. Further, the panel notes a cash settlement transfers the risk of the works to the complainants. In such a context, it is fair in all the circumstances that 25% be added to the relevant quotation or average. Interest is not payable on the cash settlement sum. This is because it will be based on current rates for the cost of repairs.