Home / IAG / Determination 651034
Determination 651034
Cyclone damage claim: roof declined, mould, asbestos and cash settlement disputed
Summary
The complainant claimed for cyclone damage including the roof, mould and asbestos, and disputed the insurer's cash settlement. AFCA declined the roof claim but ordered further payments for mould, asbestos, the settlement uplift, accommodation, professional costs and non-financial loss.
The roof damage was found to be caused by pre-existing maintenance and deterioration rather than the cyclone, while the insurer was partly liable for mould and asbestos handling and the cash settlement was too low.
Issues
- Claim denial primary · not upheld“The available evidence does not establish, on balance, the roof damage was from the insured event... the insurer is entitled to decline that part of the claim.”
- Claim amount dispute secondary · upheld“The insurer's previous cash settlement for repairs was not fair or reasonable... should be increased by a further 20% ($12,831.11).”
- Inadequate claim investigation secondary · upheld“the insurer could have handled the mould and asbestos risk better... did not obtain its own asbestos report, despite being advised to do so.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss
Related
Text of the determination
Determination
Case number 651034
Financial firm Insurance Australia Limited
Determination | Case number: 651034 Page 2 of 19
Case number: 651034 14 April 2020
1 Determination overview
1.1 Complaint
The complainant holds a home building insurance policy with the financial firm (the
insurer). The complainant lodged a claim for damage to her property from a cyclone.
The insurer accepted the claim and agreed to cover some of the identified damage
but excluded cover for the roof on the basis it was not damaged by the cyclone. The
insurer cash settled the complainant for accepted repairs.
The complainant wants the insurer to pay the building sum insured (to cover the roof
and other damage, including mould and asbestos issues). As well, she believes the
insurer should pay her costs incurred in dealing with the claim, as well as for
additional temporary accommodation, and compensation for non-financial loss.
1.2 Issues and key findings
Is the insurer entitled to decline cover for the roof?
The available evidence does not establish, on balance, the roof damage was from the
insured event and so the insurer is entitled to decline that part of the claim.
Is the insurer liable for mould in the property?
The evidence shows there was extensive mould at the property shortly after the
cyclone, some of which was, on balance, pre-existing and the result of the
deteriorated state of the roof. However, it is fair that the insurer pay $2,000 towards
mould remediation issues.
Is the insurer liable for the removal of asbestos?
The policy covers additional costs for ensuring compliance with applicable
government by-laws, including to do with asbestos. It is fair in the circumstances that
the insurer pays $5,000 towards asbestos-related issues, beyond basic repairs.
Was the insurer’s cash settlement for repairs fair and reasonable?
The insurer’s previous cash settlement for repairs was not fair or reasonable in the
circumstances and should be increased by a further 20% ($12,831.11) to allow for
contingencies and the passing of risk to the complainant.
The insurer is also liable for the costs of removing and storing furniture for the period
of repairs, as well as a further $4,000 for temporary accommodation.
The insurer is not liable for damaged contents.
Determination | Case number: 651034 Page 3 of 19
Is the complainant entitled to professional costs?
The complainant is not entitled to professional costs incurred for her eng ineer’s report
since the evidence does not show that assisted her in her claim.
She is, however, entitled to a contribution towards her claims manager costs (upon
provision of an invoice), and for her asbestos report for $2,345 (together with statutory
interest on these amounts if already paid, calculated from the date she paid to the
date of settlement).
Is the complainant entitled to compensation for non-financial loss?
The insurer ’s actions caused the complainant an unusual degree of inconvenience
and upset, particularly in regard to its lack of proactivity dealing with the potential
asbestos risk and mould issues. She is entitled to $1,000 compensation for that.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is not liable for roof repairs, but it is required to pay the complainant:
$2,000 for mould issues/remediation in the property
$5,000 towards asbestos-related issues
an additional $12,831.11 for claim-related repairs (being 20% of the original cash
settlement)
an additional $4,000 for temporary accommodation
furniture removal and storage costs for ten weeks (based on a reasonable quote to
be obtained by the insurer)
$2,345 for the asbestos report (plus statutory interest if already paid by the
complainant)
$1,000 for claims management cost (plus statutory interest if already paid by the
complainant)
$1,000 as compensation for non-financial loss.
It is not required to take any other action.
Determination | Case number: 651034 Page 4 of 19
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
This decision has been made by a panel consisting of an ombudsman, an individual
with extensive insurance experience and another individual with extensive consumer
experience. The decision follows consideration of all the material exchanged. It is
based on what is fair in all the circumstances having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
previous decisions where applicable.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome.
2.1 Is the insurer entitled to decline cover for the roof?
Complainant has established a claimable loss
The complainant carries the initial onus to establish, on balance, the loss or damage
arises from an event covered under the policy. This is known as establishing a valid
claim.
Once this is established, the onus shifts to the insurer to show, on balance, the
loss/damage falls within a policy exclusion or that it is otherwise entitled to decline the
claim.
The policy provides cover for accidental loss or damage to the complainant’s building.
‘ Accidental loss or damage’ i s not defined in the policy, however is generally accepted
to mean damage which is unforeseen and unexpected. The policy provides cover for
buildings only. There is no cover under the policy for contents.
The complainant’s property was damaged by Cyclone Debbie in March/April 2017.
The panel is satisfied the complainant has established a claimable loss.
The insurer accepted the claim but did not accept that all the claimed damage was
covered. That means it needs to establish, on balance, that it is entitled to decline
cover for the damaged roof and the other rejected elements of the claim.
Insurer’s e vidence identifies no cyclone damage to the roof
When making the claim, the complainant reported various issues , including windows
lost, damaged fences and garage door, and ‘section of roof is leaking’. The insurer
has since explained, and the evidence indicates, the reference to the roof was that on
the rear landing.
Determination | Case number: 651034 Page 5 of 19
Loss adjuster A attended on 13 April 2017, and there is no reference to cyclone-
related roof damage in their report.
Builders J were then engaged to quote for the repairs. Water was reported as having
come in through windows, with damage identified in two bedrooms, where the
complainant had already removed carpet and underlay. There was damage to the
ceilings, and mould was visible on door/doorframes.
J appointed roofer P to complete a leak detection test (21 April 2017). P found
evidence of deterioration, maintenance issues and previous damage. He
recommended that, because of its poor condition, the entire roof line be replaced to
bring it up to industry standard. P stated there was no sign of damage to the roof as a
result of Cyclone Debbie.
The insurer also provided a report from builder T (2 February 2018) which states a
specialist roof inspector (later identified as roof plumber AF) had found the roof was
coming to the end of its serviceable life, showing corrosion, deterioration and previous
repairs. No evidence of cyclone-related damage was identified.
Given the reports of P and T, the insurer declined the claim for the roof on the basis
that there were no signs of damage from the insured event (cyclone).
Complainant’s report does not establish roof was damaged by the cyclone
The complainant provided a report from building consultant M (8 December 2018). M
only inspected about half of the roof framing because of accessibility issues and
acknowledged the condition of a large portion of the roof framing was unknown.
M found impact damage to roof sheeting (saying most of that could be readily
attributable to foot traffic) and other roof damage which he said was typical of and
consistent with high winds (including water-staining in the roof space from wind-driven
rains penetrating the sheeting/flashings). M attributed the damage to the cyclone.
The panel is not persuaded b y M’s report, or the other available evidence, that the
roof was itself damaged by the cyclone. M’s report is consistent with P’s findings of
impact damage and evidence of old repairs and patching. However, M did not inspect
the entire roof, and the inspection that was conducted was almost 2 years after the
cyclone event (while P inspected within a month).
While the winds and rain of the cyclone may have entered through various openings
in the roof, it has not been shown the cyclone itself was the proximate cause of those
openings or areas of weakness, even if it may have exacerbated them. Instead, the
evidence indicates, on balance, the roof had pre-existing maintenance and gradual
deterioration issues which were responsible for its condition.
That means the insurer is entitled to decline the claim for damage to the roof.
Determination | Case number: 651034 Page 6 of 19
2.2 Is the insurer liable for mould in the property?
Information indicates mould was found in the property shortly after the event
The insurer submits the mould is a result of the complaina nt ’s own delays in attending
to repairs. The insurer further submits the roof was leaking prior to the cyclone, given
the evidence of P’s report .
Less than a month after the cyclone, restoration company R first attended the
property to assess the damage. From two inspections (in April and May), R reported
mould, first at ceiling and then also at floor level. R recommended a scope of work for
the mould be arranged, as well as urgent testing for asbestos.
The panel is satisfied excessive visible mould was found in the property shortly after
the cyclone event.
Insurer is partly liable for mould remediation in the property
The insurer has noted that the policy does not cover contents, and so it is not liable
for any mould or other damage to those. The panel accepts the contents are not
covered.
With regard to the building, the insurer relies on the policy exclusion for mould and
maintains its position the mould was a result of the delays caused by the complainant.
In the insurer’s claim file notes from June 2017, it requested R not to re-attend and to
close their file since the insurer had an assessor working on the claim. There is
nothing to show the insurer took any action on R’s recommendations for mould
remediation at that time or subsequently.
When the complainant’s building consultant M attended over a year later, he noted
the significant amount of visible mould in the property (which M said showed the roof
was not weatherproof) and stated there was also likely to be more that was not
immediately obvious throughout the ceilings, walls and suspended floors. M
recommended the appointment of a mould specialist to ensure appropriate testing
and remediation could be carried out before repairs were undertaken.
Based on the evidence about the previous state of the roof, the panel is satisfied it is
more likely than not there was on-going moisture ingress into the roof cavity (and
resulting water damage and mould) over some time before the cyclone hit. That is
likely to account at least for some of the mould identified by both J and R. The insurer
is not liable for that, given the exclusion for mould and because it was not caused by
an insured event.
However, it is also likely that the mould issue was exacerbated by, and in some areas
did arise from the cyclone; and in that case, the insurer is liable to the extent that the
proximate cause was the insured event (although there is no precise way of
identifying what an appropriate apportionment might be).
Determination | Case number: 651034 Page 7 of 19
The issue then continued untreated during the course of the claim, and the
complainant did not subsequently take steps herself to mitigate the effects of this
problem (given the dispute about settlement). However, the insurer appears to have
deliberately let the matter rest from a very early stage when it could and, in the
panel’s view, should have investigated further and accepted liability for at least some
of the mould.
The panel notes that W’s repair quote did not specifically mention mould or the need
to address that issue, although that may have been because of the extensive repairs
it recommended, which may have involved removal of mould-affected materials in any
case.
In the circumstances, though, the panel considers it fair that the insurer pay the
complainant $2,000 in recognition of the mould issues for which it was at least in part
liable.
2.3 Is the insurer liable for the removal of asbestos?
Some asbestos found at the complainant’s property when tested
The complainant obtained an asbestos report from asbestos specialist A who, on 29
November 2018, conducted a ‘non - destructive’ inspection to take samples and
identify the extent of any asbestos products in the property.
A said the wall and ceilings linings should be presumed to contain asbestos and
noted most of the products in the house were obviously of an asbestos-containing
type of sheeting. A also tested and found asbestos in the remnants of lino left after
the complainant had removed flooring, and observed there was a danger from the
spread of dust from that removal.
A stated that there was still a ‘slight possibility’ that some asbestos fibres remained
even nineteen months after the contamination (by the flooring removal), and that
presented a ‘small risk’. A recommended further testing. There is nothing to show that
has been carried out.
Policy provides for additional costs relating to removal of asbestos
The policy requires the insurer to rebuild or repair damage to the insured property ‘to
the same condition as when they were new’.
The policy also includes an allowance for ‘any additional costs required for the
building to comply with government or local authority by- laws’.
The insurer says it can no longer repair the walls to the condition they were in when
new, since that would mean using asbestos sheeting, which is no longer allowed
under relevant by-laws. The intent of the policy is that the building be repaired to an
as-new condition, using comparable materials to the extent those are reasonably
available. Given the age of the house (about fifty years), it is to be expected that not
Determination | Case number: 651034 Page 8 of 19
all materials used in its construction at the time would either be currently available, or
indeed currently approved for use. However, it is reasonable to accept that means the
insurer would use the closest available ‘’modern’ equivalent materials.
In effecting those repairs/replacements, the insurer will of course need to remove the
damaged walls and other areas, whether they contain asbestos or not. In doing so,
the panel acknowledges there will be extra costs specifically in dealing with the
asbestos.
The insurer says it is entitled to limit its liability for repair of asbestos -based walls to
$25,000, which is the applicable policy limit. However, the panel considers the policy
allowance for dealing with relevant by-laws (in this case, for asbestos removal) is
intended t o cover what are clearly described as ‘additional costs’, over and above
those incurred in meeting the fundamental liability for repairs.
So, to be clear, the insurer is liable for repair of those parts of the house damaged by
the cyclone event, including any walls. On top of that it is liable for any additional
costs that apply because the walls and other parts of the property contain asbestos
(up to the policy limit of $25,000).
Insurer’s scope of works refers to asbestos removal
The insurer’s builder T included removal of damaged asbestos wall sheeting and
flooring in their revised scope of works/quote (for $64,155.52) dated 12 December
2017, on which the insurer based its cash settlement . However, at the end of the
quote there is a statement saying that no allowance had been made for dealing with
asbestos-based products, and it is possible that means no allowance had been made
for the additional costs involved in specifically complying with applicable by-laws.
In the repair quote the complainant obtained from builder W (13 February 2019), there
is an amount of $35,720 included for asbestos removal for all internal ceiling and wall
linings. That quote specifically includes the cost of having a qualified asbestos
assessor monitor the work, and for obtai ning an asbestos clearance certificate -
neither of which are referred to in T’s quote.
However, the insurer’s liability is limited to repair of only those ceilings and walls
damaged by the cyclone event, and not all ceilings and walls, as catered for in W’s
quote. Since the panel considers the roof had been leaking for some time, then it
considers as well that internal water damage to ceilings and walls will also have been
occurring over time, and so not all would be attributable to the cyclone event and the
insurer’s responsibility .
Complainant entitled to additional costs relating to asbestos removal
Based on the available evidence, the panel is satisfied the insurer should be liable for
additional costs incurred for the removal of asbestos to comply with government or
local authority by-laws up to the policy limit of $25,000. It is, however, not clear just
Determination | Case number: 651034 Page 9 of 19
how much (if any) of the quoted costs from T or from W can be attributable
specifically to those likely additional costs.
It is also worth noting that T’s quote is now over two years old, and W’s over a year.
Costs can reasonably be expected to have increased in that time.
The panel considers it fair in the particular circumstances that the insurer contributes
$5,000 to allow for any additional costs related to asbestos/asbestos removal in the
property.
Insurer to pay for complainant’s asbestos report
The panel also considers it is fair and reasonable for the insurer to pay for the
complainant’s asbestos report. The insurer did not obtain its own asbestos report,
despite being advised to do so by R. Given the significance of possible asbestos
contamination, the panel considers that advice should have been acted upon;
particularly since the complainant’s report confirms R’s f indings that there was
asbestos present at the property.
The complainant has provided a tax invoice for the asbestos report for the amount of
$2,345, which the insurer is required to pay. If the complainant has already paid that
invoice (and can evidence that), the insurer is also required to add statutory interest
on the amount, calculated form the date the complainant paid, to the date of
settlement by the insurer.
2.4 Wa s the insurer’s settlement for repairs fair and reasonable?
Complainant is not entitled to sum insured
Since the insurer was unable to commence repairs without the maintenance work first
being undertaken by the complainant, o n 10 October 2018 it paid a cash settlement of
$64,155.52 for repairs and $4,000 for temporary accommodation.
At the time of the cash settlement, the insurer did tell the complainant it would still
review any reports/documents she might later submit. She subsequently submitted
M’s report and later W’s quote.
The panel appreciates the complainant’s concerns that additional damage occurred
because of the insurer’s delays in dealing with the damage. However, the evidence
shows J had been authorised to commence repairs in May 2017, and then following
some variations in the scope, work was again authorised in October 2017. The
complainant did not, however, allow repairs to be carried out, and the matter was
cash settled (while allowing for further evidence to be submitted by the complainant
and an amendment of the settlement should that be justified).
In the meantime, because of the state of the roof, further damage was allowed to
happen.
Determination | Case number: 651034 Page 10 of 19
While the complainant disputes this, there is also evidence which suggests that it was
not until 30 May 2018 (more than a year after the event) that the complainant raised
concerns about broader roof damage from the cyclone, beyond that to the rear
landing.
On the available evidence, the panel is not satisfied the complainant is entitled to the
sum insured ($290,666), as she is claiming.
Insurer is still required to increase cash settlement
Any cash settlement should be based on a quote that would be actionable by the
complainant as a retail customer. In other words, it is not fair or reasonable for the
insurer to cash settle based on a quote which includes trade or other discounts not
available to the complainant. That is because the policy is intended to effectively put
the insured back into the position they would have been in if not for the claim-related
damage.
The cash settlement should also reflect the fact that the complainant loses the benefit
of the insurer’s lifetime guarantee on repairs i t would otherwise carry out; as well as
allowing for contingencies (and T’s quote, on which the original cash settlement was
based, did not include an allowance for any additional claim-related damage or mould
which might be found in the course of repairs).
In the circumstances, the panel considers that it is fair for the insurer to pay an
additional amount of 20% ($12,831.11) on top of the previous cash settlement to
reflect these issues, including the transfer of risk.
Further temporary accommodation payable by insurer
The policy provides cover for temporary accommodation up to 20% of the $290,066
sum insured.
The insurer has already paid the complainant a total of $34,000 for temporary
accommodation. That comprises cover for the anticipated 10 weeks of repairs
(calculated at $400 per week) together with $30,000 originally offered in March 2019
as an ex gratia payment.
The complainant submits available accommodation costs were higher than that rate,
since she needed a furnished apartment because her contents were damaged. As
already noted, the policy does not cover contents, and so the panel is not persuaded
additional accommodation expenses for that particular reason alone should be
payable by the insurer.
At the same time however, it is not clear that the complainant was able to find
reasonable appropriate accommodation for $400 per week. In the circumstances, the
panel considers it is fair and appropriate that the insurer increase the settlement for
accommodation for the anticipated ten week repair period by paying a further $4,000.
Determination | Case number: 651034 Page 11 of 19
Costs for removal and storage of furniture payable by insurer
A quote from J had allowed $1656 to cover the cost of removing and storing the
complainant’s furniture during repairs. However, T’s quote did not include an y
allowance for removal and storage of furniture. Since this is a cost reasonably
required to enable repair of the property and protection of the complainant’s furniture
in the meantime, it is fair that the insurer cover that. The insurer should obtain a
current quote (which would be actionable by the complainant) for removal and storage
of the complainant’s furniture at an appropriate storage facility for a ten week period
and pay the reasonable quoted amount to the complainant.
However, if the complainant has already incurred removal and storage costs , the
insurer is required to pay those (for a ten-week period), subject to the complainant
providing reasonable evidence of those expenses.
2.5 Is the complainant entitled to professional costs?
AFCA may award professional costs in some circumstances
Under the AFCA Rules, we may require an insurer to reimburse a complainant for
professional costs incurred regarding their claim. However, we will not require an
insurer to contribute more than $5,000 to these costs, unless exceptional
circumstances apply.
AFCA provides a service which is free for complainants. It is not usually necessary for
them to be represented. We decide whether the insurer should contribute to these
kinds of claimed costs by considering what is fair in the circumstances, taking into
account the complexity of the complaint and whether the complainant genuinely
required expert assistance.
The complaint itself was not particularly complex. While the representative (appointed
by the complainant in late 2018) may have knowledge and experience of claims, it is
not clear to the panel his assistance was required in correspondence with the insurer
and with our Service. At the same time, however, the panel appreciates this matter
became protracted and would have been difficult for the complainant, and the
assistance will have given her some comfort and did help in obtaining reports
(although they did not assist her position).
In the circumstances, the panel considers it fair that the insurer pay $1,000 toward the
professional costs of the complainant’s claim manager, subject to the provision of an
invoice.
Since M’s report did not assist the complainant’s position, the insurer is not required
to cover those costs.
Determination | Case number: 651034 Page 12 of 19
2.6 Is the complainant entitled to compensation?
AFCA may award compensation in some circumstances
Under the AFCA Rules, we may award compensation (capped at $5,000) for non-
financial loss where a complainant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
However, we adopt a conservative approach to the award of compensation for non-
financial loss. We expect complainants to be moderately robust and bear the usual
stress and inconvenience associated with an insurance claim.
Complainant believes the insurer failed to appropriately manage the claim
The complainant believes the insurer did not appropriately manage the claim. The
complainant’s concerns include possible non-compliance with the General Insurance
Code of Practice, as well as delays and failure to properly assess the property.
The complainant alleges the insurer has not complied with the General Insurance
Code of Practice, in that it failed to appoint licenced service providers to assess the
property (section 6.3) and did not conduct its internal dispute review appropriately
(section 10.5). The panel appreciates the complainant’s concerns but is not satisfied
on the evidence that the insurer acted inappropriately or outside the scope of the
Code in either respect.
Queries about the qualifications/licencing of the insurer’s assessors/experts do not
show they could not be used or reasonably relied upon. Similarly, it is not clear from
the evidence regarding the insurer’s internal review of the dispute that the insurer
acted inappropriately.
Failings in assessing the full scope of property damage
The complainant submits the insurer failed to properly assess the property.
The complainant says the insurer failed to complete a make-safe and did not address
the mould and asbestos risk at the property. The insurer provided information which
establishes J was instructed to complete a make-safe at the property, although the
complainant declined the offer of the make- safe.
However, as already considered, the panel does agree the insurer could have
handled the mould and asbestos risk better. The panel accepts the failures regarding
the mould and asbestos would have caused the complainant an unusual degree of
inconvenience and interference with her peace of mind, given the possible health
impacts of those issues.
Determination | Case number: 651034 Page 13 of 19
No information to show unreasonable delays and inappropriate claims handling
The complainant is dissatisfied with the manner the claim was handled, and the time
taken. In particular, the complainant alleges the insurer forced a cash settlement to
resolve the claim.
In response, the insurer noted the complainant did not accept the scope of works
provided, and she advised she was going to obtain her own reports to show the roof
was damaged by the cyclone. This was not done until the complainant appointed her
representative and a report was obtained approximately 20 months after the cyclone
event.
The insurer submits it decided to cash settle the complainant in an attempt to resolve
the claim. There is no evidence to show the insurer forced a cash settlement to
finalise the claim, since it still offered to consider any further evidence.
The panel is not satisfied the insurer caused unreasonable delays or forced a cash
settlement. However, it appears the reluctance of the complainant to accept the scope
of works contributed to delays.
Insurer should pay $1,000 non-financial loss
After carefully considering the available information, the panel accepts the insurer did
cause the complainant to suffer an unusual degree of inconvenience and interference ,
particularly with regard to its failure to thoroughly address the risk of asbestos and
mould contamination.
The panel considers it fair and appropriate that the insurer pays $1,000 as
compensation for non-financial loss.
Determination | Case number: 651034 Page 14 of 19
3 Supporting information
3.1 Relevant policy wording
Section 1 – Your Buildings and Contents – page 13
What is covered
Accidental Damage Cover
Your Buildings and/or your Cont ents as set out in your Policy Schedule are covered if they are
accidentally destroy ed, accident ally lost or accidentally damaged. They are covered only if you own
them, or are liable for their destruction, loss or damage.
…
We cover your Buildings and/or Contents as set out on your Policy Schedule for accidental destruction,
accidental loss or accidental damage.
…
What we will not pay for
We will not pay for Buildings or Contents which are destroyed, lost or damaged by:
…
Rust, corrosion, gradual deterioration, depreciation, wear or tear.
The most we will pay for your Buildings or your Contents – page 22
The most we will pay for any claim for destruction, loss or damage to your Buildings or your Contents is
the corresponding sum insured shown on your Policy Schedule. This does not apply to amounts
payable under ‘Additional things we will pay for when you have insured your Buildings’, or ‘Additional
things we will pay for when you have insured your Contents’, or ‘Additional things we will pay for when
you have insured your Buildings and/or your Cont ents’.
How we pay a claim for your Buildings - page 23
When destruction, loss or damage occurs to your Buildings, we will pay the cost of rebuilding your
Buildings, or repairing the damaged portions of your Buildings, to the same condition as when they
were new.
We will also pay any additional costs required for your Buildings to comply with government or local
authority bylaws. We will not however pay these additional costs if you were required to comply with
these bylaws, and had not done so, before the destruction, loss or damage occurred. The most that we
will pay for costs required for your Buildings to comply with requirements of any authority in any one (1)
period of insurance is $25,000.
General Terms and Conditions
General exclusions applying to all Sections of this Policy – page 31
..
3. This Policy also excludes claims for loss, damage, destruction or liability arising from:
…
Determination | Case number: 651034 Page 15 of 19
c. Mildew, atmospheric or climatic conditions
d. Mould or fungi.
3.2 Expert reports
Record Key points
insurer ’s expert ( J )
Report
24 April 2017
two of the aluminium framed windows upstairs have blown
completely open which has ripped the windows off from the
hinges.
water has ent ered into the kitchen area and swollen laminated
benches, cabinets and wall units.
sections of both the side timber fences and the two front garage
gates have blown over or bent during the cyclonic winds.
there are other damaged items throug hout the external of the
property which include a rear down pipe to the water tank, rear
screen door, sheeting has lifted on the rear landing and eaves
above have blown out.
the underside timber joists of the rear landing appeared weathered
and deteriora ting.
if repairs are to be granted to this area the insured will be
responsible for replacing members where required.
the damages sustained to the residenc e are a direct result of
severe winds and heavy rain during Tropical Cyclone Debbie.
the external c asement windows have been forced open which has
enabled wind riven rain to enter the kitchen.
water has completely damaged the kitchen cabinets and bench
tops beyond repair from swelling to the chip board.
cyclonic winds have blown over the rear timber f ences, sprung
open the two front garage doors and damaged other items to the
exterior of the property.
upon inspection of the residence there was found to be damages
sustained to the property consistent with affects caused by a
Tropical Cyclone.
two of th e aluminium casement windows upstairs sprung
completely open which has beet and snapped the d oors off from
their hinges.
s evere water damage is eviden t in the upstairs kitchen to the
laminated benches, cabinets and wall units in the direct vicinity of
the missing window.
sections of the both the side timber fences have snapped off at the
posts at ground level and when the front garage gates sprung
open, it has bent the hinges and cracked the timber frame behind
the sheeting.
external damaged areas of the property also identified include the
rear PVC down pipe which originally connected to the water tank,
the rear screen door and track is bent.
a se ction of vinyl cladding from rear eaves above have been
partially removed.
water damage was also sustained to a rear solid core timber door
of the laundry.
Determination | Case number: 651034 Page 16 of 19
Record Key points
insurer ’s expert ( P )
Leak Detection Report
21 April 2017
water ingress is a result of poorly installed and poorly sealed ridge
capping where it is cut into the roof at the cent re fr ont of dwelling.
the silicon that seals between the ridge capping and the roof
sheeting is starting to deteriorat e, allowing water to penetrate the
roofline.
an open area was observed in the roof line in the same area
where water ingress has occurred, with a large bird nest inside.
a poorly sealed rust hole in the corrugated roof sheeting in the
front valley could also be causing water ent ry.
there is no sign of dama ge as a result of TC Debbie.
rusting was observed in several areas with the most severe being
located on the split pitch at the rear of dwelling.
due to poor condition, we would recommend the insured replace
the entire roof line to bring up to industry standard.
insurer ’s expert ( T and AF )
Roof Report
2 February 2018
the roof is a painted galvanised corrugate profile with lead head
nails and is in fair condition for its age.
believe it to be the original roof and would be more than 50 years
old.
the owner report ed no water ingress issu es to the onsite inspector.
upon inspection found no cyclone related damage.
some maintenance repairs have be en carried out in the past with
some nails replaced with screws.
these screws are now corroded.
there is also a Zincalume slip sheet repair.
due to dissimilar metals, electrolysis will occur and affect
galvanised valleys, gutters and other sheeting in c ontact with
water runoff.
corrosion has occurred to roof sheeting and fixings due to age of
roof.
no evidence of cyclone related damage.
believe the roof to be coming to the end of its serviceable life and
will require replacement in the future.
complainant ’s expert ( A )
Asbestos Report
2 9 November 2018
possible dust danger due to damaged asbestos containing lino
having been removed by the owner.
s ampling needed throughout house to ascertain asbestos
products.
a visual inspection and bulk sampli ng has determined that the wall
and ceiling linings in the house are all presumed to contain
asbestos.
only a small amount of sampling was necessary due to the fact
that most of the products in the house are the obvious golf ball
type of asbestos containi ng fibre cement sheeting.
the compressed fibre cement sheeting to the front deck and the
rear landing to the clothesline were sampled and found not to
contain asbestos.
there were remnants of lino flooring still attached to the floor in the
bedroom 3.
t his was sampled and found to be positive for asbestos.
Determination | Case number: 651034 Page 17 of 19
Record Key points
this is a friable product and there would have been some fibre
release during the removal process possibly exposing the
removalist.
with these products there is also the possibility of transmigration of
fugitive fibres and tracking by foot of asbestos debris throughout
the house and it is recommended to perform further sampling to
make that determination.
even though there has been a long time (ninet een months) since
the contamination event, there still remains a slight possibility that
some asbestos fibres will remain in situ presenting possible small
risk to the occupant.
it is also recommended to makesafe the area in the bedroom by
spraying the remaining lino on the floor with a PVA solution,
sealing the door with cloth tape and installing danger tape.
it was recommended to the client that this door remain closed and
no one to enter until the results of sampling.
it is further rec ommended to engage a licence A Class asbestos
removalist company to remove the remaining lino on the floor in
bedroom 3.
it is recommended to remove the mould affected asbestos
containing fibre cement sheeting and replace to prevent the mould
reoccurring i n these products.
this may be performed by an A or B class asbestos removalist.
a clearance certificate from an independent licensed asbestos
assessor will be needed at completion of removal works.
complainant ’s expert ( M )
Engineer Report
8 Dec ember 2018
from the inspection, damage was confirmed from above the roof -
top and from below, wit hin the ceiling space.
specifically, damage to the roof consisted of separation of sheeting
at some side laps.
loose roof sheeting fixings.
loss of protective coating to roof sheeting.
impact damage to roof sheeting.
separation of timber roof battens from rafters (7 instances found
within the accessible portion of the ceiling space).
cracking/splitting to two rafters
water staining to timb er framing, confirming that roof - water has
penetrated roofing.
it is noted that only approximately half of the roof framing could be
inspected, due to inaccessibility of the entire ceiling space.
the condition of a large portion of the roof framing is un known.
the out - most rows of roofing screws were not checked during the
rooftop inspection, due to safety concerns with roof slope and
potential fall - height.
the roofing damages identified are consistent with typical
consequences of high winds.
uplift/se paration to sheeting laps occur when winds create
differential pressures above and below the sheeting, resulting in
uplift to the overlying sheet.
when separation occurs bet ween the laps , s ubsequent winds can
Determination | Case number: 651034 Page 18 of 19
Record Key points
blow directly into the res ulting gap, furtheri ng the separation and
driving rain - water through the gap and into the underlying roof
space.
loose roof sheet fixings can occur due to similar wind - driven
mechanisms as described for sheeting lap separation.
over time, wind - driven uplift actions can fati gue the connections,
causing either partial or total disengagement of the nails or screw
threads.
in either scenario, the sheeting becomes less secure, with the
increase risk of subsequent large - scale failures.
loss of protective coating to roof sheeting occurs when wind - blow
debris is swept across the upper roof surface, or roof hardware
becomes detached, flailing across the sheeting with the winds.
either scenario results in removal of protective coatings from the
sheeting and flashings.
the sheeting is apparently relatively old and the coating system
was likely to be somewhat weathered.
it is obvious that high winds would be detrimental to the coating
causing further damage/deterioration.
loss of coating to roof sheets had occurred throughout the roof
area, causing the underlying steel to corrode in places.
impact damage to roof sheeting occurs when wind - blown
debris/hardware strikes the roof with sufficient force to
permanently buckle or puncture the roof sheeting.
batten separation from rafters is also symptomatic of wind
damage, occurring as described for loose screw symptoms.
f luctuating pressure differentials above and below the roofing
fatigue the batten - rafter connection, causing the fixings to
dise ngage as seen.
cracking/splitting to timber framing members also occurs as
described above, whereby fluctuating pressures can cause timber
members to fatigue over time,
splitting along the weaker direction parallel with the timber grain.
in isolation, this specific instance of damage may be considered as
relatively minor, bit does server to further support the case of wind
damage to roofing as evidence by the various other manifestations
of damage describe above.
water - staining within the roof space is a direct result of wind - driven
rains penetrating the sheeting/flashings.
various openings throughout the upper surface of roof were
evident together with separations to sheeting laps.
within the ceiling space daylight was visible around pe rimeter of
the roofing whereby wind - blown moisture will have entered into the
ceiling space.
during the cyclone event wind - driven moisture would have entered
and filled the ceiling space as a mist, saturating framing, ceiling
insulation and ceiling sheeti ng alike.
mould as seen throughout internal ceilings occurs as a direct
result of the above - described water penetration.
all of the above failure mechanisms are prone to be magnified
Determination | Case number: 651034 Page 19 of 19
Record Key points
when wind loadings are excessive in magnitude (speed) and
duration.
in the case of Cyclone Debbie, the winds were both high speed
and long in durations of loading particularly in a cyclic (gusting)
pattern, will increase fatigue stresses within structures, resulting in
further damage than that created by short - term high magni tude
loadings alone.
given that a variety of roof damages were evident to the residence,
all of which are consistent with damage due to high wind loading,
and wind - driven moisture, as described above, the authors
attributes these roof damages to the winds and rains of TC
Debbie.