Text of the determination
Determination
Case number 651476
Financial firm AAI Limited
Determination | Case number: 651476 Page 2 of 5
Case number: 651476 18 February 2020
1 Determination overview
1.1 Complaint
The complainant holds a landlords’ insurance policy with the financial firm (insurer)
covering her investment property. She made a claim for a damaged balcony. After the
damage was assessed, the insurer arranged for its builder to carry out a make safe.
The builder demolished the balcony.
The insurer subsequently denied the claim. The complainant says her builder
believed the balcony had been repairable.
The case officer provided the parties with a recommendation on the issues in dispute.
The recommendation was partly in favour of the complainant and partly in favour of
the insurer. A copy of the recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered. I agree with the case officer ’s reasons for the recommendation and with
the recommended outcome.
Was the insurer entitled to demolish the balcony, and deny the claim?
The insurer was entitled to deny the claim because the available evidence shows, on
balance, the balcony damage was the result of long term exposure to the weather.
The policy does not respond to this type of damage.
The insurer was not strictly entitled to demolish the balcony, as it correctly declined
liability for the claim and so was not responsible for it. However, its actions were not
unreasonable in the particular circumstances. That is because the evidence shows,
on balance, the balcony was unsafe and needed to be demolished in any case, and
that action was taken as part of the make safe before the claim was declined.
However, the complainant is entitled to compensation for non-financial loss because
the insurer’s actions (through its builder) caused her avoidable upset and
inconvenience.
1.3 Determination
This determination is partly in favour of the complainant and partly in favour of the
insurer. The insurer is required to pay compensation of $2,500 to the complainant for
non-financial loss. It is not required to take any other action.
Determination | Case number: 651476 Page 3 of 5
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case based on what I consider is fair in the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
AFCA decisions. I have taken into account all the material submitted by the parties,
both before and after the recommendation. I am satisfied that the documentation I
have relied on has been provided to both parties.
I am satisfied that the case offic er’s recommendation contains an accurate summary
of the complaint, the issues to be determined, any applicable paragraphs of the Rules
and any relevant law.
2.2 Was the insurer entitled to demolish the balcony and deny the claim?
Complainant has not established she has a valid claim under the policy
The complainant bears the onus of establishing she has a valid ( prima facie ) claim to
which the policy responds.
The policy covers only specified insured events, including storm , in respect of ‘a
single event, accident of occurrence which [the insured] did not intend or expect to
happen’. The policy excludes cover for wear and tear and gradual deterioration.
The insurer ’s structural engineer (M) visited the property on 23 April 2019 and
provided a comprehensive report, concluding the proximate cause of the damage was
water ingress over time from long-term exposure to weather, resulting in rot
developing in the structural beams. There is no compelling evidence to contradict M’s
findings and conclusions, and indeed the evidence from a phone call between the
insurer and JL, the complainant’s repairer, confirms previous repairs to the balcony
and evidence of water ingress and likely inadequate waterproofing.
I am not satisfied the complainant has shown the damage was the result of an insured
event – such as a single storm event. Instead, I consider it was, on balance, the result
of wear and tear and deterioration over time, and so the insurer is entitled to decline
the claim.
Engineer found balcony was structurally unsound
From his inspection, M concluded the balcony was structurally unsound and would
need to be demolished before being rebuilt entirely. The complainant was put on
notice about this on 29 April 2019, when she was told the insurer’s builder would
attend to carry out a make-safe, which would involve complete demolition of the
balcony.
Determination | Case number: 651476 Page 4 of 5
The complainant’s concern is that this happened before the insurer had formally
made a claim decision, and that it was only on 9 May 2019, after she followed up, that
the insurer told her the claim was declined.
Insurer should have handled the claim process and demolition better
The complainant said the insurer had been in a position to make the claim decision
when it received M’s report on 29 April, but instead had taken action which deprived
her of the ability to handle the process of dealing with the damaged balcony in a
timely and financially manageable way.
The complainant has provided statements from two builders who viewed the balcony
in early April 2019 (LK who installed the first agro-prop for her, and JL who later
attended to quote on repairs) and both said they thought it was repairable. She also
provided photographs which she believes indicate not all the wooden timber was
rotten under the balcony once the sheeting was removed, and that it did not need to
be totally demolished.
However, from the call recording of the insurer’s phone conversation with JL, I
consider it is not clear that further damage would not have been discovered once a
more thorough investigation was carried out, or if work had started. JL said that he
had quoted on one part of the balcony only, but that there was evidence of previous
damage and repairs and long-term water issues.
I acknowledge, as well, the quote the complainant provided for repair work to her
neighbour’s similar balcony (which was apparently not required to be demolished).
However, I do not accept that in itself necessarily means her balcony was in the same
condition or had suffered the same damage.
The course of events also shows the insurer itself incurred the costs of the make-
safe/demolition when it need not have done so, since it was not liable for the damage
in the first place. That reasonably suggests it was an error on the insurer’s part to
proceed with the demolition when it did.
On the available evidence, however, I am satisfied it is more likely than not the
balcony did need to be demolished sooner rather than later, regardless of the
outcome of the claim. At the same time, I consider the insurer could and should have
handled the matter better – and communicated more clearly and earlier with the
complainant about the steps it was taking and why.
Complainant entitled to compensation
The AFCA Rules provide a maximum of $5,000 may be awarded as compensation for
non-financial loss, however that is only awarded where the complainant has suffered
an unusual amount of physical inconvenience or stress, or the financial firm’s conduct
has meant the time taken to resolve the situation has been unusually protracted.
Determination | Case number: 651476 Page 5 of 5
The insurer’s actions in demolishing the balcony (and then unexpectedly declining
responsibility for the claim) means the complainant has been forced to undertake a
complete rebuild of the balcony sooner than she was ready to do, taking account of
the need to arrange for the cost involved, have plans drawn up, permits obtained and
contractors engaged. While I accept the balcony did need to be demolished, the use
of props and appropriate closing of access to the balcony area in the short-term might
still have been sufficient while the complainant organised the necessary work.
In the meantime however, other damage to the front door and windows of the
property (exposed after removal of the balcony) has been identified. As well, the
complainant also received a notice from the local authority saying she needed a
permit before demolishing the balcony (although it is not clear where that issue
currently stands).
The outcome of the insurer’s actions is that the complainant has experienced
significant avoidable stress, inconvenience and upset in an already difficult situation.
At the same time, however, the insurer has effectively covered part of the claim by
removing the damaged balcony.
I am satisfied that an award of $2,500 compensation for non-financial loss is
warranted in the circumstances.
Recommendation
Case number 651476
Financial firm AAI Limited
Recommendation | Case number: 651476 Page 1 of 5
Case number: 651476 19 December 2019
3 Overview
3.1 Complaint
The complainant holds a landlords’ insurance policy with the financial firm (insurer)
covering her investment property. The complainant contacted the insurer to claim for
a damaged balcony. The insurer arranged an engineer to assess the damage. After
receiving the report, the insurer asked its builder to carry out a make-safe with respect
to the balcony. The builder demolished it.
The insurer subsequently denied the claim. However, the complainant does not
accept the situation she is facing. She says her builder believed the balcony had been
repairable. She also says the current situation is placing added stress on her.
3.2 Issues and key findings
Whether insurer entitled to deny claim?
The insurer was entitled to deny the claim because its engineer concluded the
damaged balcony resulted from long term exposure to the weather. The policy does
not respond to this type of damage.
Whether insurer entitled to demolish balcony?
The insurer was not entitled to demolish the balcony as it did not accept the claim. As
such, it did not take responsibility for the balcony’s condition.
Whether complainant entitled to compensation?
The complainant is entitled to compensation for non-financial loss because the
insurer’s actions (through its builder) resulted in increased stress. The situation could
have been more effectively managed.
3.3 Recommendation
This recommendation is partially in favour of the insurer and partially in favour of the
complainant.
The insurer was entitled to deny the claim. However, it is required to pay
compensation of $2,500 to the complainant for non-financial loss.
Recommendation | Case number: 651476 Page 2 of 5
4 Reasons for recommendation
4.1 Whether insurer entitled to deny claim?
Complainant claimed for damaged balcony
The complainant arranged a builder to check the damaged balcony at her investment
property. The builder said the balcony needed repairing and suggested her insurance
may cover the repair costs.
The complainant lodged a claim against her landlords’ insurance policy. The
complainant bears the onus of establishing a valid (also called prima facie ) claim for
which the policy responds.
Engineer’s report identified cause of damage
The insurer asked its engineer (M) to assess the damage. M visited the property and
provided a report (dated 26 April 2019). M concluded the proximate cause of the
damage was water ingress over time, resulting in rot developing in the structural
beams. M said it was not a single event which caused the damage. Instead, long term
exposure to the weather caused the damage.
Insurer denied claim
The insurer denied the claim. It said the damage to the balcony had not resulted from
an insured event. As such, the policy did not respond to the complainant’ s claim.
Although the complainant’s builder indicated he believed the balcony could be
repaired, he provided no reasons for this conclusion.
M provided an extensive outline about the balcony’s condition, including photographs
in support. M drew conclusions based on those observations. There is no other
information which indicates these conclusions are incorrect. As such, the insurer was
entitled to rely on M’s findings which indicated the damage did not result from an
insured event.
Insurer entitled to deny claim
The complainant has not met the onus of establishing a valid claim for which the
policy responds. As such, the insurer was entitled to deny the claim.
4.2 Whether insurer entitled to demolish balcony?
Engineer also made other comments
M’s report also m ade various observations about the condition of the balcony. M
concluded the balcony was structurally unsound and would need to be demolished,
before being rebuilt entirely. M also said the main columns were masonry and could
probably be retained.
Recommendation | Case number: 651476 Page 3 of 5
Insurer’ s builder demolished balcony
The insurer advised the complainant on 29 April 2019 its builder would attend the
property to carry out a make-safe, which was to be a complete demolition of the
balcony. The builder attended the property that same day and proceeded to demolish
the balcony.
However, the insurer denied the claim on 9 May 2019. When the complainant
questioned the insurer about this action, the latter said the demolition was urgently
required because of safety concerns.
Insurer not justified in taking that action
Had the insurer accepted the claim, the demolition would have been justifiable as part
of the claims process. However, it denied the claim, which means the insurer was not
taking responsibility for the property. Instead, responsibility for the property remained
with the complainant as owner of that property. The responsibility had not at any
stage shifted to the insurer.
The insurer should have made it clear, verbally and in writing, the balcony needed to
be demolished. In addition, the insurer should have made it clear no one should step
out on to the balcony because of serious safety concerns. As it is, there is only a
taped-up door preventing people from stepping out into thin air.
4.3 Whether complainant entitled to compensation?
Compensation available in certain circumstances
The AFCA Rules provide a maximum of $5,000 may be awarded as compensation for
non-financial loss. AFCA takes a conservative approach to awarding compensation. It
is only awarded where the complainant has suffered from a n unusual amount of
physical inconvenience or stress, or the financial firm’s conduct has meant the time
taken to resolve the situation has been unusually excessive. AFCA expects
complainants to bear the normal degree of inconvenience experienced when a
problem occurs and to take reasonable steps to manage the situation.
Complainant entitled to compensation
The insurer’s builder’s actions in demolishing the balcony means the complainant has
been forced to undertake a complete rebuild of the balcony. She said she was not
prepared for this as she needs to get plans drawn, obtain permits, arrange a builder
and so forth. In addition, the door leading on to the balcony has now become fully
exposed to the weather, which will also require her immediate attention.
The insurer said it was inevitable the complainant would have needed to rebuild the
balcony. However, it should have managed the situation in a better manner, instead
of taking it upon itself to demolish the complainant’s property. The insurer’s actions
Recommendation | Case number: 651476 Page 4 of 5
left the complainant with an immediate need to arrange finance to undertake the
rebuild.
This meant an unnecessary additional stress and inconvenience for the complaint. As
such, the complainant is entitled to compensation for non-financial loss. The insurer is
required to pay the complainant $2,500 compensation.
Recommendation | Case number: 651476 Page 5 of 5
5 Supporting information
5.1 AFCA approach
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issue raised.
All provided material has been read and considered. The parties raised numerous
issues in their submission to AFCA. For the purpose of this recommendation,
commentary is restricted to only those issues considered relevant.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.