Text of the determination
Determination
Case number 649425
Financial firm AIG Australia Limited
Determination | Case number: 649425 Page 2 of 4
Case number: 649425 13 May 2020
1 Determination overview
1.1 Complaint
The complainant made claims under the residential strata insurance policy held with
the financial firm (insurer) after water damage was found in both Lot One and Lot Two
of the insured property, in March 2018 and September 2016 respectively.
The insurer accepted the claims and agreed to repair the water damage resulting
from the leaks (to particleboard ceilings/floors below the bathrooms where the leaks
originated). However, it denied cover for the failed waterproofing membrane and the
repair costs associated with fixing that issue. The complainant says that to complete
repairs, the whole bathrooms need to be effectively removed. He believes that
additional cost should be covered; as well as cover for loss of rent.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the insurer. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered. I agree with the case analyst ’s reasons for the recommendation and the
recommended outcome.
Is the insurer entitled to deny the claims?
The complainant has established valid claims under the policy for accidental damage
caused by an escape of liquid from the bathrooms. However, the insurer has shown
an exclusion applies to entitle it to decline the claims in full (although it did agree to
cover some resulting damage, and it is fair in the circumstances that be paid). The
damage was caused, on balance, by ‘ faulty workmanship ’ in the installation of the
waterproofing membrane, and that is a policy exclusion. The insurer is not liable for
loss of rent as the lots did not become uninhabitable or unfit for their intended
purpose because of the water damage.
1.3 Determination
This determination is substantially in favour of the insurer. The insurer is to settle the
claim by paying PB’s quoted repair costs of $2,911.65, as it has agreed to do; and
reimburse the costs of the builder Q’s report invoice, together with statutory interest
on the latter. It is not required to take any further action.
Determination | Case number: 649425 Page 3 of 4
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case based on what I consider is fair in the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
AFCA decisions. I have taken into account all the material submitted by the parties,
both before and after the recommendation. I am satisfied that the documentation I
have relied on has been provided to both parties.
I am satisfied that the case analyst ’s recommendation contains an accurate summary
of the complaint, the issues to be determined, any applicable paragraphs of the Rules
and any relevant law.
2.2 Is the insurer entitled to deny the claims?
Policy covers accidental damage, subject to exclusions
The policy is a broad form accidental loss or damage policy. The policy does not
define ‘accidental’, however I am satisfied it is appropriate to accept the usual or
ordinary meaning of it as being something that is unintended and unexpected.
I am satisfied the complainant established valid claims for accidental damage to his
property from the leaking of water from the bathrooms.
However, the policy specifically excludes any loss or damage to the insured property
‘ directly or indirectly caused by or arising out of or in consequence of or contributed to
by’ faulty materials or faulty workmanship, as well as wear and tear.
Cause of waterproofing failure was, on balance, faulty workmanship
T he complainant’s builder (Q) confirmed in his report the damage to the particleboard
of both lots was due the failure of the waterproofing membrane of the shower
recesses, and has also confirmed that poor workmanship is the single biggest cause
of such failure.
There has been no other possible cause substantiated in the evidence, although there
was an unsupported suggestion of a leaking pipe. The evidence that has been
presented shows the property was very newly constructed when the first of the leaks
occurred and the leaks in both lots occurred in the same location (the shower
waterproofing). I am satisfied it is more likely than not the cause was faulty
workmanship in installation of the waterproofing.
Insurer is entitled to deny the claim
I acknowledge the complainant’s understandable confusion about the extent of cover,
since the insurer initially proceeded on the basis that the policy would cover resultant
damage from the leaks, despite the policy exclusion. That was not consistent with the
Determination | Case number: 649425 Page 4 of 4
policy terms, which entitle the insurer to decline the claims in full, since all damage
was the result of the excluded poor workmanship.
I also acknowledge the complainant’s concern that the wording of the relevant
exclusion in the policy document is ambiguous. However, I am not satisfied that is the
case. The exclusions that apply specifically to the insured property are listed in
section 7 on page 25 of the product disclosure statement. They appear in two
separate groupings, which I am satisfied are clear and sufficient to adequately inform
an insured of the relevant triggers.
Since the insurer is not liable for the claims (and the properties were not deemed to
be uninhabitable during repairs in any case), it is also not liable for any loss of rent.
Fair that insurer’s settlement offer be paid
However, having recognised its mistake, the insurer has agreed to honour its
proposed settlement for the particleboard flooring, which is based on its quotes from
builder PB of $2,911.65.
I consider that is fair in the circumstances; even though I do not consider the
complainant was prejudiced by that mistake, since he would have had to deal with all
repairs in any case.
The insurer is not required to add statutory interest to that amount, since it is not
strictly liable for those repairs under the terms of the policy.
While I acknowledge the work required to fully rectify the waterproofing issues will
involve extensive disruption, I do not accept the complainant’s submission that the
insurer should be required to cover all repairs. There is no basis for that either under
the terms of the policy or otherwise.
Fair that insurer also pay cost of Q’s report
However, since the insurer was able to rely on the report of the complainant’s builder
Q in support of its entitlement to decline the claim, I consider it is fair that it reimburse
the complainant the costs of obtaining that report.
The complainant has provided a copy of Q’s invoice dated 5 March 2018 for
$1,372.80. The insurer is required to pay that amount, together with statutory interest
on it, calculated from the date of the invoice to the date of payment.
Recommendation
Case number 649425
Financial firm AIG Australia Limited
Recommendation | Case number: 649425 Page 1 of 7
Case number: 649425 20 March 2020
3 Overview
3.1 Complaint
The complaint concerns the settlement offered by the financial firm (insurer) and
whether it adequately responds to the loss in accordance with the terms of the policy.
The complainant says the insurer has accepted resultant damage to the particleboard
of the first-floor ceilings in both units. However, to repair this damage, the complainant
says the builder is required to remove essentially the complete bathroom. The
complainant believes these additional costs should be covered.
3.2 Issues and key findings
Is the insurer entitled to deny the claim?
The complainant has established a valid claim under the policy as there was a leak
from the second story bathroom causing damage below.
The insurer has established a valid exclusion applies. The evidence suggests the
damage is caused by faulty workmanship of the water proofing system in the shower,
circumstances excluded under the policy.
3.3 Recommendation
This recommendation is substantially in favour of the insurer.
The insurer is to settle the complainant $2,911.65 in accordance with the quotes for
repairs of the part icleboard provided by the insurer’s repairer (PB).
This is a fair and reasonable settlement for its misrepresentation of the extent of cover
under the claim.
The insurer is not required to pay any interest on this amount or take any further
action.
Recommendation | Case number: 649425 Page 2 of 7
4 Reasons for recommendation
4.1 Is the insurer entitled to deny the claim?
Onus rests with complainant to establish a valid claim
When lodging a claim with an insurer, the insured must establish a valid claim. That
is, on the balance of probabilities, an event covered by the policy must have caused
the loss.
Once a valid claim is established, the insurer must show, on the balance of
probabilities, the policy excludes or otherwise does not cover the loss.
We review the available information to determine if the insured has established a valid
claim. If the information:
does not establish a valid claim, then we will not require the insurer to pay the
claim
establishes a valid claim, the insurer has the onus to demonstrate why it should not
pay a claim. If it does not meet its onus, we may decide the insurer should pay the
claim.
AFCA will consider the documents provided by both parties. AFCA will generally
place more weight on objective information, such as independent expert reports. The
more qualified the person providing information, the more likely we are to place
weight on the information.
Complainant established a valid claim
The policy is a broad form accidental loss or damage policy.
The policy does not define accident. If we look at the every day meaning using
Macquarie Dictionary, accident is defined as:
1. an undesirable or unfortunate happening; casualty; mishap
2. anything that happens unexpectedly without design, or by chance.
It is clear the damage was a result of an unfortunate happening and was unexpected
or without design.
The complainant established a claim for accidental damage to his property.
Policy does not provide cover under some circumstances
The policy has some general exclusions, which are not relevant to this claim, and
then some event specific exclusions.
Recommendation | Case number: 649425 Page 3 of 7
Under the property insured section, the policy does not cover any damage directly or
indirectly caused by but not limited to faulty materials, faulty workmanship.
The expert evidence shows the proximate cause is faulty workmanship
In his report, the complainant’s builder (Q) confirmed the damage to the particleboard
flooring of both townhouses was due the failure of the waterproofing membrane of
both shower recesses.
Having reviewed this report, Q has not elaborated on the nature and the mechanism
of this failure. In his subsequent email dated 11 September 2018, Q says:
he single biggest cause of the failure of waterproofing membrane is workmanship
in accordance with the Australian Institute of Waterproofing the main cause of the
failure is poor workmanship
the entire bathroom including the shower recess relies on complete water proofing
system, the rectification requires the removal of the existing membrane
a new membrane is required to be installed to the entire bathroom including recess
to comply with the relevant building code
to rectify the entire bathroom including the recess, the bathroom requires
demolition and reconstruction.
The complainants’ arguments do not advance his position
In substantiating his position, the complainant says:
the policy provides cover for exploratory costs
the removal of the bathroom tiles is a requirement to fix the resultant damage
Q’s conclusion is only assumption and the failure of the membrane may have
occurred due to other events
The faulty workmanship exclusion should only apply to the shower recess and floor
however not the remainder of the claimed damage.
For finality, I will address the above arguments. Given the proximate cause of the
damage is excluded under the policy i.e. faulty workmanship, there is no cover for any
additional benefits under the policy such as the exploratory costs or loss of rent.
With regards to the removal of the bathroom tiles, even if I accept the complainant is
required to strip the bathroom to access the resultant damage, I do not accept the
resultant damage is covered under the policy. It follows the consequential loss being
the bathroom damage is also excluded. Further, the evidence shows the complainant
is required to demolish and reconstruct the bathroo m to address the waterproofing
issue.
Q is a builder and he has provided his opinion as an expert. Q has logically stepped
through the mechanism and the nature of the damage. The damage is only located
Recommendation | Case number: 649425 Page 4 of 7
where the shower recesses are. Given the leak occurred within the same year as
when the units were constructed, on balance, I accept the waterproofing membrane
has failed. I accept Q’s conclusion regarding the cause of the failure.
The exchanged documents suggest a leaking pipe might have contributed to the
damage; however the complainant has not tendered any compelling evidence to
substantiate this assertion.
Having carefully considered the complainants’ arguments, I do not accept they do not
advance his position.
The insurer is entitled to deny the claim
H aving carefully considered the policy wording, I note the insurer’s policy excludes
any physical loss, destruction or damage directly or indirectly caused by or arising out
of or in consequence of or contributed to by to faulty workmanship. Given the
proximate cause of the failure of the membrane faulty workmanship, I accept the
claim falls outside the policy’s scope of cover.
In its claim decision and both final decision letters, the insurer says the policy
responds to the resultant damage caused by the failed waterproofing membrane.
It is this statement, provided multiple times, which has led to the complainant’s
confusion regarding the extent of cover.
The complainant maintains, if the insurer is liable for the resultant damage, then its
quoted repair costs are insufficient and inadequate to complete the required work.
However, after reviewing the policy, I am satisfied the policy does not provide cover
for resultant damage. It isn’t until 21 November 2019, after this complaint was
progressed to the preliminary assessment stage, the insurer corrects its mistake for
the first time.
In noting this, I accept there is no reliance issue. There is no evidence the
complainant has relied on this incorrect acceptance to his detriment as he was
required to repair the damage in any event.
Insurer to honour its offer of settlement
Despite its mistake, and eventual correction, the insurer remains committed to settling
the claim based on its quote for the particleboard flooring repairs.
I acknowledge the complainant’ s position regarding the full cost of these repairs.
However, his reliance on the insurer’s error has caused him no loss. He was required
to complete the repairs in any case.
I am satisfied the insurer correctly declined the claimed but it is fair and reasonable it
settles the complainant its quote of $2,911.65 for its misrepresentation.
Recommendation | Case number: 649425 Page 5 of 7
Further, I consider it is fair the insurer reimburses the complainant for the cost
incurred in Q’s assessment fees (if any), subject to the complainant tendering a copy
of the invoice. The insurer has relied in Q’s report in denying the claim, I consider it is
fair and reasonable for the insurer to meet this cost.
Recommendation | Case number: 649425 Page 6 of 7
5 Supporting information
5.1 Key references
Report summary
Report Key points
Insurer’s expert (Q)
Caus ation r eport
05 - 03 - 2018
a hole cut in the garage ceiling of townhouse 2 exposed the
severely wat er damaged particleboard flooring
this is damaged from leaking over a period of time
a moisture meter revealed high moisture content readings on the
underside of the flooring, this is consistent with recent and
ongoing leaking
the water damage particleboard flooring is directly below the main
bathroom shower recess
inspection of the entry to the bathroom noted no moisture related
damage to the tongue and groove floorin g of the hallway, whic h
indicates an isolated failure of the water proofing membrane in
the shower recess
the cause of the damage to the particleboard flooring substrate of
townhous e 2 main bathroom is a failed water proofing membrane
in the shower recess
inspection of the same areas of townhouse 1 revealed an
identical layout and noted the same findings as for townhouse 2.
Policy sections
Page Key points
18 Section 1 – Property Insured
1. The Indemnity
We will pay You up to the Sum Insured specified
in the Schedule for Building(s) and Common
Contents, for accidental loss or damage to the
Building(s) or Common Contents which occurs
during the Period of Insurance.
We will not pay You under Section 1 of the Policy
in respect of any of the matters set out in the
Exclusions or the General Exclusions. You must
comply with the Special Conditions in Section 1
and the General Conditions.
Recommendation | Case number: 649425 Page 7 of 7
Page Key points
25 - 26 7. Exclusions
We will not be liable in respect of any physical
loss or damage, destruction or damage directly or
indirec tly caused by or arising out of or in
consequence of or contributed by:
7.16 wear, tear, …., gradual deterioration, ….
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.