1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (the insurer).
He lodged a claim on 6 July 2018 for damage to his property caused by an escape of
water.
The insurer accepted the claim and authorised its contractors to undertake initial work
at the property. It then offered to cash settle the claim, because of other maintenance
issues impacting the necessary claim-related repairs. However, a dispute arose about
the extent of claim-related damage and the scope of works.
The complainant wants his property to be repaired to its pre-damaged state and says
the settlement offered by the insurer is not adequate. He also says further damage
was caused by the insurer’s delay in repairing his property , and that he has incurred
additional alternative accommodation costs because of delays in finalising the claim.
The complainant submits the insurer has been grossly negligent in the way it has
handled his claim and believes he should receive compensation for that.
1.2 Issues and key findings
Is the insurer’s proposed cash settlement fair?
T he insurer’s proposed cash settlement is , on balance, insufficient to cover all claim-
related work which the complainant will need to undertake himself, without the benefit
of the insurer’s lifetime guarantee on repairs. The cash settlement should be
increased to $45,000 for the repairs to the property (together with statutory interest to
be paid on that amount, calculated from 18 July 2018 until the payment date), as set
out in section 2 of this determination. The settlement for accommodation costs should
also be increased by a further $5,214 , and the complainant’s electricity costs
attributable to the insurer’s drying work at the property should be covered by the
insurer, if not already paid.
Is the complainant entitled to compensation?
The complainant is entitled to compensation for non-financial loss, for the very
significant upset and inconvenience caused by the insurer’s handling of the claim.
1.3 Determination
The determination is substantially in favour of the complainant. The insurer is required
to cash settle the claim for repairs, accommodation and electricity costs as set out in
section 2 of this determination; and pay $5,000 compensation for non-financial loss.
Determination | Case number: 651583 Page 2 of 13
2 Reasons for determination
I have decided this case on the basis of what I consider fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous AFCA decisions.
I have taken into account all the material submitted by the parties. I am satisfied that
the documentation I have relied on has been provided to both parties. For the
purposes of this determination, I will deal with only those points considered relevant.
2.1 Is the insurer’s proposed cash settlement fair?
Policy cover is subject to terms and limits
The complainant’s home insurance policy covers listed insured events, subject to
certain terms and limitations. One of those insured events is loss or damage caused
by the escape of water or liquid from a fixed pipe or drain.
The policy states the insurer, at its discretion, can settle a claim by repairing or
rebuilding any damage, or by cash settling the complainant the cost of repair or
rebuild.
The policy also states that if the insurer opts to repair the property, the insurer will:
repair only the damaged portion to a condition as close as possible to when new
but not better
try to match any material used for repairs with the original material or the closest
equivalent available material
ensure the repairs comply with relevant building standards/bylaws
allow the complai nant to choose his own repairer.
The policy provides an additional benefit for alternative temporary accommodation
costs for up to 12 months if the complainant’s property is uninhabitable as a result of
loss or damage which the insurer has agreed to cover.
The policy excludes damage arising from settling, shrinkage or any movement of
earth.
Water damage was identified and investigated
The complainant’s property was damaged by water when a tap at the kitchen sink
was left running while the complainant and his family were away for the weekend. The
complainant’s neighbour noticed water flowing from the property and switched off the
water main.
The insurer accepted the claim and appointed restorer C and builder B to attend the
property and assess the damage.
Determination | Case number: 651583 Page 3 of 13
Restorer C attended on 10 July 2018 and found water damage to the timber floor in
the kitchen and dining room, noting the floors at the property required drying. They
say they installed two air movers and two dehumidifiers.
When re-attending on 16 July 2018, C reported a strong odour of mould in the
kitchen, believed to be coming from behind the kitchen cabinets (which they
recommended should be removed), but said the property was adequately dried and
so they removed their drying equipment.
Builder B also attended the property on 10 July 2019 and reported:
the property was approximately 80 years old
timber flooring and kitchen base cabinets were water-damaged
there were other underlying issues, including with the sub-floor and stumps
the timber floor was uneven with a spring which was evident when walked on, and
there was some evidence of previous timber rot
the unevenness of the floor was evident by the lean in the fridge
the property would be uninhabitable during two weeks of repairs.
Based on its findings, B recommended the floor be restored by sanding and finishing,
and proposed the claim be cash settled, due to the other maintenance issues
identified for which the insurer was not responsible. B estimated the repair costs at
that time would amount to $18,373.78.
However, in response to the complainant ’s concerns about remaining moisture and
mould, t he insurer’s internal assessor SR and hygienist EH attended the property.
EH’s inspection report dated 4 September 2018 states:
a malodour associated with water damage and mould growth was detected
the subfloor under the kitchen remained wet with visible mould
the building style contributed to the moisture due to poor ventilation design
the timber floor in the kitchen recorded an elevated moisture compared to the
unaffected areas.
Based on its findings, EH recommended further drying and mould remediation works.
Evidence shows certain pre-existing issues and damage
The complainant then raised concerns about the appearance of new cracks in the
property and so the insurer appointed engineer H to determine the cause of that
movement damage.
H conducted a floor level survey and, in a report dated 23 October 2018, noted:
there is a wide variation of floor levels in the comp lainant’s property
Determination | Case number: 651583 Page 4 of 13
the floor level that showed the highest variation was a drop of 69mm in the main
bedroom
the lounge room floor recorded a drop of 40mm to 50mm
the soil at the property was a reactive clay type
seasonal changes in moisture can cause up to 40mm of movement
the cracking and movement at the complainant’s property is consistent with
differential settlement of timber stumps
differential settlement of timber stumps can occur due to seasonal changes on
moisture content of the foundation soil, long term deterioration of stumps and the
presence of excessive moisture under the sub-floor caused by the insured incident.
H identified previous repairs of cracks that it says is evidence of cracking and
movement damage that had been occurring at the property prior to the water leak.
However, based on some cracks showing clean edges, H acknowledges the escape
of water from the tap had caused new cracks in the dining room and lounge room.
H says the fall of the land would have caused the water to extend towards the dining
and lounge room and not extend towards the main bedroom where most of the
movement issues are evident.
H also observed some of the timber stumps at the property had been replaced and
attributes this to previous decay in the stumps, noting the leak had not caused the
stumps to rot but that there had been rotting occurring for some time before that
incident.
H concluded that decayed timber stumps caused 70% of the movement damage at
the property and the water leak caused 30% of it.
The insurer appointed builder E to provide a quotation for the repairs it accepted as
claim-related, and offered to settle the claim based on their 23 November 2018 quote
and scope of works ($28,689.16 plus four weeks ’ temporary accommodation costs).
The complainant disputes E’s scope of works, which includes the cost of removing
and replacing the timber floor in the kitchen, dining and passage at the property,
relevelling the kitchen sub floor, repairing the cracks in the dining area and painting
the walls in the dining area – but which also recommends the completion by the
complainant of other non-claim-related work (drainage, controlling/diverting run-off
from the yard away from sub-floor cavity, and installing ventilation to the sub -floor
cavity).
The complainant has submitted a quotation from builder D (dated 24 March 2019)
amounting to $79,115.30 and one from builder RJ (dated 25 October 2019)
amounting to $72,476.70. It is worth noting that RJ states the property presented with
structural issues that are consistent with ‘ prolonged flood damage ’ but does not
differentiate between what might be attributable specifically to the water leak which
Determination | Case number: 651583 Page 5 of 13
had happened over a year before, and how much of the damage was from more long-
term exposure to water.
In response to RJ’s quote and comments, the insurer’s loss adjuster S (in an email of
16 December 2019) agreed with RJ’s conclusion that the structural issues are
consistent with prolonged flood damage, but went on to say that was because of ‘the
design of the property where the flow of rainwater runoff is directly under the house’
and where there was not enough ventilation to allow the runoff to sufficiently dry, so
that there was always moisture under the house. S noted that was exacerbated by the
front left-hand downpipe not having been connected for a number of years.
Based on the available evidence, I am satisfied the claimed leak did cause water
damage, including to flooring and the kitchen cabinets, as well as movement damage
externally to certain stumps, and internally with cracking to walls and associated
paintwork.
However, I do not consider the evidence supports the conclusion that the water leak
was responsible for all the damage/repairs the complainant is claiming . On balance, I
am satisfied there was pre-existing rotting and movement of stumps, and other
ongoing issues (such as the apparently inadequate sub-floor ventilation and drainage,
and a disconnected downpipe) which are the responsibility of the complainant
because they were not themselves caused by the insured event.
Complainant says the insurer’s delay has caused further damage
The complainant also says that as well as the damage from the incident itself, further
damage occurred/was exacerbated because of the actions of the insurer and its
contractors, including:
C removed the drying equipment from the property prematurely and this resulted in
the development of mould
his property remained wet for approximately 6 months and this caused the timber
foundation stumps to deteriorate and resulted in movement damage
the insurer’s trades failed to remove the damaged kitchen cabinets , which
developed mould and contaminated the property’s a ir ducts
the insurer had to dismiss C due to negligent work
the insurer had to dismiss B for failing to carry out its instructions
his property remains unrectified.
The evidence does show C never completed structural drying of the property, and
there was no drying equipment installed between July and October 2018.
In November 2018 the insurer appointed loss adjuster, S, to manage the claim. S in
turn appointed hygienist SM to complete further drying and mould remediation works.
Determination | Case number: 651583 Page 6 of 13
After a delay in commencing those works, SM completed drying of the sub-floor and
mould remediation at the property on 15 January 2019 (as recommended by EH).
The complainant says because the property, including the sub-floor, remained wet for
a significant period of time, there were further movement issues at the property.
However, he has not provided any experts ’ reports specifically in support of that
position but instead relies on the findings of H, the ins urer’s engineer.
Insurer accepts some additional damage
The insurer had initially offered a sum of $18,373.78 in July 2018 to cash settle the
claim ba sed on B’s scope of works and quote. This involved rectifying the timber floor
in the kitchen and dining area and replacement of the damaged kitchen cabinets.
The insurer says, in acknowledgment of the delays in finalising the claim, it increased
its settlement offer to $28,689.16, based on E’s 23 November 2018 quotation. That
took account of replacing the damaged floors, rather than just sanding and repolishing
them, as was originally proposed. The insurer also says it is happy to pay for
accommodation while repairs are being completed at the property, which it says will
be approximately six weeks.
I accept that an increase in the settlement amount was warranted because it was
more likely than not that the delays did add to the damage caused – particularly,
because of the inadequate drying.
The complainant is seeking $80,000 for repairs based on the quotes provided by D
and RJ. He says the entire sub-floor at the property needs to be re-levelled and also
points out the insurer’s settlement offer does not include:
engineering costs for the underpinning design
costs for building permits
structural warranty insurance
replacement of the entire ceiling ducting system due to mould infestation
removal and re-instatement of carpets in all three bedrooms to facilitate
underpinning
removal and replacement of the timber floor to facilitate underpinning
removal and replacement of a feature ply wall
repair and painting of all cracked walls.
The complainant has not, however, provided expert evidence to establish the insurer
should be liable for all those items to the extent they are not already included.
In a comprehensive and detailed response, S reviewed all elements of RJ’s quote and
concluded the maximum cost for claim-related work should be $24,105.73, but
accepted E’s quote of $28,689.16 as being an appropriate basis for cash settlement.
Determination | Case number: 651583 Page 7 of 13
I am not persuaded, on the evidence, that the insurer is liable under the policy (or as
a result of further damage caused by its actions/delays) for all the additional matters
being claimed by the complainant. I do not accept, for example, that the entire sub-
floor should be covered by the insurer. I also acknowledge the insurer’s (S’s)
comments that it considers the complainant’s quoted costs for replacement of the
laminate kitchen cabinets and wooden floors to be excessive, since they were not
like-for-like quality with the existing components; as were, S says, the costs for
plumbing and electrical work.
Settlement offer for repairs to be increased
The complainant agrees his property had pre-existing movement damage, however,
he says 70% of the movement damage was caused by the insured escape of water
event.
I am not satisfied the available evidence does establish that proportion of the damage
can be attributed to the insured event. Instead, the information shows the property
had pre-existing and ongoing movement issues. For example, t he insurer’s engineer
H recorded the highest variation in floor level in the main bedroom and says given the
slope of land and the location of the main bedroom, this damage is not consistent with
damage caused by the escape of water. I am, however, satisfied on balance the
damage in the kitchen, dining and lounge floors is consistent with the claimed escape
of water.
The insurer has offered to increase the cash settlement of $28,689.16 based on E’s
quote by an additional 30%, to allow for contingencies. This would bring the
settlement to $37,295.91.
I consider a cash settlement is the appropriate way of the insurer discharging its
liability for the claim. That is because there is other work which needs to be done
before/in conjunction with the insured repairs and for which the complainant is
responsible.
I also agree the cash settlement should be increased from $28,689.16 in order to
cater for contingencies (including further claim-related damage which might be found
in the course of repair work), but also to take account of the fact the 28 November
2018 quote on which that is based is now over a year old, and the costs for labour
and materials are likely to have increased since then.
As well, by accepting a cash settlement and having to arrange for the work himself,
the complainant will lose the benefit of the insurer’s lifeti me guarantee on repairs, and
it is fair that the settlement amount reflects that assumption of risk.
It is also not clear that the quote was one which would have been actionable by the
complainant himself as a retail customer of the builder; and he should not be
Determination | Case number: 651583 Page 8 of 13
disadvantaged by accepting a cash settlement which might not actually cover the
claim-related work.
In the circumstances, I consider it fair and reasonable for the insurer to increase the
cash settlement for repairs by a further 20%, rounding the figure to $45,000. It is also
required to pay interest on this amount from 18 July 2018 (the date the initial offer
was made) to the date of payment.
Insurer is to increase settlement offer for accommodation
The information shows the insurer paid for alternative accommodation until 12
February 2019.
The complainant says he has incurred over $25,000 for alternative accommodation
since then. The information submitted by the complainant shows he paid $2,607 per
month for rent commencing 12 February 2019. E estimates the claim-related repairs
would be completed in approximately six weeks.
I consider it fair in the circumstances that the insurer pays for a further two months ’
accommodation at a rate of $2,607 per month, totalling $5,214, plus statutory interest
calculated from 12 February 2019 to the date of payment.
Insurer to pay for electricity costs
The complainant also wants the insurer to pay for electricity costs incurred when the
property was being dried. The insurer has agreed to settle this cost. If that has not
already been dealt with, the insurer is to pay the complainant for the electricity costs
at his property for the period drying was being undertaken, based on the electricity
bills for the relevant period submitted by the complainant, together with statutory
interest on that amount calculated from the payment date of the bills to the date of
settlement by the insurer.
2.2 Is the complainant entitled to compensation?
Complainant is entitled to compensation for non-financial loss
Under the AFCA Rules, we may award compensation (capped at $5,000) for non-
financial loss where a complainant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
The complainant has raised a number of serious and justifiable concerns about the
manner in which the insurer’s contractors managed his claim. The complainant says:
the insurer’s contractors failed to dry his property suitably, causing significant
damage and deterioration at the property
the insurer’s contractors failed to show up for appointments
Determination | Case number: 651583 Page 9 of 13
its representatives did not respond to his requests
its representatives failed to promptly progress the claim
the insurer’s contractors’ delays caused significant financial stress on his family as
he had to pay his mortgage and also bear the costs of alternative accommodation
from 12 February 2019
the insurer’s contractors blamed him for the delays.
I acknowledge th e complainant’s concerns regarding the insurer’s contractors not
drying his property adequately. This is evidenced in hygienist E’s report on 4
September 2018, stating the dehumidifiers used by C were not effective and
confirming the presence of moisture and mould at the property even after C’s drying
works. The drying was then not concluded until mid-January 2019 by SM.
E also identified water damage to kitchen cabinets at the property almost 8 weeks
after the incident date.
As I understand it, the repairs remain incomplete at the time of this determination,
which is over 18 months since the incident. The complainant and his young family
were required to reside in a hotel and then subsequently in a rented property while
the property remained uninhabitable.
In the meantime, despite the insurer covering temporary alternative accommodation
costs for some time, the complainant has had the disruption to his home and family
life and the serious financial pressures of trying to cover both alternative
accommodation and mortgage payments while his property remained uninhabitable.
I note the insurer changed contractors (both builders and hygienists) during the claim.
As previously noted, the complainant says the insurer’s authorised contractors failed
to keep appointments and failed to resolve his claim in a timely manner, and the need
to change those critical service providers in the course of the matter reasonably
indicates issues with them and their work (for which the insurer is responsible). He
says this resulted in him having to escalate his concerns to the insurer on many
occasions. I acknowledge these circumstances would have added to the significant
concerns about the claim and caused unnecessary and excessive inconvenience and
stress to the complainant.
The insurer says the complainant himself delayed authorising its trades to carry out
work. However, having reviewed the information on the claim, I am not persuaded the
complainant was responsible for material delays during the claim process.
In acknowledgment of the complainant’s claims experience, the insurer says it offered
to replace the timber flooring in the affected areas at the complainant’s property
instead of just restoring the flooring. However, I consider that extra work more likely
reflects additional damage caused by the delay in the drying process, for which the
insurer should in any case be responsible.
Determination | Case number: 651583 Page 10 of 13
In the particular circumstances, I consider an award of $5,000 as compensation for
non-financial loss is fair and appropriate.
Determination | Case number: 651583 Page 11 of 13
3 Supporting information
3.1 Reports
Record Key points
financial firm ’s engineer ( H )
Report
23 October 2018
The cracking and movement in the house is typical of problems that
occur due to differential settlement of the timber stumps. Differential
settlement of the timber stumps can occur due to several factors
including the seasonal changes in the moisture
content of the foundation material, long term rotting of stumps and
water occurring under the dry sub - floor area due to the water tap
being left on.
Cracking and movement has been occurring prior to the recent
water leak as evident by the patching that has been carried out.
Further cracking and movement has been occurring recently with
new cracks now being evident in several rooms of the house. These
c racks showed clean edges which would indicate that the cracking
has occurred recently.
Email from financial firm’s
engineer (H)
18 October 2019
[…] the dominant cause is the rotted stumps. I would recommend
the following percentages.
Rotted stumps 70%
Water leak 30%
3.2 Policy wording
Record Key points
Water or liquid da mage Loss or damage caused by water or liquid escaping from:
A fixed pipe or an object attached to a pipe, fixed gutter, fixed tank
or a drain
Additional building benefits Alternate temporary accommodation
We will cover
Costs of alternative accommodation for up to 12 months if your
buildings suffer loss or damage and you are unable to live in your
buildings as a result.
[…]
The loss or damage must occur as a result of an event we have
agreed to cover.
We will pay:
up to an amount that is equal to the weekly rental value of your
buildings before the event occurred, and
the reasonable costs of alternative accommodation for you r pets
We won’t c over
Costs if you do not need to pay for alternative accommodation
Determination | Case number: 651583 Page 12 of 13
Record Key points
Exclusions We will not pay for any loss or damage which is caused directly or
indirectly by:
settling, shrinkage or any movement of earth
How we settle a buildings
claim
We will decide how we will settle your claim
if we accept your claim, we will decide whether to:
repair
rebuild
pay you the cost to repair or rebuild that part of your buildings that
suffered damage (cash settlement)
What happens if we decide
to repair your buildings
If we decide to repair your building(s), we will:
only repair the part or parts of your building that actually sustained
damage, including damaged portions of fixed coverings to walls,
floors and ceilings, in the rooms, halls or passages where the
damages occurred, to a condition as close as possible to when
new, but not better.
t ry to match any material used to repair your bui ldings with the
original material or nearest equivalent available to the original
materials
ensure the repairs to your buildings co mply with government and
local authority bylaws
allow you to choose your own repairer or tradesperson, or we can
help you to find one; we may decide not to accept your chosen
repairer if the quote and credentials are not accept able.
Deal directly with the repairs or tradesperson concerning
payments.
Note: if repairs do not start within six months of acceptance of your
claim, we may not pay any increase in costs caused by your delay.
What happens if we decide
to pay you the cost to repair
or rebuild your buildings
If we decide to pay you the cost to repair or rebuild your buildings,
we will:
pay you the cost of repairing your buildings to a condition as close
as possible to when new, but not better
pay you the full building replacement cost of rebuilding your
building(s ) to a condition as close as possible to when new, but
not better, in the event of a total loss
deduct any:
- excess
- unpaid premium
- input tax credit you would have been entitled to under A
New (Goods and Services Tax) Act 1999 if you had paid to
repair or rebuild your buildings.
Matching materials When we pay to rebuild or repair your building, we’ll pay the
reasonable cost to match materials however if we can’t we will
match to the nearest equivalent material available.
Lifetime guarantee on
building repairs
We guarantee that if we have:
selected and directly authorised or arranged for a repairer to
Determination | Case number: 651583 Page 13 of 13
Record Key points
replace, repair or rebuild your buildings and
paid, or have legal liability to pay, the supplier, repairer or builder
directly for this work, and
a defect arises in the lifetime of your buildings as a result of poor
workmanship or use of incorrect or poor materials
we will rectify the problem by arranging, directly authorising and
paying for further replacement, repair or rebuilding.